The Operations Manual is a set of record documentation, (manuals and drawings), for the client/facility

manager focused primarily on the technical/mechanical systems in the assigned buildings.

It is the requirement of the operation to coordinate, monitor, and facilitate the maintenance (PM & RM)

works in the buildings.

The Manual should be made available for any person who needs to coordinate and make sure any building

related tasks are done.

INDEX

1 INTRODUCTION & GUIDE

Section Title Notes

1 Introduction and

guide

Definition of this manual and what it is needed

2 General Build-

ings Information

A brief description of the buildings nature and layouts

(including labs)

3 HVAC Details of different parts and equipments within the service

4 Hydraulics Details of different parts and equipments within the service

5 Fire Fighting &

Alarm Systems

Details of different parts and equipments within the service

6 Electrical Details of different parts and equipments within the service

7 Civil Details of different parts and equipments within the service

8 Elevators Details of different parts and equipments within the service

9 Audio Visual Details of different parts and equipments within the service

10 LFO 4 Core

Labs

Details of different parts and equipments within the service

11 Evacuation Plan Emergency evacuation route

Page 3: Building 5 operations handbook

Handling Manual 3

Buildings 5 Handling Manual

Al Kindi is a Laboratory Facility with the area of 57,360 Sqm. The occupied areas are predominantly on

levels 2, 3, & 4 and each level in the buildings is consisted of six areas as follows:

Areas 3 & 6 consist of 1 meeting room, 5 huddle rooms, and 72 workstations.

Areas 2 & 5 consist of 16 PI offices, 2 meeting rooms, and 32 workstations.

Areas 1 & 4 consist of 12 PI offices, 5 meeting rooms, 3 huddle rooms, and 80.

Areas 1 & 4 in level 5 consist of 2 main conference rooms with sky fold partitions and 6 meeting

rooms.

All meeting rooms are equipped with a state of the art audio visual system.

2 GENERAL BUILDINGS INFORMATION

Page 4: Building 5 operations handbook

Handling Manual 4

Buildings 5 Handling Manual

Level 5 consists of HVAC units cooling the facilities and extraction systems from the labs to the roof

stacks. Solar panels are installed in level 6 rooftop and that’s to provide the buildings with hot water and

solar energy through a converter in level 0.

Labs List:

LAB

NO.

NEW LAB

NAME

LOCATION LAB NAME STATUS

Building Level Area Zone

LFO4 5-3830 B5 L3 A4 800 Solar Technology - Ultrafast Laser Spec-troscopy

In Operation

LFO4 5-3630 B5 L3 A1 600 Solar Technology - Wet Chemistry Lab In Operation

LFO4 B5 L0 A1,

A3 & A4

Solar Technology - Clean Room In Operation

LFO30 5-3920 B5 L3 A6 900 Functional Materials Design (FMD3) In Operation

LFO34 5-3910 B5 L3 A6 900 Molecular Electrical Interfaces In Operation

LFO43A (Zone 1+2)

5-4840/5-4850

B5 L4 A4 800 Clean Combustion Research Center In Operation

LFO61 5-3950 B5 L3 A6 900 Inorganic Synthesis Lab In Operation

Page 5: Building 5 operations handbook

Handling Manual 5

Buildings 5 Handling Manual

BUILDING 5 LEVEL 0 LAYOUT

Consists of:

3 Substation Rooms 6 MTER and TER Rooms

1 Solar Hot Water Pump Room 1 Fire Command room

5 Mechanical and Pumps Rooms 4 Electrical Rooms

2 AHU 1 Server and Operation room

Page 6: Building 5 operations handbook

Handling Manual 6

Buildings 5 Handling Manual

BUILDING 5 LEVEL 2 LAYOUT

Consist of:

4 PI Rooms 1 Café and Reading Rooms (Spine Area)

4 Huddle Rooms 2 Break Areas

5 Conference Rooms 4 Janitorial Rooms

142 Open Office Cubicles 6 TER Rooms

6 Electrical Rooms

Page 7: Building 5 operations handbook

Handling Manual 7

Buildings 5 Handling Manual

BUILDING 5 LEVEL 3 LAYOUT

Consist of:

32 PI Rooms 2 Break Areas

7 Huddle Rooms 4 Copy Print Rooms

8 Conference Rooms 2 TEA Room

180 Open Office Cubicles 6 Electrical Rooms

6 TER Rooms 4 Janitorial Rooms

Page 8: Building 5 operations handbook

Handling Manual 8

Buildings 5 Handling Manual

BUILDING 5 LEVEL 4 LAYOUT

Consist of:

32 PI Rooms 2 Break Areas

7 Huddle Rooms 4 Copy Print Rooms

8 Conference Rooms 2 TEA Room

180 Open Office Cubicles 4 Janitorial Rooms

6 Electrical Rooms 6 TER Rooms

Page 9: Building 5 operations handbook

Handling Manual 9

Buildings 5 Handling Manual

BUILDING 5 LEVEL 5 LAYOUT

Consist of:

8 Conference Rooms 24 AHU’S 4 Mechanical Rooms

2 Kitchen 3 Storage Rooms

10 Fan Rooms 1 Electrical Room

Page 10: Building 5 operations handbook

Handling Manual 10

Buildings 5 Handling Manual

3. HVAC

SERVICE

Page 11: Building 5 operations handbook

Handling Manual 11

Buildings 5 Handling Manual

Heating, ventilation, and air conditioning is the technology of indoor and vehicular environmental comfort.

3. HVAC SERVICE

Page 12: Building 5 operations handbook

Handling Manual 12

Buildings 5 Handling Manual

Page 13: Building 5 operations handbook

Handling Manual 13

Buildings 5 Handling Manual

HVAC Equipment/s:

AN AIR HANDLER, or air handling unit (often abbre-

viated to AHU), is a device used to condition and circu-

late air as part of a heating, ventilating, and air-

conditioning (HVAC) system. An air handler is usually

a large metal box containing a blower, heating or cool-

ing elements, filter racks or chambers, sound attenua-

tors, and dampers. Air handlers usually connect to

a ductwork ventilation system that distributes the con-

ditioned air through the building and returns it to the

AHU. Sometimes AHUs discharge (supply) and admit (return) air directly to and from the space served

without ductwork.

Air handling unit ( AHU 200 & 100 ) made HUNTAIR, 24 AHUs located in Bldg.5 level 5 mechani-

cal and 2 located in level 0 of both buildings. Fan Coil Unit ( FCU 100 ) : they are mostly located in staircases of Building 5 level 5 and level 0. FAN COIL UNIT (FCU) is a simple device consisting of a heating or cooling coil and fan. It is part of

an HVAC system found in residential, commercial, and industrial buildings. Typically a fan coil unit is not connected

to ductwork, and is used to control the temperature in the space where it is installed, or serve multiple spaces. It is con-

trolled either by a manual on/off switch or by thermostat.

Due to their simplicity, fan coil units are more economical to install than ducted or central heating systems with air

handling units. However, they can be noisy because the fan is within the same space. Unit configurations are numer-

ous including horizontal (ceiling mounted) or vertical (floor mounted).

Air Cooling Unit ( ACU 101 ) : Air Cooling Unit is a major or home appliance, system, or mechanism designed to change the air tempera-

Page 14: Building 5 operations handbook

Handling Manual 14

Buildings 5 Handling Manual

ture and humidity within an area (used for cooling and sometimes heating depending on the

air properties at a given time). The cooling is typically done using a simple refrigeration cycle, but some-

times evaporation is used, commonly for comfort cooling in buildings and motor vehicles. In construction,

a complete system of heating, ventilation and air conditioning is referred to as "HVAC"

Exhaust Fan Unit ( EXF 100 ) : located in

level 5 mechanical area by the atrium of both

bldgs.

A mechanical ventilation device that helps to

draw out stale and impure air from your occu-

pied area and bring in fresh air, thereby improv-

ing the quality of indoor air. Exhaust fans are

typically ducted to the exteriors of your facility,

through which bad indoor air can effectively be

removed.

Page 15: Building 5 operations handbook

Handling Manual 15

Buildings 5 Handling Manual

STAIR PRESSURIZATION SYSTEMS: located in Bldg.5 level 5 mechanical areas 2 & 5.

Are the most commonly utilized means for protecting exit stairwells in high-rise buildings from smoke in

the event of fire. Stair pressurization systems are difficult to design for tall buildings due to the impact of

stack effect on maintaining uniform pressures over the building’s height, and creation of excessive

door overpressures that may impact exiting is a concern. The effectiveness of a stair pressurization system

is also dependent on maintaining the doors predominately closed to maintain the required pressure differen-

tial to keep smoke from entering the stair, a situation that may not be possible during the event of a full

building evacuation or where catastrophic damage has occurred to the stair.

Page 16: Building 5 operations handbook

Handling Manual 16

Buildings 5 Handling Manual

Control Valves: located in Building 5 level 5 mechanical areas and level 0 & it s installed on every

AHU.

Are valves used to control conditions such as flow, pressure, temperature, and liquid level by fully or par-

tially opening or closing in response to signals received from controllers that compare a "set point" to a

"process variable" whose value is provided by sensors that monitor changes in such conditions.

Chilled Water Pump: located in pump rooms in building 5 level 0 areas 3 & 6.

Is a commodity often used to cool a building's air and equipment, especially in situations where many indi-

vidual rooms must be controlled separately, such as our academic buildings.

Page 17: Building 5 operations handbook

Handling Manual 17

Buildings 5 Handling Manual

Page 18: Building 5 operations handbook

Handling Manual 18

Buildings 5 Handling Manual

4. HYDRAULICS SERVICE

Page 19: Building 5 operations handbook

Handling Manual 19

Buildings 5 Handling Manual

Motor Control Panel: located in Bldg.5 level 5 mechanical areas.

It is a Power distribution systems used in large commercial and industrial applications & can be complex.

Power may be distributed through switchgear, switchboards, transformers, and panel boards.

Power distributed throughout a commercial or industrial application is used for a variety of applications

such as heating, cooling, lighting, and motor-driven machinery

Variable Air Valve & Volume Unit: located in Bldg.5 all catwalks and level 5 mechanical areas.

Is a type of heating, ventilating, and/or air-conditioning (HVAC) system. The simplest VAV system incor-

Page 20: Building 5 operations handbook

Handling Manual 20

Buildings 5 Handling Manual

Vaporizers at South Pad: There are total of 2 Vaporizers in the same area of the nitrogen plant behind building 4&5.

Vacuum Systems:

Their purpose is to remove the toxic gases released from chemical reactions. The system is located in

Building 5 areas 3 & 6 mechanical rooms in level 0.

Compressed Air System: the system is located in Building 5 areas 3 & 6 mechanical rooms in level 0.

It is needed to supply air in the labs.

Page 21: Building 5 operations handbook

Handling Manual 21

Buildings 5 Handling Manual

Air Quality:

Adsorption dryers remove water vapor by passing air over a regenerative adsorbent material known as des-

iccant, which strips the moisture from the air. All adsorption dryers remove water vapor using this method,

however the adsorbent must be periodically regenerated to ensure a continuous supply of dry air. A number

of different regeneration methods are available.

Pressure Dew Point, PDP:

Pressure dew point is the term used to describe the temperature at which condensation will occur and the

water removal efficiency of a dryer is expressed as a pressure dew point (written as a temperature). Adsorp-

tion dryers are extremely efficient and typically provide pressure dew point's of -40°C or -70°C. This

means for water vapor to condense into a liquid, the air temperature would need to drop below -40°C or -

70°C respectively.

Typically, a pressure dew point of -40°C is used in most applications as compressed air with

a dew point below -26°C will not only prevent corrosion, it will also inhibit the growth of microorganisms

within the compressed air system.

Solar Panels: located in Building 5 level 6 roof top.

Their purpose is to provide hot water and solar energy into the building

Page 22: Building 5 operations handbook

Handling Manual 22

Buildings 5 Handling Manual

5. FIRE FIGHTING & ALARM SYS-

TEMS

Page 23: Building 5 operations handbook

Handling Manual 23

Buildings 5 Handling Manual

Fire Alarm System:

Cultural property management is entrusted with the responsibility of protecting and preserving an institu-

tion's buildings, collections, operations and occupants. Constant attention is required to minimize adverse

impact due to climate, pollution, theft, vandalism, insects, mold and fire. Because of the speed and totality

of the destructive forces of fire, it constitutes one of the more serious threats. Vandalized or environmental-

ly damaged structures can be repaired and stolen objects recovered. Items destroyed by fire, however, are

gone forever. An uncontrolled fire can obliterate an entire room's contents within a few minutes and com-

pletely burn out a building in a couple hours. The first step toward halting a fire is to properly identify the

incident, raise the occupant alarm, and then notify emergency response professionals. This is often the func-

tion of the fire detection and alarm system.

Vesda (Early Warning Aspirating Smoke Detection):

VESDA by Xtralis very early warning aspirating smoke detection solutions with continuous air sampling

provide the earliest possible warning of an impending fire hazard. VESDA ASDs buy the critical time

needed to investigate an alarm and initiate an appropriate response to prevent injury, property damage or

business disruption. VESDA detectors have multi-level warnings and a wide range of sensitivity that does

not degrade or change over time, so even minute levels of smoke can be detected before a fire has time to

escalate. In addition, VESDA systems are manufactured using targeted Six Sigma techniques and ISO 9000

standards and have been certified by regulatory bodies worldwide.

5. FIRE FIGHTING & ALARM SYSTEMS

Page 24: Building 5 operations handbook

Handling Manual 24

Buildings 5 Handling Manual

Supply Piping Network:

The riser diagram below shows the supply network for the campus buildings.

Each branch controlled by check valve and alarm control gate valve.

Three control valves installed on the main line between building 18 and 5 ,building 3 and 1,the third inside

the pump room between building 2 and 14 .

The main line supply to RPIC and two hydrants FH9 and FH11 a crossing the

road under the ground by 200mm UPVC pipe.

Page 25: Building 5 operations handbook

Handling Manual 25

Buildings 5 Handling Manual

Sprinklers: The ones used in the campus are of different manufacturers but of the same specification. There are differ-

ent types of sprinklers used and they are manufactured by two different companies Tyco and Reliable.

The ones used in Campus by Tyco are:

Fast response pendent sprinklers.

Rapid response residential pendent sprinklers ( white cover ).

Recessed pendent sprinklers.

The one used from Reliable is:

Concealed pendent (chrome cover ) RFC 43.

The common specifications for all types of sprinklers are:

Ambient temperature : 38 C.

Operation temperature : Varies from 68 to 74 C.

Minimum distance between sprinklers : 2200 mm .

Maximum covers : 3600*3600 mm2.

Maximum pressure discharge :12 bars.

Minimum pressure discharge : 7.2 bars.

Page 26: Building 5 operations handbook

Handling Manual 26

Buildings 5 Handling Manual

Stand pipes:

The stand or the main riser is installed in the corner of the emergency stair case. The role of this riser is to

supply the water to each branch in the building. The landing valve is installed on stand pipe per each level

to supply water to the fire hoses in emergency cases. The check valve and alarm control gate valve is in-

stalled per each level.

Hose Cabinets:

Are installed in each level behind the landing valve for emergency cases. Each cabinet contains two high

pressure fire hoses and one water regulator gun. These cabinets should be checked every month.

Page 27: Building 5 operations handbook

Handling Manual 27

Buildings 5 Handling Manual

Fire fighting pumps:

Pre Action System:

It is a dry system with the following model: TOTAL PAC 2.

Page 28: Building 5 operations handbook

Handling Manual 28

Buildings 5 Handling Manual

6. ELECTRICAL SERVICE

Page 29: Building 5 operations handbook

Handling Manual 29

Buildings 5 Handling Manual

Light Fixtures by:

Voice Suspended Product ( F – 39 -1 ) , located inside PI offices and open areas 2, 5, 1, & 4 of all levels.

Leda Light Pure FX ( F – 34 ): located in lab corridors and the glass conference rooms in bldg.5 areas 2 & 5

of all levels 2, 3, & 4.

Eklisse ( F – 14 ), located in all staircases in bldg. 5 all levels all areas and in lev-

el 5 mechanical areas 2 & 5.

6 ELECTRICAL SERVICE

Page 30: Building 5 operations handbook

Handling Manual 30

Buildings 5 Handling Manual

Stiller ( F – 28 ), located in all labs of Building 5.

Infinite 3 fixture( F – 28 ), located in break areas in areas 1,

4, 3, & 6 of all levels in bldg.5. In addition to the inside of

all toilets. The round one is located by corridor doors in all

levels all areas of the bldgs.

Leda Light Voice ( F – 40 ), located inside all toilets of Building 5.

Page 31: Building 5 operations handbook

Handling Manual 31

Buildings 5 Handling Manual

Light cast Down light ( C – 01 ), it has different sizes and located in toilets and

hall ways to the toilets of Building 5 all levels all areas.

Sure Lights – EXIT Signs ( X – 04 ), located on all

kinds of exit doors in building 5 all level all areas.

HID Mini Base Mount ( H – 28 ), located in level 5 mechanical areas

2 & 5. In addition to the external on the buildings in level 5 only.

Projector – Flood Lights( H – 25 ), located in the plaza of building 5 level 2 by sign

boards.

Page 32: Building 5 operations handbook

Handling Manual 32

Buildings 5 Handling Manual

Square Aperatur Lights ( H – 23 ), located in Building 5 areas 2 & 5 of levels 2, 3,

& 4.

Page 33: Building 5 operations handbook

Handling Manual 33

Buildings 5 Handling Manual

Substation:

Normal Power Supply, Located in Unit Substation (Room 0128) Bldg.5 Level 0, Between Area 3&6.

13.8KV to 380Y/220V.

Emergency Power Supply, Located in Unit Substation (Room 0127) Bldg.5 Level 0, Between Area 3&6.

Panel Board (EATS-Emergency Power / BATS-Optional stand by power / SATS-Legally Required stand

by power). Located in Unit Substation (Room 0128&0127) Bldg.5 Level 0, Between Area 3&6.

Page 34: Building 5 operations handbook

Handling Manual 34

Buildings 5 Handling Manual

Switch Board panel, Located in Unit Substation (Room 0128) Bldg.5 Level 0, Between Area 3&6.

Normal Lighting Panel Board, Located in All electrical rooms in the building.

Emergency Lighting Panel Board, Located in All electrical rooms in the building.

Page 35: Building 5 operations handbook

Handling Manual 35

Buildings 5 Handling Manual

7. CIVIL

SERVICE

Page 36: Building 5 operations handbook

Handling Manual 36

Buildings 5 Handling Manual

Ceiling:

CLG-10 Trade 130 (Metal Ceiling), Located in Labs Corridor of the bldg.

CLG-11 Trade 130 (Ultima), Located in Open office areas of the bldg.

CLG-03B & 03C (Diacaustic) Located in all janitorial rooms of the bldg.

7 CIVIL SERVICE

Page 37: Building 5 operations handbook

Handling Manual 37

Buildings 5 Handling Manual

Walls:

WD-22 Trade 134 (Wood), Located in all PI offices and Toilet rooms of the bldg.

P-40 & 41 Trade 260 (Latex Paint), Located in Level 0&5 All areas of the bldg.

Durasan—03, Located in Level 2,3,4 All areas of the bldg.

Page 38: Building 5 operations handbook

Handling Manual 38

Buildings 5 Handling Manual

WC-10 Trade 260 ( Wall Fabric), Located in all PI offices of the bldg.

ST-30 Trade 240 (Stone Basalt), Located in all Toilets of the building.

GT-01C and 17C Trade 220 (Glass Tiles), Located in All women toilet in the bldg.

Page 39: Building 5 operations handbook

Handling Manual 39

Buildings 5 Handling Manual

CT-21 & 19 Trade 220 (Royal Mosa)

P-37 Trade 260 (Latex Paint), Located in Bldg.5 Level 2, 3, & 4 Huddle rooms.

ST-52 Trade 240 (Marble). Located outside of the bldg.

Page 40: Building 5 operations handbook

Handling Manual 40

Buildings 5 Handling Manual

WD-20 Trade 330 (Cherry Wood), This located in all toilet and Double Doors in the bldg.

WD-08 Trade 159 (Wood), Located in all PI Offices of the bldg.

WD-41 Trade 334 ( Solid IPE), This located in center stairs in level 4 to Level 2 of the bldg.

Page 41: Building 5 operations handbook

Handling Manual 41

Buildings 5 Handling Manual

Flooring:

ST-30 Trade 240 (Stone Basalt), This is located in All toilets of the bldg.

ST-50A Trade 240 (Stone Base), This is located in Level 2, 3 & 4 Walkway and Break Areas.

QT-01 Trade 220 (Vinyl), This is located in all Labs of the bldg.

Page 42: Building 5 operations handbook

Handling Manual 42

Buildings 5 Handling Manual

LN-10 Trade 210 (Marmoleum), This is located inside the top of cabinet in conference room .

ST-01 Trade 249 (Granite), This is located inside Toilet rooms.

Page 43: Building 5 operations handbook

Handling Manual 43

Buildings 5 Handling Manual

Carpet:

C-50 Trade 210 (Carpet Syncopation), Located in Bldg.5 Level 2,3&4 Corridors of the bldg.

C-52 Trade 210 , Located in all huddle rooms of the bldg.

C-56 Trade 210 (Carpet Solmates), Located in Level 2,3&4 conference rooms.

Page 44: Building 5 operations handbook

Handling Manual 44

Buildings 5 Handling Manual

C-63 Trade 210 (Brocatelle), Located in Level 5, Big conference rooms of the bldg.

C-64 Trade 210 , Located in Bldg.5 Level 2,3&4 Corridors of the bldg.

C-65 Trade 210 (Carpet tile—SIAM), Located in Level 2 center carpet of the building.

Page 45: Building 5 operations handbook

Handling Manual 45

Buildings 5 Handling Manual

Doors:

Double steel doors, Located in level 6, area 3 (roof top) of the bldg.5

Single steel doors, Located in level 5 areas 1,4,3&6 mechanical rooms.

Single metal door with glass, Located in Bldg. 5 level 5 area 5 exit stairs.

Page 46: Building 5 operations handbook

Handling Manual 46

Buildings 5 Handling Manual

Push bar double wooden doors, Located in bldg.5 all Labs corridors.

Single wooden doors, Located in bldg.5 all mechanical rooms.

Single glass doors, Located in Bldg. 5 all huddle rooms.

Page 47: Building 5 operations handbook

Handling Manual 47

Buildings 5 Handling Manual

Double glass doors, Located in Level 2, 3, & 4 Entrance door of the office areas.

Push bar double door glass with frame, Located in bldg.5 Level 3, 4 & 5 in connecting bridge.

Single glass sliding doors, Located in some huddle rooms in Bldg.5 all level and areas.

Page 48: Building 5 operations handbook

Handling Manual 48

Buildings 5 Handling Manual

Single push bar wooden door, Located in all Exit doors in the bldg.

Single glass door with frame, Located in Bldg.5 all door labs.

Single glass door with wood frame. Located in Bldg.5 all Print rooms in the bldg.

Page 49: Building 5 operations handbook

Handling Manual 49

Buildings 5 Handling Manual

Double glass door with frame, Located in level 5, Big conference room accessing to lobby.

Single Wooden doors, Located in Bldg.5 all PI Rooms and Toilets.

Single wooden doors, Located in bldg.5 toilet cubicle doors.

Page 50: Building 5 operations handbook

Handling Manual 50

Buildings 5 Handling Manual

Double wooden door with glass. Located in level 0, Lab corridor.

Single Metal door. Located in bldg.5 Level 0 Exit doors going outside the bldg.

Single Metal doors with frame. Located in Level, 2,3,4 all areas access to outside terracotta.

Page 51: Building 5 operations handbook

Handling Manual 51

Buildings 5 Handling Manual

Double Metal doors. Located in bldg.5 Level 0, area 3&6 Emergency exit doors going outside of the bldg.

Double Metal door (White paint). Located in bldg.5 level 0 area 3&6, Mechanical rooms.

Page 52: Building 5 operations handbook

Handling Manual 52

Buildings 5 Handling Manual

Electrical and Manual Curtains located on glass walls.

Page 53: Building 5 operations handbook

Handling Manual 53

Buildings 5 Handling Manual

8. ELEVATOR SERVICE

Page 54: Building 5 operations handbook

Handling Manual 54

Buildings 5 Handling Manual

Panoramic Elevators # 4 & 5, located in areas 2 & 5 on the main entrance side of Bldg.5.

They serves levels 2, 3, & 4. Manufacturer is SCHENDLER.

Service Elevators # 2, 3, 7, & 8 - SCEHNDLER, located in service corridors of areas 3, 6, 1, & 4 of

Bldg.5. They serve levels 0, 2, 3, 4, 5 mechanical, & 6 where accessible and this includes catwalks.

Seaside Elevators # 1 & 6– SCHENDLER, located in areas 1 & 4 seaside open space of bldg.5. They

serve levels 0, 2, 3, 4, & 5 conference rooms area.

8 ELEVATOR SERVICE

Page 55: Building 5 operations handbook

Handling Manual 55

Buildings 5 Handling Manual

Auditorium Elevator # 9 - SCHENDLER, it is located in bldg.5 area 5 and it is currently put off ser-

vice.

It serves the auditorium area, 5, levels 0 & 2.

Glass Sliding Doors, located in Bldg.5 level 2 plaza by the solar tower.

Shutter Doors, located in bldg.5 level 5 mechanical areas and level 0 loading areas.

Page 56: Building 5 operations handbook

Handling Manual 56

Buildings 5 Handling Manual

Elev.#6 Elev.#1

Elev.#2

Elev.#4 Elev.#5

Elev.#7

Elev.#9

Elev.#8

Elev.#3

Page 57: Building 5 operations handbook

Handling Manual 57

Buildings 5 Handling Manual

Plasma TV, Located in Small conference rooms in bldg.5 Level, 2,3,4&5 Area 1&4.

Touch Panel (CRESTRON), Located in all Conference room.

2 Sets of Projector Controller with Laptop. Located in Level 5, Area 1&4 Seaside (Huge Conference room

5209&5220)

9 AUDIO VISUAL

Page 58: Building 5 operations handbook

Handling Manual 58

Buildings 5 Handling Manual

Huge Plasma TV Screen, Located in Bldg.5 Level 2,3 & 4 Blue Conference room and Spine areas.

Video Camera (TANBERG), Located in All Conference rooms in Bldg.5 level 2, 3 & 4.

Projector White Screen, Located in Conference rooms in bldg.5 Area 2&5 Level 3&4.

Page 59: Building 5 operations handbook

Handling Manual 59

Buildings 5 Handling Manual

10. LFO 4 Core

Labs Systems

Page 60: Building 5 operations handbook

Handling Manual 60

Buildings 5 Handling Manual

Compressed Dry Air (CDA) is air kept under a pressure that is greater than atmospheric pressure, Mainly its used for cleaning. Located in Building 5 level 0 area 1&4. The system contains 2 compressors and 2 dryers

Process Vacuum maintain vacuum for multiple laboratory outlets from a central location. Vacuum system will come in contact with solvent vapors and small objects from the labs. Located in Building 5 level 0 are-as 1&4.

Process Cooling Water systems (PCW) maintain constant flow of cooled or chilled water to process criti-cal tools and machinery, it maintains the water flow at constant temperature and pressure ensuring the

LFO 4 Core Labs Systems:

Page 61: Building 5 operations handbook

Handling Manual 61

Buildings 5 Handling Manual

Acid Wastes Neutralization Systems are used for the neutralization of acids and bases from any industrial wastewater source prior for disposal. Located in building 5 level 0 area 1&4

Ultrapure water systems are combined units for producing ultrapure water. The systems feature with unique deionization cartridges to produce pure and ultrapure water of highest quality. The pure | ul-trapure water twin systems deliver consistently high-grade water quality for critical and routine applica-tions. Located in building 5 level 0 area 1&4

Page 62: Building 5 operations handbook

Handling Manual 62

Buildings 5 Handling Manual

Evacuation Plan in Level 0

Assembly Area

Page 63: Building 5 operations handbook

Handling Manual 63

Buildings 5 Handling Manual

Evacuation Plan in Level 2

Page 64: Building 5 operations handbook

Handling Manual 64

Buildings 5 Handling Manual

Evacuation Plan in Level 3

Page 65: Building 5 operations handbook

Handling Manual 65

Buildings 5 Handling Manual

Evacuation Plan in Level 4

Page 66: Building 5 operations handbook

Handling Manual 66

Buildings 5 Handling Manual

Evacuation Plan in Level 5

Page 67: Building 5 operations handbook

Handling Manual 67

Buildings 5 Handling Manual

UNIT 1 C MANAGEMENT & ADMINISTRATION TEAM:

HASSAN SIDAOUI, UNIT MANAGER. TEL: 012 8084879,

EMAIL: [email protected].

BILAL KAHWAJI, UNIT SUPERVISOR. TEL: 012 8081202, EMAIL: [email protected].

ADEL AL TALHI, UNIT SUPERVISOR. TEL: 056 4007080, EMAIL:

[email protected].

YASIR KHATEEB, UNIT SUPERVISOR. TEL: 054 6634423,

EMAIL: [email protected].\

JOHN CENON CASAYURAN, ADMINISTRATOR. TEL: 012

8084982, EMAIL: [email protected].

MARK ANTHONY MUZONES, ADMINISTRATOR. TEL: 012

8082173, EMAIL: [email protected]