Case Study Brighton Secondary College Brighton, Victoria Replacement of a synthetic hockey facility Name of Project Brighton Secondary College Date of Project February 2015 Value of Project P.O.A FIH/ITF Certification Fully Compliant Health and Safety Full Compliance Project Description Removal and replacement of synthetic hockey facility Size: 6100m 2 Removal of existing 25mm sand filled surface and roll out shock pad. Installation of new 12mm insitu rubber shock pad. Surfacing with POLIGRAS H.T Coolplus Line marking for 8 tennis courts, hockey and 2 half hockey fields.