  • Building Mechanical and Electrical Inspection

  • Inspection Method

  • TUV Rheinland Kick Off Project 2012 PRE-VISIT Purpose

  • TUV Rheinland Kick Off Project 2012 DOCUMENT REVIEW

  • TUV Rheinland Kick Off Project 2012 DOCUMENT REVIEWLIST OF DOCUMENTS REQUIRED:

  • TUV Rheinland Kick Off Project 2012 VISUAL INSPECTION Purpose

  • TUV Rheinland Kick Off Project 2012 VISUAL INSPECTIONGROUP TO BE INSPECTED:

  • TUV Rheinland Kick Off Project 2012 VISUAL INSPECTIONMAIN GROUP TO BE INSPECTED:

  • TUV Rheinland Kick Off Project 2012 VISUAL INSPECTIONMAIN GROUP TO BE INSPECTED:

  • TUV Rheinland Kick Off Project 2012 VISUAL INSPECTIONMAIN GROUP TO BE INSPECTED:

  • TUV Rheinland Kick Off Project 2012 VISUAL INSPECTIONMAIN GROUP TO BE INSPECTED:

  • TUV Rheinland Kick Off Project 2012 MEASUREMENTPurpose: To identify the actual condition of the equipment which related to performance, efficiency and current capacity.

  • TUV Rheinland Kick Off Project 2012 MEASUREMENTTYPICAL CONDITION THAT COMMONLY MEASURED:

  • TUV Rheinland Kick Off Project 2012 NON DESTRUCTIVE TEST

  • TUV Rheinland Kick Off Project 2012 NON DESTRUCTIVE TESTHOW TO DO IT?

  • TUV Rheinland Kick Off Project 2012 FUNCTIONAL TESTPurpose: To identify the equipment response in accordance with standard function. During this inspection the equipment simulated with standard load and tetsed all standard function including interlock system and safety function.

  • TUV Rheinland Kick Off Project 2012 REPORTINGThe report method will capture all result of document review, visual inspection, measurement and testing activity that carried out previously.

    The report will provide a comprehensive analysis of all inspected equipment, including the followings: Major Finding, which will lead to the major risk. Minor Finding, which will lead to the minor risk. Observation, which related to improvement opportunity. Recommendation, which related to the master plan of repair activity, improvement, replacement and overhaul process..

  • TUV Rheinland Kick Off Project 2012

  • TUV Rheinland Kick Off Project 2012 THANK YOUT.E.A.M : Together Everyone Achieve More