Top Banner
BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood Executive Director Ouachita River Valley Association 1
34

BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

Dec 29, 2015

Download

Documents

Magdalen George
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

BRIEFING FORBG DUKE DELUCA

COMMANDER, MISSISSIPPI VALLEY DIVISIONPRESIDENT-DESIGNEE, MISSISSIPPI RIVER

COMMISSIONJANUARY 22, 2014

William B. HobgoodExecutive Director

Ouachita River Valley Association1

Page 2: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA HISTORY

• 1893 – “Ouachita River Improvement Association”

• 1950 – “Ouachita River Valley Association”

2

Page 3: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

AREA OF OPERATION

3

Page 4: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA MISSION

• Non-profit organization that promotes development of water and land resources

• Major focus is on operation, maintenance and completion of Ouachita-Black Rivers AR and LA,

Navigation Project

• Represent the private sector of the economy

4

Page 5: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA ORGANIZATIONAL STRUCTURE

OFFICERS BOARD OF DIRECTORS STAFF - President - Louisiana – 7 -Executive Director- Vice President - Arkansas – 7

- Sec./Treasurer

GENERAL MEMBERSHIP REVENUE

100 +

5

Page 6: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

PROJECT/STUDY

1. Ouachita-Black Navigation Project, Red River to Camden, AR

2. Ouachita-Black Navigation Project, Red River to Camden, AR – Bank Stabilization

3. Ouachita-Black Navigation Project, Red River to Camden, AR – Little River Addition

4. Ouachita River Levees, LA

5. Arkansas Lakes - Ouachita, DeGray, and Greeson

6. Ouachita River Watershed Study, AR and LA

ORVA SUPPORTED STUDIES/PROJECTS

OUACHITA RIVER BASIN, AR AND LA

6

Page 7: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

Ouachita-Black Navigation Project

7

Page 8: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

8

Page 9: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

9

Page 10: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

10

Page 11: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

Red-Ouachita Basin Levees, Louisiana11

Page 12: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

12

Page 13: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

Ouachita River Watershed13

Page 14: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

OUACHITA-BLACK WATERWAY SYSTEM

“MUCH MORE THAN NAVIGATION”

14

Page 15: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

OUACHITA-BLACK RIVERS NAVIGATION PROJECT

FUNDING(in millions)

FY 2006-2010 FY FY FY FY Avg. 2011 2012 2013 2014$10.9 $7.5 $7.4 $7.5 $9.7 $3.2 supplemental $10.6

15

Page 16: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

Dredge Butcher Conducting Dredging Operations on the Ouachita River

$3.2 Million Needed Annually for Dredging Operations

16

Page 17: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

INLAND MARINE TRANSPORTATION SYSTEM STUDY

GUIDELINES TABLE

BUILDING STRONG®

11

Guidelines Table

Level #

Title Guideline for Range of Lock Operation Data

1 Full 24/7/365 More than 1000 commercial lockages per year

2 Two Shifts Per Day

Between 500 to 1000 commercial lockages per year.

3 One Shift Per Day

Less than 500 commercial lockages per year

4 Set times per day Limited commercial and/or substantial recreational traffic, with a more consistent pattern of lockage

5 Weekends & Holidays

Little to no commercial lockages with significant recreational lockages (500 or more per year) with no consistent pattern.

6 Commercial Lockages by Appointment only

Limited commercial traffic with no consistent pattern of lockage.

Guidance to district to start the evaluation of possible reduction options:Identify initial candidates and then look at other factors (per the process)

17

Page 18: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

REDUCTION IN OPERATIONAL SERVICESOUACHITA-BLACK RIVERS NAVIGATION

PROJECT

-Effective July 29, 2012 - 3 shifts to 2 shifts

- Jonesville and Columbia Locks & Dams – 18 hrs. daily-Felsenthal & Thatcher Locks & Dams – 16 hrs. daily

August 1, 2013 - Jonesville and Columbia Locks & Dams – 20 hrs. daily

- Felsenthal & Thatcher Locks & Dams – No Change

- FUTURE – Jonesville and Columbia – Back to 24/7/365

-Felsenthal and Thatcher Lock and Dams – Based on IMTS Criteria After Installation of Remote Control

18

Page 19: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

OUACHITA-BLACK RIVERS NAVIGATION PROJECT

IMTS IMPACTS(July 29, 2012 – July 29, 2013)

No. of Commercial Lockages

No. of Tows Delayed

Average Delay Time

Total Delay Time

Direct Financial Loss

875 127 1.75 hours 220.8 hours $66,200----------------------------------------------------------------

- Shippers Incurring Delays/Financial Losses - One out of seven tows being delayed/15 percent- Recreational craft lockages down 50-60 percent- No new industries located on Ouachita-Black Rivers 19

Page 20: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

RECENT POSITIVE DEVELOPMENTSOUACHITA-BLACK RIVERS

NAVIGATION PROJECT, AR & LA

-Operational Hours Increased at Jonesville/Columbia L&D

-2013 Tonnage Exceeds 1 mil.

-Significant New Fuel Shipment by Genesis Energy/Placid Refining Co.

-TETRA Technologies Growth

-Hydropower Initiative20

Page 21: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

TONNAGEOUACHITA-BLACK RIVERS

NAVIGATION PROJECT, AR & LA

YEAR TONNAGE2000 1,476,0002003 2,198,0002006 2,029,0002009 1,283,0002011 942,5472012 955,0002013 1,023,000

21

Page 22: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

22

FUEL BARGES UNLOADINGRED RIVER TERMINAL, MONROE DIVISION

GENESIS ENERGY

Page 23: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

TETRA TECHNOLOGIES, INC.BARGE SHIPMENTS*

CROSSETT, ARKANSAS

2011 82012 212013 302014 48

*Typically each barge holds 1,400 tons

23

Page 24: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

24

HYDROPOWER DEVELOPMENT INITIATIVEOUACHITA/BLACK RIVERS NAVIGATION

PROJECT, AR & LA

COMPANYFREE FLOW POWER

BOSTON, MA

STRUCTURES (L&D’s)

- Jonesville L&D Study in Process - Columbia L&D Permit Applied For - Felsenthal L&D Study in Process - H. K. Thatcher L&D Under Consideration

Page 25: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA Semi-Annual Congressional Visits

25

Page 26: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

26

Page 27: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

27

Page 28: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA Meets With Senior USACE Officials 28

Page 29: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA Briefs MRC During High and Low Water Inspections

29

Page 30: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA’S 49TH ANNUAL CONVENTIONAugust 26-27, 2014

West Monroe, LA Convention CenterWest Monroe, LA

Photos of West Monroe, LA Convention Center

30

Page 31: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

ORVA 2014 ANNUAL CONVENTIONAUGUST 26-27, 2014WEST MONROE, LA

PRINCIPAL FEDERAL SPEAKERS

- Senator David Vitter - BG Duke DeLuca, Commander, MVD - Congressman Vance McAllister - COL John Cross, District Engineer

STATE SPEAKERS-State Representative Karen St. Germain, Chairperson, House of

Representatives Transportation Committee-Robert Barham, Director, LA Dept of Wildlife and Fisheries

-Garrett Graves, Office of the Governor, LA Coastal Restoration

-PRIVATE SECTOR SPEAKERS-Dr. Keith Ouchley – LA Nature Conservancy

31

Page 32: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

32

Page 33: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

33

Page 34: BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

CONCLUSIONS: 1.NAVIGATION PROJECT FACES DIFFICULTY2. THINGS ARE IMPROVING3. NEED MVD/MRC SUPPORT - Keep Projects Viable - Obtain Authorization4. ORVA’S POSITION - Fully Funded Navigation Project ($11 Million annually) - Operate Navigation Project 24/7/3655. ORVA will “Stay in Fight”6. Thanks

34