Seawolf Project Building a charter boat service on Lake Ray Hubbard
46

building of Sea wolf project 2007

Dec 23, 2014

Download

Business

Scott Self

Pictures and plans of the actual building of Seawolf wooden sailing catamaran by Scott Self.
a two year project
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: building of Sea wolf project 2007

Seawolf Project

Building a charter boat service on Lake Ray Hubbard

Page 2: building of Sea wolf project 2007

Steps

• First step was to get my USCG Master Captains license – the course took a total of 10 days and costs $1200.

• Second was to make sure I could get Liability insurance

• Third was to make a deal for docking and pick up of passengers

• Next was to find a boat

Page 3: building of Sea wolf project 2007

Make or Buy

• I found you can buy a 40 ft white fiberglass sailing catamaran that can take 40 passengers in South Florida New for about $650,000. The problem was that it was 25 feet wide and would cost $100,000 to ship to North Texas

• I determined that I could build one for much less and make out wood leaving a natural wood finish.

Page 4: building of Sea wolf project 2007

How much time and Money?

• Cost of Materials $200,000

• Labor $100,000

• Time: July 2006 to April 2008

• Two years of my life

• Survey shows that most boats take out about 2,000 passengers a year.

• The boat comes apart so if it does not work on Lake Ray Hubbard, I can move it.

Page 5: building of Sea wolf project 2007

Sail Plan – Malcolm Tennent is world Famous Yacht Designer

Cost of plans $5,500

Page 6: building of Sea wolf project 2007

Interior of Hull Malcolm Tennent – New Zealand

Page 7: building of Sea wolf project 2007

Setting up forms

Page 8: building of Sea wolf project 2007

Lofting the hulls

Page 9: building of Sea wolf project 2007

Setting forms in place

Page 10: building of Sea wolf project 2007

Spanish Cedar from Stuart Florida 16,000 liner feet at $2.65 a foot

Page 11: building of Sea wolf project 2007

Forms are set up in Oct 2006

Page 12: building of Sea wolf project 2007

Setting the bow stem

Page 13: building of Sea wolf project 2007

Planking of the Hull

Page 14: building of Sea wolf project 2007

Planking the hull

Page 15: building of Sea wolf project 2007

Fairing the hull

Page 16: building of Sea wolf project 2007

Adding the bow

Page 17: building of Sea wolf project 2007

Filling the gaps

Page 18: building of Sea wolf project 2007

One hull done starting number 2

Page 19: building of Sea wolf project 2007

Finishing hull # 1

Page 20: building of Sea wolf project 2007

Sand and fair the Hull, Nov. 2007

Page 21: building of Sea wolf project 2007

Apply layer of fiberglass

Page 22: building of Sea wolf project 2007

Taking deck off to fiberglass

Page 23: building of Sea wolf project 2007

Filling gaps in strip planks

Page 24: building of Sea wolf project 2007

Building seats into deck

Page 25: building of Sea wolf project 2007

Greg Working on Deck

Page 26: building of Sea wolf project 2007

Installing ring frame

Page 27: building of Sea wolf project 2007

6 oz glass and epoxy

Page 28: building of Sea wolf project 2007

Taking the deck off

Page 29: building of Sea wolf project 2007

Finishing Seawolf Hulls

Page 30: building of Sea wolf project 2007

Aluminum cross beams

Page 31: building of Sea wolf project 2007

Working on Mast

Page 32: building of Sea wolf project 2007

Leaving factory for Marina

Page 33: building of Sea wolf project 2007

Ready to move to Marina

Page 34: building of Sea wolf project 2007

Mounting the Crossbeams

Page 35: building of Sea wolf project 2007

Stepping the Mast

Page 36: building of Sea wolf project 2007

Mounting Deck beams

Page 37: building of Sea wolf project 2007

Ready to launch

Page 38: building of Sea wolf project 2007

Seawolf under sail

Page 39: building of Sea wolf project 2007

Boarding the boat

Page 40: building of Sea wolf project 2007

Enjoying the sail on Seawolf

Page 41: building of Sea wolf project 2007

Parties and Romanic moments

Page 42: building of Sea wolf project 2007

Plenty of space for up to 49

Page 43: building of Sea wolf project 2007

Great Publicity in Dallas

Page 44: building of Sea wolf project 2007

Seawolf at a distance

Page 45: building of Sea wolf project 2007

2 minute video of the Project

By Mark Walsh’

nVision Digital

469 556 9408

Nvisiondigital.net

Page 46: building of Sea wolf project 2007

How are we doing?

• In 2012 we had over 11,500 passengers

• Over 52,000 passengers since beginning.

• I hope to keep doing this until 2020.

• Our season starts again April 16.