(brief) Update on the target facility M. Calviani , on behalf of the CENF SBWG team CENF PTM meeting – 5 th February 2014
12

(brief) Update on the target facility

Feb 16, 2016

Download

Documents

serge

(brief) Update on the target facility. M. Calviani , on behalf of the CENF SBWG team CENF PTM meeting – 5 th February 2014. Updates on integration work. Mass 35t. Upgrades on the support module design Detail about the air tightness - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: (brief) Update on the target facility

(brief) Update on the target facility

M. Calviani, on behalf of the CENF SBWG teamCENF PTM meeting – 5th February 2014

Page 2: (brief) Update on the target facility

Updates on integration work

Mass 35t

Upgrades on the support module design

Detail about the air tightness

A new designer (V. Clerc) will start working in the overall integration

S. Girod

Page 3: (brief) Update on the target facility

Outstanding items Target cost very high

due to reduced horn inner conductor (IC) diameter (24 mm Ø) Future mechanical

studies will assume the possibility of a 30 mm IC Ø (MiniBooNE)

Preliminary neutrino studies have been performed for this config.

24 + 12 mm Ø

30 + 12 mm Ø

Page 4: (brief) Update on the target facility

Complete extraction system CV

M. Battistin, M. Archambault

Page 5: (brief) Update on the target facility

Cooling circuits in the cooling room

Horn & Reflector Cooling: 17-22 °C Shield + 2xHelium

cooling: 27-> °C

M. Battistin, M. Archambault

Page 6: (brief) Update on the target facility

CV further feedbacks Hydraulic circuits under completion AL capable of executing a conceptual design of a

purification system for the CENF helium vessel1. He purity in the order of 1% can be reached with a

single membrane circuit2. He purity in the order of 0.1% can be reached with a

double cascade membrane circuit (PRESENT REFERENCE)

3. He purity in the order of the ppm (or more) requires active carbons, silica gel and cryogenic trap technology.

M. Battistin

Page 7: (brief) Update on the target facility

V. Venturi

Page 8: (brief) Update on the target facility

V. Venturi

Page 9: (brief) Update on the target facility

V. Venturi

Page 10: (brief) Update on the target facility

Radioprotection aspects Input for dump design (waste zoning) Air contamination for the He vessel (1%, 0.1%

and ppm)

C. Strabel

Page 11: (brief) Update on the target facility

Dump (1st and 2nd) installation 2 solutions proposed

by EN/HE “open trench” solution Installation with blocks

on baskets After an ensuing

discussions a hybrid solution with the first dump installed via a vertical shaft will be further investigated

R. Rinaldesi, C. Bertone

Page 12: (brief) Update on the target facility

Thanks