Who Can Apply QLASSIC 01. Project Owner 02. Main Contractor 03. Property Developer SCOPE OF QLASSIC BASIC M&E FITTINGS ARCHITECTURAL WORKS EXTERNAL WORKS A. Detached, Semi-detached, Terrace and Cluster Houses. Flat, Apartments, Condominium, Service Apartment, Small Office Home Office (SOHO) and Town Houses Office Building, School, Factories, Warehouse, Workshops, Hangers, Small Office Virtual Office (SOVO), Religious Buildings, Stadiums, Community Halls, Hospitals, Airports, Universities, Colleges, Police Stations, etc BUILDING CATEGORY FOR QLASSIC ASSESSMENT Stratified Housing Public Commercial/industrial Building Without Centralize Cooling System Landed Housing Public Commercial/industrial Building With Centralize Cooling System B. C. D. • Automatic CCD Points = 20 CCD points for contractor’s registration renewal. • Towards Continuous Improvement in construction quality. • Eligible to be awarded during QLASSIC Day. • To have a standard quality assessment system for quality of workmanship of building projects. BENEFITS OF QLASSIC: 20 POINTS CCD Quality Assessment System in Construction (QLASSIC) is an independent assessment tool to measure and evaluate the workmanship quality of a building construction works based on Construction Industry Standard (CIS 7:2014 Quality Assessment System for Building Construction Works). QLASSIC enables the quality of workmanship in that particular project to be objectively measured through a scoring system. National Housing Policy (2018-2025) under Focus No. 2 which is to emphasize QLASSIC Certification for all new public and private housing projects.
2
Embed
BUILDING CATEGORY FOR QLASSIC ASSESSMENTMANAGER Construction Assessment Centre (CASC), Construction Research Institute of Malaysia (CREAM) Level 29, Sunway Putra Tower, No. 100, Jalan
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Who Can Apply QLASSIC
01. Project Owner 02. Main Contractor 03. Property Developer
SCOPE OF QLASSIC
BASIC M&E FITTINGS
ARCHITECTURALWORKS
EXTERNALWORKS
A.
Detached, Semi-detached, Terrace and Cluster Houses.
Flat, Apartments, Condominium, Service Apartment, Small O�ce
Home O�ce (SOHO) and Town Houses
O�ce Building, School, Factories, Warehouse, Workshops, Hangers, Small O�ce Virtual O�ce (SOVO), Religious Buildings, Stadiums,
Community Halls, Hospitals, Airports, Universities, Colleges, Police Stations, etc
BUILDING CATEGORY FOR QLASSIC ASSESSMENT
StratifiedHousing
Public Commercial/industrial Building Without Centralize Cooling System
LandedHousing
Public Commercial/industrial Building With Centralize Cooling System
• Towards Continuous Improvement in construction quality.
• Eligible to be awarded during QLASSIC Day.
• To have a standard quality assessment system for quality of workmanship of building projects.
BENEFITS OF QLASSIC:
20POINTS
CCD
Quality Assessment System in Construction (QLASSIC) is an independent assessment tool to measure and evaluate the workmanship quality of a building construction works based on Construction Industry Standard (CIS 7:2014 Quality Assessment System for Building Construction Works).
QLASSIC enables the quality of workmanship in that particular project to be objectively measured through a scoring system. National Housing Policy (2018-2025) under Focus No. 2 which is to emphasize QLASSIC Certification for all new public and private housing projects.
MANAGERConstruction Assessment Centre (CASC),Construction Research Institute of Malaysia (CREAM) Level 29, Sunway Putra Tower, No. 100, Jalan Putra, 50350 Kuala Lumpur.Phone : 03-4040 0040 Fax : 03-4050 2649 Email : [email protected] / [email protected] / [email protected] Mobile : 019-3656428 (Syed Hazni)
Borang Permohonan Penilaian QLASSICQLASSIC Assessment Application Form
Bahagian A – Maklumat projek Section A - Project information
Tajuk ProjekProject Title
Nama & Alamat Klien Client’s Name & Address
Nama & Alamat Kontraktor Utama Name & Address of Main Contractor
hereby on behalf of our company do agree and give permission to CREAM assessors to carry out QLASSIC assessment based on CIS 7:2014 for the above project. The information provided above is correct as of ________________(date).