Building a Tier 4 Data Center on a Tier 1 Budget Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting • Denver, CO A Walk Through of TIA-942
68

Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

May 23, 2018

Download

Documents

vanhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Building a Tier 4 Data Center on a Tier 1 Budget

Peter P. Charland III, RCDD/NTS/WD, CETRTKL Associates Inc.

March 27, 2008BICSI South Central Region Meeting • Denver, CO

A Walk Through of TIA-942

Page 2: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

TIA-942 History -

Timeline• 1960’s and 1970’s -

Data centers limited

to finance, telecommunications, and government sectors.

• 1989 -

18 companies come together in NYC– Forum for users and owners of data

centers to share information– Continues to develop into various groups

and associations

Page 3: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

TIA-942 History –

Moving Forward• 1993 –

Site Uptime Network formed by

The Uptime Institute, Inc.– Network of member companies sharing

information and collaborating to find solutions.

Page 4: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

TIA-942 History –

Tiers• Several systems developed to classify

data centers with respect to architecture, electrical, mechanical, and telecommunications.

• Systems tended to be complex for non- technical management.

• The Uptime Institute’s four-tier system provides simple means to understand data center investments.

Page 5: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

TIA-942 History –

A Beginning

• In April 2005, ANSI/TIA approves ANSI/TIA-942 Telecommunication Infrastructure Standard for Data Centers

• Based on four-tier system of The Uptime Institute

Page 6: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

TIA-942 -

Overview• Spaces within a “data center”• Architectural design elements of data

center spaces• MEP design elements• Cabling and pathways

Page 7: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

What’s in your data center?

Page 8: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

A Data Center - More than a computer room

• Computer room

Page 9: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR

A Data Center - More than a computer room

Page 10: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR• Operations center

A Data Center - More than a computer room

Page 11: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR• Operations center• Support staff offices

A Data Center - More than a computer room

Page 12: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR• Operations center• Support staff offices• Entrance facilities

Data Center -

More than a computer room

Page 13: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR• Operations center• Support staff offices• Entrance facilities• Loading docks, storage, burn-in rooms

A Data Center - More than a computer room

Page 14: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR• Operations center• Support staff offices• Entrance facilities• Loading docks, storage, burn-in rooms• Secured yards –

generators & fuel

A Data Center - More than a computer room

Page 15: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

• Computer room• Computer room TR• Operations center• Support staff offices• Entrance facilities• Loading docks, storage, burn-in rooms• Mechanical and electrical spaces

A Data Center - More than a computer room

Page 16: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Data Center Spaces• Entrance Rooms & Access Providers• Main Distribution Area & “edge”

devices• Horizontal Distribution Areas • Telecommunications Room• Racks & Cabinets

Page 17: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Topologies within Data CenterTypical • Single Entrance Room• One or more TRs• Several Horizontal Distribution Areas

Page 18: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Topologies within Data CenterMinimized • Single Main Distribution Area

– Entrance facility– Telecommunications room– Horizontal distribution within data center

Page 19: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Topologies within Data CenterDivergent • Multiple Entrance Rooms• One or more TRs• Multiple Horizontal Distribution Areas

with redundant backbone cabling

Page 20: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Architectural Elements• Size• Equipment: electrical and mechanical• Ceiling heights• Treatments• Lighting• Doors• Floor loading

Page 21: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Data Center Cabling

Page 22: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Cabling Elements• Service provider cables• Backbone cables• Horizontal cables• Zone distribution

Page 23: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Cabling Elements• ANSI/TIA/EIA-568-B.2 still applies!

Page 24: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Cabling Elements• Data center can be a

“building”• Backbones within data

center• Centralized optical

fiber cabling• Horizontal cable

“reduced”• Redundancy

Page 25: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Power Elements• Generators• UPS and batteries• Bonding and

grounding• Power &

environmental monitoring

• Emergency-power- off (EPO)

Page 26: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Mechanical Elements• Cooling operations• Environmental parameters• Fire suppression

Page 27: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Redundancy -

the start of “Tiering”

• Entrance pathways - OSP• Access provider services• Entrance facilities• Main distribution areas (with care)• Backbone cabling• Horizontal cabling• Mechanical and electrical systems

Page 28: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Concurrent Maintainability

Systems can be maintained, upgraded, and tested without impacting normal operations.

Page 29: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Fault Tolerant

System can handle any unplanned failure or planned outage without impacting normal operations including loads on support systems.

Page 30: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1 -

“N” A starting point

• “Need”

-

Just enough

Page 31: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1 -

“N”• Architectural

– Plain box

Page 32: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1 -

“N”• Cabling/Equipment

– Single feeder pathway for access provider– Single entrance room– Single-path distribution– No redundancy

Page 33: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1 -

“N”• Power

– Single power feeder– UPS - single module or non-redundant

modules– Generator optional– PDU’s may be used

Page 34: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1 -

“N”• Mechanical

– Single cooling source– Multiple cooling units to need immediate

need– Generator power, if available

Page 35: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1 -

“N”• “Need”

-

Just enough

• Failure of single unit or disruption for maintenance will disrupt operations

Page 36: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1

Page 37: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 2 -

“N+1” The start of redundancy

• “Need plus one”

Page 38: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 2 -

“N+1”• Architectural

– Physical protection against disruption, natural and man-made

– Environmental conditioning improvements– Loading dock

Page 39: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 2 -

“N+1”• Cabling/Equipment

– Two feeder pathways for access provider– Single entrance room– Redundant backbone cables within data

center– Critical equipment with redundant

components

Page 40: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 2 -

“N+1”• Power

– Single power feeders with ATS– UPS - redundant UPS modules (N+1)– Generator sized as “N”– Redundant PDU’s, preferably from

separate UPS systems– Dual power cords for all equipment– Grounding Infrastructure

Page 41: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 2 -

“N+1”• Mechanical

– Multiple units plus redundant unit– Single piping pathways– Generator power– Air supplied via raised floor

Page 42: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 2 -

“N+1”• “Need plus one”• Single pathway for systems• Maintenance of critical power will

disrupt operations• Less susceptible to disruption from the

failure of single unit

Page 43: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1

Tier 2

Page 44: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 3 -

“2N” Doubling up

• Two complete systems for each needed:– One active set of systems– One standby set of systems

Page 45: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 3 -

“2N”• Architectural

– Specific protections against most disruption

– Physical separate of redundant systems– Security checkpoints, access controls,

and fences– Site access improvements– EMI protection– 2 or more loading docks

Page 46: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 3 -

“2N”• Cabling/Equipment

– Two access providers or two points-of- presence

– Redundant backbone cables & pathways within data center

– Hot, standby spare for all critical equipment

Page 47: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 3 -

“2N”• Power

– A mix of “N+1” and “2N”– Dual utility feeders, one active & one

inactive– N+1 redundancy at all component levels– Redundant power to mechanical systems– Generator sized for equipment and

mechanicals plus 1– Any component can be isolated– Power monitoring

Page 48: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 3 -

“2N”• Mechanical

– Fully redundant cooling units– Dual path piping system– Redundant power– Environmental monitoring

Page 49: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 3 -

“2N”• One active, one standby• Redundant pathways, each able to

carry full load• Planned outages of systems without

disruption to service• Unplanned failure of one system

without disruption to service• Susceptible to disruption in

failure/maintenance mode

Page 50: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1

Tier 2

Tier 3

Page 51: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 4 -

“2(N+1)” Two of everything, all the time

• Two complete systems for each needed:– Two active sets of systems– Each set is N+1

Page 52: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 4 -

“2(N+1)”• Architectural

– Specific protections against all disruption– Secured equipment yard

Page 53: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 4 -

“2(N+1)”• Cabling/Equipment

– Secondary distribution area for redundant routers & switches

– Secondary area isolated from main area for all systems

– Armored cables or conduit pathways– Dual power supplies for electronic

equipment

Page 54: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 4 -

“2(N+1)”• Power

– Utility feeder from two different sub- stations

– Both feeders are active– Primary and reserve UPS systems– Generator sized for building load plus 1

Page 55: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 4 -

“2(N+1)”• Mechanical

– Alternative water storage for evaporative cooling systems

Page 56: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 4 -

“2(N+1)”• Two active, each able to carry full load• Planned outages of systems without

disruption to service• Unplanned failures without disruption

to service• Redundant pathways, • Very limited susceptibility to service

disruptions

Page 57: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Tier 1

Tier 2

Tier 3

Tier 4

Page 58: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Data Center Costs

TierAnnual Outage*

Construction Cost

1 “N” 28.8 hrs $450 / sq. ft.

2 “N+1” 22.0 hrs $600 / sq. ft.

3 “2N” 1.6 hrs $900 / sq. ft.

4 “2(N+1)” 0.8 hrs $1,100 / sq. ft.

* Outage times based on actual field data by The Uptime Institute, Inc.

Page 59: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Growth, a planned cost?• Right-sizing the initial design

– Not too big, not too small• Total Cost of Ownership• Realistic planning for growth

Page 60: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Word of caution

There is no “almost.”

Page 61: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

It is only a standard.

Page 62: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

A different approach to tiering• A compromise -

Application tiering

Page 63: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

A different approach to tiering• A compromise -

Application tiering

• Dual site data center and redundancy

Page 64: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

A different approach to tiering• A compromise -

Application tiering

• Dual site data center and redundancy• 1 + 1 = ?

Page 65: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Question• Can you build a Tier 4 data center on a

Tier 1 budget?

Page 66: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Answer• Well …

sort of?

Page 67: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Concluding remarks• TIA-942 provides an excellent basis of

design, not a blueprint for design.• Designers must educate owners.• Designers must consider creative

solutions.• 1 + 1 = 4, but 1$ + 1$ ≠

1$

Page 68: Building a Tier 4 Data Center on a Tier 1 Budget. A Walk ... - Building a... · Building a Tier 4 Data Center on a Tier 1 Budget ... – Two feeder pathways for access provider –

Questions?