Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh Raipur
23

Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Dec 15, 2015

Download

Documents

Martha Lamkin
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Bringing Green Revolution in Eastern India (BGREI)IInd Meeting of

Central Steering Committee

Meeting dt. 31.10.2014

Department of Agriculture, Chhattisgarh Raipur

Page 2: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

I N D E XI N D E X

Particular Page No.

Chhattisgarh an Overview 01

Assessment of achievement under BGREI Year 2013-14 02-03

Impact of implementation of BGREI and NFSM 04

Assessment of achievement under NFSM Year 2013-14 05

Assessment of achievement under BGREI Year 2014-15 06-08

Photographs of demonstrations 09

Assessment of achievement under NFSM Year 2014-15 10

Strategy adopted by State for Site Specific Activites 11-12

Efforts in increasing procurement 13

Result of Crop Cutting 14

Issues for Consideration 15

Page 3: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Chhattisgarh–An Overview

Agro Climatic Zones

Northern Hills Zone

Chhattisgarh Plains Zone

Bastar Plateau Zone

Sub-divided into three agro climatic zones.

Geog. area : 138 lakh ha.

Forest cover : 63.36 lakh ha. (46%)

Net sown area : 47.75 lakh ha.

(35 % of its geog. area)

57 % soil is medium to light.

Average rainfall : 1327 mm.

Net Irrigated Area : 16.87 lakh ha (35%)

Farm families : 37.46 lakh

80% small & marginal Farmers

32% ST, 12 % SC

Cropping intensity : 138 % 11

Page 4: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

(a.) Component-wise Achievement - BGREI Year 2013-14

S. No.

Components

Approved Programme

Achievement

Phy Fin. Phy.Fin.

(upto March 14)

Fin.(upto

20.10.14)

Total Fin.

A. Rice Block Demonstration          

1

(a) Rainfed Upland Rice 20400 1614.05 20688 1270.88 417.24(Payment made to

institutions against

supplied inputs)

(b) Shallow Low land Rice 30400 2405.25 31205 1877.75

(c) Irrigated - Traditional Variety 39394 2699.28 37268 2208.56

(d) Irrigated - Hybrid 20900 1633.75 20379 1363.50

  Total (A) 111094 8352.33 109540 6720.69 417.24 7137.93

B. Assets Building          

2 Dug Wells/Borewell 3000 900.00 0 0.00  - 0.00

3Paddy Transplanters (Asst.@ Rs. 40,000 /-unit )

0.00 60.00 31 11.60 - 11.60

4Distri. of Agri.Impl. As per MMA Norms

0.00 700.00 5084 561.46 -  561.46

  Total (B)   1660.00   573.06 0.00 573.06

Unit : Rs. in lakhs

22

Page 5: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

S. No.

Components

Approved programme Achievement

Phy Fin. Phy.Fin.

(upto March 14)

Fin.(upto

20.10.14)

Total Fin.

C State Specific          

5 Construction of Check dams 273 2507.43 236 1867.83 172.85 2040.68

6 Construction of MIT 35 837.53 20 269.06 193.48 462.54

  Total (C)   3344.96   2136.89 366.33 2503.22

D Marketing Support   2044.00   0.00   0.00

  Grand Total (A+B+C+D)   15401.29   9430.63 783.57 10214.20

Total allotment received 10225.00

Expenditure (Upto March 14) 9430.63

Expenditure (upto Oct. 14) 783.57

Toal Expenditure 10214.20

Expenditure % 99.89

Contd. . .

Due to unavailability of fund.

Unit : Rs. in lakhs

Final progress report and utilization certificate submitted to GOI vide letter No. 407 dt. 28.10.14 .

33

Page 6: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

• Increase in area under improved technology • Increase in area under improved technology

IMPACT IMPACT

Particular Unit 2010 2013 % Increase

SRI Method 000 Ha. 12.25 68.0 455

Line Sowing 000 Ha. 245 285 16

• Use of Quality Seed• Use of Quality Seed

Particular Unit 2010 2013 % Increase

SRR (Rice) % 28.41 40.23 11.82

Area Under Hybrid Rice 000 Ha. 123.78 199 61

• Increase in Production and Productivity • Increase in Production and Productivity

Particular Unit 2010 2012 % Increase

Productivity Kg/ha. 1751 2041 17

Production 000 MT 6159.10 7340.30 19

44

Page 7: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Assessment of NFSM, during 2013-14

Components of

NFSM

Approved

Programme for

2013-14

Financial

Achievement

during 2013-14

% Financial

Achievement

Rice 5481.80 3738.11 68.19

Pulses 2798.10 1883.71 67.32

A3P 1849.00 1123.84 60.78

Rs. In Lakh

55

Page 8: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Unit : Rs. in lakhs

(b) Component-wise achievement - BGREI Year 2014-15 (upto 20.10.14)

S.No.

Components

Approved Programme

Achievement(upto 20.10.14)

Phy. Fin. Phy. Fin.

1

Block Demonstration

(a) Rainfed Upland Rice Unit Cost : Rs. 7500 per ha. 15000 1125.00 9433 274.68

(b) Shallow Low land Rice Unit Cost : Rs. 7500 per ha.

28300 2122.50 15989 597.65

(c) Irrigated - Traditional Variety Unit Cost : Rs. 7500 per ha.

41500 3112.50 25484 645.24

(d) Irrigated - Hybrid Unit Cost : Rs. 7500 per ha. 22533 1690.00 42779 2245.00

TOTAL (Demonstration) 107333 8050.00 93685 3762.57

Payments being made to institutions.

66

Page 9: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Contd. . .

S.No.

Componets

Approved Programme

Achievement(upto 20.10.14)

Phy. Fin. Phy. Fin.

Asset Building

2Shallow Tubewell @Rs. 20000 per unit (For drilling Rs. 5000 and Installation of pump Rs. 15000)

2500 500.00 1050 192.40

3 Borewell @Rs. 30000 per unit 2000 600.00 20 0.00

4 Agriculture Implements 50% cost limited

a Zero till seed drills/Seed Drills/Power Weeders/Paddy Thresher (Max. Rs. 15000)

100 15.00 9 0.00

b Self propelled paddy transplanter (Max. Rs. 75000) 30 22.50 7 5.25

c Conoweeder/Manual Sprayers (Max. Rs. 600) 2000 12.00 995 6.00

d Drum Seeders (Max. Rs. 1500) 50 0.75 15 2.25

e Power Knapsack Spryer (Max. Rs. 3000) 800 24.00 225 6.75

f Multi-crop Thresher (Max. Rs. 40000) 195 78.00 10 4.00

  TOTAL (Implements) 3175 152.25 1261 24.25

Unit : Rs. in lakhs

77

Page 10: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Unit : Rs. in lakhs

Contd. . .

S.No.

Componets

Approved Programme

Achievement(upto 20.10.14)

Phy. Fin. Phy. Fin.

Site Specific

5Construction of Check dams in Govt. Land @ Rs. 10 Lakh

389 3890.00 127 1269.70

6Construction of MIT in Govt. Land @ Rs. 25 Lakh

10 250.00 4 0.000

Marketing Support

7Marketing Support (Construction of Pakka Chabutra for Stacking of paddy purchased by PACS)

1479 1610.00 0 0.00

  Grand Total   15052.25   5248.92Allotment Received 8050.00

Expenditure (upto 20 Oct. 14) 5248.92

Ex- % 65%

88

Page 11: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Line Sowing Weeding by Conoweeder

Transplanting SRI Method

99

Page 12: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Component-wise Financial Achievement under NFSM

up to 2nd Quarter during 2014-15

Components of

NFSM

Fund

Allocated by

GOI for 2014-

15

Fund Released

by GOI up to

2nd Quarter

(july-sep) 2014-

15

Financial

Achievement

up to 2nd

Quarter (july-

sep) 2014-15

Financial

%

Achievement

Rice 5149.65 2574.83 994.91 38.64

Pulses 4252.61 2126.31 593.28 27.90

Coarse Cereals 186.00 93.00 13.47 14.48

Total 9588.26 4794.14 1601.66 33.41

Rs. In Lakh

1010

Page 13: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

(c) Strategy Adopted by State for Site Specific Activities

Average rainfall of the state is fairly high (1327 MM).

For conservation and its utilization of runoff water rainwater harvesting

structures are being constructed under site specific activity.

Site selection is done with the consent of gram panchayat / Zila panchayat

are authorized to accord administrative sanction upto 20 lakh.

Components 10-11 11-12 12-13 13-14 TotalEstimated Area brought under Irrigation (Ha.)

Construction of Check Dams

224 158 273 225 880 11583

Construction of Micro Irrigation Tanks

100 32 103 20 255 6375

Drilling of Tubewell (State scheme with top-up subsidy - BGREI)

- 4537 1601 - 6138 12270

1111

Page 14: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Check damCheck dam

Minor Irrigation TankMinor Irrigation Tank

1212

Page 15: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

(d) Procurement and Storage

2007-08 2008-092009-

10

2010-

112011-12

2012-

13

2013-

14

Target

for 2014-15

31.51 37.47 44.08 50.73 59.59 71.48 79.29 80.00

Procurement in Minimum Support Price (Paddy)

(Lakh MT)(Lakh MT)

State Govt. has made adequate arrangement to procure

paddy from farmers at minimum support price through 1,976

centers across the state. Online monitoring system and

same day payment through cheque have been ensured.

Procurement arrangement for kharif marketing season, 2014 Procurement arrangement for kharif marketing season, 2014

1313

Page 16: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

(e) Result of Crop Cutting Year 2013-14

SituationNo. of Cluster

Demonstration Plot Control Plot

Prod. increased

%

No. of Crop

Cutting

Prod. under

5x5 (kg.)

Prod. per ha.

(qtls.)

No. of Crop

Cutting

Prod. under 5x5 (kg.)

Prod. per ha. (qtls.)

1 2 3 4 5 6 7 8 9

Upland 140 2066 9.607 38.43 1983 7.998 31.99 20%

Shallow low land

187 3143 9.868 39.47 2842 8.445 33.78 17%

High yielding 221 4299 10.720 42.88 4017 9.036 36.14 19%

Hybrid 171 2484 11.464 45.86 2347 9.831 39.32 17%

1414

Page 17: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

(f) Issues for consideration

State may be given liberty for selection of varieties under block

demonstration and general distribution as per the local situations

& suitability.

State Government should be permitted for inter-componental

change upto the 20% within approved programme.

1515

Page 18: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.
Page 19: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Physical Target and Achievement under NFSM-Rice during 2013-14

S.

N

Intervention Unit Physical Target

Physical

Achievement

%

Achievement

1 Demonstration Ha 28,926 33,149 116.61

2 Seed Distribution Qtl 3,45,000 2,71,772.03 78.77

3 Plant and Soil Conservation Management

a Micronutrients and Soil Ameliorents

Ha 21,000 25,780.86 122.77

b Plant Protection Ha 1,16,350 38,867.43 59.19

4 Resource Conservation Techniques and Tools

Nos 12,299 60,423 491.28

5 Pump Distribution Nos 424 284 66.98

6 Cropping System Based Training

Nos 200 188 94.00

Page 20: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Physical Target and Achievement under NFSM-Pulses during 2013-14

S.

N

Intervention Unit Physical Target

Physical

Achievement

%

Achievement

1 Demonstration + A3P Ha 47,690 45,265 94.91

2 Seed Distribution Qtl 56,167 35,721.70 63.59

3 Plant and Soil Conservation Management

a Micronutrients and Soil Ameliorents

Ha 17,800 19,501.20 109.55

b Culture Distribution Ha 1,62,600 1,07,069.5 65.85

c Integrated Pest Management

Ha 34,000 31,889 93.79

4 Resource Conservation Techniques and Tools

Nos 4,105 10,322 257.00

5 Pump Distribution Nos 50 108 216.00

6 Sprinkler Distribution Ha 1,000 653.58 65.36

7 Cropping System Based Training

Nos 180 154 85.56

Page 21: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

Physical Target and Achievement under NFSM-Rice & Pulses during 2014-15

S.

N

Intervention Unit Physical Target

Physical

Achievement

%

Achievement

1 Demonstration (Rice) Ha 39,190 37,141 94.77

2 Demonstration (Pulse) Ha 24,237 15,852 65.40

3 Seed Distribution (Rice) Qtl 30,982 17,879.49 57.71

a Seed Distribution (Pulses)

Qtl 23,800 3,326.62 13.98

b Rotavator Distribution Nos 450 167 37.11

c Seed Drill Distribution Nos 800 170 21.25

4 Sprinkler Distribution Nos 2,995 140.67 4.70

5 Micronutrients Distribution (Rice)

Ha 20,000 6,782 33.91

6 Micronutrients Distribution (Pulses)

Ha 18,000 2,010 11.16

7 Godown Construction Nos 200 7 3.5

*

*

* Due to un-availability of seeds of varieties of less than 10 years.

Page 22: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.
Page 23: Bringing Green Revolution in Eastern India (BGREI) II nd Meeting of Central Steering Committee Meeting dt. 31.10.2014 Department of Agriculture, Chhattisgarh.

BGREI Districts

Year 2010-11 to 2013-14 Year 2014-15

BGREI Districts (11)NFSM District (16)

BGREI Districts (8)NFSM Districts (19)