Gary A. Loew
Headquarters, U.S. Army Corps of Engineers
March 11, 2009
Gary A. Loew
Headquarters, U.S. Army Corps of Engineers
March 11, 2009
BUILDING STRONGBUILDING STRONG
Winter Leader Conference February 4, 2009 “ Building Strong “ 2
Budgets and Appropriations( $ Millions )
* No FY09 Energy & Water Development Appropriation has been passed. We are operating at FY08 levels under a Continuing Resolution Authority until Mar 09.
FY08Execution
FY08Budget
FY08Approp
FY09Budget
FY09Conference
Investigations 156 90 167 91 168
Construction 2,221 1,523 2,294 1,402 2,140
Operation & Maintenance 1,971 2,471 2,244 2,475 2,202Mississippi River & Tributaries 385 260 387 240 384
Regulatory 158 180 180 180 183Flood & Coastal Emergencies 953 40 0 40 40
F.U.S.R.A.P. 139 130 140 130 140
Expenses 168 177 175 177 179
ASA(CW) 4 0 5 6 4.5
Sub - Total 6,155 4,871 5,592 4,741 5,401
Supplemental Approps 3,383 3,383 5,761 5,761
Stimulus Bill 4,600
Total 6,155 8,254 8,975 10,502 15,694
Winter Leader Conference February 4, 2009 “ Building Strong “ 3
Civil Works Business Programsin FY2009 Budget & Supplemental
Environmental Protection& Restoration
Flood & CoastalStorm Damage
Reduction
Hydropower Recreation
Navigation
Water SupplyRegulatory Support for Others
EmergencyManagement
Figures from FY09 Budget + Supplemental. Total = $9.475 M (includes $183 M Management & Oversight not listed in pictures)
$1,892 M
** Estimated reimbursement from supported agencies, not in budget
$7,083 M $511 M
$319 M $58 M $270 M
$2,400 M**$6 M$180 M
Winter Leader Conference February 4, 2009 “ Building Strong “ 4
Civil Works Program TrendsFY06 – 13
0
2
4
6
8
10
12
14
16
18
20
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
$ B
illi
on
s
Stimulus Package
Tot SFO
Non-Federal
FUSRAP
FC ( MR & T )
GI
RP + FCCE
GE
O&M
Construction
Winter Leader Conference February 4, 2009 “ Building Strong “ 5
FY2009-11 Budgets and Appropriations
• 1 Oct 08- 11Mar 09–FY09 Continuing Resolution Act (CRA)• 17 Feb 09 – ‘American Recovery and Reinvestment Act’
-- PL 110-5 (ARRA)• 24 Feb 09 – FY09 Omnibus Appns Conference Rpt Filed• 26 Feb 09 – President presents FY10 Budget Overview• ~11 Mar 09? – FY09 Appropriations Act• 11 Mar 09 – FY11 Budget Guidance to field offices• ~16 Mar 09 – ARRA funds issued to field offices• Mar 09 – FY09 Appns Act funds issued to field offices• ~24 Apr 09 – FY10 Budget details released to public• ~Apr 09 – House T&I ARRA Oversight Hearing• 30 Apr 09 – House FY10 Budget Hearing• Early-mid 2010 – Another Stimulus Bill?
Winter Leader Conference February 4, 2009 “ Building Strong “ 6
FY2009 Appropriations ---Some Provisions---
• CRA and FY09 Appropriations exempt inland waterway Rehabilitation (not new construction) projects from Inland Waterways Trust Fund cost sharing for FY 2009
• Executive Order (E.O.) instructs agencies to ignore Report directions.
• Current version of Bill incorporates Conference Report text and tables into law by reference to counteract E.O. except for Section 1, Reprogramming instructions.
• New Administration position on E.O. unknown
Winter Leader Conference February 4, 2009 “ Building Strong “ 7
Economic Stimulus American Recovery and Reinvestment Act
• $4.6 billion for Corp programs• ARRA funds are not to be cost shared with
Inland Waterways Trust Fund• No cost-share exemption from the HMTF or
cost-shared projects • Significant “transparency” requirements for
tracking, monitoring and reporting of specific metrics
• Final selection of projects scheduled for approval in mid Mar 09 with work allowances to Districts immediately following selection.
• All unobligated funds (except for E&D, S&A and claims) expire 30 Sep 2010.
Winter Leader Conference February 4, 2009 “ Building Strong “ 8
ARRA Appropriations
APPROPRIATIONS by ACCOUNT
($Billions)• Investigations $0.025
Construction $2.000• O&M $2.075• MR&T $0.375• Regulatory $0.025• FUSRAP $0.100• TOTAL $4.600
Winter Leader Conference February 4, 2009 “ Building Strong “ 9
Other ARRA Provisions
• Projects are eligible only if funded “heretofore
or hereafter” [i.e. no new starts]• Relief from cost sharing with IWTF• Unlimited reprogramming authority (?)• Up to 0.5% to administer the Act (Mgmt & Oversight) • NLT $200M for Environmental Infrastructure• Section 902 relief• Ceiling relief for Section 14, 205, 206 and 1135
Programs• Funds may be retained after 30 Sep 2010 expiration
for E&D, S&A, Claims
• WRDA Sec 9006 relief (levee surveys)
Winter Leader Conference February 4, 2009 “ Building Strong “ 10
Stimulus-Project Selection Criteria
Project selection criteria in Conference Report are projects, programs or activities that will:
• be obligated/executed quickly; • result in high, immediate employment; • have little schedule risk; • be executed by contract or direct hire of temporary
labor; and • complete either a project phase, a project, an
element, or will provide a useful service that does not require additional funding.
Winter Leader Conference February 4, 2009 “ Building Strong “ 11
Stimulus-Project Selection Criteria - II
Criteria Implementation
Obligate/execute quickly;
High, immediate employment
Sort by award date.
For same date, sort by completion date
Little schedule risk Districts filter out all projects with schedule risk
Complete project phase, project, or element, or will provide a useful service that does not require additional funding
Districts prepare work packages accordingly
Execute by contract or direct hire of temporary labor
No in-house labor except for OH/E&D/S&A
No reimbursements
No land purchase
Winter Leader Conference February 4, 2009 “ Building Strong “ 12
Stimulus-Project Selection Criteria III
In addition, some CW Program Goals
• Reasonable distribution across programs, e.g. flood risk management, coastal and inland navigation,, environmental restoration, hydropower, recreation
• Reasonable geographic distribution
• These goals were applied in select cases:– IWTF project funding set at a reasonable appropriation level
• FY 2004-08/4 = $368/ IWTF Stimulus projects = $358 M)– Environmental Infrastructure = $201M, consistent with legal minimum – CAP requests totaled $60 M; all were included;– Element size was capped at $50 M to enable geographic and
business line balance
Winter Leader Conference February 4, 2009 “ Building Strong “ 13
Stimulus Projects Submitted
Civil Works Data Base of Eligible Projects that could be Executed by 30 Sep 2010
Account Number of Work Packages
Amount
(Millions)
Construction 3,600 $7,700
Opns & Maint 6,600 $7,000
MR & T 700 $ 700
Total 10,900 $15,400
Winter Leader Conference February 4, 2009 “ Building Strong “ 14
Projects Selected - PREDECISIONAL
Account Work Packages Projects
Amount
Construction - IN
($2 billion)
272 packages
250 projects
$25 K - $49 M
$25 K - $90 M
Construction – OUT 468 packages
117 projects
$2 K - $355 M
$2 K - $1.2 B
O&M - IN
($2.075 billion)
2,164 packages
516 projects
$1 K - $36 M
$23 K - $85 M*
O&M – OUT 3,418 packages
655 projects
$1 K - $43 M
$12 K - $147 M
Investigations - IN 69 projects $20 K - $2 M
Investigations – OUT 420 projects $1 K - $4 M
MR&T – IN ($375 M) 247 packages
39 projects
$25 K - $24 M
$231 K - $41 M
Winter Leader Conference February 4, 2009 “ Building Strong “ 15
Benefits-Jobs Created
• Jobs created by USACE portion of stimulus estimated at 139,000. – Direct creation of ~37,000 new
private sector jobs with average annual wages between $38,000 and $42,500
– Additional 102,000 new jobs in industries supplying construction and O&M activities and sell goods and services to new workers and their families.
Winter Leader Conference February 4, 2009 “ Building Strong “ 16
FY2010 Budget - Status
• President will delivered the FY10 Budget Overview to Congress on Feb 27th. It is a high level document (with no accompanying agency detailed project information)
• OMB has provided the Corps a FY10 Budget ceiling
• ASA/Corps staff are working with OMB on the final criteria, program amounts and project details.
• Target is to release FY10 Budget detailed information in mid-late April
Winter Leader Conference February 4, 2009 “ Building Strong “ 17
And for the Out Years …
• FY 2011 Budget Guidance to divisions and districts to be sent on Mar 11th
• Expect a major debate on Federal funding priorities to commence with the FY 11 budget
• We will continue to place a high priority on accurate ‘capability’ estimates from
• We will continue to place a high priority on execution of all that is appropriated
• We will seek to improve our budget ‘defense’ of the value to the nation of the water resources infrastructure for which we are responsible
Winter Leader Conference February 4, 2009 “ Building Strong “ 18
Trends To Watch
• Continuing Pressure on Budget• Entitlement Programs ( Medicare, Medicaid, Social Security)• Interest on the National Debt• Status of US & World Economies
• Cost of Infrastructure Recapitalization• Improved Inspection Techniques• Modern Design Standards• Cost of meeting ESA and other legal requirements
Winter Leader Conference February 4, 2009 “ Building Strong “ 19
• National Economic Efficiency?National Economic Efficiency?
• Environmental Sustainability?Environmental Sustainability?
• Security?Security?
• Quality of Life?Quality of Life?
• All of the Above?All of the Above?
• None of the AboveNone of the Above
• Other????Other????
Making the Case for InfrastructureMaking the Case for Infrastructure
What is the Message?What is the Message?
Winter Leader Conference February 4, 2009 “ Building Strong “ 20
BUILDING STRONGBUILDING STRONG