DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.121
(207)
BSC Implementat ion forETP/ETP-A in Initial FlexiBSCRelease
Delivery: HW UpgradeProduct Family: Radio ControllersProduct: Flexi
BSCRelease: S16 onwards
Approval date: 12-Dec-2013
Nokia Solutions and Networks is continually striving to reduce
the adverse environmental effects of itsproducts and services. We
would like to encourage you as our customers and users to join us
inworking towards a cleaner, safer environment. Please recycle
product packaging and follow therecommendations for power use and
proper disposal of our products and their components.
If you should have questions regarding our Environmental Policy
or any of the environmental serviceswe offer, please contact us at
Nokia Solutions and Networks for additional information.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.122
(207)
Table of Contents1 Purpose
..................................................................................................................................................
52 Scope of applications
..............................................................................................................................
63 Using the document
................................................................................................................................
7
3.1 General info
.......................................................................................................................................................
73.2 Upgrade macro
..................................................................................................................................................
8
3.2.1 Structure
......................................................................................................................................
83.2.2 Communication
............................................................................................................................
8
4 Introduction
...........................................................................................................................................
105 Pre-requirements
..................................................................................................................................
12
5.1 Pre-requirements & Actions needed prior upgrade
............................................................................................
125.2 Restrictions
.....................................................................................................................................................
125.3 Needed documentation
....................................................................................................................................
135.4 Needed equipment
..........................................................................................................................................
135.5 HIT and upgrade
macros..................................................................................................................................
13
5.5.1 System requirements for HIT
......................................................................................................
135.5.2 Installing HIT
..............................................................................................................................
135.5.3 Installing HIT upgrading macros
..................................................................................................
145.5.4 HIT
settings................................................................................................................................
145.5.5 Connection settings
....................................................................................................................
145.5.6 Starting the HIT application / macro execution
.............................................................................
26
6 Fallback copying of the current package
................................................................................................
327 BSC configuration printout (pre-check)
..................................................................................................
338 Licence installation and feature activation
..............................................................................................
349 ETPLAN CONFIGURATION
..................................................................................................................
35
9.1 Make SWU units to passive state
.....................................................................................................................
369.2 Make SWU units to SE-NH state
......................................................................................................................
369.3 Cabling changes
..............................................................................................................................................
36
9.3.1 Move and reconnect following cables
..........................................................................................
369.3.2 Add new configurations to ESB cards manually.
..........................................................................
36
9.4 Change topology
.............................................................................................................................................
379.5 Configure SWU 6 and 7 to the hw
database......................................................................................................
389.6 Check internal LAN index with command
..........................................................................................................
389.7 Add SWUs to the internal LAN
.........................................................................................................................
389.8 Change all SWUs state to the WO-EX
..............................................................................................................
389.9 Activate all SWU s back to use
.........................................................................................................................
38
10 Create ETPSIG-I IP address to MCMU and BCSU
................................................................................
3911 Packet Abis over Ethernet(ETPE), PIU type ETP
...................................................................................
40
11.1 Creation of ETPE unit with transmission/line protection
.....................................................................................
4011.1.1 Install Plug-in units, terminators and cables
.................................................................................
4111.1.2 Create HW configuration
............................................................................................................
5211.1.3 Check Plug-in unit software
........................................................................................................
5511.1.4 Diagnostic
..................................................................................................................................
5711.1.5 Check PCU configuration
...........................................................................................................
58
11.2 Creation of ETPE unit with hardware protection
................................................................................................
5811.2.1 Install Plug-in units, terminators and cables
.................................................................................
5811.2.2 Create HW Configuration
............................................................................................................
7611.2.3 Check Plug-in unit software
........................................................................................................
8211.2.4 Diagnostic
..................................................................................................................................
8411.2.5 Check PCU configuration
...........................................................................................................
84
12 Packet Abis over TDM (ETPT), PIU type
ETP........................................................................................
8612.1 Creation of ETPT unit with transmission/line protection.
....................................................................................
86
12.1.1 Install Plug-in units, terminators and cables
.................................................................................
8712.1.2 Create HW configuration
..........................................................................................................
10012.1.3 Check Plug-in unit software
......................................................................................................
11012.1.4 Diagnostic
................................................................................................................................
11212.1.5 STMU s to WO-EX state
...........................................................................................................
11212.1.6 Check PCU configuration
.........................................................................................................
113
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.123
(207)
12.2 Creation of ETPT unit with hardware protection
..............................................................................................
11312.2.1 Install Plug-in units, terminators and cables
...............................................................................
11412.2.2 Create HW configuration
..........................................................................................................
13912.2.3 Check Plug-in unit software
......................................................................................................
15312.2.4 Diagnostic
................................................................................................................................
15512.2.5 STMU s to WO-EX state
...........................................................................................................
15512.2.6 Check PCU configuration
.........................................................................................................
156
13 A over IP (ETPA), PIU type ETP-A
......................................................................................................
15713.1 Creation of ETPA unit
....................................................................................................................................
157
13.1.1 Install Plug-in units and cables
..................................................................................................
15713.1.2 Create HW configuration
..........................................................................................................
16313.1.3 Check Plug-in unit software
......................................................................................................
16413.1.4 Diagnostic
................................................................................................................................
167
14 A over IP (ETPA), PIU type ETP
..........................................................................................................
16814.1 Creation of ETP(A) unit
..................................................................................................................................
168
14.1.1 Check the source configuration for overlapping Plug-in
units......................................................
16814.1.2 Deleting the interface and unit In case the upgrade is
done to swap existing ETP-A withETP 16814.1.3 Install Plug-in units
and cables
..................................................................................................
16814.1.4 Create HW configuration
..........................................................................................................
17814.1.5 Check Plug-in unit software
......................................................................................................
18114.1.6 Diagnostic
................................................................................................................................
183
15 Copy the HW equipment database information to the disk (DBC)
......................................................... 18516
Actions after upgrade & Post conditions
..............................................................................................
186
16.1 BSS Integration
.............................................................................................................................................
18616.2 BSC configuration printout (post-check)
..........................................................................................................
18616.3 Return to the old HW configuration
.................................................................................................................
186
17 Appendix :
...........................................................................................................................................
18717.1 Appendix 1: SW 256B Dip switch settings
.......................................................................................................
187
17.1.1 SW256B jumper settings
..........................................................................................................
18717.1.2 PCM mode settings (SW1)
.......................................................................................................
18717.1.3 Interchangeability code settings (SW2)
.....................................................................................
18817.1.4 Serial Broadband SB1 settings (SW3)
.......................................................................................
18817.1.5 Serial Broadband SB2 settings (SW4)
.......................................................................................
19017.1.6 Serial Broadband SB3 settings (SW5)
.......................................................................................
19117.1.7 Serial Broadband SB4 settings (SW6)
.......................................................................................
191
17.2 Appendix 2: GTIC & ETC PCM usage in case of initial
delivery Flexi BSC
....................................................... 19217.3
Appendix 3: Update ESBs with latest software
................................................................................................
198
17.3.1 Update ESB
Software...............................................................................................................
19817.3.2 Enabling or disabling the automatic loading of
configuration files ...............................................
198
17.4 Appendix 4: ETP/STMU strapping settings.
....................................................................................................
19917.4.1 ETP-A C111828
.......................................................................................................................
19917.4.2 ETP C111826
..........................................................................................................................
20117.4.3 ETS2
.......................................................................................................................................
202
17.5 Appendix 5: ETP username & password settings
............................................................................................
204
Contact:
Contact your local Nokia Solutions and Networks support
Summary of changes:
12-Dec-2012 0.1-0 Creation date12-Dec-2012 1.0-0 Approval
date21-Dec-2012 1.1-0 Added PIU update for mate STMUs in chapters
12.1.5
and 12.2.5.Updated subchapter titles under chapters11.1.1
,11.2.1 ,12.1.1,12.2.1,13.1.1and 14.1.3.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.124
(207)
Removed chapters 9.4 and 9.11 as part of
CR1004implementation.
16-Jan-2013 1.2-0 Added CR75 details01-Feb-2013 1.3-0 Added
connection settings for Linux in chapter 5.5.5.218-Feb-2013 1.4-0
Added note regarding COM issue in HIT3.3 in chapter
5.5.5.1.2 and 5.5.5.2.227-Feb-2013 1.5-0 Updated chapter 9.4
with topology details.Added note
on IuA messaging configuration for all ETP variants04-Apr-2013
1.6-0 Removed note regarding COM issue from chapters
5.5.5.1.2 and 5.5.5.2.2.Also updated the hit version
as3.4-0.Updated appendix 5
02-Jul-2013 1.7-0 Updated chapter 1025-Sep-2013 1.8-0 Template
update21-Feb-2013 1.9-0 Updated chapter 9.4, 11.2 and 12.2 related
to pronto
81810ESPE03. Added note Create the PEP link toETPGID 0 first if
you want to get the ETP object ID forthe ETPGID to match in NetAct
in chapter 11.1.2,11.2.2, 12.1.2 and 12.2.2.
20-Mar-2014 1.10-0 Updated note in chapter 5.407-Oct-2014 1.11-0
The purpose text in Appendix 5 updated.23-Oct-2014 1.12-0 Chapter
9.4 updated.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.125
(207)
1 PURPOSE
This document describes the implementation of ETP/ETP-A plug-in
unit to the BSC environment. This documentdoes not support Combined
TCSM3i part. That upgrade can be handled with TCSM implementation
forETP/ETP-A procedure.
This document can be used with following environments:x
FlexiBSC3000 (initial delivery)x FlexiBSC4200 (initial
delivery)
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.126
(207)
2 SCOPE OF APPLICATIONS
The BSC implementation for ETP/ETPA in Initial Flexi BSC is
available for Initial Flexi BSC 3000/4200 in S16release
onwards.
The procedure cannot be executed without traffic interruption.
Traffic must be moved from concerningETS2/ET16/ETIP plug-in unit
before the actual upgrade.
Procedure must be performed locally at BSC site.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.127
(207)
3 USING THE DOCUMENT
3.1 General info
The BSC implementation for ETP/ETP-A can be done using the HIT
(Holistic Integration Tester) software tool.Optional way is to make
the upgrade manually by following this documentation.
The SWU6 and SWU7 upgrade is done manually with the HIT macro.
However procedure must be performedlocally at BSC site as there are
cabling changes and IP address reallocation.
The HIT software automates most of the tasks necessary for the
software or hardware upgrade. The HIT softwareand the instructions
are included in this manual. It is recommended that the HIT User's
Manual is gone throughbefore starting the program.
When using the HIT for upgrading BSC, these instructions should
be followed for a more detailed description ofthe different phases,
which take place during the upgrade. The upgrade macro menu dialog
is designed to followclosely this document.
NOTE: The commands executed by the HIT macro do not always match
exactly with the commandspresented in the manual. This is because
sometimes the automated tasks of the HIT macro require morecommands
and different command syntaxes, than are presented in the
manual.
When using the HIT, the MML commands are executed automatically.
It is not necessary to type any commandsuntil it is specifically
requested by HIT.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.128
(207)
3.2 Upgrade macro
3.2.1 StructureAll the SW & HW macros are gathered under one
main macro (UPGMAIN.HIT), from which the wanted SW / HWupgrade can
be selected. Regardless of which macro (SW or HW upgrade) is wanted
to run, the user alwaysstarts with the same main macro.Example of
macro structure:
UPGMAIN.HITx Select wanted upgrade:
o SOFTWARE UPGRADES SW upgrade S15 -> S16
o HARDWARE UPGRADES
HW upgrade 1 HW upgrade 2
Under each upgrade / tool there is a upgrade specific menu which
describes the steps which can be executedindividually:
SW upgrade S15 -> S16 (selected from main menu)x Select
wanted step
o Make fallbacko Check Firmwareo Make pre-checko Copy SWo o
When a step is completed successfully, the user is brought back
to upgrade menu and a Done. -sign will appearat beginning of the
name of the step. If step execution fails for some reason, macro
stops and user can correctthe error manually and then continue
macro execution normally.
If macro or computer freezes totally during step execution and
macro needs to be restarted, user cannot re-runthe incomplete step
from the menu. In this case, the user must complete that certain
step manually, using thisdocumentation as guide. When the step has
been completed manually, user can continue the macro executionfrom
next available step. Note, that in the upgrade menu, there will be
Man. sign instead of Done. sign atbeginning of name of the manually
executed step.
Note!Once, user enters from main menu to upgrade menu, only way
to get back to the main menu is to restartwhole macro.3.2.2
CommunicationThe macro communicates with user by using the HIT
Pop-up windows.
x Asking the user to give information (e.g. paths, file names,
etc.) & other user selections.x Error situationsx Manual
execution steps (i.e. when macro expects user to do some actions
manually (e.g. copy some
files, install new HW /cabling etc.)x Macro completion
3.2.2.1 Log filesThe upgrade macro provides different log files,
from where the user can verify the executed steps in macro andthe
success of the different steps & commands executed in the
macro. There are three different kind ofinformation / log files:x
Log file from HIT Response window (.log)
o This log contains all the information of the macro execution
(each MML command and thewhole output of the macro execution)
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.129
(207)
o User can accept the default log-file name or specify a new
one. Macro gives following pop-upwindow for selection:
x Macro writes separate log files for following steps:o
Configuration printout (PRE)o Firmwareo Plug-in unit software
upgradeo Safecopyo Transfer software to BSCo Configuration printout
(PRE)
x The same information can be found from both from a main log
file and from these specified smaller logfiles.
o Log file from HIT Message window (Messages.log)x The contents
of the message window are saved after macro execution.x Information
about errors in macro execution
o Log print of HIT (TimeTable.log) This is a shorter description
of the execution of the macro,and the log contains information
about:
x Starting an execution step in macrox Execution status (Done).x
Completion of execution step in macro
If macro execution is stopped for some reason, the log files
still remain in the folder the user has specified. Whenmacro
execution is started again, the log writing is continued from the
end of existing log files. All previouslywritten log information
remains intact and nothing is overwritten.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1210
(207)
4 INTRODUCTION
The BSC implementation for ETP/ETP-A in Initial Flexi BSC
procedure consists of the following tasks:
- Fallback copying of the current software
- BSC configuration printout (pre-check)
- Licence installation and feature activation
- BSC implementation for ETPE in case of transmission/line
redundancy or HWredundancy
- BSC implementation for ETPT in case of transmission/line
redundancy or HWredundancy
- BSC implementation for ETPA in case of Pool redundancy
- MCMU diagnostic
- Actions after upgrade and post conditions
o BSS Integrationo BSC configuration printout (post-check)
Fallback copying, BSC configuration printout tasks can be
executed during daytime.
Actual upgrade is recommended to be executed during night-time.
This procedure can be done for Initial FlexiBSC.
In case when old configuration needs to be removed, the traffic
must be moved, interface(s) removed becausethe plug-in unit needs
to be deleted from equipment database. After successful upgrade and
interfaces has beencreated back, the traffic can be moved back.
Note: The ETPLAN configuration will affect BSCs IP related
connectivity and existing traffic in Gb over IP,Sigtran, DFCA.
The estimated time for HW upgrade depends on the configuration
of the BSC.
The upgrade cannot be executed with traffic and traffic needs to
be re-hosted. During upgrade effected unit(s) willbe blocked and
state changed to TE-EX or SE-NH.
There is a choice of several options how the GTIC and ETC
cartridges has been equipped before upgrade. Thechoices depend on
the PIU types and configurations, like following:x use ETP (either
for ETPE or ETPT) plug-in unit with line or hardware redundancy.x
use ETPA Plug-in unit with Pool redundancy.
Background Picture below describes the functioning of ETP plugin
units:
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1211
(207)
Packet Abis and AoIP implementations are needed in BSC3i. These
features require new ETP PIUs. In practisethe HW will be a couple
of ETP variants (e.g. ETP and ETP-A), because of the variety of
requirements concerninginterfaces and functions. Packet Abis makes
possible to use a packet switched based transmission of
signalingand traffic (payload) between BTS and BSC.
This allows cellular network operators to migrate from
traditional static TDM to PSN, and the low-cost transport ofIP and
Ethernet, in a more efficient and cost effective way than with the
already available solution adopting PWE3CESoPSN.
The concept is anyway valid regardless of the underlying Layer 1
solution being TDM based or Ethernet based.As a matter of fact,
most of the gains provided by Packet Abis will also be capitalized
in case legacy TDMnetworks have still to be supported (e.g. smooth
migration path); especially the bandwidth saving achieved byonly
transferring packets that contain data, compared with the previous
technology that required empty packets tomaintain a constant bit
rate.
ETP terminates Packet Abis in the BSC
AoIP provides A-interface u-plane and c-plane connections
between BSS and CN over IP. SIGTRAN signalling isused for the
c-plane. RTP payload formats for different speech codecs and CS
data/fax are used in the u-plane.A over IP is standardized in
3GPP.
There are two architecture options:
1. The Transcoder function is located in the BSS (that is, the
standard GSM architecture). The Transcoder is theA over IP
termination point.
2. The Transcoder function is located in the Core Network (that
is, the 3G network architecture). The BSC is the Aover IP
termination point. At the same time, the BSC hides the mobility
from the Core Network
In both cases the ETP terminates the A over IP u-plane.
PCU2-D
BSC
IP-BTSPacket Abisover TDM
(STM-1/OC-3)
GSWB
A over IPTC in MGW
TCSM3i
MGW
A over IPTC in BSS
IP-BTS
Packet Abisover Ethernet
ETTCSM2i,TCSM3ior MGW
TDMAter
ET
TDMAter
MGWESB24s
ETBTSDynamic Abis
PCU2-E* )
*) PCU2-E uses internalLAN for ETP
connectivity.
SET
SET
TCSM3i
MGW
A over IPTC in BSS
BCSUsm/c planeto ETPs
Packet-switchednetwork
Packet-switchednetwork
Sn+pair
Sn+group
SBMUX
TR3sETPT
ETPE
ETP
ETPA
ETP-A
ETS2
STMUETP
ETPTETPE1/
T1
GigE
GigE
GigE
GigE
ETP
Sn+pair
Sn+pair
Sn+pair
ETPC
ETP-A
Sn+pair
ETPC
ETP-A
Sn+pair
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1212
(207)
5 PRE-REQUIREMENTS
5.1 Pre-requirements & Actions needed prior upgrade
The procedure can be implemented for S16 release software
onwards. It is recommended to install all availablechange
deliveries prior to the upgrade.
Note!1. L3 configuration in BSC is mandatory when ETPA,ETPE
and/or ETPT are used.2. SW licence and licence for L3 functionality
for SWU unit is needed to be installed before actual
upgrade can be started.3. T5 topology should be active in
Initial Flexi delivery BSC before starting upgrade.4. Following
configurations should be ready before starting upgrade to minimise
downtime.5. 1. IP Address Plan.6. 2. SWU configurations from SWU-0
to SWU-7. Which includes Vlan, MSTP, OSPF/Static route; VRRP
and interface configurations to equip ETPs as well as other IP
based applications.7. 3. Site Switch configuration.8. 4. All
required upgrade cable kits.
IMPORTANT!Re-direct traffic from STMU/ETIP/ET16 cards in GTIC
and ETC cat ridges before actual upgrade. Each ETPunit must be
handled case by case and PCM areas which are affected during
upgrade may vary. In caseupgrade causes disturbances to some other
unit, the traffic needs to be re-directed, interfaces removedand
unit needs to be deleted (PCM areas released to new ETP unit usage)
from hardware database beforenew configuration is created.
BSS Split tool offers automated process to support BSC renewal.
This is extremely useful, when older BSC(s) aremodernised to
BSC3i(s). This process includes the automation of labor-intensive
re-hosting of BTS to new BSC(s)including data and parameter updates
to name a few. The downtime of operational BTS(s) is this way
minimisedduring re-homing. If re-homing speed is the key driver,
more than 100 sites can be moved to the new BSC duringone night by
using .XML files for data transfer between the BSC(s) assisted by
CM tools (CM Plan Manager, CMEditor and CM Analyser). Further
information about BSS Split tools is available from Nokia OSS / Net
Actrepresentatives.
5.2 Restrictions
During upgrade, the unit will be blocked, meaning that the
interfaces which controlling unit is upgraded will beaffected.
Macro informs user about affected PCM areas (and units handling
that area) which are needed to bedeleted. After the upgrade has
been finished successfully for one ETP unit the traffic can be
re-directed back.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1213
(207)
5.3 Needed documentation
To perform the upgrade successfully, the following documentation
is required:x BSC implementation for ETP/ETP-A in Initial Flexi BSC
(this document).x L3 BSC IP Site Connectivity upgradex Plug-in unit
software upgrade procedurex Creating and managing BSC hardware
(NED)x Cabling Instructions for Flexi BSC(NED)x Equipment list for
Flexi BSC (NED)x Pre-Processor Program Informationx Fallback
copying instructions of DX200 BSC for S16 (NED)x Technical Support
Note: Minimum HW Requirements for BSC S1xx Releasex HIT Users
manualx BSC Site IP Connectivity Guidelines and BSC Site IP
Configuration Examples (NED documents).x Firmware change and memory
upgrade document
5.4 Needed equipment
To perform the upgrade successfully, the following HW are
required:x PC with installed HIT and upgrading macrosx Upgrade Set
for upgrading transmission redundancy to HW redundancy for ETP plug
in units in
BSC installation
x Set required to implement either transmission redundancy or HW
redundancy for ETP plug in unitsin BSC installation for the first
time
x Note: ETP card is used as ETPE ( Packet Abis over ETH) and
ETPT (Packet Abis over ETH)x Needed amount of ETP/ETP-A plug in
unitsx Note: Interchangeability E of ETS2 unit brings support for
Packet Abis over TDM-
functionality.
5.5 HIT and upgrade macros
5.5.1 System requirements for HITHIT 3.4-0 swup is designed to
operate on Windows and Linux.The HIT installation requires
approximately 20MB disk space, of which the documentation occupies
approximately5MB.5.5.2 Installing HITIt is necessary to go through
this section only if the HIT release 3.4-0 swup has not been
installed. If the softwarehas already been installed, proceed to
the next section: Installing HIT upgrading macros.
HIT release 3.4-0 swup is delivered in SW Release Binder found
from NOLS (Nokia Online Services). Theinstallation of the software
is done by executing the SETUP.EXE -program and following the
instructions of theinstallation program.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1214
(207)
5.5.3 Installing HIT upgrading macros
After the HIT program has been installed, it is necessary to
install the upgrading macros. The upgrading macrosare included in
the SW Release Binder which can be found from NOLS (Nokia Online
Services). Release bindercontains all the macros used in different
upgrades related to the SW Release.
To install the macros into PC, specify the folder to which the
macros will be installed, press Unzip and the macroswill be
installed.This zipped executable file includes the whole upgrade
macro and the needed directory structure. The only userexecutable
file, UPGMAIN.HIT, is extracted to root directory of macro folder
HIT settings
5.5.4 HIT settings
Before running HIT, it is recommended that the 'use of FIFO
buffers' be turned off from the used communicationsport. This needs
to be done, because some PCs communications port handling is
unreliable with this settingactive.It is recommended that you
contact your local PC support for instructions on how to turn off
the use of FIFObuffers.If you are familiar with the settings of the
PC, here's an example of how to turn the use of FIFO buffers off.
InWindows 2000, the use of FIFO buffers is turned off in the
following way:
1. Start Control Panel
2. From Control Panel select System
3. In the System Properties dialog select Hardware/Device
Manager
4. In Device Manager select desired communications port (usually
COM1) and double-click it
5. In Communications Port (COMx) Properties dialog select Port
Settings
6. In Port Settings select Advanced
7. In Advanced Port Settings dialog deactivate the 'Use FIFO
buffers' and press OK
8. Close all the opened dialogs by pressing OK
When opening the HIT program the first time, remember to
check/create the used device (ref. Hitguide.doc). It isrecommended
to use the network element name for the devices.5.5.5 Connection
settingsWhen opening the HIT program the first time, remember to
check/create the used devices (ref. Hitguide.doc).When the macro is
started, the available devices are listed to select device to be
connected.
Following connection types are supported:x Local connection
(COM)x Telnetx SSHx Via Netact (SSH)
Note: in S16 level, via Netact (SSH) is only allowed.5.5.5.1
Connection settings for Windows5.5.5.1.1 Configuration example for
creating Telnet / SSH / NetAct connection
Select Device > Set Configuration from menu.Following window
appears
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1215
(207)
Select New
Give name for connection and IP address of OMU or NetAct
server.Note!DX_TELNET is selected for telnet connection and SSH is
selected for SSH connection inType/Protocol: field. Default port
for telnet is 23 and for SSH is 22.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1216
(207)
In case of Telnet or SSH connection option, select Login,Q/A
sheet and define the username and password ofBSC MML session.
Note!In case of NetAct via SSH connection option, select Login
sheet and define the username and password ofNetAct communication
server and BSC MML session.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1217
(207)
Select Terminal sheet and define the MML log file.
If connection type is Telnet, press OK. In SSH connection,
define also settings of SSH sheet. Define security level to medium
or low level.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1218
(207)
After defining SSH related parameters, Press OK.
5.5.5.1.2 Configuration example for creating COM connection
Select Device > Set Configuration from menu.Following window
appears
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1219
(207)
Note! COM connection is selected
Select Login,Q/A sheet and define the username and password of
BSC MML session.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1220
(207)
Select Terminal sheet and define the MML log file.
Press OK.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1221
(207)
5.5.5.2 Connection settings for Linux5.5.5.2.1 Configuration
example for creating Telnet / SSH / NetAct connection
Select Edit> Devices > from menuFollowing window
appears
Select New
Give name for connection and IP address of OMU or Net Act
server.
Note! DX_TELNET is selected for telnet connection and SSH is
selected for SSH connection inType/Protocol: field. Default port
for telnet is 23 and for SSH is 22.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1222
(207)
In case of Telnet or SSH connection option, select Login,Q/A
sheet and define the username and password ofBSC MML session.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1223
(207)
In case of NetAct via SSH connection option, select Login sheet
and define the username and password ofNetAct communication server
and BSC MML session.
Select Terminal sheet and define the MML log file.
If connection type is Telnet, press OK.
In SSH connection, define also settings of SSH sheet. Define
security level to medium or low level.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1224
(207)
After defining SSH related parameters, Press OK.
5.5.5.2.2 Configuration example for creating COM connection
Select Edit> Devices > from menuFollowing window
appears
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1225
(207)
Note! COM connection is selectedSelect Login,Q/A sheet and
define the username and password of BSC MML session.
Select Terminal sheet and define the MML log file.
Press OK.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1226
(207)
5.5.6 Starting the HIT application / macro executionFirst of
all, close List and Macro windows, as those are not needed. In
Response window all MML commands areprinted out. It is recommended
to keep Messages window as big as possible to able to follow up the
macroexecution. The important information is printed out to the
messages window.
Open file UPGMAIN.HIT from the location it was extracted and
press Green Arrow to start the execution.
At the beginning, the main menu is shown and macro prompts user
to choose which upgrade to execute. ClickingCANCEL in main menu
aborts the macro execution.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1227
(207)
The macro informs user about the chosen procedure with following
pop-up window:
Select ini file from the list.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1228
(207)
Select target network element from the list.
Note!
If NetAct connection has been chosen, choose the correct device
which contains IP address definition toNetAct server.
User may choose the location where the macro log files should be
saved.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1229
(207)
Also, user can define whether to use default log file name or
define own.
The status of the current BSC software package is checked. Note
that the current software package must be withstatus BU before the
actual upgrade can be started. The software status is to be checked
with command:
ZWQO:RUN;
Check from the output that all the computer units which are
currently in use are running on correct softwarepackage with the
status BU. If the software package status is FB or NW, find out the
cause for the setting.
If the status of the package is something else than BU, macro
gives following pop-up window:
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1230
(207)
The status can be changed to BU with command:
ZWSC:STAT=NW:STAT=BU;
The active and blocked alarms (DX200 and BTS alarms) can be
printed out with following commands:
ZAHO;ZABO;ZEOL;ZEOE;
Alarm printings can be skipped and macro asks user about the
wanted action with following pop-up:
Some environment information (status) is checked with following
commands:
ZQRI;ZIWQ:,OMU:WS=0,;ZDCD;ZUSI:ALL;ZWTI:P:OMU;ZUSI:BCSU;ZWTI:P:GSW,0;ZYE?
This information is gathered for BSC type analysis.
IMPORTANT!If MML session is needed during upgrade, open another
MML connection than specified for the upgradeexecution. The same
MML connection usage for interrogate or modification purposes may
confuse the macroexecution.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1231
(207)
The procedure dialog is divided in main chapters, which may also
contain sub-chapters. Chapters and their sub-chapters correspond
directly to the document. Select the chapter to run and press
OK.Note!In order to complete upgrade successfully, the chapters and
steps must be executed in ascending order.
Select a step to run and press OK.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1232
(207)
6 FALLBACK COPYING OF THE CURRENT PACKAGE
A fallback copying of the running software package must be made
before the upgrade.A fallback copying from the old SW can be made
by running macro step Fallback copying of the currentpackage.
Manually, the fallback copying can be made following the
document: Fallback copying in BSC. The documentcan be found from
NED.
Take running configurations from each SWU units seperately.
Refer BSC Site IP Connectivity Guidelines for this.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1233
(207)
7 BSC CONFIGURATION PRINTOUT (PRE-CHECK)
The information about the BSC configurations and conditions are
collected.Precondition checking is recommended to do during the
daytime before the actual upgrade will be started. Thechecking can
be made by using the macro (UPGMAIN.HIT) or manually following the
instructions from BSCconfiguration printout-document delivered in
S1xx Release Binder.
For macro execution, choose the BSC configuration printout (pre)
step in BSC implementation for ETP/ETP-A inInitial Flexi BSC
procedure. Follow then the macro execution according the BSC
configuration printout document.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1234
(207)
8 LICENCE INSTALLATION AND FEATURE ACTIVATION
SW licence is needed to be installed before actual upgrade can
be started.Macro checks the licence status and if licence is not
installed properly the licence needs to be installed
manuallyaccording to following instructions.
x ZW7M: FEA=1533:ON; (PA over Ethernet)x ZW7M: FEA=1535:ON; (PA
over TDM)x ZW7M: FEA=899:ON;( L-NWP IUA)x ZW7M: FEA=1234:ON;(L3
functionality for ESB switch)x ZW7M: FEA=1753:CONF; (Ao IP, TC in
MGW)
Note: - The feature 1753 should be put in CONF state.The feature
can be turned ON once the installation ofETPA/ETP(A) and MSS/MGW
configurations are completed.
Licence state can be printed with following
command:ZW7I:FEA,FULL:FEA=1533;
ZW7I:FEA,FULL:FEA=1533;FlexiBSC LION 12345 2010-09-13
14:50:48FEATURE
INFORMATION:---------------------------------------------- FEATURE
CODE:..............1533 FEATURE NAME:..............Packet Abis over
IP/Ethernet FEATURE STATE:.............ON COMMAND EXECUTED If
licence state is OFF, change the state to ON with following
command:
ZW7I:FEA=1533:ON;
If licence is not installed, install the new licence file with
the command:ZW7L::ON;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1235
(207)
9 ETPLAN CONFIGURATION
This step introduces how to install SWU-6 and SWU-7 if not
installed.
Install ESB24-D cards to the LANU-0 and LANU-1 cartridges to
track
for ini Flexi BSC.
Install ESB24-D cards to LANU-0 and LANU-1:
Initial flexi BSC
SWU indexCartridgeposition
Unit Cartridge/ Slots
6 1A4-3 LANU-0 15
7 1A5-3 LANU-1 15
Note: The traffic will be impacted during ESB configuration and
cabling changes. IP plan for each SWU unitsshould be ready before
proceeding next step. All SWU units needs to be configured when
making ETPLANcabling changes.
Following applications will not be available during upgrade.
Please plan the traffic accordingly.
1. LDI2. Sigtran3. GBoverIP4. BBI(DFCA)5. Lb6. VNP7. OSI(Q3)8.
Telnet & FTP9.
Traffic will be resumed after completion of chapter 9.This
activity will take approximately 6 hours to complete.
The following topology is required for BSC type.
1. Initial flexi BSC - T5 to T9 topology
Note:
Make sure that the SWUs are updated with latest software. Refer
Appendix 3 for more details.
Also restore automatic configuration download settings if
software upgrade is done for ESB cards manually. Donot do restore
factory defaults when doing new configuration to ESB cards
manually. This again will disable thealready enabled L3 license on
the ESBs. If you wish to start doing new configurations by doing
restore factorydefaults first, then you need to enable the L3
license.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1236
(207)
9.1 Make SWU units to passive state
ZW6E:SWU,0:P; ZW6E:SWU,1:P; ZW6E:SWU,2:P; ZW6E:SWU,3:P;
ZW6E:SWU,4:P; ZW6E:SWU,5:P;
9.2 Make SWU units to SE-NH state
ZUSC:SWU,:TE-EX; ZUSC:SWU,:SE-OU; ZUSC:SWU,:SE-NH;
9.3 Cabling changes
Mark outgoing uplink cables in top of CPRJ45-A and take those
out from connectors.
Install needed cables (management, redundant etc) to new ESB24-D
cards.
9.3.1 Move and reconnect following cablesEquipping CABLE FROM
CABLE TO
No FU Old Position NewPosition
FU Old Position NewPosition
Type Use Note
BSCC_116 LANU 0 4.0B 12.1A 4.0B 13.1C LANU 0 4.0B 13.1A 4.0B
15.2V CHES007 LAN LDI
BSCC_146 LANU 1 5.0B 12.1A 5.0B 13.1A LANU 1 5.0B 13.1A 5.0B
15.2T CHES007 LAN LDI
BSCC_450 LANU 0 4.0F13.ETH2
- LANU 0 4.0F14.ETH2
4.0F14.ETH1
CNIX006 LAN LDI
BSCC_451 LANU 1 5.0F13.ETH2
- LANU 1 5.0F14.ETH2
5.0F14.ETH1
CNIX006 LAN LDI
BSCC_460 LANU 0 4.0F12.ETH24
4.0F14.ETH23
LANU 1 5.0F12.ETH24
5.0F14.ETH23
CLC017 LAN Redund.
BSCC_461 LANU 0 4.0F13.ETH24
4.0F14.ETH24
LANU 1 5.0F13.ETH24
5.0F14.ETH24
CLC017 LAN Redund.
9.3.2 Add new configurations to ESB cards manually.
Refer BSC Site IP Connectivity Guidelines and BSC Site IP
Configuration Examples document for this.
Add following cables
Equipping CABLE FROM CABLE TO
No FU Position FU Position Type Use Note
BSCC_3480 LANU 0 4.0B 12.1A LANU 0 4.0B 15.1A CHES008 LAN
LDI
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1237
(207)
BSCC_3481 LANU 0 4.0B 13.1A LANU 0 4.0B 15.2T CHES006 LAN
LDI
BSCC_3483 LANU 1 5.0B 12.1A LANU 1 5.0B 15.1A CHES008 LAN
LDI
BSCC_3485 LANU 1 5.0B 13.1C LANU 1 5.0B 15.2V CHES006 LAN
LDI
BSCC_3486 LANU 0 4.0B 12.1E LANU 1 5.0B 12.1E CHES017 LAN
Redund.
BSCC_3488 LANU 0 4.0B 13.1E LANU 1 5.0B 13.1E CHES017 LAN
Redund.
BSCC_3489 LANU 0 4.0B 13.1G LANU 1 5.0B 13.1G CHES017 LAN
Redund.
BSCC_3491 LANU 0 4.0F 13.ETH24
LANU 0 4.0F 14.ETH2
CNIX006 LAN LDI2)
BSCC_3493 LANU 1 5.0F 13.ETH24
LANU 1 5.0F 14.ETH2
CNIX006 LAN LDI2)
BSCC_3496 LANU 0 4.0F 15.ETH1
LANU 1 5.0 F15.ETH1
CLC017 LAN Redund.2)
BSCC_3497 LANU 0 4.0F 15.ETH2
LANU 1 5.0 F15.ETH2
CLC017 LAN Redund.2)
BSCC_3498 LANU 0 4.0F 15.ETH23
LANU 1 5.0 F15.ETH23
CLC017 LAN Redund.2)
BSCC_3499 LANU 0 4.0F 15.ETH24
LANU 1 5.0 F15.ETH24
CLC017 LAN Redund.2)
Reconnect outgoing uplink cables back to top of CPRJ45-A.
9.4 Change topology
If the topology is not T9 in Initial Flexi BSC, change it with
following command
ZW6G:T9;
There has been a recommendation that when ETPLAN is configured
the O&M IP address of OMU is reconfiguredon VLAN-10 interface.
Note that if host port VLAN tagging is used in OMU Ethernet
interface then also the switchside port has to be configured as
tagged. O&M IP address reconfiguration on VLAN interface when
configuringETPLAN is not recommended anymore in the BSC site IP
connectivity guidelines. O&M IP address on OMU cankeep on using
the physical EL0 and EL1 interfaces.
In case of O&M traffic separation:
Enable OMU separation from O&M LAN using following
command
ZW6K:ENA;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1238
(207)
9.5 Configure SWU 6 and 7 to the hw database
ZWTU:SWU,6:1A4-3;ZWTP:SWU,6:ESB24_D,3,15;ZWTU:SWU,7:1A5-3;ZWTP:SWU,7:ESB24_D,3,15;
9.6 Check internal LAN index with command
ZWYI:L;
9.7 Add SWUs to the internal LAN
ZWYC::SWU,6:MCMU,;ZWYC::SWU,7:MCMU,;
9.8 Change all SWUs state to the WO-EX
ZUSC:SWU,:SE;ZUSC:SWU,:TE;ZUSC:SWU,:WO;
9.9 Activate all SWU s back to use
ZW6E:SWU,:A:;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1239
(207)
10 CREATE ETPSIG-I IP ADDRESS TO MCMU AND BCSU
ETPE, ETPT and ETPA cards provide an untagged interface for ETP
management (ETPSIG-m) and control(ETPSIG-c) traffic.MCMU will be
DCHP server and mainitains FTP server connection.
Create ETPSIG-I in
MCMUs.ZQRA:MCMU,::EL0;ZQRA:MCMU,::EL1;ZQRA:MCMU,::,,EL0,,::;ZQRA:MCMU,::,,EL1,,::;ZQRN:MCMU,::,:"",,L,IM;
Example,ZQRA:MCMU,0::EL0;ZQRA:MCMU,0::EL1;ZQRA:MCMU,0::VLAN20,20,EL0,,::;ZQRA:MCMU,0::VLAN21,20,EL1,,::;ZQRN:MCMU,0::VLAN20,VLAN21:"10.0.1.11",26,L,IM;
Configure ETPSIG-M&C IP address to BCSU(s) / EL0 & EL1
interfaces ZQRN:BCSU,::EL0,EL1:"",,L,IMC::
Configure ETPSIG-M&C IP address to BCSU(s)/VLAN
interfacesZQRA:BCSU,::,,EL0,::;ZQRA:BCSU,::
,,EL1,::;ZQRN:BCSU,::,:"",,L,IMC::
Example,ZQRA:BCSU,0::VLAN20,20,EL0,:::;ZQRA:BCSU,0::VLAN21,20,EL1,:::;ZQRN:BCSU,0::VLAN20,VLAN21:"10.0.1.1",26,L,IMC:;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1240
(207)
11 PACKET ABIS OVER ETHERNET(ETPE), PIU TYPE ETP
The following pop up will be displayed by macro for each BSC
variants.
Select the required application and tracks to proceed
further.
11.1 Creation of ETPE unit with transmission/line protection
Check the source configuration for overlapping PCM areas and
Plug-in units.
Note!Macro ask in this point redundancy type and Plug-in Unit
location. After that macro check possibleunit/PCM overlapping.If
there is overlapping PCM areas move or remove resources from them.
Macro will remove unit and Plug-in Unitsautomatically after needed
recourses are moved or removed.
Note:- Refer Appendix 2 to check overlapping PCMs used by
existing units in BSCs. Please note to shift existingtraffic from
the plug in unit. Once traffic is shifted remove the units and
cables and then insert ETP cards to
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1241
(207)
required tracks. Please note to turn off jumper settings in GSW
units if PCMs are not used. Refer Appendix 1 tocheck jumpers
settings used for existing ETP cards.
Note:-There are two options for Installing ETPE in Initial flexi
BSC-Normal and Flexible.x Normal option: Configurations supported
before S15 EP 2.1 releases.x Flexible option: New flexible ETP
layout in Flexi BSC.The implementation of flexible option in
initial flexi BSC will be supported only from software S15
EP2.1.
11.1.1 Install Plug-in units, terminators and cables
11.1.1.1 Terminators and setting modules
Remove PCMC8A connectors
Normal option.
Position ID Name FU Use Note ETPEINDEX
1.0B 22.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
11-0
1.0B 23.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
11-0
1.0B 25.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
12-0
1.0B 26.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
12-0
2.0B 22.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
3-0
2.0B 23.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
3-0
2.0B 25.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
4-0
2.0B 26.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
4-0
Notes:1) When ETP PIU is used in this slot.
Flexible option.
Position ID Name FU Use NoteETPEINDEX
1.0B 19.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
11-0
1.0B 20.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
11-0
1.0B 22.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
12-0
1.0B 23.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
12-0
1.0B 25.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
13-0
1.0B 26.2M C111523 PCMC8A ETC 0 PCM connector module 1)ETPE
13-0
2.0B 19.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
3-0
2.0B 20.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
3-0
2.0B 22.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
4-0
2.0B 23.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
4-0
2.0B 25.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
5-0
2.0B 26.2M C111523 PCMC8A ETC 2 PCM connector module 1)ETPE
5-0
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1242
(207)
Notes:1) When ETP PIU is used in this slot.
Add Terminators and setting modules
Normal option.
Position ID Name FU Use NoteETPEINDEX
1.0B 224E C108719 ADMOD00 ETC 0 For ETPE 1) ETPE 11-01.0B 254E
C108719 ADMOD00 ETC 0 For ETPE 1) ETPE 12-01.0B 294E C108719
ADMOD00 ETC 1 For ETPE 1) ETPE 13-02.0B 224E C108719 ADMOD00 ETC 2
For ETPE 1) ETPE 3-02.0B 254E C108719 ADMOD00 ETC 2 For ETPE 1)
ETPE 4-02.0B 294E C108719 ADMOD00 ETC 3 For ETPE 1) ETPE 5-0
1.0B 181A C101501 CABID1A ETC 0
CABID forETP /ETP-A
ETPE11-0/ETPE12-0
1.0B 273D C101501 CABID1A ETC 1
CABID forETP /ETP-A ETPE 13-0
1.0B 181C C101530 CARID11 ETC 0
CARID forETP /ETP-A
ETPE 11-0/ETPE 12-0
1.0B 271A C101530 CARID11 ETC 1
CARID forETP /ETP-A ETPE 13-0
2.0B 181A C101501 CABID1A ETC 2
CABID forETP /ETP-A
ETPE 3-0/ETPE 4-0
2.0B 273D C101501 CABID1A ETC 3
CABID forETP /ETP-A ETPE 5-0
2.0B 181C C101536 CARID21 ETC 2
CARID forETP /ETP-A
ETPE 3-0 /ETPE 4-0
2.0B 271A C101536 CARID21 ETC 3
CARID forETP /ETP-A ETPE 5-0
Notes:1) When ETP PIU is used as ETPE in this slot.
Flexible option.
Position ID Name FU Use Note ETPEIndex
1.0B 194E
C108719ADMOD00
ETC 0 ForETPE
1)ETPE 11-0
1.0B 224E
C108719ADMOD00
ETC 0 ForETPE
1)ETPE 12-0
1.0B 254E
C108719ADMOD00
ETC 0 ForETPE
1)ETPE 13-0
2.0B 194E
C108719ADMOD00
ETC 2 ForETPE
1)ETPE 3-0
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1243
(207)
2.0B 224E
C108719ADMOD00
ETC 2 ForETPE
1)ETPE 4-0
2.0B 254E
C108719ADMOD00
ETC 2 ForETPE
1)ETPE 5-0
1.0B 181A
C101501 CABID1A ETC 0 CABIDfor ETP /ETP-A
ETPE11-0/ETPE12-0/ETPE 13-0
1.0B 181C
C101530 CARID11 ETC 0 CARIDfor ETP /ETP-A
ETPE11-0/ETPE12-0/ETPE 13-0
2.0B 181A
C101501 CABID1A ETC 2 CABIDfor ETP /ETP-A
ETPE 3-0/ETPE 4-0/ETPE 5-0
2.0B 181C
C101536 CARID21 ETC 2 CARIDfor ETP /ETP-A
ETPE 3-0/ETPE 4-0/ETPE 5-0
Notes:1) When ETP PIU is used as ETPE in this slot.
11.1.1.2 Plug-in unit installation
Normal option.
Cartridge SGC1Cposition
Unit Cartridge /Slots
ETPEgroupindex
1.3 ETC-0 22&23 11-0
2.3 ETC-2 22&23 3-0
1.3 ETC-0 25&26 12-0
2.3 ETC-2 25&26 4-0
1.3 ETC-1 29&30 13-0
2.3 ETC-3 29&30 5-0
Note: Check Appendix 4 for ETP strappings.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1244
(207)
Flexible option.
CartridgeSGC1Cposition
Unit Cartridge /Slots
ETPE groupindex
1.3 ETC-0 19&20 11-0
2.3 ETC-2 19&20 3-0
1.3 ETC-0 22&23 12-0
2.3 ETC-2 22&23 4-0
1.3 ETC-0 25&26 13-0
2.3 ETC-2 25&26 5-0
Note: Check Appendix 4 for ETP strappings.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1245
(207)
11.1.1.3 Cabling
11.1.1.3.1 Change MCMU-0, SWU-0, SWU-2, SWU-4 and SWU-6 SE-NH
state
ZUSC:MCMU,0:SP; If
neededZUSC:MCMU,0:TE;ZUSC:MCMU,0:SE;ZUSC:MCMU,0:SE;
ZUSC:EMB,0:SP; If neededZUSC:EMB,0:TE;
ZUSC:EMB,0:SE;ZUSC:EMB,0:SE;
ZUSC:SWU,0:TE;ZUSC:SWU,0:SE;ZUSC:SWU,0:SE;
ZUSC:SWU,2:TE;ZUSC:SWU,2:SE;ZUSC:SWU,2:SE;
ZUSC:SWU,4:TE;ZUSC:SWU,4:SE;ZUSC:SWU,4:SE;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1246
(207)
ZUSC:SWU,6:TE;ZUSC:SWU,6:SE;ZUSC:SWU,6:SE;
11.1.1.3.1.1 For Normal Option
Note:- Please check whether CHFX or CHES cables(Starting from
cable numbers BSCC_480 to BSCC_495) arepresent in back side of BSC
from beginning of upgrade itself. Note to remove this if not
required. CHFX andCHES cables are needed in case of HW redundancy
part of ETP as mentioned in cabling part of upgradeprocedure.
Move and reconnect or Add following cables if needed.
Equipping CABLE FROM CABLE TO
ETPEINDEX
No FU OldPosition
NewPosition
FU OldPosition
NewPosition
Type Use Note
BSCC_416 ETC 0 1.0F14.SB1-0
1.0F23.SB2-0
GSW2KB-A 0
1.0F02.SB1-0
1.0F8.SB4-0
CSB007 Hotlink ETPE11-0
Add needed ETPLAN and Hotlink cables from GSW-0 and LANU-0 to
required tracks
Equipping CABLE FROM CABLE TOETPE
INDEXNo FU Position FU Position Type Use Note
BSCC_3301 LANU0
4.0B 15.1E ETC 0 1.0B22.4G
CHES025 ETPLAN ETPE11-0
BSCC_3302 LANU0
4.0B 15.1G ETC 0 1.0B25.4G
CHES025 ETPLAN ETPE12-0
BSCC_3303 LANU0
4.0B 15.1J ETC 1 1.0B29.4G
CHES024 ETPLAN ETPE13-0
BSCC_3307 LANU0
4.0B 15.2A ETC 2 2.0B22.4G
CHES021 ETPLAN ETPE3-0
BSCC_3308 LANU0
4.0B 15.2C ETC 2 2.0B25.4G
CHES020 ETPLAN ETPE4-0
BSCC_3309 LANU0
4.0B 15.2E ETC 3 2.0B29.4G
CHES019 ETPLAN ETPE5-0
BSCC_3400 ETC2
2.0F26.SB2-0
GSW2KB0
1.0F01.SB2-0
CSB016 Hotlink 1) ETPE4-0
BSCC_3402 ETC3
2.0F30.SB2-0
GSW2KB0
1.0F04.SB1-0
CSB015 Hotlink 1) ETPE5-0
BSCC_3404 ETC2
2.0F23.SB2-0
GSW2KB0
1.0F05.SB1-0
CSB013 Hotlink 1) ETPE3-0
BSCC_3406 ETC0
1.0F26.SB2-0
GSW2KB0
1.0F03.SB1-0
CSB009 Hotlink 1) ETPE12-0
BSCC_3408 ETC1
1.0F30.SB2-0
GSW2KB0
1.0F02.SB1-0
CSB010 Hotlink 1) ETPE13-0
Notes:1) These cables are installed and tied with soft cable
ties to the front side of the cabinet to be ready for
connecting
plug in units
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1247
(207)
Check SW256B dips switching. See appendix 1
11.1.1.3.1.2 For Flexible option
Note:- Please check whether CHFX or CHES cables(Starting from
cable numbers BSCC_480 to BSCC_495) arepresent in back side of BSC
from beginning of upgrade itself. Note to remove this if not
required. CHFX andCHES cables are needed in case of HW redundancy
part of ETP as mentioned in cabling part of upgradeprocedure.
Remove cables if needed.
Equipping CABLE FROM CABLE TO
No FU Position FU Position Type Use Note
BSCC_417 GTIC 0 1.0F14.SB2-0
GSW2KB-A 0
1.0F02.SB2-0
CSB012 Hotlink 1)
BSCC_432 GTIC 1 2.0F13.SB1-0
GSW2KB-A 0
1.0F03.SB1-0
CSB011 Hotlink 2)
BSCC_433 GTIC 1 2.0F13.SB2-0
GSW2KB-A 0
1.0F03.SB2-0
CSB012 Hotlink 3)
BSCC_412 GTIC 0 1.0F13.SB1-0
GSW2KB-A 0
1.0F06.SB1-0
CSB005 Hotlink 4)
BSCC_413 GTIC 0 1.0F13.SB2-0
GSW2KB-A 0
1.0F06.SB2-0
CSB005 Hotlink 5)
Notes:1) These cables have to be removed only in case an ETP is
taken in use in ETC 2 slot 19 (ETPT/E)2) These cables have to be
removed only in case an ETP is taken in use in ETC 0 slot 22
(ETPT/E)3) These cables have to be removed only in case an ETP is
taken in use in ETC 2 slot 22 (ETPT/E)4) These cables have to be
removed only in case an ETP is taken in use in ETC 0 slot 25
(ETPT/E)5) These cables have to be removed only in case an ETP is
taken in use in ETC 2 slot 25 (ETPT/E)
Move and reconnect or Add following cables if needed.Equipping
CABLE FROM CABLE TO ETPE
IndexNo old FU Old
PositionNew
Positionold FU Old
PositionNewPosition
Type Use Note
new FU new FU
BSCC_416 GTIC 0 1.0F14.SB1-0
1.0F23.SB2-0
GSW2KB0
1.0F02.SB1-0
1.0F03.SB1-0
CSB007 Hotlink 1) ETPE12-0
ETC 0
Note:1) These cables shall only be moved and re-connected, if an
ETP PIU is taken in use in this slot(s).
Add needed ETPLAN and Hotlink cables from GSW-0 and LANU-0 to
required tracks
Equipping CABLE FROM CABLE TO ETPEIndex
No FU Position FU Position Type Use Note
BSCC_3300 LANU 0 4.0B15.1C
ETC 0 1.0B19.4G
CHES026 ETPLAN ETPE11-0
BSCC_3301 LANU 0 4.0B15.1E
ETC 0 1.0B22.4G
CHES025 ETPLAN ETPE12-0
BSCC_3302 LANU 0 4.0B15.1G
ETC 0 1.0B25.4G
CHES025 ETPLAN ETPE13-0
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1248
(207)
BSCC_3306 LANU 0 4.0B15.1P
ETC 2 2.0B19.4G
CHES023 ETPLAN ETPE3-0
BSCC_3307 LANU 0 4.0B15.2A
ETC 2 2.0B22.4G
CHES021 ETPLAN ETPE4-0
BSCC_3308 LANU 0 4.0B15.2C
ETC 2 2.0B25.4G
CHES020 ETPLAN ETPE5-0
BSCC_5040 ETC 0 1.0F20.SB2-0
GSW2KB0
1.0F02.SB1-0
CSB010 Hotlink 1) ETPE11-0
BSCC_5046 ETC 0 1.0F26.SB2-0
GSW2KB0
1.0F06.SB1-0
CSB009 Hotlink 4) ETPE13-0
BSCC_5042 ETC 2 2.0F20.SB2-0
GSW2KB0
1.0F02.SB2-0
CSB015 Hotlink 2) ETPE3-0
BSCC_5044 ETC 2 2.0F23.SB2-0
GSW2KB0
1.0F03.SB2-0
CSB013 Hotlink 3) ETPE4-0
BSCC_5048 ETC 2 2.0F26.SB2-0
GSW2KB0
1.0F06.SB2-0
CSB016 Hotlink 5) ETPE5-0
Note:1) These cables are included in partlist but shall only be
connected in case an ETPE is taken in use in ETC 0 slot
19/20.2) These cables are included in partlist but shall only be
connected in case an ETPE is taken in use in ETC 2 slot
19/20.3) These cables are included in partlist but shall only be
connected in case an ETPE is taken in use in ETC 2 slot
22/23.4) These cables are included in partlist but shall only be
connected in case an ETPE is taken in use in ETC 0 slot
25/26.5) These cables are included in partlist but shall only be
connected in case an ETPE is taken in use in ETC 2 slot
25/26.
Check SW256B dip switching. See appendix 1
11.1.1.3.2 Change MCMU-0, SWU-0, SWU-2, SWU-4 and SWU-6 to WO-EX
state.
ZUSC:MCMU,0:SE;ZUSC:MCMU,0:TE;ZUSC:MCMU,0:SP;ZUSC:MCMU,0:WO;
ZUSC:EMB,0:SE; ZUSC:EMB,0:TE; ZUSC:EMB,0:SP; ZUSC:EMB,0:WO;
ZUSC:SWU,0:SE;ZUSC:SWU,0:TE;ZUSC:SWU,0:WO;
ZUSC:SWU,2:SE;ZUSC:SWU,2:TE;ZUSC:SWU,2:WO;
ZUSC:SWU,4:SE;ZUSC:SWU,4:TE;ZUSC:SWU,4:WO;
ZUSC:SWU,6:SE;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1249
(207)
ZUSC:SWU,6:TE;ZUSC:SWU,6:WO;
11.1.1.3.3 Change MCMU-1, SWU-1, SWU-3, SWU-5 and SWU-7 SE-NH
state
ZUSC:MCMU,1:TE;ZUSC:MCMU,1:SE;ZUSC:MCMU,1:SE;
ZUSC:EMB,1:TE;ZUSC:EMB,1:SE;ZUSC:EMB,1:SE;
ZUSC:SWU,1:TE; ZUSC:SWU,1:SE;
ZUSC:SWU,1:SE;
ZUSC:SWU,3:TE;ZUSC:SWU,3:SE;ZUSC:SWU,3:SE;
ZUSC:SWU,5:TE;ZUSC:SWU,5:SE;ZUSC:SWU,5:SE;
ZUSC:SWU,7:TE;ZUSC:SWU,7:SE;ZUSC:SWU,7:SE;
11.1.1.3.3.1 For Normal Option
Note:- Please check whether CHFX or CHES cables(Starting from
cable numbers BSCC_480 to BSCC_495) arepresent in back side of BSC
from beginning of upgrade itself. Note to remove this if not
required. CHFX andCHES cables are needed in case of HW redundancy
part of ETP as mentioned in cabling part of upgradeprocedure.
Move and reconnect or add following cable if needed.Equipping
CABLE FROM CABLE TO
No FU OldPosition
NewPosition
FU OldPosition
NewPosition
Type Use Note ETPEINDEX
BSCC_418 ETC 0 1.0F14.SB1-1
1.0F23.SB2-1
GSW2KB-A 1
2.0F02.SB1-0
2.0F8.SB4-0
CSB011 Hotlink ETPE11-0
Add needed ETPLAN, Hotlink cables from GSW-1 and LANU-1 side to
required tracks.
Equipping CABLE FROM CABLE TO ETPEINDEX
No FU Position FU Position Type Use Note
BSCC_3321 LANU 1 5.0B 15.1E ETC 0 1.0B22.4J
CHES026 ETPLAN ETPE11-0
BSCC_3322 LANU 1 5.0B 15.1G ETC 0 1.0B25.4J
CHES026 ETPLAN ETPE12-0
BSCC_3323 LANU 1 5.0B 15.1J ETC 1 1.0B29.4J
CHES025 ETPLAN ETPE13-0
BSCC_3327 LANU 1 5.0B 15.2A ETC 2 2.0B22.4J
CHES022 ETPLAN ETPE3-0
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1250
(207)
BSCC_3328 LANU 1 5.0B 15.2C ETC 2 2.0B25.4J
CHES021 ETPLAN ETPE4-0
BSCC_3329 LANU 1 5.0B 15.2E ETC 3 2.0B29.4J
CHES020 ETPLAN ETPE5-0
BSCC_3401 ETC 2 2.0F26.SB2-1
GSW2KB1
2.0F01.SB2-0
CSB011 Hotlink 1) ETPE4-0
BSCC_3403 ETC 3 2.0F30.SB2-1
GSW2KB1
2.0F04.SB1-0
CSB011 Hotlink 1) ETPE5-0
BSCC_3405 ETC 2 2.0F23.SB2-1
GSW2KB1
2.0F05.SB1-0
CSB009 Hotlink 1) ETPE3-0
BSCC_3407 ETC 0 1.0F26.SB2-1
GSW2KB1
2.0F03.SB1-0
CSB013 Hotlink 1) ETPE12-0
BSCC_3409 ETC 1 1.0F30.SB2-1
GSW2KB1
2.0F02.SB1-0
CSB014 Hotlink 1) ETPE13-0
Notes:1) These cables are installed and tied with soft cable
ties to the front side of the cabinet to be ready for connecting
plug-
in unit
Check SW256B dips switching. See appendix 1
11.1.1.3.3.2 For Flexible option
Note:- Please check whether CHFX or CHES cables(Starting from
cable numbers BSCC_480 to BSCC_495) arepresent in back side of BSC
from beginning of upgrade itself. Note to remove this if not
required. CHFX andCHES cables are needed in case of HW redundancy
part of ETP as mentioned in cabling part of upgradeprocedure.
Remove following cables if needed.Equipping CABLE FROM CABLE
TO
No FU Position FU Position Type Use Note
BSCC_419 GTIC 0 1.0F14.SB2-1
GSW2KB-A 1
2.0F02.SB2-0
CSB012 Hotlink 1)
BSCC_434 GTIC 1 2.0F13.SB1-1
GSW2KB-A 1
2.0F03.SB1-0
CSB007 Hotlink 2)
BSCC_435 GTIC 1 2.0F13.SB2-1
GSW2KB-A 1
2.0F03.SB2-0
CSB007 Hotlink 3)
BSCC_414 GTIC 0 1.0F13.SB1-1
GSW2KB-A 1
2.0F06.SB1-0
CSB011 Hotlink 4)
BSCC_415 GTIC 0 1.0F13.SB2-1
GSW2KB-A 1
2.0F06.SB2-0
CSB011 Hotlink 5)
Notes:1) These cables have to be removed only in case an ETP is
taken in use in ETC 2 slot 19 (ETPT/E)2) These cables have to be
removed only in case an ETP is taken in use in ETC 0 slot 22
(ETPT/E)3) These cables have to be removed only in case an ETP is
taken in use in ETC 2 slot 22 (ETPT/E)4) These cables have to be
removed only in case an ETP is taken in use in ETC 0 slot 25
(ETPT/E)5) These cables have to be removed only in case an ETP is
taken in use in ETC 2 slot 25 (ETPT/E)
Move and reconnect or add following cable if needed.
Equipping CABLE FROM CABLE TO ETPEIndex
No old FU OldPosition
NewPosition
old FU OldPosition
NewPosition
Type Use Note
new FU new FU
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1251
(207)
BSCC_418 GTIC 0 1.0F14.SB1-1
1.0F23.SB2-1
GSW2KB1
2.0F03.SB1-0
CSB0011 Hotlink 1) ETPE12-0
ETC 0
Note:1) These cables, shall only be moved and re-connected, if
an ETP PIU is taken in use in this slot(s).
Add needed ETPLAN, Hotlink cables from GSW-1 and LANU-1 side to
required tracks.
Equipping CABLE FROM CABLE TO ETPE Index
No FU Position FU Position Type Use Note
BSCC_3320 LANU 1 5.0B 15.1C ETC 0 1.0B 19.4J CHES027 ETPLAN
ETPE 11-0BSCC_3321 LANU 1 5.0B 15.1E ETC 0 1.0B 22.4J CHES026
ETPLAN
ETPE 12-0BSCC_3322 LANU 1 5.0B 15.1G ETC 0 1.0B 25.4J CHES026
ETPLAN
ETPE 13-0BSCC_3326 LANU 1 5.0B 15.1P ETC 2 2.0B 19.4J CHES024
ETPLAN
ETPE 3-0BSCC_3327 LANU 1 5.0B 15.2A ETC 2 2.0B 22.4J CHES022
ETPLAN
ETPE 4-0BSCC_3328 LANU 1 5.0B 15.2C ETC 2 2.0B 25.4J CHES021
ETPLAN
ETPE 5-0BSCC_5041 ETC 0 1.0F
20.SB2-1GSW2KB1
2.0F02.SB1-0
CSB014 Hotlink 1)
ETPE 11-0BSCC_5047 ETC 0 1.0F
26.SB2-1GSW2KB1
2.0F06.SB1-0
CSB013 Hotlink 4)
ETPE 13-0BSCC_5043 ETC 2 2.0F
20.SB2-1GSW2KB1
2.0F02.SB2-0
CSB011 Hotlink 2)
ETPE 3-0BSCC_5045 ETC 2 2.0F
23.SB2-1GSW2KB1
2.0F03.SB2-0
CSB009 Hotlink 3)
ETPE 4-0BSCC_5049 ETC 2 2.0F
26.SB2-1GSW2KB1
2.0F06.SB2-0
CSB011 Hotlink 5)
ETPE 5-0
Note:1) These cables are included in partlist but shall only be
connected in case an ETPT is taken in use in ETC 0 slot
19/20.2) These cables are included in partlist but shall only be
connected in case an ETPT is taken in use in ETC 2 slot
19/20.3) These cables are included in partlist but shall only be
connected in case an ETPT is taken in use in ETC 2 slot
22/23.4) These cables are included in partlist but shall only be
connected in case an ETPT is taken in use in ETC 0 slot
25/26.5) These cables are included in partlist but shall only be
connected in case an ETPT is taken in use in ETC 2 slot
25/26.
Check SW256B dips switching. See appendix 1
11.1.1.3.4 Change MCMU-1 to SP-EX, SWU-1, SWU-3, SWU-5 and SWU-7
to WO-EX state.
ZUSC:MCMU,1:SE;ZUSC:MCMU,1:TE;ZUSC:MCMU,1:SP;
ZUSC:EMB,1:SE;ZUSC;EMB,1:TE;ZUSC:EMB,1:SP;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1252
(207)
ZUSC:SWU,1:SE;ZUSC:SWU,1:TE;ZUSC:SWU,1:WO;
ZUSC:SWU,3:SE;ZUSC:SWU,3:TE;ZUSC:SWU,3:WO;
ZUSC:SWU,5:SE;ZUSC:SWU,5:TE;ZUSC:SWU,5:WO;
ZUSC:SWU,7:SE;ZUSC:SWU,7:TE;ZUSC:SWU,7:WO;
11.1.2 Create HW configuration
Create cartridges if not existGTIC-0, ETC-0 and ETC-1
cartridge:ZWTC:SGC1C_A,1A1-3,,:AL=1A1-11-12;
GTIC-1, ETC-2 and ETC-3
cartridge:ZWTC:SGC1C_A,1A2-3,,:AL=1A1-11-13;
Create ETPE functional unitNormal option.
ZWTU:ETPE,11,0:1A1-3;ZWTU:ETPE,12,0:1A1-3;ZWTU:ETPE,13,0:1A1-3;ZWTU:ETPE,3,0:1A2-3;ZWTU:ETPE,4,0:1A2-3;ZWTU:ETPE,5,0:1A2-3;
Flexible
option.ZWTU:ETPE,11,0:1A1-3;ZWTU:ETPE,12,0:1A1-3;ZWTU:ETPE,13,0:1A1-3;ZWTU:ETPE,3,0:1A2-3;ZWTU:ETPE,4,0:1A2-3;ZWTU:ETPE,5,0:1A2-3;
Create ETPE plug-in unit
Normal
option.ZWTP:ETPE,11,0:ETP,0,22::ETPCS,8,1984&&2047,TSL,0&&31;ZWTP:ETPE,12,0:ETP,0,25::ETPCS,8,512&&575,TSL,0&&31;ZWTP:ETPE,13,0:ETP,0,29::ETPCS,8,256&&319,TSL,0&&31;ZWTP:ETPE,3,0:ETP,0,22::ETPCS,8,1024&&1087,TSL,0&&31;ZWTP:ETPE,4,0:ETP,0,25::ETPCS,8,64&&127,TSL,0&&31;ZWTP:ETPE,5,0:ETP,0,29::ETPCS,8,768&&831,TSL,0&&31;
Flexible
option.ZWTP:ETPE,11,0:ETP,0,19::ETPCS,8,256&&319,TSL,0&&31;ZWTP:ETPE,12,0:ETP,0,22::ETPCS,8,512&&575,TSL,0&&31;ZWTP:ETPE,13,0:ETP,0,25::ETPCS,8,1280&&1343,TSL,0&&31;
ZWTP:ETPE,3,0:ETP,0,19::ETPCS,8,320&&383,TSL,0&&31;
ZWTP:ETPE,4,0:ETP,0,22::ETPCS,8,576&639,TSL,0&&31;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1253
(207)
ZWTP:ETPE,5,0:ETP,0,25::ETPCS,8,1344&&1407,TSL,0&&31;
Note:For legacy A-interface: Hotlinks are connected from port
0&1 to GSWs. ETPCS functionality is created in plugin unit to
support legacy A interface.For A over IP: Traffic will be routed
though EEP interface created (via ETPA card).For PS via PCU2_E
cards: No separate PCMs are required. This will use PEPeth link
created in ETP cards tocommunicate with PCU2_E cards in BCSU.This
will support CS calls in (A over IP,A over TDM) and PS calls if
PCU2_E cards are used in BSCs.
Connect functional unitsZWUC:ETPE,,:ETP,0:IF=ABIS:;
Note: This command is required only if PCMs are created in ETP
plug in units
Connect hotlink ports
ZWTA:GSW,0:SW256B,:HOTLINK,:ETPE,,:ETP,:HOTLINK,:;
ZWTA:GSW,1:SW256B,:HOTLINK,:ETPE,,:ETP,:HOTLINK,:;
Normal option.ETPE 11-0
ZWTA:GSW,0:SW256B,7:HOTLINK,6:ETPE,11,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,7:HOTLINK,6:ETPE,11,0:ETP,0:HOTLINK,1:;
ETPE 3-0
ZWTA:GSW,0:SW256B,4:HOTLINK,0:ETPE,3,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,4:HOTLINK,0:ETPE,3,0:ETP,0:HOTLINK,1:;
ETPE 12-0
ZWTA:GSW,0:SW256B,2:HOTLINK,0:ETPE,12,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,2:HOTLINK,0:ETPE,12,0:ETP,0:HOTLINK,1:;
ETPE 4-0
ZWTA:GSW,0:SW256B,0:HOTLINK,2:ETPE,4,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,0:HOTLINK,2:ETPE,4,0:ETP,0:HOTLINK,1:;
ETPE 13-0
ZWTA:GSW,0:SW256B,1:HOTLINK,0:ETPE,13,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,1:HOTLINK,0:ETPE,13,0:ETP,0:HOTLINK,1:;
ETPE 5-0
ZWTA:GSW,0:SW256B,3:HOTLINK,0:ETPE,5,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,3:HOTLINK,0:ETPE,5,0:ETP,0:HOTLINK,1:;
Flexible option.ETPE 11-0
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1254
(207)
ZWTA:GSW,0:SW256B,1:HOTLINK,0:ETPE,11,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,1:HOTLINK,0:ETPE,11,0:ETP,0:HOTLINK,1:;
ETPE 3-0
ZWTA:GSW,0:SW256B,1:HOTLINK,2:ETPE,3,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,1:HOTLINK,2:ETPE,3,0:ETP,0:HOTLINK,1:;
ETPE 12-0
ZWTA:GSW,0:SW256B,2:HOTLINK,0:ETPE,12,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,2:HOTLINK,0:ETPE,12,0:ETP,0:HOTLINK,1:;
ETPE 4-0
ZWTA:GSW,0:SW256B,2:HOTLINK,2:ETPE,4,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,2:HOTLINK,2:ETPE,4,0:ETP,0:HOTLINK,1:;
ETPE 13-0
ZWTA:GSW,0:SW256B,5:HOTLINK,0:ETPE,13,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,5:HOTLINK,0:ETPE,13,0:ETP,0:HOTLINK,1:;
ETPE 5-0
ZWTA:GSW,0:SW256B,5:HOTLINK,2:ETPE,5,0:ETP,0:HOTLINK,0:;ZWTA:GSW,1:SW256B,5:HOTLINK,2:ETPE,5,0:ETP,0:HOTLINK,1:;
Configure ETPSIG-M TCP/IP stack configuration for ETPE
(SE-NH).ZQRA:ETPE, ,::IL0::UP;ZQRA:ETPE, ,::IL1::UP;ZQRA:ETPE,
,::BOND0,IL0,IL1,::UP:;
Configure ETPSIG-M IP address with parameters PDM to BOND0
interface. ZQRN:ETPE,,::BOND0:"",,P,IDM:;
Create ETPSIG-C IP address
ZQRN:ETPE,,>unit_index>::BOND0:"",,L,ICV::;
Create IuA messaging configuration for ETPSIG-M and
ETPSIG-CZD2C:M:BCSU,::ETPE,,:::;ZD2C:C,NOR:BCSU,::ETPE,,:::;
Note!ETPSIG-M is created only to Gateway BCSU and ETPSIG-C must
be created to all BCSUs for all ETP/ETP-Aunits
Create EL0 IP address to ETPE ZQRA:ETPE,,::EL0::UP;
ZQRN:ETPE,,::EL0,:"",,P,:;
Create EEP interface for traffic between ETPE and
ETPAZQRA:ETPE,,::,,BOND0,;ZQRN:ETPE,,::,:"",,L,VI:;ZQRP:ETPE,,:::"":TAG,"EEP":;
Note: EEP interface creation is required only if A over IP is
used.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1255
(207)
Note: Create the PEP link to ETPGID 0 first if you want to get
the ETP object ID for the ETPGID to match inNetAct.
Create PEP interface if PCU2-Es are in useZQRA:ETPE,
,::,,BOND0,;ZQRN:ETPE,,::,:"",,L,VI:;ZQRP:ETPE,
,:::"":TAG,"PEP":;
Create IN0 interface( Internal Octeon-DSP
interface)ZQRA:ETPE,,:IN0::UP;ZQRN:ETPE,,::IN0,,P,I::;
Create static routeZQKC:ETPE, ,:::"":PHY:;
Change state of ETPE to TE-EXZUSC:ETPE,,:SE;ZUSC:ETPE,,:TE;
11.1.3 Check Plug-in unit softwareNote: The flashing does not
succeed if the username and password in the ETP card does not match
the BSCsusername & password. Refer Appendix 5 to see an example
how to update the username & password via ETPservice
terminal.
Check the flash software of ETP
cards:-ZWDM:UT=,UI=,MODE=ACTIVE;ZWDM:UT=,UI=,MODE=STANDBY;
Check the CBUHAN version in BSC
package.ZDDE::"ZMXP:W0-MMDIRE/CBU*.*";
Macro will choose a valid option (option1 or option2 or option3)
based on the output of above interrogationcommands.
Option 1:- When existing ETP version is same or older than the
versions mentioned below and ETPsoftware in OMU DISK is newer than
PAC versions mentioned below. If CBUHAN version is older than
theversion mentioned below, then option 1 needs to be selected.
Image Name PAC Version existing on ETP
GGNCOMAB 2.3-0GGNETPET 3.30-0GGNETPAA 3.29-0GGNETPAB 4.29-0
CBUHAN 12.95-1
Upgrade the ETP software on the Active flash of the ETP card
using following MML
command:ZWDL:UT=,UI=0,SERVER=,SW=W0-LFILES/,MODE=ACTIVE;
Note: For FTP server IP address, check MCMU ETPSIG-I IP address.
Image file is GGNETPET.IMG forETPE.
Restart the ETP card. Note that after this point, the upgraded
software will be running on ETP card.ZUSU:UT=,UI=;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1256
(207)
Verify that the new software version has been upgraded on active
flash using following command :ZWDM:UT=,UI=,MODE=ACTIVE;
Upgrade the ETP software on the Standby flash of the ETP card
using following MML
command:ZWDL:UT=,UI=0,SERVER=,SW=W0-LFILES/,MODE=STANDBY;
Note: For FTP server IP address, check MCMU ETPSIG-I IP address.
Image file is GGNETPET.IMG forETPE.
Verify that the new software version has been upgraded on
standby flash using following command
:ZWDM:UT=,UI=,MODE=STANDBY;
Option 2:- When existing ETP version is newer than PAC versions
mentioned below and also if CBUHANversion is newer than the version
mentioned.
Image Name PAC Version existing on ETP
GGNCOMAB 2.3-0GGNETPET 3.30-0GGNETPAA 3.29-0GGNETPAB 4.29-0
CBUHAN 12.95-1
Upgrade the ETP software on the STANDBY flash of the ETP card
using following MML
command:ZWDL:UT=,UI=0,SERVER=,SW=W0-LFILES/,MODE=STANDBY;
Note: For FTP server IP address, check MCMU ETPSIG-I IP address.
Image file is GGNETPET.IMG forETPE.
Use command ZWDS to switch upgraded flash as ACTIVE flash on the
ETP card:ZWDS:UT=,UI=,PT=,PI=:;
Restart the ETP card. Note that after this point, the upgraded
software will be running on ETP card. This will verifyif flash
upgrade was successful.
ZUSU:UT=,UI=;
Upgrade the ETP software on the new STANDBY flash of the ETP
card using following MML
command:ZWDL:UT=,UI=0,SERVER=,SW=W0-LFILES/,MODE=STANDBY;
Note: For FTP server IP address, check MCMU ETPSIG-I IP address.
Image file is GGNETPET.IMG forETPE.
Use command ZWDS to switch upgraded flash as ACTIVE flash on the
ETP card:ZWDS:UT=,UI=,PT=,PI=:;
Restart the ETP card. Note that after this point, the upgraded
software will be running on ETP card from theoriginal flash.
ZUSU:UT=,UI=;
Option 3:- When existing ETP version is same or older than the
versions mentioned below and ETPsoftware in OMU DISKis also same or
older than PAC versions mentioned below.
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1257
(207)
Image Name PAC Version existing on ETP
GGNCOMAB 2.3-0GGNETPET 3.30-0GGNETPAA 3.29-0GGNETPAB 4.29-0
CBUHAN 12.95-1
Upgrade the ETP software on the Active flash of the ETP card
using following MML
command:ZWDL:UT=,UI=0,SERVER=,SW=W0-LFILES/,MODE=ACTIVE;
Note: For FTP server IP address, check MCMU ETPSIG-I IP address.
Image file is GGNETPET.IMG forETPE.
Restart the ETP card. Note that after this point, the upgraded
software will be running on ETP card.ZUSU:UT=,UI=;
After card restart, log-in to the card using following MML
commands -ZDDS;ZRS:switch_flash ctot
After the card comes up, upgrade the ETP software on the this
new flash of the ETP card using following MMLcommand:
ZWDL:UT=,UI=0,SERVER=,SW=W0- LFILES/,MODE=ACTIVE;
Note: For FTP server IP address, check MCMU ETPSIG-I IP address.
Image file is GGNETPET.IMG forETPE.
Restart the ETP card. Note that after this point, the upgraded
software will be running on ETP card.ZUSU:UT=,UI=;
Verify that the new software version has been upgraded on active
flash using following command :ZWDM:UT=,UI=,MODE=ACTIVE;
Verify that the new software version has been upgraded on
standby flash using following command
:ZWDM:UT=,UI=,MODE=STANDBY;
To restore to the original default flash, we need to switch
flash again. So as the ETP card comes up, log-in to thecard using
following MML commands -
ZDDSZRS:
Switch to other flash using below command ST command
-switch_flash ctot
NOTE: This command will switch flash and restart the ETP card as
well. After the card comes up, open anew MML session.
Verify that the new software version has been upgraded on active
flash using following command :ZWDM:UT=,UI=,MODE=ACTIVE;
Verify that the new software version has been upgraded on
standby flash using following command
:ZWDM:UT=,UI=,MODE=STANDBY;
11.1.4 Diagnostic
Run diagnostic to the ETPEZUDU:ETPE,,;
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1258
(207)
Note: The diagnostic part will be run on both MCMUs.
Change working state of ETPE to WO-EXZUSC:ETPE,,:WO;
11.1.5 Check PCU configuration
If Packet Abis interface is also used in PS traffic check PCU
configuration. PCU2-D or PCU2-E must be created tothe PCUPAB
function that it can carry Packet Abis PS data.
For PCU2_E cards PEP interface creation is required to support
PEP Eth link. These creations are mentioned inthe below
document.
PCU configuration can be checked with following
command:ZWTI:BCSU,;
Use BSCPCU HW implementation for PS traffic procedure if PCU
configurations need to change.
ETP- PCU connection.
ZESK:ETPE,:BCSU,:PCU,:;
Note :This is required for both PCU2_E and PCU2_D cards.
11.2 Creation of ETPE unit with hardware protection
Note!Macro asks in this point Plug-in redundancy type and Unit
location. After that macro check possibleunit/PCM overlapping.If
there is overlapping PCM areas move or remove resources from them.
Macro will remove unit and Plug-in Units automatically after needed
resources are install Plug-in units, terminators and cables
Note: - Refer Appendix 2 to check overlapping PCMs used by
existing units in BSCs. Please note to shift existingtraffic from
the plug in unit. Once traffic is shifted remove the units and
cables and then insert ETP cards torequired tracks. Please note to
turn off jumper settings in GSW units if PCMs are not used. Refer
Appendix 1 tocheck jumpers settings used for existing ETP
cards.
Note:-There are two options for Installing ETPE in Initial flexi
BSC-Normal option and Flexible option.
Normal option: Configurations supported before S15 EP 2.1
releases.
Flexible option: New flexible ETP layout in Flexi BSC. The
implementation of flexible option in initial flexi BSC willbe
supported only from software S15 EP2.1. If flexible option is taken
to use, the supported topology is T29.Change it with following
command: ZW6G:T29;
11.2.1 Install Plug-in units, terminators and cables
11.2.1.1 Terminators and setting modules
Remove PCMC8A connectors
-
DN09124902BSCImplementationforETP/ETP-AininitialFlexiBSCCopyright2013NokiaSolutionsandNetworks.Allrightsreserved.CONFIDENTIALAPPROVED1.1259
(207)
11.2.1.1.1 Normal option
Position ID Name FU Use NoteETPEINDEX
1.0B14.2M
C111523 PCMC8A GTIC 0 PCM connector module 1)ETPE 0,0
1.0B15.2M