Top Banner
Budapest 2006 Grid Activities in Grid Activities in Ukraine Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006
22

Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Jan 20, 2016

Download

Documents

Corey Owens
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Grid Activities inGrid Activities inUkraineUkraine

Nataliya Kussul

Space Research Institute

NASU-NSAU, Ukraine

WGISS 21, Budapest 2006

Page 2: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Main issues:Main issues:

• Infrastructure– Hardware resources– Technologies

• Applications– Numerical Weather Prediction– Meteosat Data Processing Services

• Cloud Mask• Cloud Motion• Fractal Feature Extraction

• Current State of Grid

• Projects involved

• Prospects

Page 3: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Current InfrastructureCurrent Infrastructure

Page 4: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Hardware resourcesHardware resources

• Cluster SKIT-1– 24x2 Intel Xeon (2.6 GHz)– Infiniband interconnect

• Cluster SKIT-2– 32x2 Intel Itanium II (1.4 GHz)– SCI interconnect

• Development cluster– 2x2 AMD Opteron (2.2 GHz)– Gigabit Ethernet interconnect

Page 5: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Hardware resourcesHardware resources

• LustreFS NAS: 14TB storage• iSCSI SAN: 2TB storage• Gigabit Ethernet inter-cluster connection• A number of UNIX-based workstations• Condor pool of MS Windows workstations

Page 6: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

SKIT-1 SKIT-2 Development cluster

Page 7: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Cluster load reportsCluster load reports

WRF model load profile

Page 8: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

TechnologiesTechnologies

• Globus Toolkit v4 – Grid middleware

• Karajan – workflow description language

• UNM MapServer – OGC-compliant software for geospatial data presentation

• Torque – local cluster scheduler

• OpenMPI & Scaly – MPI standard implementations

• Ganglia – monitoring tool

• Ruby – scripting language

Page 9: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

ApplicationsApplications

• Meteosat cloud mask extraction• Cloud motion estimation• Fractal features extraction• Numerical Weather Prediction (WRF model)

Page 10: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

WRF run subsystem (1)WRF run subsystem (1)

• Configured for territory of Ukraine• Input & boundary condition from GFS• 3 day forecasts every 6 hours• 10 km horizontal grid, 200x200 gridpoints• 31 vertical levels• One run takes 3.5 hours on 2x2 Opteron

system

Page 11: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

WRF run subsystem (2)WRF run subsystem (2)

Page 12: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

WRF run subsystem (2)WRF run subsystem (2)

Page 13: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

WRF visualizationWRF visualization• UMN MapServer based• Available at http://cosmogis.org.ua/?option=com_wrf

Page 14: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Meteosat visualizationMeteosat visualization• UMN MapServer based• Available at http://cosmogis.org.ua/?option=com_mapserver

Page 15: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Cloud motion estimationCloud motion estimation

– useful as the source data for Numerical Weather Prediction models

– temporary interpolation/extrapolation of image sequences for now casting

– based on adapted optical flow techniques

Page 16: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Fractal features extraction

– Based on modeling of Meteosat images by Generalized Brownian Motion processes

– Useful for detecting turbulent areas

Page 17: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Current stateCurrent state

• At the moment Grid middleware is being deployed on SKITs frontend node.

• SKITs are using proprietary local scheduler

• An adapter between Globus GRAM and scheduler should be developed

Page 18: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Projects involved (1)Projects involved (1)

• “Cosmogis” project supported by Ukrainan National Space Agency

• STCU project “Grid technologies for environmental monitoring using satellite data” (started on December, 2005)

• Innovative project of National Academy of Science of Ukraine ”Development of pilot project of Ukrainian GEOSS/GMES segment” (2006)

Page 19: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Projects involved (2)Projects involved (2)

• INTAS-CNES-NSAU call – Project “Data Fusion Grid Infrastructure” is

under preparation -

Practical way to initiate cooperative activity of agencies on Grid creation

• We are looking for partners!

Page 20: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Plans: TechnologyPlans: Technology

• To develop Grid-enabled archive for geospatial data based on OGSA-DAI

• To establish data assimilation of MSG and ATOVS data into modeling process

• To use Grid infrastructure to perform a model automatic adaptation experiment

• To work out patterns for inter-domain security policy

Page 21: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Plans: organizationalPlans: organizational

• To connect to European academic network GEANT

• To connect to Ukrainian academic network URAN

• To become a regional center of GEOSS/GMES

• To participate in the development of WAG• To include Ukrainian databases into ECHO

system

Page 22: Budapest 2006 Grid Activities in Ukraine Nataliya Kussul Space Research Institute NASU-NSAU, Ukraine WGISS 21, Budapest 2006.

Budapest 2006

Thank you!