Top Banner
BR/TSD ق ش م د2005 BCD Planning Software 16 - 18 ب آ- س ط س غ آ2005 ق ش م دDavid Botha Workshop for the Arab Group of Countries
28

BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

Dec 10, 2015

Download

Documents

Matthew Forbes
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCD Planning Software

آب - 18 - 16 2005أغسطس

دمشق

David Botha

Workshop for the Arab Group of Countries

Page 2: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCD

Procedure for the production of a planCompatibility analysis and synthesis process

Analysis

Synthesis

Admin/BR

Admin/BR

BR/PXT

BR/PXT

Admin/BR/PXTAdmin/BR

Admin/BR/PXT

Admin.

Workshop for the Arab Group of Countries

Page 3: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDCurrent status

Delivery of software

The EBU delivered:

1. Software for the:• Prediction of the service area of analogue television

assignments• Compatibility assessment of digital sound broadcasting

assignments and allotments• Compatibility assessment of digital television

broadcasting assignments and allotments• Compatibility assessment:

• Mutually between requirements• Against existing and planned analogue television

broadcasting assignments• Against existing and planned assignments to other

primary services • Coded in FORTRAN

Workshop for the Arab Group of Countries

Page 4: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDCurrent status

Delivery of software continued

The EBU delivered:

2. Plan synthesis software for:• Digital sound and television broadcasting requirements

in band III• Digital television broadcasting in band IV/V• Code in FORTRAN

3. Total package:• 74 source files resulting in 42 individual programs• 28 reference data files

Workshop for the Arab Group of Countries

Page 5: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDCurrent status

Verification and testing

BR assisted by PXT to specify and perform tests on:

1. Basic software functionality:• Compile source code• Execute routines based on general data examples• Reporting errors and implement updates

2. Calculation verification:• Verification of basic propagation functionality• Compatibility assessment for simple cases• Synthesis results based on artificial problems

Workshop for the Arab Group of Countries

Page 6: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDCurrent status

Verification and testing continued

BR assisted by PXT specify and perform tests on:

3. Planning test scenarios:• Software performance vs. system requirements• Results from analyses and syntheses• Variation of scenario parameters

4. Planning exercise scenarios:• Results from analyses and syntheses• Implementing different approaches to planning• Findings as input to IPG meeting

5. Report on testing and verification submitted to the first IPG meeting

Workshop for the Arab Group of Countries

Page 7: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDCurrent status

Planning software: How does it work?

Input data:Reference situations

New digital BC requirements

Data conversion

Analogue TV assignment

services areas

Compatibility identificationCombination of analyses

Syntheses

VH

F a

nd U

HF

tre

ated

in p

aral

lel

and

inde

pend

ently

Workshop for the Arab Group of Countries

Page 8: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDCurrent status

Planning software: How does it work? (continued)

Analyses

Data preprocessing

Syntheses:Different algorithms

Combination of resultsIdentification of “best” solutionV

HF

and

UH

F t

reat

ed in

par

alle

lan

d in

depe

nden

tly

Plan

Workshop for the Arab Group of Countries

Page 9: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDAnalysis

Detailed overview

General steps:

1. Data preparation of:• Extracts of reference situations for broadcasting and

other primary services into text;• Requirements for digital broadcasting (assignments,

allotments for T-DAB and DVB-T) into text;• Conversion of text files into proprietary binary files.

Workshop for the Arab Group of Countries

Page 10: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDAnalysis

Detailed overview continued

General steps continued:

2. Calculation of:• Service areas of analogue TV assignments• Service areas of digital broadcasting assignments

(equivalent service areas based on noise limited reduced by 3 dB);

• Incompatibilities identified pair-wise between digital broadcasting requirements mutually – cannot share the same channel;

• Incompatibilities identified pair-wise between digital requirements and existing and planned assignments - the relevant acceptable channels become not available;

• Incompatible when the protection margin on any test point and for any channel is less than –0.5 dB

Workshop for the Arab Group of Countries

Page 11: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDAnalysis

Detailed overview continued

General steps continued:

3. Post processing of results:• Combining of incompatibility results of different cases;

• Analogue TV assignment Digital requirement• Digital requirement Analogue TV assignment• Digital requirement Digital requirement• Digital requirement Other primary service• Other primary service Digital requirement

• Consideration of administrative declarations• Preparation of files for bands III and IV/V separately.

Workshop for the Arab Group of Countries

Page 12: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDBasis of the analysis

Input data

• Conversion of analogue assignments from the “reference” situation or new requirements;

• Existing and planned analogue TV assignments taken into account;

• Existing and planned assignments to other primary services taken into account.

Workshop for the Arab Group of Countries

Page 13: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDBasis of the analysis

Technical considerations

• Analogue assignment service areas calculation, multiple interference based on power sum method;

• Conversions indicated and taken into account;• Calculation of estimated service areas based on

noise limited coverage areas reduced by a margin by 3 dB;

• No receiving antenna directivity or polarisation discrimination for mobile and portable indoor reception;

• For fixed reception receiving antenna directivity and polarisation were taken into account.

Workshop for the Arab Group of Countries

Page 14: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDResults of the analysis

Coverage presentation

• Coverage presented relative to the IDWM national borders (both analogue TV assignments and digital broadcasting requirements);

• Selection of results possible;• Results can be displayed without having to repeat

the calculation.

Workshop for the Arab Group of Countries

Page 15: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDResults of the analysis

Detail incompatibility information

• Conference mode:• Indicate limited worst case incompatibility;• All incompatibilities are listed;• Different incompatibility cases are provided in

separate output files.

• Named mode:• Change the configuration file to enable this

mode;• Detail incompatibility information provided for a

specific site / requirement;• Information specifically useful for coordination.

Workshop for the Arab Group of Countries

Page 16: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Detailed overview

General steps:

1. Preprocessing of incompatibility results:• Conversion of digital to digital requirement incompatibility

results into required file format;• Generation of lists of available channels as opposed to

acceptable channels;• Data prepared for each requirement;• Separate sets for bands III and IV/V.

Workshop for the Arab Group of Countries

Page 17: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Detailed overview continued

General steps continued:

2. Synthesizing frequency plans:• Search for solutions based on input data

and 49 channels in band IV/V and 67 combinations of channels overlapping in band III;

• Apply 162 individual ‘fast’ algorithms in band III and 230 algorithms in band IV/V;

• Software can treat 150 000 requirements in band IV/V and 32 000 in band III;

• Requires 2 GB of random access memory.

Workshop for the Arab Group of Countries

Page 18: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCD

Synthesis

Workshop for the Arab Group of Countries

Page 19: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Detailed overview continued

General steps continued:

3. Preparation of output data:• Generate combined list of all solutions

found for each algorithm;• Identify the ‘best’ solution as separate

output.

Workshop for the Arab Group of Countries

Page 20: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Assigning frequency resources using a structured procedure

• Using algorithms as methods to assign channels / frequency blocks;

• Requirements are anonymous;• Available channels are taken into account;• Incompatibilities amongst digital broadcasting

requirements indicate that requirements cannot share the same channel / frequency block.

Workshop for the Arab Group of Countries

Page 21: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Workshop for the Arab Group of Countries

In the absence of a full conference-like database, the synthesis results of a limited

situation are not conclusive!!!!!!

Page 22: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Synthesis the colourful way

• Plan to all have one requirement• Acceptable choices = Acceptable channels / frequency

blocks

Workshop for the Arab Group of Countries

GreenBluePink

Yellow

Page 23: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Synthesis the colourful way

Same colour as neighbour = Incompatibility

Workshop for the Arab Group of Countries

Existing services = Pre-selected colour

Page 24: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDSynthesis

Synthesis the colourful way

Frequency assignment = Colour selection

Workshop for the Arab Group of Countries

Page 25: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDFurther development

Items to be considered for improvement/correction

General further development:

• Continued verification and testing;• Report errors to EBU;• Implement corrections and repeat testing;• Suggest improvements;• PXT and IPG request changes;• Implement and test improvements and

changes.

Workshop for the Arab Group of Countries

Page 26: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCDFurther development

Items to be considered for improvement/correction

Specific further development:

• Implement IPG-1 request for equitable access in the synthesis;

• Implement additional planning options and variants;

• Improvement in calculation speed;• Additional synthesis routines that improve

planning efficiency (longer calculation time)• Implementation of the final analysis.

Workshop for the Arab Group of Countries

Page 27: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCD

Workshop for the Arab Group of Countries

Page 28: BR/TSD دمشق 2005 BCD Planning Software 16 - 18 أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.

BR/TSD

2005دمشق

BCD

جزيال شك را Thank you

Workshop for the Arab Group of Countries