Building a Pump Station on the Water April 20 th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW W ATER INTAKE A T LAKE CONROE
33

Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Jul 26, 2018

Download

Documents

vanhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Building a Pump Station on the Water

April 20th 2016

DESIGN AND CONSTRUCTION CHALLENGES FOR A

RAW WATER INTAKE AT LAKE CONROE

Page 2: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Agenda

• Introductions

• Project Overview

• Design Challenges Encountered

• Construction Challenges Encountered

• Q&A

2

Page 3: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Surface Water Facilities Program Project Overview

• Supply 24 MGD Surface Water to Montgomery County

• $480 Million Total Cost– $191 Million for SWF

• Treated Surface Water Delivery by January 1, 2016

3

Page 4: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Surface Water Facilities Program Project Overview

• Lake Conroe Surface Water Facilities– Raw Water

Intake and Pump Station

– Surface Water Treatment Plant

– High Service Pump Station

4

Page 5: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Surface Water Facilities Program Project Overview

• Successful SWF Project Team– SJRA

– Three Engineers

– Construction Manager at Risk

– Construction Inspection

– 36 Contractors

– 350 Peak Workforce

5

Page 6: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Raw Water Intake and Pump Station Project Overview

• Located near the dam

• 300 feet long bridge– Access deep water

• Initial Capacity of 47 MGD– Planned expansion of 3 pumps

6

Page 7: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Under-Slab Items

• Pump Room Challenge– Open floor plan, accessible for O&M equipment

– Exposed platform over lake, vulnerability to weather and vandalism

• Solution– Hardened electrical conduit

7

Page 8: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Under-Slab Items

8

Page 9: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Under-Slab Items

9

Page 10: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Under-Slab Items

10

Page 11: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Pump/Barrel Design

• Vertical Turbine Pumps Challenges– Variable Intake Elevations

– Wave Forces on Pump Columns

• Solution– Enclosed Barrels with Three Gates

11

Page 12: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Pump/Barrel Design

12

Page 13: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Pump/Barrel Design

13

Page 14: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Design Challenges Encountered Pump/Barrel Design

14

Page 15: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges Encountered Pump/Barrel Installation

• Construction Challenge– Installation of Pumps and Barrels

• Solution– CMAR involvement/input during design phase

– Pre-work planning with CMAR

15

Page 16: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges Encountered Pump/Barrel Installation

16

Page 17: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges Encountered Pump/Barrel Installation

17

Page 18: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges Encountered Pump/Barrel Installation

18

Page 19: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredDrilled Shafts over Water

• Construction Challenge– Drilled shaft installation over water

• Solution– Work from inland “flexi-float” barges

– Extensive pre- and post-installation testing

19

Page 20: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredDrilled Shafts over Water

• Insert text here

20

Page 21: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredDrilled Shafts over Water

• Insert text here

21

Page 22: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredDrilled Shafts over Water

22

Page 23: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredDrilled Shafts over Water

23

Page 24: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredInstalling Pipes through Dam

• Construction Challenge– Install raw water line, fire protection line, sample/chemical lines, electrical

duct bank through dam embankment

• Solution– Work with CMAR to schedule work outside of hurricane season

– Extensive planning and contingencies

24

Page 25: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredInstalling Pipes through Dam

25

Page 26: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredInstalling Pipes through Dam

26

Page 27: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredInstalling Pipes through Dam

27

Page 28: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredInstalling Pipes through Dam

28

Page 29: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredInstalling Pipes through Dam

29

Page 30: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredPump Startup

• Construction Challenge– Starting up pumps without treatment plant online

• Solution– Bypass flows to lake

30

Page 31: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Construction Challenges EncounteredPump Startup

31

Page 32: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Q&A

32

Page 33: Building a Pump Station on the Water - Freese and Nichols ... a Pump Station... · Building a Pump Station on the Water April 20th 2016 DESIGN AND CONSTRUCTION CHALLENGES FOR A RAW

Contacts

• Shane Porter, PE– [email protected]

• Sam Meisner, PE– [email protected]

• Jason Ward, PE– [email protected]

33