Page 1: Bridge Investment Analysis Strategies

1

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Bridge Investment Analysis Strategies

Nathaniel D. Coley Jr.

Economic Analysis Program Federal Highway Administration

Page 2: Bridge Investment Analysis Strategies

2

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Topics

•Economic Concepts/Examples•Strategies for Applying Economic Analysis

to assets with Limited Funding•Life-Cycle Evaluation Framework

•Benefit-Cost Analysis•Life-Cycle Cost Analysis•Items to Consider

Page 3: Bridge Investment Analysis Strategies

3

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Goals

By the end of this Discussion you should:

• Recognize how the economic analysis of bridge life-cycles supports the development of bridge maintenance strategies

• Understand Economic Analysis Methods and available resources

Page 4: Bridge Investment Analysis Strategies

4

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

A Question After 60 Years

Page 5: Bridge Investment Analysis Strategies

5

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Life-Cycle of Highway Projects

16 17 18 19 20

Initial Capital

Cost

Year

Dollars

Benefits

Costs

1514131211109876543210

Typical Life-Cycle Profile

Example Direct Benefits•Life-Cycle Cost Savings•Reduced Accident Costs•Reductions in Delay Costs•Reduced noise or emissions

Example Indirect Benefits•Land use impacts•Employment•Non-user benefits

Page 6: Bridge Investment Analysis Strategies

6

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Application of Economic Analysis: Network View

What are our Bridge Replacement needs over the next 20years given our budget expectations? And when?

Interstate Bridges All Other Except Locals

Page 7: Bridge Investment Analysis Strategies

7

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Interstate Bridges All Other Except Locals

Application of Economic Analysis: Network View

How much will we need for our Bridge Replacement needs over the next 20years given our budget? And when?

How can maintenance/preservation change the numbers?

Page 8: Bridge Investment Analysis Strategies

8

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Application of Economic Analysis: Network View

The result of more aggressive preservation activities on specific elements of interstate bridges?

Interstate Bridges All Other Except Locals

Page 9: Bridge Investment Analysis Strategies

9

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Timing is Everything

Should we act now or wait?Acting now has a benefit cost ratio of 2.2Waiting 7 years has a benefit cost ratio of 3.7Waiting 12 years has a benefit cost ratio of 1.6

Page 10: Bridge Investment Analysis Strategies

10

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Application of Economic Analysis: Project View

What is the best alternative for this project from a life-cycle cost perspective?

Total CostAlternative 1:

Preservation PlanAlternative 2: Replace w/Prestressed Concrete

Bridge Design

Agency Cost ($1000)

User Cost ($1000)

Agency Cost ($1000)

User Cost ($1000)

Present Value 2,961.57 1,759.94 3,098.19 1,608.60

EUAC 123.84 73.59 129.55 67.26Lowest Present Value Agency Cost

Alternative 1: Preservation Plan

Lowest Present Value User Cost

Alternative 2: Prestressed Concrete Bridge Design

Page 11: Bridge Investment Analysis Strategies

11

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Leveraging BCA to Support Policies

BridgeManagement

System

MaintenanceManagement

System

Pavement Management

System

TransportationInvestmentCandidate

File

TradeoffAnalysis

Priority settingResource allocationBudgetingProgramming

Maximizesystemwide

benefits

Equity anddistributional

goals

Policy andpoliticalgoals

Transportation Asset Management Guide:Vol.2 A Focus on Implementation (Chapter 5)

Page 12: Bridge Investment Analysis Strategies

12

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Performance Goals in FHWA 2012 Budget Proposal

• Safety: Reduction in transportation-related fatalities and injuries. (Fatalities and Fatality Rate)

• Environmental Sustainability: Increased use of environmentally sustainable practices in the transportation sector. (No. of Projects with sustainable design and/or tools).

• State of Good Repair: Increased proportion of highways and bridges in good condition. (Pavement and Bridge Condition)

• Livable Communities: Improved networks that accommodate pedestrians and bicycles. (No. of State & MPO Plans that address)

• Economic Competitiveness: Maximum economic returns on transportation policies and investments. (Travel Time Reliability)

Page 13: Bridge Investment Analysis Strategies

13

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Life-Cycle of Highway Projects

16 17 18 19 20

Initial Capital

Cost

Year

Dollars

Benefits

Costs

1514131211109876543210

Typical Life-Cycle Profile

Example Direct Benefits•Life-Cycle Cost Savings•Reduced Accident Costs•Reductions in Delay Costs•Reduced noise or emissions

Example Indirect Benefits•Land use impacts•Employment•Non-user benefits

Page 14: Bridge Investment Analysis Strategies

14

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

The Role of Economic Analysis

Mechanism for monetizing, evaluating and comparing long-term costs and benefits of alternatives Economic analysis results

• Help structure project and program level tradeoffs• Quantify & Qualify costs and benefits to the agency and to roadway users• Support repeatable and transparent project justification and prioritization

Does not provide THE decision. It provides a logical framework to support decisions

Adam Smith

Page 15: Bridge Investment Analysis Strategies

15

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Terminal Serviceability or Health Index

Perf

orm

an

ce

Measu

re

InitialActivity

Activity One Activity Two

Time

How do we expect Maintenance/Preservation to impact performance?

Service Life

Asset Performance

Analysis Period

Page 16: Bridge Investment Analysis Strategies

16

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Definition of Benefit Cost Analysis

For public agencies benefit-cost analysis is essentially ROI. Traditional benefit cost analysis and ROI analysis for transportation includes user benefits (time, cost, safety) for travelers and select environmental effects (air, quality, noise) along with capital, operations, and maintenance(O&M) costs.

Page 17: Bridge Investment Analysis Strategies

17

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Benefit Cost Analysis

•Benefit Cost Analysis - the comparison of benefits over time and of costs over time for proposed projects. BCA is a tool used to aid in public investment decision making by measuring the return on investment(ROI) of spending from the viewpoint of net benefit to society.

•BCA is different from financial analysis, which focuses on how to fund a project

Page 18: Bridge Investment Analysis Strategies

18

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Analyze Risks

Benefit Cost Analysis Establish Objectives

Specify Assumptions

Define Alternatives

Analyze Traffic Impacts

Estimate Benefits and Costs

Compare Net Benefits and Rank Alternatives

Make Recommendations

The Process

Page 19: Bridge Investment Analysis Strategies

19

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Comparing Benefits and Costs

Different BCA Measures

• Net Present Value (NPV)• Benefit-Cost Ratio (BCR)• Other measures include:

Equivalent Uniform Annual Value (EUAV)Internal Rate of Return (IRR)

Page 20: Bridge Investment Analysis Strategies

20

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Life-Cycle Analysis Tools

Software Tools to assist in identifying “good” bridge preservation strategies:BCA.NET: web-based project-level benefit-cost analysis tool NBIAs: network level bridge needs assessment toolNCHRP BLCCA: Project Level Life-Cycle Cost Analysis ToolNIST BLCC: Project Level Life-Cycle Cost Analysis ToolRealCost LCCA Tool: Project Level Life-Cycle Cost Analysis Tool

Page 21: Bridge Investment Analysis Strategies

21

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

21

Life-Cycle Analysis Tools – NIST BLCC

Page 22: Bridge Investment Analysis Strategies

22

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Life-Cycle Analysis Tools – BCA.net

Page 23: Bridge Investment Analysis Strategies

23

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Uncertainty and Risk

Measured uncertainty is known as risk

Basic risk analysis questions are:What can happen?How likely is it to happen?What are the consequences?

Once understood, risk can be capitalized on or mitigated

Page 24: Bridge Investment Analysis Strategies

24

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Boston Central Artery 1985-2007 $2.5 to $14+ Billion

The Poster Child Example

Page 25: Bridge Investment Analysis Strategies

25

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

•Inputs are defined by their range of values and probability of occurrence (probability distribution)

•Through simulation, outputs are expressed as ranges of values with probabilities of occurrence

Inputs Output

Probabilistic Analysis

Page 26: Bridge Investment Analysis Strategies

26

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Simulation Results: HistogramF

req

uen

cy

2.8 2.9 3.0 3.1 3.2 3.3 3.4Range = 0.4

BestCase

WorstCase

MostLikely

Net Present Value (NPV), $Millions

Page 27: Bridge Investment Analysis Strategies

27

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Economic Analysis Tools - Risk

Page 28: Bridge Investment Analysis Strategies

28

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Economic Analysis Tools - Risk

Page 29: Bridge Investment Analysis Strategies

29

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

More Information

Page 30: Bridge Investment Analysis Strategies

30

Bridge Investment Analysis StrategiesNathaniel D. Coley Jr.

Thank You