Oct 30, 2014
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:56 Page 2
Keseco is a UK based energy reduction specialist
offering a unique energy saving technology called
Ultra. Keseco works closely with clients to deliver
tangible savings and believes that Ultra can play a
significant role in helping businesses to reduce
their energy use and carbon emissions.
The rising cost of wholesale energy and theraw materials for energy production arecontributing to significant increases incommercial utility costs. In addition the costof environmental energy policies such asthe Climate Change Levy and the CRCEnergy Efficiency Scheme are beginning toimpact businesses both large and small. Thebiggest impact for UK companies will bethrough changes in their electricity costs,which are anticipated to rise significantlyover the next 5 years.
New systems and technologies are allowingcompanies to better reduce, monitor, andmanage their energy consumption andenergy wastage. Energy managementsolutions combine a variety of technologiessuch as current optimisation and voltagereduction to deliver sizeable savings tobusinesses across many different sectors.Both Government and the private sector areoffering a range of support to helpbusinesses reduce their energy costs andcarbon emissions.
As UK businesses take a closer look at theircontributions to climate change, anincreasing number are working to reducetheir carbon footprints. By combiningenergy management technology and carbonmanagement techniques, businesses areable to develop synergies to strengthentheir brands and enhance theircompetitiveness. The tangible valuedelivered improves a business’ corporatereputation and environmental credibility.
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:56 Page 3
Introducing Ultra
Tel: +44 (0) 1727 884 756 www.keseco.com
Our Customers
Ultra has been specifically engineered for commercial and
industrial environments where inductive motor loads such
as pumps, compressors, conveyors, air handling and
cooling, heavy machinery and refrigeration equipment are
present. Our clients are most commonly found in the
following industries:
• Manufacturing and Heavy Industry
• Production and Engineering
• Aggregates and Construction
• Utilities
• Food Retail
• Airports and Railway Stations
• Hotel and Leisure
• Public Sector
Our Product
Ultra provides a new approach to energy saving that
combines state of the art technology with a range of
models and bespoke installation to match our clients’
operational and energy consumption profiles. Ultra will
reduce an organisation’s carbon emissions and power
consumption, delivering typical cost savings of 10-15%
and a return on investment of less than 2 years.
The level of saving that can be achieved by Ultra depends
on how and when a client uses their energy and the types
of equipment a client uses on site. Each Ultra client is
different and Keseco will always conduct a detailed survey
to establish what level of saving can be achieved prior to
each installation.
Ultra can be installed alongside other existing energy
saving solutions including Voltage Optimisation, Power
Factor Correction and Soft Start Technologies to deliver
additional savings.
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:56 Page 4
At the forefront of energy saving technology
The benefits of Ultra
Ultra is a unique technology that reduces kWhconsumption, electricity costs and carbon emissions bywhile delivering a shorter return on investment than otherenergy reduction technologies.
• A typical return on investment of less than 24 months
• Potential savings of up to 15% on kWh consumption,
cost and carbon emissions
• Fast and unobtrusive installation
• No on-going maintenance
• Considerably smaller than comparative technologies
• Dispersed installation can target individual loads
and equipment
• Compatibility with other energy saving technologies
delivering additional savings
The 14 Ultra models range from 0.5 kVA to 1,500 kVA
enabling Keseco to match its solution to a client’s level of
energy consumption and usage profile. With our dispersed
multi-unit design and installation process we focus on the
usage patterns, types of load and differing load
requirements to maximise the savings efficiency.
Finding a suitable location for installation is simple as Ultra
units are up to 90% smaller and lighter than equivalent
capacity equipment used by other optimisation and load
management technologies.
WATT HOURMETER
Distribution Board
ONOFF
LI L2 L3 N Earth
Power(Motor)
CommunicationsEquipment
Lighting
Air Conditioner
MAINSWITCH
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 5
A unique and flexible solution
Ultra is connected as a T-connection to the supply at any
point before or after the electrical distribution board. Ultra
is not fused and is designed as an open circuit with no
current being drawn by the unit. Ultra requires no
maintenance and runs 24 hours a day, 365 days a year.
A unique feature of the Ultra solution is its ability to target
specific loads using a multi-unit installation design. Units
can be installed immediately prior to specific equipment
maximising both the achievable savings levels and the
return on investment.
Keseco’s team of registered engineers will project manage
the installation of Ultra from start to finish. Our engineering
team manage a UK-wide network of experienced electrical
engineers to undertake the site surveys and installations.
A normal installation takes less than one hour to install
each unit.
• All installations are made by NIC EIC or ECA registered
qualified electricians.
• Ultra is installed in accordance with IEE Requirements
for Electrical Installations (currently 17th Edition)
BS 7671.
• Ultra is installed within an insulating box and all cabling
is protected within an armoured conduit.
Tel: +44 (0) 1727 884 756 www.keseco.com
A unique and flexible solution
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 6
The Ultra Effect
Ultra is based on a breakthrough in current improvement
and energy saving technology. Ultra improves the
efficiency of the current by decreasing the demand curve
of inductive motor loads on start-up and during variable
operation.
The Ultra effect responds to the frequency and amplitude
of a load’s normal demand curve. Simply put the more
frequent the change in demand and the higher the level of
demand in a given period of time, the higher the level of
savings Ultra can deliver. Ultra is designed to deliver
savings where inductive motor loads are
present, and where the equipment’s
normal demand curve is varied
due to the design or the usage
profile.
To create the Ultra effect the Ultra unit emits a magnetic
wave into the electrical supply that changes the polarity of
the electron spin causing an alignment of the electron spin
vortexes, producing a spin wave within the electrical
supply.
The magnetic wave emitted by the Ultra unit results from a
combination of far infrared rays, emitted by the ceramic
lining of the unit, and the effect of the alternating
electromagnetic waves within the supply on the
electromagnetic properties of a second ceramic
compound within the unit.
3
1
4
5
2
7
8
6
1 Ceramic A (lining)2 Ceramic A (plate)3 Ceramic B (compound)4 Copper busbars x 35 Isolating blocks6 Front cover panel7 Rear housing8 Connectors x 3
The fastest route to energy reduction
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 7
Survey
To ensure clients achieve the optimum levels of
performance following installation, Keseco collects certain
key data during the survey including:
• Identification and location of all main and sub distribution
boards and the size of their loads
• Operating days and hours of all loads
• Details of any installation constraints such as access
and space
• Variables influencing the consumption of the loads
• Historical consumption data for the site and individual
equipment (typically 12 months of half hourly readings)
Design and Installation
The Ultra solution design process involves the analysis of the
data collected during the survey and the evaluation of the
operating profile of each individual load and the building as a
whole. The operating profile and consumption is determined
using Keseco’s data analysis software. The consumption
profile of the load is determined, allowing the matching of the
correct Ultra model to the load.
Performance Measurement
Measuring the performance of Ultra ensures that all
savings data is accurately provided for clients. By clearly
identifying the savings delivered by Ultra, Keseco is able to
accurately predict the return on investment the client will
achieve.
Keseco has adopted the International Performance
Measurement and Verification Protocol (IPMVP) as used by
the leading energy service companies and suppliers.
IPMVP allows Keseco to adopt a variety of approaches to
measuring energy savings that correspond to the specific
environment where Ultra is being installed.
Delivering measurable results
Tel: +44 (0) 1727 884 756 www.keseco.com
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 8
CASE STUDY 1
Aggregate Industries quarries, manufactures and supplies a
wide range of heavy building materials to the construction
industry. On 26th August 2011, an Ultra model UC50 was
installed in the company’s Barton under Needwood on a
Haarup 75kW aggregates mixer used in the manufacture
paving stone composites. During a test period of 10 weeks
prior to installation the average consumption was
17.68kWh; during the continuous 4 week period post-
installation the average consumption was reduced to
14.64kWh. Ultra delivered an average 17.15% reduction in
kWh consumption.
Based on the operation of the single mixer the reduction in
consumption produces an annual saving of £5,064, an
anticipated Return on Investment of 6 months and an
annual carbon reduction of 31,171 kilogrammes. Following
the successful pilot Keseco UK are planning to roll out the
Ultra solution to other areas of the Barton under Needwood
production facility. Finding a suitable location for
installation is simple as Ultra units are up to 90% smaller
and lighter than equivalent capacity equipment used by
other optimisation and load management technologies.
12
14
16
18
20
10
8
6
4
2
0Pre-installation Post-installation
Reduction in Energy Consumption
Reduction in average consumption (kWh)
Actual saving in kWh consumption 17.15%
Projected annual CO2 emission savings 31,171 kg
Projected annual financial savings £5,064
Projected ROI 6 months
Keyfacts
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 9
Tel: +44 (0) 1727 884 756 www.keseco.com
CASE STUDY 2
The Cohline group of companies manufactures tube and
hose line systems for the automotive sector, commercial
vehicles, construction and agricultural machinery and the
motor industry. On 29th December 2010, Ultra eco® models
UC100 and UR30 were installed in the company’s Manston
factory to cover the main compressor responsible for the
factory’s manufacturing and the main incoming supply
respectively.
For the purposes of accurate comparison and measurement
only energy consumed during hours of production was used
to calculate the achieved reduction in energy consumption.
During the 12 month period prior to installation the plant
consumed an average of 50,299 kWh of electricity per
month. In January and February, post-installation, the plant
consumed an average of 45,936 kWh per month. In the two
months post installation,
Ultra eco® delivered an average 8.7% reduction in kWh
consumed per month, a potential annual saving of £3,760.
Following the successful pilot the system was purchased
with an anticipated Return on Investment of 12 months and
an annual carbon reduction of 27 tonnes.
Actual saving in kWh consumption 8.7%
Projected annual CO2 emission savings 27,090 kg
Projected annual financial savings £3,760
Projected ROI 12 months
60,000
50,000
40,000
30,000
20,000
10,000
0Pre-installation Post-installation
Reduction in Energy Consumption
Keyfacts
Average monthly operating consumption (kWh)
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 10
CASE STUDY 3
Wire Belt is a leading manufacturer of stainless steel
conveyor belts for product handling and processing.
On 8th January 2011, Ultra eco® models UC100 and UR30
were installed in the company’s Sittingbourne factory to
cover the Main Distribution Board and Air Compressors
respectively.
For the purposes of accurate comparison and measurement
the operating consumption was analysed in relation to the
production level of Spacers. During the 11 months prior to
installation the average operating consumption per Spacer
was measured as 2.93kWh/Spacer. In the three month
period, post installation, the average operating consumption
per Spacer was measured as 2.71kWh/Spacer.
In the three month period post-installation, Ultra eco®
delivered an average 7.6% reduction in operating
consumption per Spacer, delivering a potential saving of
6.4% on the total operating and non-operating
consumption, a potential financial saving of £1,546, an ROI
of 23 months and an annual reduction in carbon emissions
of 8,567 kilogrammes.
3.00
3.50
4.00
2.50
2.00
1.50
1.00
0.50
0Pre-installation Post-installation
Reduction in Energy Consumption
Average operating consumption per spacer (kWh)
Actual saving in kWh consumption 7.6%
Projected annual CO2 emission savings 8,567 kg
Projected annual financial savings £1,546
Projected ROI 23 months
Keyfacts
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 11
Tel: +44 (0) 1727 884 756 www.keseco.com
CASE STUDY 4
Oriel Printing Company is a leading UK print manufacturer.
On 15th November 2011, 3 x Ultra model UC100s and 1 x
Ultra model UC50 were installed at the company’s printing
plant on two Heidelberg Speedmaster CD102 6 and 7
colour offset Presses. For the purposes of accurate
comparison and measurement the pilot compared the
average operating kWh consumption over a five month
period pre-installation, with the same five month period
post-installation.
During the 5 month period prior to installation the average
consumption was 20.31kWh/Operating Hour; during the 5
month period post-installation the average consumption
was reduced to 18.62kWh/Operating Hour. Ultra delivered
an average 8.33% reduction in kWh consumption per
operating hour. Based on the operation of the two presses
the savings produce a potential annual saving of £8,025 an
anticipated Return on Investment of 21 months and an
annual carbon reduction of 43,722 kilogrammes. Following
the successful pilot the company are considering rolling-out
the Ultra solution to other areas of the company’s
production facility.
Oriel’s Managing Director, Richard Simms, commented
“We installed the Keseco Ultra system in December 2011
and are delighted with the level of savings shown during the
5 month trial. We are projecting a return of our entire
investment for this system in just less than 21 months. Ultra
is by far the easiest and most economical energy reduction
solution the company has installed to date.”
Actual saving in kWh consumption 8.33%
Projected annual CO2 emission savings 43,722 kg
Projected annual financial savings £8,025
Projected ROI 21 months
Keyfacts
22.00
24.00
26.00
20.00
18.00
16.00
14.00
12.00
10.00Pre-installation Post-installation
Reduction in Energy Consumption
Operating consumption per impression (kWh)
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 12
Ultra -eco® Input Voltage Frequency Size (cm) Weight Capacity
Model (Phase) (V) (Hz) (WxLxH) (Kg) (kVA-AC)U1500 3 100~600 50-60 40 x 60 x 25 50.0 1500
U1000 3 100~600 50-60 40 x 60 x 20 40.0 1000
U500 3 100~600 50-60 35 x 45 x 15 25.0 500
U300 3 100~600 50-60 30 x 40 x 10 15.0 300
UC200 3 100~600 50-60 25 x 35 x 8 11.0 200
UC100 3 100~600 50-60 22 x 30 x 8 8.0 100
UC50 3 100~600 50-60 18 x 25 x 6 5.0 50
UR30 3 100~600 50-60 14 x 20 x 6 3.5 30
UR20 3 100~600 50-60 13 x 20 x 6 2.7 20
UR10 1 or 3 100~600 50-60 13 x 18 x 5 2.3 10
UR7 1 100~600 50-60 11 x 17 x 4 1.6 7
UR5 1 100~600 50-60 9 x 10 x 4 1.0 5
UM1 1 100~600 50-60 8 x 11 x 3 0.8 1
UM0.5 1 100~600 50-60 6 x 10 x 3 0.6 0.5
Q: What electrical loads can Ultra be used with?A: All electrical loads are suitable for Ultra eco®. Ultra has the
highest energy saving potential on variable inductive loads.
Q: Can Ultra be used on AC and DC currents?A: No. AC currents only.
Q: Can Ultra be used in conjunction with UPS?A: Yes. If the UPS operates through a DC link, Ultra should be
connected downstream of the UPS.
Q: Can Ultra be used with aluminium and copperconductors?
A: Yes.
Q: Will Ultra work with a Switched-Mode Power Supply(SMPS), fluorescent lighting, variable speed drives onmotors,direct on line motors and wye-delta motorstarts?A: Yes. It is important Ultra is connected in the correct
place to deliver the optimum level of savings.
Q: Is Ultra voltage optimisation?A: No. Ultra does not affect the voltage within the circuit. Ultra
optimises the conductivity within the circuit.
Q: Is Ultra power factor correction?A: No. Ultra may marginally improve the power factor of the
load but it is not its primary function merely an additionalbenefit.
Q: Will Ultra conflict with a Residual Current CircuitDevice (RCCD)?
A: No. Ultra will not affect the operation of a RCCD.
Q: What size load can Ultra be used with?A: Ultra can be used with any size of low voltage load. With
14 model sizes Ultra can be installed in single or multipleunits to suit the sites operational requirements. There is nomaximum or minimum load.
Q: Where should Ultra be connected on a circuit?A: Ultra can be connected anywhere on the circuit.
Installations are targeted to suit general and large inductiveand variable loads. This may be achieved by connectingUltra to the main distribution board or multiple units beingdispersed throughout the circuit.
Q: How much energy does Ultra consume?A: Ultra is designed as an open circuit installed in parallel.
Ultra does not draw any load and does not consume anyenergy.
Q: What maintenance is required to Ultra ?A: None. Ultra has no electrical circuits, no electronics or
moving parts. Although Ultra does not require anymaintenance we recommend that periodic checks aremade to ensure that no damage has been caused to theunit.
Q: What is the life expectancy of an Ultra unit?A: 15 years.
Q: Does Ultra have a manufacturer’s warranty?A: Yes. Ultra is provided with a 3 year manufacturer’swarranty.
Frequently Asked Questions…
Ultra Model Specifications
Ultra has been independently tested in accordance with European Low Voltage Directive 2006/95/EC as amended by 93/68/ECC as per the provisions
of the relevant clauses of EN 50178:1997.
Ultra has been independently tested in accordance with European Electromagnetic Compatibility Directive 2004/108/EC as amended by 92/31/EEC
and by Article 5 of 93/68/EEC as per the provisions EN 61000-6-4:2007 and EN 61000-6-2:2004.
Ultra has been independently tested in accordance with European Restriction of the use of Hazardous Substances (RoHS) Directive 2002/95/EC for
materials Pb, Cd, Cr, Hg, PBB and PBDE for homogeneous materials and European Directive 2005/618/EC as amending 2002/95/EC for
heterogeneous materials.
Ultra has also independently tested for raw materials Cd, Bp, Cr6+, PBDEs and PBBs.
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 13
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:57 Page 14
Keseco UK Ltd | Fountain Court | 2 Victoria Square St Albans | AL1 3TFwww.keseco.com Tel: +44 (0) 1727 884 756
KESECO_BROCHURE_14pp_Layout 1 08/11/2012 12:56 Page 1