Briefing on the Northern and Trans Pennine ITTs Transforming the North’s Railways Richard Watts Rail Development Team Manager Lancashire County Council 15 th April, 2015
13

Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Jul 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Briefing on the

Northern and Trans Pennine ITTs

Transforming the North’s Railways

Richard Watts

Rail Development Team Manager

Lancashire County Council

15th April, 2015

Page 2: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Purpose of the briefing

•To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

•Identify key issues; and

•Areas for further action.

Role of Rail North•The new franchises will be managed by a partnership between Rail North and DfT.

•CC John Fillis is the Director appointed to serve on Rail North Ltd for the NW (N)

area:

made up of Cumbria and Lancashire CCs and Blackburn with Darwen BC and

Blackpool BC.

•Rail North will be based in Leeds and share offices with the WYCA.

•The Partnership Agreement between Rail North and DfT was signed by 26th March

Page 3: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Current position in ChorCurrent position in ChorCurrent position in ChorCurrent position in Chorley Boroughley Boroughley Boroughley Borough::::

ServicesServicesServicesServices

•Blackpool to Manchester Airport – TPE (hrly semi fast)

•Blackpool to Manchester Victoria – Northern (hrly slow)

•Blackpool to Hazel Grove – Northern (hrly semi fast)

•Blackpool to Liverpool via Euxton Balshaw Lane – Northern (hrly semi fast

incl Euxton Balshaw Lane)

•Preston to Ormskirk – Northern (13 trains per day all stations incl Croston)

Stations:Stations:Stations:Stations:

All stations are owned by Network Rail and leased to Northern Rail

Community Rail:Community Rail:Community Rail:Community Rail:

West of Lancashire Community Rail Partnership (covers the Preston to

Ormskirk Line)

Electrification: Electrification: Electrification: Electrification:

Liverpool to Preston/Blackpool and Blackpool to Manchester via Chorley

Page 4: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Remapping:

A number of passenger services in Lancashire will transfer to the

new Northern franchise from Trans Pennine Express:

üBlackpool North to Manchester Airport via Preston & Chorley

üBarrow in Furness to Manchester / Manchester Airport via

Lancaster & Preston

üWindermere to Preston / Manchester Airport via Lancaster

• Stations on remapped services will also be transferred to

Northern in Lancashire this affects one station:

üCarnforth

A number of other services across the north are also being

remapped.

Page 5: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Rolling stock:•Removal of all Pacer units by 2020 (class 142/143/144 – rail buses)

•New trains – minimum 120 new build vehicles for use on non electrified routes

•Northern has about 240 Pacer vehicles comprising 2 and 3 car trains

•Full refurbishment of all units remaining in the fleet post 2019 so that they comply with PRM – TSI requirements

•By 2020 Northern Regional Passenger Services to feature:

ü Effective air conditioning and heating systems

ü Fixed or folding tables

ü Power sockets or USB charging points

ü Adequate space for luggage

ü Compliance with PRM – TSI requirements

ü Deployment on services transferred from TP to Northern but also on other Northern Regional Services

•Action points:

ü Which additional services should be branded as ‘Northern Regional Passenger Services’?

ü Need to maintain pressure on bidders and government to ensure enough new vehicles are

built to replace all Pacers.

All Pacers to be replaced under the

rolling stock plans for the new

Northern franchise

Page 6: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Passenger Services (1)

• Overviewü Extra weekday services

ü Extra Sunday services

ü Bidders asked to submit proposals for services on Boxing Day

• Changes to note1 - weekdays

ü By Dec 2017 Manchester to Blackburn – additional 8 return off peak services to provide 1/2

hourly frequency (N)

ü By Dec 2017 additional evening return Manchester to Glasgow service (TP)

ü By Dec 2017 2 return journeys Windermere to Manchester Airport (N)

ü By Dec 2019 2 additional journeys between Skipton and Lancaster (N)

ü At start of franchise extension of the (Wigan) Manchester - Todmorden service to Blackburn via

Burnley via Todmorden Curve funded by Lancashire CC. (N)

•Changes to note 2 – Sundays

ü By Dec 2017 additional return journey between Manchester and Glasgow (TP)

ü All year round Sunday service between Preston and Blackpool South (N)

•In addition

ü TP bidders have been asked to look at the potential for a Liverpool/Blackpool to Scotland service

via the WCML. (TP)

Page 7: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Passenger Services (2)Passenger Services (2)Passenger Services (2)Passenger Services (2)Trans PennineThe Manchester Airport to Scotland services will revert to the Bolton/Chorley route on completion of electrification –

expected during 2017.

Northern (based on to Manchester services)

Notesa.One TP train stops at Adlington

b. Does not include potential TP stops at Chorley in the Scotland to Manchester airport service.

c.Potential for the Manchester airport to Scotland services to call at Chorley/Buckshaw Parkway (TP)

d.Potential for the Barrow and Windermere to Manchester Airport services to call at Chorley/Buckshaw Parkway up to 12 trains per day (N)

Current frequency Dec 2017 Dec 2019

Buckshaw Parkway 46 50 50

Chorley 50 50 (b) 50 (b)

Adlington 23(a) 22 22

Euxton Balshaw Lane 16 18 18

Croston 13 14 14

Page 8: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

STATIONSSTATIONSSTATIONSSTATIONSStation Improvement Fund

• £30m fund for Northern only

ü At least £15m for stations with a footfall of 100,000 or lower

ü At least £10m for stations with a footfall of 101,000 to 250,000

ü At least £5m for stations with a footfall of over 250,000

• Areas for action:

ü Safety and security eg CCTV, help points

ü Information eg CIS, LLPA, information panels

ü Ticket and other retailing purchases eg TVM, coffee karts etc

ü Physical comfort eg adequate passenger waiting shelters, seats, heated waiting areas

• Action points

ü Gap analysis of all Northern stations in Lancashire

ü Identification of where new or additional facilities may be required

• Timescale:

ü Between 2016 and 2018

• Note:

ü This won’t fund big projects such as access ramps or lifts which are dealt with through

Access for All

Page 9: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

STATIONS (continued)•Social and Commercial Development Plan

ü Covers a rolling 40 year period

ü Aim to better use redundant space at stations for:

§ Commercial use

§ Community possibly in partnership with CRP’s, social enterprises or charitable

organisations

ü Plan requires regular consultation with customers and local communities to identify priorities

for

Investment

•Station Asset Management Plan

ü Covers a rolling 40 year period

ü Transfer of some assets where there is split responsibility between the TOC for maintenance

and Network Rail for renewal.

•Customer and Communities Improvement Fund

ü Aim to improve customer experience in the latter years of the franchise

ü No set projects but could be used for small scale station investments, transforming stations

into ‘community hubs’, ticket retailing initiatives etc

ü For Northern this will be £2.3m per year from 2020

ü For Trans Pennine this will be £700,000 per year from 2020

ü Action point: paper developed by ACoRP on stations as ‘Community Hubs’.

Page 10: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

COMMUNITY RAIL (Northern ITT)• The ITT significantly increase support for the 19 CRPs across the north of England.

• One CRP in area - West of Lancashire CRP covering Preston to Ormskirk.

• The draft Franchise Agreement mandates that the Northern franchise will contribute

£500,000 per annum towards the 19 CRPs.

• A senior manager will be appointed by the Northern franchisee to work with CRPs, Rail

North, ACoRP etc.

• A representative from both franchises will attend CRP meetings.

• An annual conference for all N orthern CRPs will be arranged jointly by both

franchisees and in partnership with ACoRP.

• Produce an annual ‘Community Rail Report’ this MUST demonstrate that the franchisee

has discussed with each CRP its funding requirements.

• Develop a new Station Adopters Scheme

•To note:

•The 4 Lancashire CRPs could receive around £100k per annum which will meet the

wages for the 2 Community Rail Development Officers and support small scale projects.

Page 11: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Other points:Other points:Other points:Other points:

•Increased capacity especially on routes into the main city regions

•Fares – no +2% rise to pay for the transformational package of

improvements

•Fare simplification especially between shire and PTE areas

•Introduction of SMART ticketing

•Gradual introduction of Driver Controlled Operation (DCO) with drivers

being responsible for all safety aspects of the train including the

operation of the doors while the conductor will be responsible for

customer facing duties including ticket sales, provision of information

and passenger comfort.

•Improved customer satisfaction targets

Page 12: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Role of Rail North

Page 13: Briefing on the Northern and Trans Pennine ITTs ... · 15 th April, 2015. Purpose of the briefing •To provide an overview of the key points in the ITTs for Northern and Trans Pennine;

Questions?Questions?Questions?Questions?