` GRADUATION PROJECT PART II – COMMUNITY CENTRE BY BROOKS GOAY WOOI AUN 10UEB06721 YEAR 3 TRIMESTER 3 STUDIO MASTER: AR LEE CHOR WAH TUTOR: AR BOBBY LOW
`
GRADUATION PROJECT PART II – COMMUNITY CENTRE
BY BROOKS GOAY WOOI AUN 10UEB06721 YEAR 3 TRIMESTER 3
STUDIO MASTER: AR LEE CHOR WAH
TUTOR: AR BOBBY LOW
GRADUATION PROJECT PART II – COMMUNITY CENTRE
PROJECT BRIEF DESIGN CONCEPT/INTENTIONS FLOOR PLANS SECTIONS ELEVATIONS 3D
FROM THE MASTER PLAN, DEVELOP THE COMMUNITY CENTRE ON THE
GIVEN SITE WITHIN THE GIVEN ENVELOPE. STUDENTS ARE FREE TO
PROPOSE WHATEVER COMMUNITY FACILITIES THAT THEY SEE FIT FOR
THE SITE BASED ON THEIR SURVEY, RESEARCH AND
UNDERSTANDING OF THE AREAS SURROUNDING THE SITE.
STUDENTS ARE TO DEVELOP A BRIEF FOR THE PROJECT, THEN
PROCEED TO DESIGN THE PROJECT. TOTAL GFA SAY, 5,000 SM, AND
MAXIMUM NUMBER OF STOREYS IS 6.
AS PART OF THE KL2020 CITY PLAN, DBKL PLANS TO INCLUDE MORE
PEOPLE-ORIENTATED SPACES IN THE CITY OF KUALA LUMPUR, FOR
EXAMPLE, COMMUNITY CENTRE. A COMMUNITY CENTRE IS PUBLIC
LOCATION WHERE MEMBERS OF A COMMUNITY TEND TO GATHER FOR
GROUP ACTIVITIES, SOCIAL SUPPORT, PUBLIC INFORMATION, AND
OTHER PURPOSES. THIS COMMUNITY CENTRE COULD BE A LIBRARY,
LEARNING & TRAINING CENTRE, COMMUNITY THEATRE, HEALTH
FACILITIES, FITNESS CENTRE…
PRECEDENT STUDIES: 1 LOCAL, 2 FOREIGN
TOTAL GROSS FLOOR AREA = APPROXIMATELY 5000M2
MAXIMUM HEIGHT: 6-STOREY
TYPE OF COMMUNITY SERVICES:
INTEGRATED LEARNING AND TRAINING CENTRE
COURSES/WORKSHOPS:
I) TO COORDINATE HIV/AIDS (CHRONIC DISEASES) PROGRAMME WITH
THE GOAL OF ELIMINATING DISCRIMINATION VIA EDUCATION,
PREVENTION, CARE AND SUPPORT INTERVENTION;
II) TO PROMOTE HEALTHY LIVING VIA PROPER DIETARY PLANS AND
EXERCISES;
III) LITERACY CLASSES (COMPUTER/MODERN LANGUAGES ETC) TO
SERVE THE LESS FORTUNATE AND THE UNDERPRIVILEGED PEOPLE.
REFERENCES:
DBKL DRAFT PLAN 2020, NEUFERT ARCHITECT’S DATA, UBBL,
COMMUNITY CENTRE DESIGN HANDBOOK, GBI RATING TOOL
COMMUNITY CENTRE [8 WEEKS]
*THE CHOSEN SITE IS INDICATED IN RED.
FUNCTIONAL REQUIREMENTS:
DROP OFF AREA (COVERED), VIP / HYBRID CAR PARKING
SPACES, LOBBY AND RECEPTION, ADMINISTRATION OFFICES,
MEETING ROOM/S, WASHROOMS AND TOILETS, A CAFETERIA,
A SMALL LIBRARY AND ICT COMPUTER ROOM,
HORIZONTAL AND VERTICAL CIRCULATION, CLASSROOMS AND
WORKSHOPS, TEMPORARY ACCOMMODATION,
COMMUNITY OWNED GREEN SPACE/GARDEN FOR
YOGA/AEROBIC EXERCISES, M&E SPACES, STORAGE,
REFUSE CHAMBER ETC
THE SUNSET COMMUNITY CENTRE, VANCOUVER, CANADA
INTRODUCTION
CONCEIVED AS A LINK BETWEEN NATURE AND
THE VIBRANT MULTI-CULTURAL COMMUNITIES
THAT SURROUND IT. UNIQUE YET NOT FOREIGN
TO ITS SURROUNDINGS, SUNSET COMMUNITY
CENTRE IS AN ELEGANT AND TRANSPARENT
BUILDING, CAREFULLY SITED ON A MAJOR
THOROUGHFARE TO GIVE THE BUILDING
VISIBILITY AND ACCESSIBILITY TO THE
COMMUNITY. THE BACK AND SIDES OF THE
BUILDING SERVE AS A BACKGROUND FOR
OUTDOOR ACTIVITIES WITH ITS SPECTACULAR
SOUTHERN VIEWS AND SETTING AMONG THE
FIELDS, GREENHOUSES AND PLANTING BEDS.
3 PRIMARY ELEMENTS
THE TILT-UP CONCRETE WALLS, THE
CURVILINEAR ROOF AND THE CURTAIN WALL
LEED GOLD
CERTIFIED
• PASSIVE DAY-
LIGHTING CONTROL
THROUGH THE
CURTAIN WALL’S
HIGH-EFFICIENCY
GLAZING SYSTEM
• USE OF LOCAL
MATERIALS
• USE OF LOW
EMITTING
MATERIALS
• DUAL-FLUSH LOW-
FLOW TOILETS
• EXTENSIVE USE
OF DURABLE
MATERIALS
• CONTROL OF
ENERGY USE.
ARCHITECT: BING THOM ARCHITECTS
LANDSCAPE ARCHITECT: BLAIR GUPPY, PHILLIPS SMALLENBERG
LOCATION: 6810 MAIN STREET, VANCOUVER, BC, CANADA
PROJECT AREA: 30 000 SQF
PRECEDENT STUDIES DESIGN CONCEPT/INTENTIONS FLOOR PLANS SECTIONS ELEVATIONS 3D
THE SERANGOON
WITH ITS VIBRANT AND COLOURFUL WINDOWS, YOU
CANNOT MISS THE EYE-CATCHING COMMUNITY CENTRE.
THE SERANGOON IS THE FIRST COMMUNITY CENTRE TO
INTRODUCE A GERMAN LANGUAGE CLASS AS WELL AS A
COFFEE GOURMET CLASS. IN ADDITION, THROUGH ITS
SENIOR CITIZENS CONNECT PROGRAMME (SCP), THE
COMMUNITY CENTRE REGULARLY CONDUCTS FINANCIAL
AND HEALTH TALKS DELIVERED BY FINANCIAL AND
HEALTH PROFESSIONALS.
THE FACILITIES
BASKETBALL COURT,
BILLIARD ROOM, CHILD
CARE & KINDERGARTEN,
CONFERENCE ROOM, DANCE
STUDIO, LECTURE &
MEETING ROOM,
MULTI-PURPOSE HALL,
MULTI-PURPOSE ROOM,
PETANQUE COURT
ROOF TERRACE, STAGE
THEATRETTE ETC
THE SERANGOON COMMUNITY CENTRE, SINGAPORE
PRECEDENT STUDIES DESIGN CONCEPT/INTENTIONS FLOOR PLANS SECTIONS ELEVATIONS 3D
THE WOOD VIEW LEARNING COMMUNITY, PLYMOUTH, ENGLAND
INTRODUCTION
A GROUND-BREAKING
SUSTAINABLY DESIGNED TO
FULFIL THE VISION OF
ENHANCED EDUCATION,
SOCIAL INCLUSION AND A
CONTINUOUS EDUCATIONAL
ENVIRONMENT, WITH A CENTRE
DEDICATED TO SUPPORTING
PARENTS THEMSELVES STILL
IN SCHOOL.
THE BUILDINGS MAXIMISE
DAYLIGHT; ALLOW NATURAL
VENTILATION THROUGH
PASSIVE STACK EFFECT
TECHNIQUES AND LOW-
ENERGY DESIGN; THE
BUILDING MASS ACTS AS
HEAT SINK FOR WARMTH IN
WINTER AND COOLING IN
SUMMER; AND INTELLIGENT
UNDER-FLOOR HEATING AND
PIR LIGHTING RESPOND TO
MOTION.
PRECEDENT STUDIES DESIGN CONCEPT/INTENTIONS FLOOR PLANS SECTIONS ELEVATIONS 3D
RCHITECT: HLM ARCHITECTS
PRECEDENT STUDIES DESIGN CONCEPT/INTENTIONS FLOOR PLANS SECTIONS ELEVATIONS 3D
DESIGN PROCESS / CONCEPT DEVELOPMENT SPACE MASSING / EXPLORATION
PRECEDENT STUDIES DESIGN CONCEPT/INTENTIONS FLOOR PLANS SECTIONS ELEVATIONS 3D
DESIGN PROCESS / FLOOR PLANS & BUILDING FORM DEVELOPMENT
PRECEDENT STUDIES DESIGN CONCEPT/INTENTIONS GBI GREEN BUILDING INDEX ELEVATIONS 3D
GREEN BUILDING INDEX – WHY GREEN BUILDINGS?
A GREEN BUILDING FOCUSES ON INCREASING THE EFFICIENCY OF RESOURCE USE – ENERGY, WATER, AND MATERIALS – WHILE
REDUCING BUILDING IMPACT ON HUMAN HEALTH AND THE ENVIRONMENT DURING THE BUILDING’S LIFECYCLE, THROUGH BETTER
SITTING, DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, AND REMOVAL. GREEN BUILDINGS SHOULD BE DESIGNED AND
OPERATED TO REDUCE THE OVERALL IMPACT OF THE BUILT ENVIRONMENT ON ITS SURROUNDINGS.
GREEN FEATURES INCORPORATED IN THE FORTITUDE LEARNING & TRAINING COMMUNITY CENTRE:
I) ENERGY EFFICIENCY (EE) –
BUILDING ORIENTATED TO THE NORTH-SOUTH AXIS AND GLAZED
WITH CURTAIN WALLS TO HARNESS NATURAL DAYLIGHTING AND
TAKE ADVANTAGE OF THE UNDULATING LANDSCAPE GARDEN VIEW
/ SOLAR PANELS – RENEWABLE AND SUSTAINABLE FORM OF
CLEAN ENERGY / MOTION-SENSOR LIGHTING SYSTEM – TO
REDUCE ENERGY WASTAGE / ROOF-TOP SKYLIGHT – TO HARNESS
NATURAL DAYLIGHTING
II) WATER EFFICIENCY (WE) –
RAINWATER HARVESTING SYSTEM – REDUCE DEPENDENT ON
POTABLE WATER; RAINWATER IS USED FOR IRIGATION AND
TOILET FLUSHING PURPOSES.
III) SUSTAINABLE SITE PLANNING & MANAGEMENT (SM) –
THE CHOSEN SITE WITH EXCELLENT PUBLIC ACCESSIBILITY VIA
PUBLIC TRANSPORTATION; COMMUNITY SERVICES, OPEN
SPACES AND LANDSCAPING.
IV) INDOOR ENVIRONMENT QUALITY (EQ) –
THE USE OF LOW VOLATILE ORGANIC COMPOUND MATERIALS,
APPLICATION OF QUALITY AIR FILTRATION, PROPER CONTROL OF
AIR TEMPERATURE, MOVEMENT AND HUMIDITY TO ACHIEVE
GOOD QUALITY PERFORMANCE IN INDOOR AIR QUALITY AND
THERMAL COMFORT
V) MATERIALS & RESOURCES (MR) –
PROMOTE THE USE OF ENVIRONMENT-FRIENDLY MATERIALS
SOURCED FROM SUSTAINABLE SOURCES AND RECYCLING
VI) INNOVATION (IN) –
VIP HDYRID CARPARKS ARE PROVIDED TO ENCOURAGE THE USE
OF MORE GREEN & ENVIRONMENTAL FRIENDLY VEHICLE.
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
SITE ANALYSIS
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
SITE ANALYSIS
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS SECTIONS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS SECTIONS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS SECTIONS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS ELEVATIONS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS SECTIONS 3D
REMARKS: PORTFOLIO DRAWINGS ARE NOT TO SCALE
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS 3D
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS CONSTRUCTION DETAILS
PRECEDENT STUDIES DESIGN CONCEPT/PROCESS PRESENTATION BOARDS FLOOR PLANS MODEL
FINAL MODEL