PRICE SCHEDULE Project : TERMINAL 3, SOEKARNO HATTA AIRPORT - TANGERANG Customer : Offer No. : Date : Validity : Rev : NO DESCRIPTION BUILDING MANAGEMENT SYSTEM (BMS) A PENGADAAN BARANG #BMS Schneider's material PENGADAAN BARANG #Non-BMS or 3rd parties Support B PEKERJAAN & JASA C FAT, FT, ST, & SAT TOTAL VAT/PPN 10% GRAND TOTAL Our tender has been drawn-up using the following documents contained in your request for tender - RFQ - SINGLE LINE DIAGRAM Term and conditions: 1 Validity of Offer : 31-Dec-14 2 Delivery of Material : 8 ~ 12 Weeks 3 Project Completion : 24 Months 4 Coming into force : After receipt Down Payment (DP) & Drawing Approval 5 Term of Delivery : DDP Soekarno Hatta Airport - Jakarta 6 Term of Payment : 20% DP, 50% MOS Progressive, 20% Progress Installation, 10% T
ini penawaran harga untuk pembangunan Terminal 3 Bandara Soekarno Hatta tahun 2015
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
A PENGADAAN BARANG #BMS Schneider's materialPENGADAAN BARANG #Non-BMS or 3rd parties Support
B PEKERJAAN & JASA
C FAT, FT, ST, & SAT
TOTAL
VAT/PPN 10%
GRAND TOTAL
Our tender has been drawn-up using the following documents contained in your request for tender :
- RFQ
- SINGLE LINE DIAGRAM
Term and conditions:
1 Validity of Offer : 31-Dec-14
2 Delivery of Material : 8 ~ 12 Weeks
3 Project Completion : 24 Months
4 Coming into force : After receipt Down Payment (DP) & Drawing Approval
5 Term of Delivery : DDP Soekarno Hatta Airport - Jakarta
6 Term of Payment : 20% DP, 50% MOS Progressive, 20% Progress Installation, 10% Testing & Commissioning
RENCANA ANGGARAN BIAYA
PEKERJAAN PERLUASAN GEDUNG TERMINAL 3BANDARA SOEKARNO - HATTAPEKERJAAN : IBMS
No Jenis Pekerjaan Satuan Volume Ordering To:
E.3.12 PEKERJAAN BUILDING CONTROL & MONITORING SYSTEM ( BCMS )PENGADAAN BARANG
1 Basic + Aplication Software 1
2 Controlerlantai Ground, FF, SFDDC Controler Set 40 Modbus Interface Set 40 Digital input Modul 16 DI pc 364 Digital Output Module 8 DO pc 220 Super Universal Module 8 point pc 261 Bus interface Module pc 85 Bus Connection Cable pc 163 Powersupply Unit for Module pc 96 Floor Standing Box Panel 1600x800x300 (mm) c/w Acc. Set 40
3 Field DeviceWater Flow Switch pc 5 Pipe Temperature Sensor pc 26 Diff. Pressure Trans pc 3 Water Level Switch pc 34 Diff. Pressure Switch pc 157 Air Flow Switch pc 157 Duct Temperature Sensor pc 304 CO sensor pc 24 Relay pc 946 Lux Sensor pc 56
Oil Level Control pc 6
Room Temperature Sensor pc 29
Flow Meter pc 3
Termostat pc 33
Inverler 7 I kw o\rv Basic Operating Panel Unit 9
Inverter 5.6k wc ArB asic@ rating Unit 5
Inverter 3.4k wc lrr,B asic@ rating Panel Unit 8
Inverter 1.2k wc ir Basic operating Panel Unit 136
Inverter 3 kw c\w Basic operatingP anel Unit Unit 26
Dry Contact pc 4,214
4 Workstation Unit 4
5 Cable line & floor Controller 1
Control Cable 2 pair
Cable power
UTP Cable For Client
Pipa with Accessories
Peralatan listrik
Kabel NYY 1 x25mm2
Alat bantu Instalasi
6 Meja Operator Lengkap dengan Kursi (metal plat 2mm) set 4
7 Kabel NYM 3 x 1,5mm² M 9,000
8 Kabel Twisted Shielded AWG 18" M 9,000
9 UPS 5 KVA Unit 5
10 Unit 2
11 1
Harga Satuan(IDR)
Jumlah Harga(IDR)
ALot
Operator access privilage, treding, scheduller, program editor, alarm management, reporting, dynamic grapic, licence with integration base OPC, Bacnet, Modbus integration
- 19" closed rack 42U depth 1150mm + Acrylic front door + back metal door, incl: 1 unit Roof Fan Panel 2 Fan, 50 unit Cage Nut + M6 Screw, 1 unit Vertical Power Distribution Panel 12 Outlet
- Intel Core i7, 2GB DDR3, 160GB HDD 5400 RPM, 12.1 WXGA TFT, DVD±RW, Audio, GbE NIC, Dual Screen 3D 256 MB, Rechargeable Lithium-ion Battery, Win7 Pro / Windows Vista Bussiness
Instalasi Kabel Twisted Shielded AWG 18"
Instalasi / pengkabelan dari Power Panel ke UPS
Instalasi / pengkabelan dari UPS ke peralatan
- Water Differential Pressure Sensor Installation
- ATV212 7,5KW 10HP 480V TRI CEM IP20 Installation
- ATV212 7,5KW 10HP 480V TRI CEM IP20 Installation
- ATV212 4KW 5HP 480V TRI CEM IP20 Installation
- ATV212 1.5KW 5HP 480V TRI CEM IP20 Installation
- ATV212 3KW 5HP 480V TRI CEM IP20 Installation
BILL OF QUANTITY (BQ)Project :Customer :Offer No :Date :Revision :
NO DESCRIPTION BRAND MODEL QTY UNIT
BUILDING MANAGEMENT SYSTEM (BMS)
A PENGADAAN BARANG1 BASIC + APLICATION SOFTWARE 1 Set
Schneider SXWSWESXX00001 1 Ea
- WebServices, Generic Consume Schneider SXWSWGWSX00001 1 Ea
- Microsoft SQL Server 2008 Stdr Microsoft 1 Ea
- VM-Ware Software (for Redundant Application) VM-Ware 1 Ea
- Laserjet Printer, A4, 600x600 dpi, 16/4 (BW/Color) ppm Print, NIC, USB HP Pro100M175NW MFP 1
15 19" Rack Server 42U 1 Set
ABBA or Eq. 19" 42U 1
16 Mobile Maintenance Tool 1 Set
HP/DELL 1
B PEKERJAAN & JASA1 Instalasi Software BCMS Local 1 Ls2 Instalasi Digital Point Local 6,100 Points3 Instalasi Analog Point Local 891 Points4 Instalasi HLI Point Local 125 Points5 Instalasi Kabel NYM 3 x 1,5mm² Local 1 Lot6 Instalasi Kabel Twisted Shielded AWG 18" Local 1 Lot7 Instalasi / pengkabelan dari Power Panel ke UPS Local 1 Lot8 Instalasi / pengkabelan dari UPS ke peralatan Local 1 Lot9 Field Devices Installation 1 Lot
- Water Flow Switch Installation Local 5
- Pipe Temperature Sensor Installation Local 26
- Water Differential Pressure Sensor Installation Local 3
- HI/LO - Water Level Switch Installation Local 34
- Air Diff. Pressure Switch Installation Local 157
- Air Flow Switch Installation Local 157
- Duct Temperature Sensor Installation Local 304
- Wall Mount CO Sensor Installation Local 24
- Relay 24VDC Installation Local 946
- Rooom Lux Sensor Installation Local 56
- HI/LO - Oil Level Switch Installation Local 6
- Room Temperature Sensor Installation Local 29
- Water Flow Meter Installation Local 3
- Digital Thermostat Installation Local 33
- ATV212 7,5KW 10HP 480V TRI CEM IP20 Installation Local 9
- ATV212 7,5KW 10HP 480V TRI CEM IP20 Installation Local 5
- ATV212 4KW 5HP 480V TRI CEM IP20 Installation Local 8
- ATV212 1.5KW 5HP 480V TRI CEM IP20 Installation Local 136
- APC Smart-UPS RT, 5000 VA, Input 230V / Output 230V, Interface Port DB-9 RS-232, RJ-45 10/100 Base-T, Smart-Slot, Extended runtime model, 3 U
- HP Blade C3000, 2 Power Supply, 4 Fan, DVD, Trial ICE Kit Enclosure, up to 8 Half Height HP Blade Server, GbE2 Ethernet Switch Interconnect Module
- HP Blade Server BL460c, Single Processor Xeon E5450 (3.0Ghz), 12GB LowPower Memory, 2TB HDD
- 19" closed rack 42U depth 1150mm + Acrylic front door + back metal door, incl: 1 unit Roof Fan Panel 2 Fan, 50 unit Cage Nut + M6 Screw, 1 unit Vertical Power Distribution Panel 12 Outlet
- Intel Core i7, 2GB DDR3, 160GB HDD 5400 RPM, 12.1 WXGA TFT, DVD±RW, Audio, GbE NIC, Dual Screen 3D 256 MB, Rechargeable Lithium-ion Battery, Win7 Pro / Windows Vista Bussiness
- ATV212 3KW 5HP 480V TRI CEM IP20 Installation Local 26
- Dry Contact Installation Local 4,214
C FAT, FT, ST, & SAT1 Factory Training 1 Lot
- Tiket Kelas Ekonomi Jkt - Swedia (PP) - (6 Org)
- Passport (6 Org)
- Fiskal & Visa (6 Org)
- Meals ( 6 Org, 10 Hari)
- Hotels (6 Org, 10 Hari)
- Uang Saku (6 Org x @ U$ 250,-/orang x 10 hari)
2 Site Training 1 Lot
- Uang saku peserta (12 Org x @ Rp. 250.000,-/orang x 10 hari)
- Biaya Administrasi, Snack dan makan siang (10 hari)
3 Factory Acceptance Test 1 Lot
- Tiket Kelas Bisnis Jkt - Swedia (PP) - (3 Org)
- Passport (3 Org)
- Fiskal & Visa (3 Org)
- Meals ( 3 Org, 5 Hari)
- Hotels (3 Org, 5 Hari)
- Uang Saku (3 Org x @ U$ 350,-/orang x 5 hari)
4 Site Acceptance Test 1 Lot
- Uang saku peserta (6 Org x @ Rp. 450.000,-/orang x 5 hari)
- Biaya Administrasi, Snack dan makan siang (5 hari)
SCOPE OF WORKProject Name : TERMINAL 3, SOEKARNO HATTA AIRPORT - TANGERANGCustomer Name :Offer No. :Date of the offer:Rev :
NO DESCRIPTION REMARKS
BUILDING MANAGEMENT SYSTEM (BMS)
1 Engineering
Detail Design √Shop Drawing √Approval for Construction √As Built Drawing √BMS System - Programming √Graphic Display Development √Energy Report √Alarm Report Configuration √
2 Transportation to site
Delivery of all materials √ DDP Soekarno Hatta Airport - Jakarta
3 Material Handling
Unloading material √Storage facility √Placement on location / Panel Installation √Unpacking √
4 SERVER STATION
Server Computer √ HP Blade BL460c, Xeon E5450 (3.0Ghz), 12GB RAM, 2TB HDD (2x)
Keyboard + Mouse √Operating System √ Win Server 2008 Stdr
BAS Software Server License √Alert Notification & Management Trouble Ticket Software √VM-Ware Software (for Redundant Application) √WebServices, Generic Consume √
5 WORKSTATION
Computer √ Core i3-3220, 4GBDDR3, 500GBHDD, DVD±RW, GbE NIC
19" Rack (for Distribution Network Switch) √ by DATA
10 Direct Digital Controller (DDC)
Network Control Module √ Qty as per "BOM"
I/O Module Expansion √ Qty as per "BOM"
Box Panel √ Qty as per "BOM"
Power Supply √ Qty as per "BOM"
Accessories √ Qty as per "BOM"
Panel Assembly & Internal Panel Wiring √ Qty as per "BOM"
11 FIELD DEVICES / SENSORS
Relay √ by PANEL
Auto/Manual Selector Switch √ by PANEL
Contactor/Motor Starter √ by PANEL
Auxiliary Contact √ by PANEL
Water Flow Switch √ Qty as per "BOM"
Pipe Temperature Sensor √ Qty as per "BOM"
Water Differential Pressure Sensor √ Qty as per "BOM"
HI/LO - Water Level Switch √ Qty as per "BOM"
Air Diff. Pressure Switch √ Qty as per "BOM"
Air Flow Switch √ Qty as per "BOM"
Duct Temperature Sensor √ Qty as per "BOM"
Wall Mount CO Sensor √ Qty as per "BOM"
Relay 24VDC √ Qty as per "BOM"
Rooom Lux Sensor √ Qty as per "BOM"
HI/LO - Oil Level Switch √ Qty as per "BOM"
Room Temperature Sensor √ Qty as per "BOM"
Water Flow Meter √ Qty as per "BOM"
Wirakarya Scope
EBS Scope *Distributor
Jalin Mitra Scope
CUSTOMERSCOPE
Digital Thermostat √ Qty as per "BOM"
ATV212 7,5KW 10HP 480V TRI CEM IP20 √ Qty as per "BOM"
ATV212 7,5KW 10HP 480V TRI CEM IP20 √ Qty as per "BOM"
ATV212 4KW 5HP 480V TRI CEM IP20 √ Qty as per "BOM"
ATV212 1.5KW 5HP 480V TRI CEM IP20 √ Qty as per "BOM"
ATV212 3KW 5HP 480V TRI CEM IP20 √ Qty as per "BOM"
Dry Contact √ Qty as per "BOM"
Motorized Control Valve √ by VAC
Power Meter with Modbus Comm. √ by VAC
Chiller Control Panel w/ HLI √ by VAC
11 Installation, Cabling & Termination
Central Management System Installation √DDC Installation √Field Devices Installation :
Relay √ by PANEL
Auto/Manual Selector Switch √ by PANEL
Contactor/Motor Starter √ by PANEL
Auxiliary Contact √ by PANEL
Water Flow Switch √Pipe Temperature Sensor √Water Differential Pressure Sensor √HI/LO - Water Level Switch √Air Diff. Pressure Switch √Air Flow Switch √Duct Temperature Sensor √Wall Mount CO Sensor √Relay 24VDC √Rooom Lux Sensor √HI/LO - Oil Level Switch √Room Temperature Sensor √Water Flow Meter √Digital Thermostat √ATV212 7,5KW 10HP 480V TRI CEM IP20 √ATV212 7,5KW 10HP 480V TRI CEM IP20 √ATV212 4KW 5HP 480V TRI CEM IP20 √ATV212 1.5KW 5HP 480V TRI CEM IP20 √ATV212 3KW 5HP 480V TRI CEM IP20 √Dry Contact √Motorized Control Valve √Power Meter with Modbus Comm. √Chiller Control Panel w/ HLI √
Cable Installation & Termination :
Digital Point √Analog Point √HLI Point √Power Cables for UPS, DDC, Computer, Etc. √DDC Communication Cables √Continuity Test √Termination √
12 Cable Tray (Supply & Install) √ will use electronic cable tray
13 Overseas Factory Acceptance Test (FAT) √ 6 Persons, 10 Days (at Sweden)
14 Overseas Training √ 3 Persons, 5 Days (at Sweden)
15 Site Acceptance Test (SAT) √ 6 Persons, 5 Days
16 Site Training √ 12 Persons, 10 Days
17 Standby Engineer after Handover √ 1 Engineer for 1 Year
18 Warranty √ 5 Years only for Products (exclude Cabling, Installation & Services)