Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004
14
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Buffalo Chinese Christian Church

Project 99

Progress Report

September 26, 2004

Page 2: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Background

• Historical Background (last 20 years)– Purchased current building in 1985– Ongoing size/location/maintenance limitations– Several property searches over the years

• Recent Background (last 3 years)– Attendance has grown – Current facility limitations more obvious– Active consideration (2002-2003)– Council recommendation (Oct 2003)– Congregational vote (Nov 2003)– Project 99 Committee (March 2004)

Page 3: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Progress to Date

• The Committee Has Met 5 Times (March-Sept)

– Elected Dr. Herbert Lau as Committee Chair– Worked to clarify the reasons for project 99– Developed Vision Statement and Objectives– Prepared informational article and fact sheet– Developed preliminary project plan – Set up 2 subcommittees

1 - Existing Building Purchase

2 - Land Purchase and Construction

Page 4: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Progress to Date

• Subcommittee 1 (Existing Building Purchase)– Met with with several local Realtors– Commercial property search– Visited 2 existing churches– Identified several churches for sale– Sent out letters to 30 local churches– Called Catholic Diocese– Online research– Established preliminary building purchase criteria

Page 5: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Plan

• Subcommittee 1 (Existing Building Purchase)(Completed within the next 3-6 months)

– Retain a Commercial Realtor

– Expand our consideration of Commercial/Business Facilities

Unfortunately no suitable facility has been found. We will continue to pray and seek God’s provision but it appears that there may be no existing facility available

Page 6: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Progress to Date

• Subcommittee 2 (Land Purchase &Construction)– Researched local building regulations– Established preliminary land purchase criteria– Met with Town of Amherst Building Inspector– Visited several plots of land for sale– Attended 1 land sale auction– Met with Rochester Chinese Christian Church– Developed preliminary project plan

Page 7: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Plan

• Land Purchase and New Construction– Pre-Construction Phase I - Facility Master Plan

(Completed within next 6-12 months)• Retain Professional Architect• Form Design Committee• Prepare a phased Master Plan• Develop more accurate cost estimates

Page 8: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Plan

• Land Purchase and New Construction– Pre-Construction Phase II - Fund Raising

(Already in progress - next steps begin immediately)

• Form fund raising committee

• Prepare fund raising objectives based on Master Plan

• Begin regular updates & correspondence with members and alumni

Page 9: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Plan

• Land Purchase and New Construction– Pre-Construction Phase III - Land Acquisition

(Completed within next 18 months)• Finalize land purchase criteria based on Master

Plan• Retain Professional Realtor• Identify suitable parcel of land• Perform necessary pre-purchase evaluation• Purchase land with funds raised

Page 10: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Plan

• Land Purchase and New Construction– Construction Phase II-Fellowship Hall

Construction (Completed within next 3-5 years)

• Begin construction when sufficient funds are raised• Construct multifunctional fellowship hall and

supporting rooms in first construction phase

Page 11: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Plan• Land Purchase and New Construction

– Construction Phase III - Sanctuary & Continued Construction (Completed within next 5-10 years)

• Construct subsequent phases of Master Plan as funds become available

Page 12: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Funding

• By God’s grace we prefer to finance the project without incurring debt

• We will attempt to move forward as funds become available

• Formation of Fund Raising Committee• Begin fund raising campaign• Preliminary target

– $250,000 - for down payment or land purchase

Page 13: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Conclusion

Many are the plans in a man’s heart, but it is the Lord’s purpose that prevails - Proverbs19:21

Lord, you have assigned me my portion and my cup; you have made my lot secure. The boundary lines have fallen for me in pleasant places; surely I

have a delightful inheritance - Psalms 16:5-6

Page 14: Buffalo Chinese Christian Church Project 99 Progress Report September 26, 2004.

Project Background

• A combination of needs has begun to limit our ministries and growth

• Summary of Current Needs– Sanctuary size– Classroom and office space– Increasing maintenance costs– Restrooms/plumbing– Children’s nursery– Recreational facilities– Parking– Baptismal tank