July 1, 2016 Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary School 29 Hazel Wolf K-8 at Pinehurst 42 Meany Middle School 55 Olympic Hills Elementary School 63 Seattle New World School at TT Minor 74 New Thornton Creek Building 81
92
Embed
Building Excellence IV Capital Levy Projects Under ... · Building Excellence IV Capital Levy Projects Under Construction Project Slide Number ... electrical and plumbing (MEP) ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
July 1, 2016
Building Excellence IV Capital Levy
Projects Under Construction
Project Slide Number
Arbor Heights Elementary School 2
Cascadia Elementary School & Robert Eagle Staff Middle School 14
Genesee Hill Elementary School 29
Hazel Wolf K-8 at Pinehurst 42
Meany Middle School 55
Olympic Hills Elementary School 63
Seattle New World School at TT Minor 74
New Thornton Creek Building 81
Building Excellence IV Capital Levy
Arbor Heights Elementary School
Site: Landscape irrigation and drainage installation ongoing, playground equipment installation in-progress, concrete sidewalks and stairs ongoing.
South Building: Exterior – Sun-shade installation and painting complete. South stair enclosure ongoing. Interior – Acoustical ceiling tile installation complete at third floor. Casework and finish carpentry ongoing. Rubber floor tile and base molding ongoing. Window shade installation ongoing. Mechanical, electrical and plumbing (MEP) fixture installation ongoing. HVAC, plumbing, and electrical installation ongoing at first and third floor mechanical rooms and first floor boiler room.
Arbor: Exterior – Sheet metal flashing and window installation in-progress.
North Building: Exterior – Painting ongoing, sun-shade installation in-progress. Interior – Hardwood floor finishing complete at gymnasium. Window installation complete. Painting ongoing at second and third floor. Casework installation ongoing. Ceramic tile and carpet installation ongoing. MEP fixture installation ongoing.
Arbor Heights Elementary School
Site Plan
July 1, 2015July 10, 2015
Arbor Heights Elementary School
Aerial View from the North
May 31, 2016
Arbor Heights Elementary School
North Building – Northeast Perspective
June 27, 2016
Arbor Heights Elementary School
South Building – Southeast Perspective
June 27, 2016
Arbor Heights Elementary School
Site – Northeast Perspective
June 27, 2016
Arbor Heights Elementary School
South Building – Mechanical Room
June 27, 2016
Arbor Heights Elementary School
South Building – Kindergarten Room
June 27, 2016
Arbor Heights Elementary School
South Building – Special Ed Room
June 27, 2016
Arbor Heights Elementary School
North Building – Library
June 27, 2016
Arbor Heights Elementary School
North Building – Commons
June 27, 2016
Arbor Heights Elementary School
North Building – Gymnasium
June 27, 2016
Building Excellence IV Capital LevyCascadia Elementary School and Robert Eagle Staff Middle School
Site: Maintaining temporary erosion sedimentation control (TESC)
measures.
ES: Exterior - Window installation and prep for cement fiber board
panels installation ongoing. Air barrier complete. Roofing ongoing with
mid-ply nearly complete and cap sheet moving from south to north.
Site: Continued potholing and demo for street improvements.
Monitoring TESC measures ongoing.
Zone A: Framing complete. Brick installation ongoing. MEP rough-in
ongoing.
Zone B: Framing wood walls, 2nd floor. Pouring slab-on-wood-deck.
Zone C: Framing wood walls.
Zone D: Started wood framing.
Olympic Hills Elementary School
Site Plan
Olympic Hills Elementary School
Zone Map
Olympic Hills Elementary School
Aerial View from the West
June 1, 2016
Olympic Hills Elementary School
Zone A - Overhead HVAC Ductwork, 1st Floor Classroom
June 22, 2016
Olympic Hills Elementary School
Zone A - In-Wall MEP Rough-In, 1st Floor Classroom
June 22, 2016
Olympic Hills Elementary School
Zone A - Interior Framing, 2nd Floor
June 22, 2016
Olympic Hills Elementary School
Zone B - Concrete Slab-On-Wood-Deck, 2nd Floor Hallway
June 22, 2016
Olympic Hills Elementary School
Zone B - Framing and Standing Walls, 2nd Floor, Looking South East
June 22, 2016
Olympic Hills Elementary School
Zone C - Framing, Looking Southwest
June 22, 2016
Olympic Hills Elementary School
Zone D - Steel Columns Partially Erected, Looking South
June 22, 2016
Building Excellence IV Capital Levy
Seattle World School at T.T. Minor
Area A – Administration Office, Student Services, Health Clinic and Library: GWB finishing nearing completion. Overhead MEP rough-in work complete. Ceiling grid installation ongoing. Light fixture installation ongoing. Low voltage data installation ongoing. Casework installation ongoing. Finish painting ongoing. ADA stage ramp in progress.
Area B – Multipurpose, Kitchen, Boiler Room: GWB finishing nearing completion. Overhead MEP rough-in work complete. Ceiling grid installation ongoing. Light fixture installation ongoing. Low voltage data installation ongoing. Casework installation ongoing. Finish painting ongoing.
Area C – Classrooms: Painting on going. Air Handling Units being set in place. Ceiling grid installation ongoing, Data cable installation ongoing. Cabinet and casework installation ongoing. Finish floor material installation ongoing.
Site: Work on 18th Street complete.
Seattle World School at T.T. Minor
Site Plan
Area C
Area B
Area A
Area C
Area B
Area A
Seattle World School at T.T. Minor
Site – Seattle City Light Hooking Up Permanent Power
June 28, 2016
Seattle World School at T.T. Minor
Area A – Floor Sealer and Flooring Preparation
June 28, 2016
Seattle World School at T.T. Minor
Area B – Exterior Painting
June 28, 2016
Seattle World School at T.T. Minor
Area C – Window Installation On-Going
June 28, 2016
Seattle World School at T.T. Minor
Site – ADA Ramp Concrete Walls
June 28, 2016
Building Excellence IV Capital Levy
New Thornton Creek Building Site: Finishing subgrade for playfield. Chain link fencing around athletic field
on-going. Poured concrete entry and exit drives for west parking lot. Began landscaping in interior courtyard.
Off-site Improvements: Ongoing pouring of concrete sidewalks, curbs and ADA ramps along NE 80th St. Poured porous pavement on NE 80th St and 40th Ave. NE.
Building A: Roofing over Gym and Childcare on-going. Hardie panel installation on-going. Preparing and painting GWB in Commons, Gym and Childcare. Preparing floor for resilient flooring installation. Placed kitchen tile flooring. Delivered kitchen equipment. Ongoing placement of ductwork and louvers.
Building B: Hardie panel installation on-going. Completed painting on first and second floors classrooms. Completed installation of roller shades and wall panels. Began tackable wall surface installation. HVAC rough-in at mechanical penthouse on-going.
Building C: Ceramic tile installation in bathrooms on-going. Installing casework in classrooms. Completed installation of roller shades and wall panels. Began tackable wall surface installation. Trim of electrical devices on-going.
New Thornton Creek Building
Key Plan
Building C
Building B
Building A
D
New Thornton Creek Building
Aerial View from the West
June 15, 2016
New Thornton Creek Building
Site – Pavement around Dugout at Athletic Field
New Thornton Creek Building
Site – Landscaping in K-1 Courtyard
New Thornton Creek Building
Building A – Loading Dock
New Thornton Creek Building
Building A – Painting Ceilings and Walls in Gym
New Thornton Creek Building
Building A – Painting in Childcare
New Thornton Creek Building
Building A – Kitchen Equipment
New Thornton Creek Building
Building A – Geothermal Piping in Main Mechanical Room
New Thornton Creek Building
Building B – Tackable Surface over Lockers
New Thornton Creek Building
Building B – Whiteboard Installation at Classrooms