WWW.HOEFTBUILDERS.COM WWW.CHIPPEWA-WI.COM Building Guide For Manufacturers
10

Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

Mar 04, 2018

Download

Documents

lyliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

WWW.HOEFTBUILDERS.COMWWW.CHIPPEWA-WI.COM

Building Guide For Manufacturers

Page 2: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

2

CONSTRUCTIONThe Chippewa County Economic Development Corporation and Hoeft Builders, Inc. both work to foster growth and business development in Chippewa County. We have developed the following industrial end users guide to give companies some information on typical industrial floor plans, project timelines and ball park construction cost figures for pre-engineered and precast buildings.

Plans are based on the following:• Typical manufacturing layout

• Ease of warehousing

• Layout versatility

Estimated costs include:• Earthwork & Site Utilities

• Asphalt

• Site concrete

• Structural steel & steel erection

• Carpentry

• Doors & windows

• Electrical

(Non-machinery hookups)

• Fire Protection (Standard use)

• HVAC

• Masonry

• Plumbing

• Roofing, Thermal & moisture protection

• Specialties

• General conditions

20,000 sq. ft.• 1 Truck loading dock & equipment with 9’X10’

overhead door• 1 Ground level 12’X14’ overhead door• 800 amp service

• 2,000 sq. ft. office area finished

40,000 sq. ft.• 2 Truck loading docks & equipment with 9’X10’

overhead doors at each• 1 Ground level 12’X14’ overhead door• 800 amp service

• 4,000 sq. ft. office area finished

65,000 sq. ft.• 4 Truck loading docks & equipment with 9’X10’

overhead doors at each• 2 Ground level 12’X14’ overhead doors• 1,200 amp service• 5,000 sq. ft. office area finished

100,000 sq. ft.• 8 Truck loading docks & equipment with 9’X10’

overhead doors at each• 4 Ground level 12’X14’ overhead doors• 2,400 amp service• 8,000 sq. ft. office area finished

Based on building size, estimated costs also include:

Page 3: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

3

FAST-TRACK SCHEDULING

20,000 square feet ................... 5 Months

40,000 square feet ................... 7.5 Months

65,000 square feet ................... 9 Months

100,000 square feet ................. 11 Months

The chart below indicates schedules for pre-engineered and precast buildings at four spec sizes: 20,000 square feet, 40,000 square feet, 65,000 square feet and 100,000 square feet.Examples (time from preliminary drawings through construction completion)

Facility Size

1 2 3 4 5 6 7 8 9 10 11 12

20,000 sq ft

40,000 sq ft

65,000 sq ft

100,000 sq ft

20,000 sq ft

40,000 sq ft

65,000 sq ft

100,000 sq ft

20,000 sq ft

40,000 sq ft

65,000 sq ft

100,000 sq ft

20,000 sq ft

40,000 sq ft

65,000 sq ft

100,000 sq ft

20,000 sq ft

40,000 sq ft

65,000 sq ft

100,000 sq ft

MONTHDrawings

General Construction

Punch List

Closeout

Permits

Page 4: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

4

• 2x4 ceiling tiles (In office areas)

Plant to be open structure painted

• 2x4 LED recessed lights (In office areas)

• Recessed truck loading dock systems

with overhead doors

• At grade overhead doors (12’x14”)

• 6” (R-19) exterior wall insulation, R-24

ceiling insulation (Min)

• Electrical and electrical service*

• ADA Code

• Architectural plans and engineering

• IBC (International Building Code)

2010 code

• Building eave height 24’

• Flooring in offices (Plant sealed

concrete)

• Ceiling fans in plant

• Doors, frames and all hardware

• Energy efficient T-12 lighting in plant

to 70 foot candles

• Fire protection

• Footings and foundations

• Excavation and backfill

• High efficiency, gas fired forced air

heating and cooling in offices

• High efficiency, gas fired unit

heaters in plant

• Exterior lighting (LED)

• Interior wall framing

• Local permits for building

• Plumbing

• Rough site grade

• Site utilities

• Supervision and general conditions

for project

• Construction Management

BUILDING SPECIFICATIONS

Scalable building option

*800-amp (20,000 and 40,000 square foot options); 1,200-amp (65,000 square foot option); 2,400-amp (100,000 square foot option)

Page 5: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

5

100,000 SQ. FT. FACILITYGeneral ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF

IncludedIncludedIncludedIncludedIncluded

$5,710,621.00$57.11

Included

$6,310,621.81$63.11

IncludedIncludedIncludedIncluded

20,000 SQ. FT. FACILITYGeneral ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF

IncludedIncludedIncludedIncludedIncluded

$1,448,326.00$72.42

IncludedIncludedIncludedIncludedIncluded

$1,620,000.00$81.00

PRE-ENGINEERED PRECAST

40,000 SQ. FT. FACILITYIncludedIncludedIncludedIncludedIncluded

$2,431,162.00$60.78

Included

$2,731,162.56$68.28

IncludedIncludedIncludedIncluded

General ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF

65,000 SQ. FT. FACILITYGeneral ConstructionPlumbingHVACElectricalSiteworkTotal CostsCost PSF

IncludedIncludedIncludedIncludedIncluded

$3,832,004.00$58.95

Included

$4,254,250.00$65.45

IncludedIncludedIncludedIncluded

General construction includes: general conditions, fire protection, site work, concrete, masonry, steel and metal, carpentry, doors and windows, overhead doors and truck docks. Prices were estimated as of 09/2015 and may vary, depending on conditions.

Building CostsThe chart below indicates schedules for pre-engineered and precast buildings at four spec sizes: 20,000 square feet, 40,000 square feet, 65,000 square feet and 100,000 square feet.Examples (time from preliminary drawings through construction completion)

40,000 Sq Ft Precast

20,000 Sq Ft Precast

65,000 Sq Ft Precast

100,000 Sq Ft Precast

Page 6: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

6

BUILDING PLANSThe renderings and footprint samples below give you a sense of what the buildings and layout would look like.

20,000 square-foot pre-engineered facility

20,000 square-foot precast facility

Page 7: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

7

40,000 square-foot pre-engineered facility

40,000 square-foot precast facility

Page 8: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

8

65,000 square-foot pre-engineered facility

65,000 square-foot precast facility

Page 9: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

9

100,000 square-foot pre-engineered facility

100,000 square-foot precast facility

Page 10: Building Guide For Manufacturers - Home - CCEDC · PDF fileBuilding Guide For Manufacturers. 2 ... The chart below indicates schedules for pre-engineered and precast buildings at ...

10

http://www.chippewa-wi.com/

http://www.hoeftbuilders.com/

Chippewa County Economic Development Corporation770 Technology WayChippewa Falls, WI 54729Toll Free: (800) 797-997

Hoeft Builders2423 Rivers Edge Drive, Suite 1Altoona, WI 54720Phone : (715) 833-1761