Top Banner
As of 9/4/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail
60

BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

Sep 22, 2018

Download

Documents

phamnhan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

As of 9/4/2018

Report prepared by NHDOT - Bureau of Planning and Community Assistance

BRIDGE AID PROGRAM

STATUS REPORT

With Bridge Detail

Page 2: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Emergency Repair, West Bath Road over Ammonoosuc River (Village Covered Bridge), Br. #137/095 (Force Acct DOT-Br. Maint)

$0.00 $25,024.74 $6,256.19$31,280.93Bath

14439C

Complete/Final Audit

10/15/2010

Repair completed 2/2010-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, West Road over Hoyt Brook, Br. #098/114 (Municipal Managed Project)

$0.00 $428,236.23 $107,059.06$535,295.29Bradford

14284

Complete/Final Audit

5/19/2011

Inspected 10/14/10-FV45.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Borough Road over Smith River, Br. #130/165 (Municipal Managed Project)

$724,772.99 $647,326.91 $41,036.23$1,413,136.13Bristol

14278A

Complete/Final Audit

5/17/2011

Bristol-Hill Project; Inspected 10/28/10-FV9.6 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, River Road over Mascoma River, Br. #123/126 (Municipal Managed Project)

$286,478.03 $273,008.55 $20,505.80$579,992.38Canaan

14446

Complete/Final Audit

1/30/2014

Cap=100% Const/Federal+State 60/40 [also see A project]--Inspected 8/31/10-FV25.2 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, River Road over Mascoma River, Phase I, Br. #123/126 (Force Acct DOT-Br. Maint)

$0.00 $109,500.17 $30,800.57$140,300.74Canaan

14446A

Complete/Final Audit

10/4/2011

Bailey Bridge installation completed 1/16/07; Removal completed 9/23/10-FV25.2 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, High Haith Road over Squam Lake Channel, Br. #126/139 (Municipal Managed Project)

$0.00 $467,231.16 $23,309.78$490,540.94Center Harbor

15403

Complete/Final Audit

12/21/2010

100% SAB for Construction; Inspected 9/1/10-FV3.3 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Fling Road over Clay Brook, Br. #155/062 (Municipal Managed Project)

$0.00 $518,431.91 $44,295.47$562,727.38Charlestown

13534

Complete/Final Audit

3/15/2013

Construction=100% SAB+5%(Cap)- Bridge Inspection 7/14/11-FV38.6 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Columbia Covered Bridge over Connecticut River, Br. #077/140 (Force Acct DOT-Br. Maint)

$0.00 $200,349.11 $0.00$200,349.11Columbia

13815

Complete/Final Audit

2/7/2011

Columbia-Lemington,VT project; completed 6/17/20100.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Sewalls Falls Road over Merrimack River, Br. #070/117 (Force Acct DOT-Br. Maint)

$0.00 $169,094.74 $42,273.69$211,368.43Concord

12838

Complete/Awaiting Audit

(See also 12004)-Waiting payment from City0.0 14 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2010 Page 1

(Page 2 of 46)Report Date: 9/4/2018 8:11:54 AM

With Bridge Detail

Page 3: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Sandown Road over Exeter River, Br. #047/126 (Municipal Managed Project)

$0.00 $479,347.61 $18,385.75$497,733.36Danville

13535

Complete/Final Audit

10/11/2012

100% Construction w/SAB funds -Bridge Inspected 1/11/11-FV38 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Fordway Road over Beaver Brook, Br. #056/084 (Municipal Managed Project)

$611,455.66 $537,974.07 $32,584.24$1,182,013.97Derry

13650

Complete/Final Audit

4/12/2011

Inspected 11/30/10-FV72.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Area Road over Poor Farm Brook, Br. #147/138

$567,000.00 $589,709.90 $0.00$1,209,637.38Gilford $52,927.48

15626

Complete/Final Audit

10/31/2011

Gunstock Commissioners on behalf of the County; Inspected 8/19/11-FV45.7 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, NHRR over Drakeside Road, Br. #163/121(Closed) (Force Acct DOT-Br. Maint)

$0.00 $16,737.01 $0.00$16,737.01Hampton

15813

Complete/Final Audit

3/19/2010

Bridge Removal-FVN/A NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Pleasant Valley Road over Bunnell Brook, Arthur White Bridge, Br. #223/062 (Municipal Managed Project)

$0.00 $221,166.56 $10,074.00$231,240.56Lancaster

12796

Complete/Final Audit

11/24/2009

Inspected 9/11/09-FV18.4 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Gates Road over Robbins Brook, Br. #098/128 (Municipal Managed Project)

$0.00 $114,458.22 $28,614.55$143,072.77Marlborough

14939

Complete/Final Audit

4/6/2011

Inspection Date 9/28/10-FV71.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lyndeborough Road over South Branch Piscataquog River, Br. #064/056 (Municipal Managed Project)

$0.00 $854,778.90 $136,290.35$991,069.25New Boston

14247

Complete/Final Audit

11/10/2010

Inspected 11/10/10-FV33.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Emergency Repair, Mill Pond Road over Little River, Br. #204/082(Washed out) (Force Acct DOT-Br. Maint)

$0.00 $50,704.82 $22,809.48$73,514.30Nottingham

14943

Complete/Final Audit

11/3/2009

April 2007 Flood Event; BB Installed 12/6/07; inspected 7/23/08Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Garden Road over Little River, Br. #118/053 (Municipal Managed Project)

$308,700.00 $233,021.13 $6,805.28$548,526.41Plaistow

14390

Complete/Final Audit

4/1/2015

Cap=100% Construction/Federal+State Inspected 12/1/10-FV29 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, NH 1A over Sagamore Creek, Br. #198/034 (Municipal Managed Project)

$0.00 $192,386.00 $48,096.50$240,482.50Portsmouth

14493A

Complete/Final Audit

3/9/2011

Temp Repair completed 5/24/10-FV50.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2010 Page 2

(Page 3 of 46)Report Date: 9/4/2018 8:11:54 AM

With Bridge Detail

Page 4: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Durand Road over Carlton Brook, Br. #140/067 (Municipal Managed Project)

$145,828.64 $159,914.79 $15,673.93$321,417.36Randolph

14386

Complete/Final Audit

9/4/2013

Cap=100% Construction/Federal+State (60/40); Inspected 8/12/10-FV46.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lawrence Road over Spicket River, Br. #113/070 (Municipal Managed Project)

$774,068.87 $666,502.52 $37,614.15$1,478,185.54Salem

15593

Complete/Final Audit

12/17/2013

100% Construction/Federal+State - Inspected 3/22/11-FV57.5 13 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Mountain Road over Blackwater River, Pingree Bridge, Br. #095/135 (Municipal Managed Project)

$0.00 $1,142,578.87 $187,382.11$1,329,960.98Salisbury

14626A

Complete/Final Audit

2/28/2012

Inspected 12/8/10 >>Add 14626 to final payment-FV13.7 03F Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Phase I: Northwood-Bow Lake Road over Brook, Br. #085/040 (Municipal Managed Project)

$0.00 $13,566.84 $3,391.72$49,562.68Strafford $32,604.12

15502

Complete/Final Audit

6/30/2009

FEMA Disaster 8/11/08; Inspected 10/15/08-FV46.2 159 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, High Street over Melvin River, Br. #141/068 (Force Acct DOT-Br. Maint)

$0.00 $176,081.17 $44,020.29$220,101.46Tuftonboro

15291

Complete/Final Audit

11/12/2009

Completed 5/1/0940.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Phase I: Connors Mill Road over Schoodac Brook, Br. #194/172 (Force Acct DOT-Br. Maint)

$0.00 $37,858.72 $11,444.68$49,303.40Warner

14519

Complete/Final Audit

11/30/2009

May 06 Rain Event - FEMA (Bailey Bridge removed 4/9/09 )27 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Phase II: Saunders Hill Road over Baker River, Br. #142/096 (Municipal Managed Project)

$226,800.00 $433,637.11 $86,372.30$746,809.41Wentworth

14517A

Complete/Final Audit

8/13/2013

Cap=100% Construction/Federal+State Inspected 11/24/10-FV29.2 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, River Road North over Aldrich Brook, Br. #107/163 (Municipal Managed Project)

$0.00 $56,023.88 $14,005.97$70,029.85Westmoreland

15590

Complete/Final Audit

7/19/2011

Inspected 10/9/08-FV39.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2010 Page 3

(Page 4 of 46)Report Date: 9/4/2018 8:11:54 AM

With Bridge Detail

Page 5: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2010 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2010 Programmed Total

FY 2009 Balance $0.00 $6,538,415.71

$11,000,000.00 $6,804,000.00

$3,645,104.19 $8,814,651.65 $1,019,102.09

FY 2010 Appropriation

FY 2010 Funds Available $11,000,000.00 $13,342,415.71

Minus FY 2010 Programmed Total $6,998,481.77 $10,161,438.07

$4,001,518.23 $3,180,977.65Sub-total

($4,001,518.23)

$0.00

$0.00 $3,180,977.65FY 2010 Balance

$13,564,389.52

State Adjustment:App includes $6.8 M Bond; Federal Adjustment: App includes $7 M ARRA-related Funds

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2010.

$85,531.60

Number of Projects for FY 2010 By Funding Source

Funding or Managed By Tally

Federal/State 1

Federal/State/Municipal 4

Federal/State/Municipal/Other 1

Federal/State/Other 1

State 1

State/Municipal 18

State/Municipal/Other 1

27Total Number of projects

Managed By Tally

Number of Projects for FY 2010 By Managing Lead

Force Acct DOT-Br. Maint 6

Municipality 20

Other 1

27Total Number of projects

FY 2010 Page 4

(Page 5 of 46)Report Date: 9/4/2018 8:11:54 AM

With Bridge Detail

Page 6: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2011 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Places Mill Road over Sunset Lake Outlet, Br. #098/178 (Municipal Managed Project)

$0.00 $430,830.73 $75,478.16$506,308.89Alton

14239

Complete/Final Audit

12/13/2012

Br. Insp. 9/14/11-FV32.1 03P Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, River Street over Squam River, Br. #101/073 (Municipal Managed Project)

$0.00 $385,920.80 $96,480.20$482,401.00Ashland

14262

Complete/Final Audit

1/3/2012

Br. Inspection 12/8/11-FV40.9 105 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Fremont Road over Towle Brook, Br. #147/100 (Municipal Managed Project)

$0.00 $314,430.55 $78,607.64$393,038.19Chester

13696

Complete/Final Audit

11/1/2012

Br. Inspection 12/14/11-FV21.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Tasker Hill Road over Pequawket Pond, Br. #182/066 (Municipal Managed Project)

$0.00 $368,885.70 $57,052.70$425,938.40Conway

15300

Complete/Final Audit

3/31/2011

Bridge Inspected 9/29/10-FV40.6 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, South Avenue over Shield Brook, Br. #066/092 (Municipal Managed Project)

$0.00 $314,273.60 $78,568.40$392,842.00Derry

13651

Complete/Final Audit

11/29/2011

Bridge Inspection 9/19/11-FV58.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Wiswall Road over Lamprey River, Br. #070/072, 069/072 (Municipal Managed Project)

$466,413.78 $454,749.40 $65,952.20$1,721,157.29Durham $734,041.91

14453

Complete/Final Audit

6/22/2011

May 2006 Rain Event - FEMA&OEM; Inspected 12/2/10-FV20.9 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bay Road over Cocheco River, Br. #060/144 (Municipal Managed Project)

$0.00 $314,806.59 $53,026.15$367,832.74Farmington

15677

Complete/Final Audit

9/30/2010

Bridge Inspection 9/30/10-FV40.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Phase II: Mill Brook Road over Mill Brook, Br. #162/139 (Municipal Managed Project)

$0.00 $332,601.47 $78,355.35$410,956.82Grafton

13373A

Complete/Final Audit

2/27/2012

FY10>11-Bridge Inspection 10/20/11-FV19.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, High Street over North River, Br. #063/045 (Municipal Managed Project)

$0.00 $1,117,113.36 $166,934.34$1,284,047.70Lee

14842

Complete/Final Audit

10/17/2012

Bridge Inspected 2/21/12-FV55.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Old Mill Road over Oyster River, Br. #116/130 (Force Acct DOT-Br. Maint)

$0.00 $94,542.71 $23,635.68$118,178.39Lee

14843

Complete/Final Audit

4/22/2011

BM Completion Date 11/9/10-FV99.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2011 Page 1

(Page 6 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 7: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2011 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Stearns Brook Road over Stearns Brooks, Br. #254/038 (Force Acct DOT-Br. Maint)

$0.00 $25,838.09 $6,459.52$32,297.61Milan

20814

Complete/Final Audit

5/6/2014

DOT to install Bailey Br purchased by Town. BM completed 7/5/11-Pay Rec'd 8/11/14-FV21.9 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Village Road over Andrew Brook, Br. #120/078 (Municipal Managed Project)

$0.00 $601,826.34 $93,065.33$694,891.67Newbury

14916

Complete/Final Audit

3/2/2012

Br. Inspected 12/20/11-FV31.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Sutton Road over Ring Brook, Br. #138/072 (Municipal Managed Project)

$0.00 $699,673.87 $114,816.12$814,489.99Newbury

14917

Complete/Final Audit

2/11/2013

Br. Inspected 12/20/11-FV49.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Reed's Farm Road over Brook, Br. #167/148 (Municipal Managed Project)

$0.00 $97,060.27 $24,265.07$121,325.34Newport

15597

Complete/Final Audit

6/2/2011

Town Force Acct Used; Inspected 8/10/10-FV79.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Phase II: Northwood-Bow Lake Road over Brook, Br. #085/040 (Municipal Managed Project)

$0.00 $341,497.44 $55,537.66$397,035.10Strafford

15502A

Complete/Final Audit

4/12/2011

Inspected 12/20/10-FV46.2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, Main Street, Thompson Covered Bridge, Br. #093/124 (Municipal Managed Project)

$514,940.65 $169,805.79 $62,170.40$746,916.84Swanzey

14195

Complete/Final Audit

1/30/2014

Fed Historic Br; Fire protection system & center pier rehab; Completed 10/22/10-FV13.6 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Water Street over Johns River, Br. #106/106 (Municipal Managed Project)

$0.00 $22,944.72 $5,736.18$28,680.90Whitefield

15732

Complete/Final Audit

10/2/2013

Only Paying PE-FV37.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2011 Page 2

(Page 7 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 8: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2011 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2011 Programmed Total

FY 2010 Balance $0.00 $3,180,977.65

$8,000,000.00 $6,804,000.00

$981,354.43 $6,086,801.43 $1,136,141.10

FY 2011 Appropriation

FY 2011 Funds Available $8,000,000.00 $9,984,977.65

Minus FY 2011 Programmed Total $4,000,000.00 $7,012,227.21

$4,000,000.00 $2,972,750.44Sub-total

($4,000,000.00)

$0.00

$0.00 $2,972,750.44FY 2011 Balance

$8,938,338.87

State Adjustment:App includes $6.8 M Bond; Federal Adjustment: App includes $4 M ARRA-related Funds

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2011.

$734,041.91

Number of Projects for FY 2011 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 17

State/Municipal/Other 1

19Total Number of projects

Managed By Tally

Number of Projects for FY 2011 By Managing Lead

Force Acct DOT-Br. Maint 2

Municipality 17

19Total Number of projects

FY 2011 Page 3

(Page 8 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 9: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2012 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Reed Road over West Alton Brook, Br. #078/275 (Municipal Managed Project)

$0.00 $400,968.30 $100,242.08$501,210.38Alton

20403

Complete/Final Audit

7/27/2012

Bid Stage for Contract #2-Br. Inspected 12/20/11 Contract #3-FV56.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old North Branch Road over North Branch River, Br. #130/149 (Municipal Managed Project)

$488,380.13 $519,423.17 $48,459.09$1,056,262.39Antrim

14944

Complete/Final Audit

12/30/2014

Cap=100% Construction/Federal+State (+5%) Br. Inspected 1/11/12-FV38.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Water Street over Great Brook, Br. #178/069 (Municipal Managed Project)

$0.00 $303,557.87 $75,889.47$379,447.34Antrim

15350

Complete/Final Audit

2/15/2012

Bridge Inspected 10/07/10-FV40.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Phase II: West Bath Road over Ammonoosuc River (Village Covered Bridge), Br. #137/095 (Municipal Managed Project)

$0.00 $832,563.62 $208,141.85$3,360,705.47Bath $2,320,000.00

14439

Complete/Final Audit

5/4/2018

Inspected 9/8/14-FV0.0 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Prospect Street over Ammonoosuc River, Br. #071/137 (Municipal Managed Project)

$0.00 $701,048.07 $193,512.02$894,560.09Bethlehem

14228

Complete/Final Audit

1/22/2013

Br. Insp. 12/15/11-FV27 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Blair Road over Pemigewasset River; Blair Covered Bridge, Br. #117/076 (Municipal Managed Project)

$0.00 $864,197.22 $151,288.24$2,738,992.98Campton $1,723,507.52

12407

Complete/Final Audit

3/2/2015

Nat'l Historic Cov Br Preservation Program Br. Inspected 7/30/14-FV16.3 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Washburn Road over Mohawk River, Br. #188/063 (Municipal Managed Project)

$0.00 $49,200.00 $12,300.00$61,500.00Colebrook

21385

Complete/Final Audit

7/10/2012

Br. Inspection 12/13/11-FV16.6 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Davis Road over Smith River, Br. #123/104 (Municipal Managed Project)

$0.00 $352,968.54 $53,346.24$406,314.78Grafton

14627

Complete/Final Audit

3/12/2012

Bridge Inspected 12/16/11 For Estimate this project in ProMIS is under14621-FV30.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Church Street over Beaver Brook, Br. #140/075 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Keene

15345

Complete/Final Audit

5/12/2014

Project is being reprogram to Keene 2934047.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2012 Page 1

(Page 9 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 10: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2012 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Mount Orne Road over Connecticut River; Mount Orne Covered Bridge, Br. #039/105 (Force Acct DOT-Br. Maint)

$0.00 $124,577.12 $31,144.28$155,721.40Lancaster

15924

Complete/Final Audit

7/22/2013

FV2.0 Y Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Millbrook Road over Mill Brook, Br. #084/147 (Force Acct DOT-Br. Maint)

$0.00 $63,281.52 $15,820.38$79,101.90Landaff

20251

Complete/Final Audit

1/11/2012

BM completed 10/13/11-FV41 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Emergency Repair, Phase I: Loon Mountain Road over East Br Pemigewasset River, Br. #212/151 (Force Acct DOT-Br. Maint)

$0.00 $165,090.50 $60,340.04$844,519.90Lincoln $619,089.36

16400

Complete/Final Audit

11/13/2013

FEMA funds for 2 temporary bridges (Phase II=#22292)2.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Historic Preservation, River Road over Clay Brook; Edgell Covered Bridge, Br. #069/190 (Force Acct DOT-Br. Maint)

$0.00 $104,693.52 $26,173.38$130,866.90Lyme

14235

Complete/Final Audit

5/31/2013

21.1 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, Perkins Road over B&M Railroad, Br. #119/074(Closed) (Force Acct DOT-Br. Maint)

$0.00 $60,000.00 $0.00$60,000.00Madbury

15773

Under Design

Bridge Removal 12/0932.0 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Kelley Street over B&MRR/Piscataquog River, Br. #119/045 (Municipal Managed Project)

$4,103,048.47 $494,400.70 $54,352.26$5,249,079.65Manchester $597,278.22

15390

Complete/Final Audit

12/30/2014

Federal+SAB; Br. Inspected 10/01/12-FV87.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Morse Loop Road over Brook, Br. #170/024 (Municipal Managed Project)

$0.00 $41,748.80 $10,437.20$52,186.00Sutton

15346

Complete/Final Audit

6/17/2011

Town closed road & discontinued project-FV53.5 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old Westport Road over Wheelock Brook, Br. #133/163 (Municipal Managed Project)

$0.00 $339,894.26 $55,718.07$395,612.33Winchester

15317

Complete/Final Audit

2/29/2012

Br. Insp. 7/18/11-FV49.8 106 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2012 Page 2

(Page 10 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 11: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2012 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2012 Programmed Total

FY 2011 Balance $0.00 $2,972,750.44

$4,000,000.00 $6,804,000.00

$4,591,428.60 $5,417,613.22 $1,097,164.60

FY 2012 Appropriation

FY 2012 Funds Available $4,000,000.00 $9,776,750.44

Minus FY 2012 Programmed Total $0.00 $7,791,607.19

$4,000,000.00 $1,985,143.24Sub-total

($4,000,000.00)

$0.00

$0.00 $1,985,143.24FY 2012 Balance

$16,366,081.51

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2012.

$5,259,875.10

Number of Projects for FY 2012 By Funding Source

Funding or Managed By Tally

State 1

State/Municipal 16

State/Municipal/Other 3

20Total Number of projects

Managed By Tally

Number of Projects for FY 2012 By Managing Lead

Force Acct DOT-Br. Maint 5

Municipality 15

20Total Number of projects

FY 2012 Page 3

(Page 11 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 12: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2013 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Depot Street over Relief, Br. #181/071 (Municipal Managed Project)

$0.00 $249,767.46 $62,441.87$312,209.33Antrim

14940

Complete/Final Audit

8/4/2017

FV94.7 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Depot Street over Contoocook River Overflow, Br. #183/071 (Municipal Managed Project)

$0.00 $428,748.70 $107,187.18$535,935.88Antrim

14941

Complete/Final Audit

6/4/2015

Br. Inspected 11/5/13-FV63.5 8 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Depot Street over Relief, Br. #181/071 (Municipal Managed Project)

$0.00 $249,767.46 $69,738.40$319,505.86Antrim

15349A

Complete/Final Audit

6/4/2015

Br. Inspected 11/5/13--FV47.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Phase II: Depot Street over Contoocook River, Br. #184/071 (Municipal Managed Project)

$0.00 $916,609.62 $233,771.64$1,150,381.26Antrim

15349A

Complete/Final Audit

4/2/2015

Antrim-Bennington Project; PO #400343836 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Chester Turnpike over Murray Brook, Br. #120/149 (Municipal Managed Project)

$0.00 $243,868.66 $60,967.17$363,729.58Auburn $58,893.75

15512

Complete/Final Audit

7/10/2012

April 2007 Flood; Town Force Account - Inspected 11/30/1064.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Cross Road over Gunnison Brook, Br. #105/129 (Municipal Managed Project)

$0.00 $344,910.86 $86,227.72$431,138.58Goshen

16112

Complete/Final Audit

8/26/2013

Br. Inspected 8/1/2013-FV40.9 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, South Merrimack Road over Witch Brook, Br. #122/164 (Municipal Managed Project)

$0.00 $249,199.98 $62,300.00$311,499.98Hollis

14897

Complete/Final Audit

7/10/2012

Inspected 12/6/07-FV37.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Spring Street over Beaver Brook, Br. #140/078 (Municipal Managed Project)

$0.00 $85,114.71 $21,278.67$106,393.38Keene

14441

Complete/Final Audit

1/16/2014

Only paying PE and ROW. City withdrew construction-FV48.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Wire Road over Baboosic Brook, Br. #098/174 (Municipal Managed Project)

$0.00 $828,074.16 $207,018.55$1,035,092.71Merrimack

15839

Complete/Final Audit

9/16/2013

Inspected 6/27/13-FV86.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Emerson Way over Widow Harris Brook, Br. #114/108 (Municipal Managed Project)

$0.00 $406,066.26 $101,516.56$507,582.82Salem

14881

Complete/Final Audit

1/2/2013

Br. Insp. 3/23/11-FV23.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2013 Page 1

(Page 12 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 13: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2013 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Providence Hill Road over Providence Hill Brook, Br. #120/155 (Municipal Managed Project)

$0.00 $94,206.84 $23,551.71$117,758.55Salem

20225

Complete/Final Audit

5/30/2013

Only paying PE--Br. Inspection 10/15/13-FV52.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Cobble Hill Road over California Brook, Br. #082/115 (Municipal Managed Project)

$0.00 $1,180,838.16 $295,209.54$1,476,047.70Swanzey

14918

Complete/Final Audit

2/28/2014

PO #4002971; Inspected 12/3/13-FV46.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Warmac Road over Perry Brook, Br. #135/068 (Municipal Managed Project)

$0.00 $451,088.82 $112,772.20$563,861.02Swanzey

15348

Complete/Final Audit

2/28/2014

PO 4002970 Br. Inspected 12/3/13-FV39.8 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Putnam Road over Brook & Brook Overflow, Br. #116/139, 117/138 (Municipal Managed Project)

$0.00 $26,400.00 $6,600.00$33,000.00Temple

14937

Complete/Final Audit

10/18/2012

Engr Study only. Town closed project and substituted another-FV32.2 6 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Stage Road over Little Sugar River; Phase I&II, Br. #035/074 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Unity

14248

Complete/Final Audit

4/13/2012

October 2005 Rain Event-Project completed without DOT funding-FV39.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Evans Road over South Branch Baker River, Br. #136/053 (Municipal Managed Project)

$0.00 $487,227.95 $121,806.99$609,034.94Wentworth

14516

Complete/Final Audit

1/27/2014

Br. Inspected 9/17/13-FV46.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2013 Page 2

(Page 13 of 46)Report Date: 9/4/2018 8:11:55 AM

With Bridge Detail

Page 14: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2013 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2013 Programmed Total

FY 2012 Balance $0.00 $1,985,143.24

$4,000,000.00 $6,804,000.00

$0.00 $6,241,889.64 $1,572,388.20

FY 2013 Appropriation

FY 2013 Funds Available $4,000,000.00 $8,789,143.24

Minus FY 2013 Programmed Total $1,595,421.60 $11,978,199.41

$2,404,578.40 ($3,189,056.17)Sub-total

($2,404,578.40)

$0.00

$0.00 ($3,189,056.17)FY 2013 Balance

$7,873,171.59

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2013.

$58,893.75

Number of Projects for FY 2013 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 19

State/Municipal/Other 1

21Total Number of projects

Managed By Tally

Number of Projects for FY 2013 By Managing Lead

Municipality 21

21Total Number of projects

FY 2013 Page 3

(Page 14 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 15: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2014 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Crawley Falls Road over Exeter River, Br. #073/065 (Municipal Managed Project)

$0.00 $916,457.49 $229,114.38$1,145,571.87Brentwood

15277

Complete/Final Audit

7/25/2016

FY2010>12>13-Br. Inspected 10/29/14-FV32.4 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, New Boston Road over Powwow River, Br. #116/113 (Municipal Managed Project)

$0.00 $331,802.14 $82,950.53$414,752.67Kingston

14973

Complete/Final Audit

7/31/2013

Inspected 5/7/09-FV62.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Manchester Street over Pennichuck Reservoir, Br. #120/026 (Municipal Managed Project)

$0.00 $1,875,047.03 $666,005.34$2,541,052.37Nashua

13964

Complete/Final Audit

2/6/2017

Merrimack-Nashua project (Nashua is managing)-Br. Inspect 9/10/15-FV27.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Willow Street over Beaver Brook, Br. #105/069 (Municipal Managed Project)

$0.00 $1,524,504.80 $381,126.20$1,982,752.00Pelham $77,121.00

26762

Under Construction

56 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Fay Martin Road over Tully Brook, Br. #160/071 (Municipal Managed Project)

$0.00 $452,335.20 $93,093.62$545,428.82Richmond

21190

Complete/Final Audit

11/5/2013

Br. Inspected 7/24/13-FV43.1 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Teague Drive over Spicket River, Br. #095/175 (Municipal Managed Project)

$0.00 $87,092.20 $21,773.05$108,865.25Salem

27202

Complete/Final Audit

3/3/2015

ROW+CON is non-participating-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Plummer Road over Hermit Brook, Br. #148/156 (Municipal Managed Project)

$0.00 $228,204.35 $57,051.09$285,255.44Sanbornton

16081

Complete/Final Audit

12/10/2013

Town replaced without Bridge Aid. SAB paid for Engr Study only-FV14.6 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Cross Road over Town Line Brook, Br. #071/099 (Municipal Managed Project)

$0.00 $380,293.42 $95,073.36$475,366.78Sharon

15513

Complete/Final Audit

11/28/2014

Br. Inspection 10/1/2014-FV66.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Dufour Road over South Branch Baker River, Br. #162/072 (Municipal Managed Project)

$0.00 $317,040.00 $79,260.00$396,300.00Wentworth

14518

Complete/Awaiting Audit

Br. Inspection 8/27/1441.0 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Broad Brook Road over Broad Brook, Br. #070/106 (Municipal Managed Project)

$0.00 $330,921.51 $66,141.58$397,063.09Winchester

15316

Complete/Final Audit

1/5/2015

Br. Inspected 11/18/14-FV25.4 10 Remarks:Red List: FSR: WT: No Outlet: YesYes

FY 2014 Page 1

(Page 15 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 16: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2014 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2014 Programmed Total

FY 2013 Balance $0.00 ($3,189,056.17)

$4,000,000.00 $6,804,000.00

$0.00 $6,443,698.14 $1,771,589.15

FY 2014 Appropriation

FY 2014 Funds Available $4,000,000.00 $3,614,943.83

Minus FY 2014 Programmed Total $0.00 $6,803,340.57

$4,000,000.00 ($3,188,396.74)Sub-total

($4,000,000.00)

$0.00

$0.00 ($3,188,396.74)FY 2014 Balance

$8,292,408.29

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2014.

$77,121.00

Number of Projects for FY 2014 By Funding Source

Funding or Managed By Tally

State/Municipal 15

State/Municipal/Other 2

17Total Number of projects

Managed By Tally

Number of Projects for FY 2014 By Managing Lead

Municipality 17

17Total Number of projects

FY 2014 Page 2

(Page 16 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 17: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Manchester Road over Beaver Brook, Br. #134/100 (Municipal Managed Project)

$0.00 $1,010,489.66 $252,622.42$1,329,826.08Amherst $66,714.00

20242

Complete/Final Audit

2/13/2017

Br. Inspected 4/1/16-FV40.5 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Old Candia Road over Maple Falls Brook, Br. #088/159 (Municipal Managed Project)

$0.00 $267,867.58 $66,966.90$334,834.48Auburn

15657

Complete/Final Audit

9/20/2014

Br. Inspection 12/09/12-FV35.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, River Street over Saco River, Br. #109/113 (Municipal Managed Project)

$0.00 $143,931.19 $35,982.80$719,655.97Bartlett $539,741.98

22893

Complete/Final Audit

3/3/2017

Br Inspected 8-4-16-FV87.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Other, West Street (Old 3-B) over Merrimack River, Br. #132/085 (Municipal Managed Project)

$0.00 $240,058.98 $60,014.74$300,073.72Boscawen

15281

Complete/Final Audit

3/27/2015

Boscawen-Canterbury Bridge Removal Project-FVN/A BRC Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Breezy Hill Road over Warner River, Br. #161/145 (Municipal Managed Project)

$0.00 $1,153,884.19 $288,471.06$1,442,355.25Bradford

15857

Complete/Final Audit

5/8/2017

FY2016>2018; SB367>2015 offered-Br. Inspected 8/30/16-FV32.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Goose Pond Road over Goose Pond Brook, Br. #087/092 (Municipal Managed Project)

$0.00 $498,647.12 $124,661.78$623,308.90Canaan

14952

Complete/Final Audit

4/14/2016

Br. Inspected 12/12/14-FV39.8 6 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Meriden Hill Road over Lyman Brook, Br. #054/032 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Columbia

29388

Complete/Final Audit

1/5/2015

Project is canceled33.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Juniper Hill Road over Brennan Brook, Br. #093/087 (Municipal Managed Project)

$0.00 $400,201.38 $100,050.35$500,251.73Francestown

15762

Complete/Final Audit

2/8/2016

Br. Inspected 10/20/15-FV48.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Woodward Hill Road over Brennan Brook, Br. #121/077 (Municipal Managed Project)

$0.00 $506,913.68 $126,728.42$633,642.10Francestown

15764

Complete/Final Audit

2/8/2016

Br. Inspected 10/20/15-FV41.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Second NH Turnpike over So. Br. Piscataquog River, Br. #125/077 (Municipal Managed Project)

$0.00 $682,308.82 $170,577.21$852,886.03Francestown

22892

Complete/Final Audit

1/3/2014

Br. Inspected 10/10/14-FV40.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2015 Page 1

(Page 17 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 18: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Pelham Road over Second Brook, Br. #129/092(Tentative) (Municipal Managed Project)

$0.00 $622,821.70 $155,705.44$778,527.14Hudson

16175

Complete/Final Audit

Br. Inspected 1/4/16 - PO 4005738-1-Awaiting FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Phase II: Loon Mountain Road over East Br Pemigewasset River, Br. #212/151 (Municipal Managed Project)

$0.00 $1,679,436.10 $419,859.02$8,105,194.14Lincoln $6,005,899.02

22292

Under Construction

FEMA funds. PO #4003795, L2 (See also #16400) - TempBr Rental=$1600/month2 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Jennison Road over Hartshorn Brook, Br. #099/150 (Municipal Managed Project)

$0.00 $470,080.88 $117,520.22$599,246.87Milford $11,645.77

22372

Complete/Final Audit

12/29/2016

[Steel beam rental monthly@$270.83/month] Br. Inspected 11/19/1539.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Jones Crossing over Souhegan River, Br. #062/138(Closed) (Municipal Managed Project)

$0.00 $122,689.54 $30,672.39$153,361.93Milford

29509

Complete/Final Audit

11/28/2016

Bridge Removal - No A&B phases-FVN/A BRC Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Riverdale Road over Mid Branch Piscataquog River, Br. #131/147 (Municipal Managed Project)

$0.00 $739,208.76 $184,802.19$924,010.95New Boston

22352

Complete/Final Audit

8/21/2017

Br. Inspected 11/23/15 -FV100.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Paradise Road over Sugar River, Br. #177/117(Closed) (Municipal Managed Project)

$0.00 $39,016.77 $9,754.19$48,770.96Newport

14969

Complete/Final Audit

9/29/2014

Bridge Closed; Town canceled project 9/25/14-FV16.4 BRC Remarks:Red List: FSR: WT: No Outlet: YesYes

Bridge Replacement, Indian Pond Road over Bean Brook, Br. #108/075(New) (Municipal Managed Project)

$0.00 $69,919.69 $17,479.92$301,161.53Piermont $213,761.92

27450

Complete/Awaiting Audit

FEMA-State paying Construction ONLYRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Cluffs Crossing over Policy Brook, Br. #094/060 (Municipal Managed Project)

$0.00 $666,235.31 $166,558.83$832,794.14Salem

15592

Complete/Final Audit

8/11/2014

Bridge Inspection Approved 9/29/10-FV65.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Pelham Road over Porcupine Brook, Br. #058/074(New) (Municipal Managed Project)

$0.00 $287,702.59 $71,925.65$359,628.24Salem

15596

Complete/Final Audit

9/4/2014

Br. Insp. 3/22/11-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, North Main Street over Widow Harris Brook, Br. #115/115 (Municipal Managed Project)

$0.00 $553,394.25 $138,348.57$691,742.82Salem

15772

Complete/Final Audit

8/11/2014

Inspected 3/23/11-FV52.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2015 Page 2

(Page 18 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 19: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Town Farm Road over Spicket River, Br. #118/116 (Municipal Managed Project)

$0.00 $1,078,943.48 $269,735.88$1,384,623.21Salem $35,943.85

15988

Complete/Final Audit

4/10/2017

PO 4003611-Br. Inspected 6/28/16-FV27.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Other, Lawrence Road over Spicket River (Municipal Managed Project)

$0.00 $25,038.90 $6,259.72$31,298.62Salem

25121

Complete/Final Audit

3/4/2015

FEMA LOMR Prep for Project #15593 [PE, ROW, & Const were done in #15593]-FVRemarks:Red List: FSR: WT: No Outlet:

Bridge Replacement, First Crown Point Road over Big River, Br. #069/164 (Municipal Managed Project)

$0.00 $497,630.05 $76,851.71$574,481.76Strafford

24213

Complete/Final Audit

12/2/2015

Br. Inspected 6/29/15-FV52.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lower Main Street over Sugar River, Br. #094/100 (Municipal Managed Project)

$0.00 $391,175.65 $97,793.91$488,969.56Sunapee

15836

Complete/Final Audit

9/26/2016

FY17>15 PO 4005745-1-Br. Inspected 3/31/16-FV24 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Other, Sawyers Crossing Covered Bridge, Br. #136/143 (Municipal Managed Project)

$0.00 $127,616.33 $18,944.08$146,560.41Swanzey

14196

Complete/Final Audit

1/23/2015

PO#400247-Line 1 for all phases-FV21.8 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Converse Road over Whiting Brook, Br. #110/141 (Municipal Managed Project)

$0.00 $449,830.84 $71,669.21$521,500.05Temple

24178

Complete/Final Audit

12/1/2015

Br. Inspected 7/29/15-FV47.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old Cheshire County Rd over Spring Brook, Br. #205/098 (Municipal Managed Project)

$0.00 $375,368.57 $93,876.16$469,244.73Unity

22977

Complete/Final Audit

12/17/2014

Br. Inspected 8/8/14-FV41.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bartlett Loop Road over Willow Brook, Br. #177/127 (Municipal Managed Project)

$0.00 $275,908.73 $68,977.19$344,885.92Warner

27650

Complete/Final Audit

7/25/2016

Br. Inspected 12/4/15-FV40.9 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Peaslee Road over Piscataquog River, Br. #125/141 (Municipal Managed Project)

$0.00 $993,215.76 $155,856.94$1,149,072.70Weare

14339

Complete/Final Audit

3/16/2015

Br. Inspected 10/29/15-FV29.6 104 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2015 Page 3

(Page 19 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 20: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2015 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2015 Programmed Total

FY 2014 Balance $0.00 ($3,188,396.74)

$4,000,000.00 $14,800,000.00

$0.00 $14,369,536.50 $3,398,666.90

FY 2015 Appropriation

FY 2015 Funds Available $4,000,000.00 $11,611,603.26

Minus FY 2015 Programmed Total $2,665,646.00 $9,703,972.29

$1,334,354.00 $1,907,630.97Sub-total

($1,334,354.00)

$0.00

$0.00 $1,907,630.97FY 2015 Balance

$24,641,909.94

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2015.

$6,873,706.54

Number of Projects for FY 2015 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 17

State/Municipal/Other 3

21Total Number of projects

Managed By Tally

Number of Projects for FY 2015 By Managing Lead

Force Acct DOT-Br. Maint 1

Municipality 20

21Total Number of projects

FY 2015 Page 4

(Page 20 of 46)Report Date: 9/4/2018 8:11:56 AM

With Bridge Detail

Page 21: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2016 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Shaker Road over Pumping Station Brook, Br. #098/062 (Force Acct DOT-Br. Maint)

$0.00 $63,944.83 $15,986.21$79,931.04Belmont

14285

Complete/Final Audit

12/21/2015

73.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, 12th Street over Androscoggin River, Br. #256/087 (Municipal Managed Project)

$0.00 $493,976.58 $123,494.15$617,470.73Berlin

15793

Complete/Awaiting Audit

Br. Inspected 8/7/14-Awaiting FV94.7 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Charcoal Road over Charcoal Brook, Br. #085/103 (Municipal Managed Project)

$0.00 $855,004.56 $213,751.15$1,123,509.21Dublin $54,753.50

15684

Complete/Final Audit

2/21/2017

Ln 1-Br. Inspected 10/13/16-FV28.6 104 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Roberts Road over Snow Brook, Br. #078/114 (Municipal Managed Project)

$0.00 $617,922.75 $154,480.69$772,403.44Eaton

15997

Complete/Final Audit

4/24/2017

FV39.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, McGaw Bridge Road over Baboosic Brook, Br. #116/137 (Municipal Managed Project)

$0.00 $1,591,131.98 $397,783.00$1,995,426.18Merrimack $6,511.20

13923

Complete/Final Audit

10/27/2017

FY12>17 per Town request-FV28.3 20 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bean Road over Baboosic Brook, Br. #072/155 (Municipal Managed Project)

$0.00 $1,213,056.78 $303,264.20$1,516,320.98Merrimack

29736

Complete/Final Audit

9/18/2017

Transdate 10-23-14-FV86.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Deerfield Road over Back Creek, Br. #102/085(New) (Municipal Managed Project)

$0.00 $75,350.94 $18,837.74$265,188.68Nottingham $171,000.00

15720

Complete/Final Audit

8/27/2015

Former culvert -FEMA-Inspection Date 8-25-10; PO #4000912-Line 2-FV86.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Union Road over Nubanusit River, Br. #057/108 (Municipal Managed Project)

$0.00 $1,463,626.51 $365,906.63$1,829,533.14Peterborough

14935

Complete/Final Audit

8/7/2017

FV21.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2016 Page 1

(Page 21 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 22: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2016 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2016 Programmed Total

FY 2015 Balance $0.00 $1,907,630.97

$4,000,000.00 $6,804,000.00

$0.00 $6,374,014.93 $1,593,503.77

FY 2016 Appropriation

FY 2016 Funds Available $4,000,000.00 $8,711,630.97

Minus FY 2016 Programmed Total $0.00 $4,582,972.45

$4,000,000.00 $4,128,658.52Sub-total

($4,000,000.00)

$0.00

$0.00 $4,128,658.52FY 2016 Balance

$8,199,783.40

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2016.

$232,264.70

Number of Projects for FY 2016 By Funding Source

Funding or Managed By Tally

State/Municipal 4

State/Municipal/Other 2

6Total Number of projects

Managed By Tally

Number of Projects for FY 2016 By Managing Lead

Municipality 6

6Total Number of projects

FY 2016 Page 2

(Page 22 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 23: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2017 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Morrill Hill Road over Elbow Brook, Br. #127/106 (Municipal Managed Project)

$0.00 $520,843.20 $130,210.80$651,054.00Andover

14573

Under Construction

41.0 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Wallace Road over Riddle Brook, Br. #130/117 (Municipal Managed Project)

$0.00 $223,064.42 $55,766.10$278,830.52Bedford

20000

Complete/Final Audit

8/8/2016

Br. Insp. 5/2/11-FV72.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Whittier Street over Cocheco River, Br. #111/132 (Municipal Managed Project)

$2,665,646.00 $300,000.00 $741,411.50$4,056,627.50Dover $349,570.00

15402

Under Construction

PE+ROW SAB 80/20 CON MOBRR 80/202 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Echo Valley Farm Road over Griffin Brook, Br. #156/103 (Municipal Managed Project)

$0.00 $324,821.19 $81,205.30$406,026.49EPSOM

15766

Complete/Final Audit

6/29/2018

FV47.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, String Bridge Road over Squamscott River, Br. #102/074, 103/074 (Municipal Managed Project)

$0.00 $1,022,265.60 $255,566.40$1,454,582.00Exeter $176,750.00

15399

Complete/Awaiting Audit

71.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Melendy Road over First Brook, Br. #114/083 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Hudson

13353

Complete/Final Audit

6/30/2016

Substituted with project 40940-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Buffalo Road over Unnamed Brook, Br. #128/073(6/12/06) (Municipal Managed Project)

$0.00 $63,244.40 $15,811.10$316,222.01Rumney $237,166.51

26504

Complete/Final Audit

10/11/2017

FEMA funding-FV18.8 12 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2017 Page 1

(Page 23 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 24: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2017 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2017 Programmed Total

FY 2016 Balance $0.00 $4,128,658.52

$4,000,000.00 $6,804,000.00

$2,665,646.00 $2,454,238.81 $1,279,971.20

FY 2017 Appropriation

FY 2017 Funds Available $4,000,000.00 $10,932,658.52

Minus FY 2017 Programmed Total $0.00 $4,290,833.60

$4,000,000.00 $6,641,824.92Sub-total

($4,000,000.00)

$0.00

$0.00 $6,641,824.92FY 2017 Balance

$7,163,342.52

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2017.

$763,486.51

Number of Projects for FY 2017 By Funding Source

Funding or Managed By Tally

State/Municipal 5

5Total Number of projects

Managed By Tally

Number of Projects for FY 2017 By Managing Lead

Municipality 5

5Total Number of projects

FY 2017 Page 2

(Page 24 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 25: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2018 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Hillside Avenue over Dead River, Br. #232/066 (Municipal Managed Project)

$0.00 $593,381.23 $148,345.31$747,512.54Berlin $5,786.00

15792

Bid Stage

Totals provided by HEB-Awaiting Notice of Award55.3 C3 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Dunklee Road over Bow Bog Brook, Br. #182/113 (Municipal Managed Project)

$0.00 $384,160.00 $96,040.00$480,200.00Bow

40346

Under Design

Tran date 4/10/1545.0 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Breezy Hill Road over Massasecum River, Br. #170/129(Closed) (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Bradford

16106

Complete/Final Audit

12/9/2015

Project Cancelled15.3 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Old Route 110 over Upper Ammonoosuc River, Br. #042/043 (Municipal Managed Project)

$0.00 $1,472,040.00 $368,010.00$1,840,050.00Dummer

15815

Under Construction

46.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Belknap Mountain Road over Gunstock Brook, Br. #184/098 (Municipal Managed Project)

$0.00 $71,677.64 $17,919.41$89,597.05Gilford

15890

Complete/Final Audit

8/28/2017

Br. Inspection 4/15/11; PO #4003779-1-FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Spring Road Culvert over Mount Crescent Brook, Br. #027/112(Culvert) (Municipal Managed Project)

$0.00 $109,466.55 $35,459.45$606,304.00Gorham $461,378.00

41396

Bid Stage

Replacement of culvert-FEMA-SAB starts at PD-Awaiting AwardRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Bypassed Historic over Merrimack River (Lilac Bridge), Br. #083/150 (Municipal Managed Project)

$0.00 $700,000.00 $175,000.00$875,000.00Hooksett

29655

Under Construction

Bridge demolitionN/A BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, County Road over Second Brook, Br. #126/083 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Hudson

13354

Complete/Final Audit

Moved from FY06>FY08>10>13>16>18 Replace with new project 40940-FV49.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Central Street over First Brook, Br. #110/086 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Hudson

40940

Complete/Final Audit

Trans date 5/5/16-Project did not use SAB-FV54.3 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2018 Page 1

(Page 25 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 26: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2018 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, NH 12 over Beaver Brook, Br. #137/059 (Municipal Managed Project)

$0.00 $1,973,129.21 $493,282.30$2,466,411.51Keene

26505

Under Construction

51.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, NH 10 (Winchester Street) over Ash Swamp Brook, Br. #118/051 (Municipal Managed Project)

$0.00 $784,127.18 $196,031.79$980,158.97Keene

29340

Under Design

31.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, US 4 & NH 10 Over Mascoma River, Br. #120/115 (Municipal Managed Project)

$0.00 $1,103,515.66 $275,878.92$1,379,394.58Lebanon

14552

Bid Stage

76.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Oak Street over Sugar River, Br. #103/136 (Municipal Managed Project)

$1,595,421.60 $320,000.00 $478,855.40$2,394,277.00Newport

16109

Bid Stage

PE and ROW=SAB MOBRR=Con only;47.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Barton Road Bridge over Eastman Brook, Br. #092/103 (Municipal Managed Project)

$0.00 $304,548.09 $76,137.02$380,685.11Piermont

16193

Complete/Final Audit

11/26/2017

Br. Inspection 9/10/12; PO #4001792-FV88.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2018 Programmed Total

FY 2017 Balance $0.00 $6,641,824.92

$4,000,000.00 $13,608,000.00

$1,595,421.60 $7,816,045.56 $2,360,959.60

FY 2018 Appropriation

FY 2018 Funds Available $4,000,000.00 $20,249,824.92

Minus FY 2018 Programmed Total $0.00 $6,050,110.25

$4,000,000.00 $14,199,714.67Sub-total

($4,000,000.00)

$0.00

$0.00 $14,199,714.67FY 2018 Balance

$12,239,590.76

Federal Adjustment:Federal share used on other State bridges since State share sufficient to meet requests for aid in 2018.

$467,164.00

Number of Projects for FY 2018 By Funding Source

Funding or Managed By Tally

State/Municipal 13

State/Municipal/Other 1

14Total Number of projects

Managed By Tally

Number of Projects for FY 2018 By Managing Lead

Municipality 14

14Total Number of projects

FY 2018 Page 2

(Page 26 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 27: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Horace Greeley Road over Pulpit Brook, Br. #060/158 (Municipal Managed Project)

$0.00 $1,137,928.09 $284,482.02$1,422,410.11Amherst

20231

Under Construction

Awaiting Notice of Award54.3 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, New Boston Rd over Beaver Brook, Br. #109/090 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Amherst

20243

Complete/Final Audit

Project Canceled61.6 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Mallego Road over Mallego Brook, Br. #139/116 (Municipal Managed Project)

$0.00 $993,280.00 $142,600.00$1,241,600.00Barrington $105,720.00

41398

Under Design

45.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Drew Road over Drew Brook, Br. #167/101(New) (Municipal Managed Project)

$0.00 $241,903.09 $60,475.77$302,378.86Derry

16118

Complete/Final Audit

8/2/2018

Culvert Replaced w/Bridge; Inspected 7/22/11; FVRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, North Shore Road over Tributary I to Beaver Lake Outlet, Br. #099/129(New) (Municipal Managed Project)

$0.00 $326,962.40 $81,740.60$408,703.00Derry

41400

Under Design

Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Ossipee Lake Road over Danforth Bay Outlet, Br. #115/074 (Municipal Managed Project)

$0.00 $510,796.64 $127,699.16$638,495.80Freedom

15987

Under Design

48.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Old Lakeshore Road over Gunstock River, Br. #106/099 (Municipal Managed Project)

$0.00 $340,000.00 $85,000.00$425,000.00Gilford

21107

Under Design

21.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Stage Road over Brook, Br. #106/041 (Municipal Managed Project)

$0.00 $617,406.40 $154,351.60$771,758.00Gilmanton

16232

Under Design

40.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Stage Road over Nighthawk Hollow Brook, Br. #122/041 (Municipal Managed Project)

$0.00 $1,398,988.00 $349,747.00$1,748,735.00Gilmanton

16233

Under Design

50.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, South Road over Minnewawa Brook, Br. #061/060 (Municipal Managed Project)

$0.00 $630,079.60 $157,519.90$787,599.50Harrisville

16114

Bid Stage

38.5 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2019 Page 1

(Page 27 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 28: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Clark Pond Road over Clark Brook, Br. #147/109(Closed) (Municipal Managed Project)

$0.00 $138,000.00 $34,500.00$690,000.00Haverhill $517,500.00

41724

Under Negotiations

Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Valley Cross Road over Wildcat Brook, Br. #153/066 (Municipal Managed Project)

$0.00 $692,800.00 $173,200.00$866,000.00Jackson

40808

Under Negotiations

52.4 12 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Roxbury Street over Beaver Brook, Br. #140/077 (Municipal Managed Project)

$0.00 $663,200.00 $165,800.00$829,000.00Keene

15854

Under Design

18.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, NH 12A over BMRR, Br. #062/117 (Municipal Managed Project)

$6,144,000.00 $28,000.00 $1,543,000.00$7,715,000.00Lebanon

13558A

Under Design

MOBRR and SABRemarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Goffs Falls Road over B&MRR, Br. #188/092(func obsol) (Municipal Managed Project)

$0.00 $1,380,000.00 $345,000.00$1,725,000.00Manchester

15401

Under Design

FY201852.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bedford Road over Baboosic Brook, Br. #113/159 (Municipal Managed Project)

$0.00 $3,707,352.80 $926,838.20$4,634,191.00Merrimack

15841

Bid Stage

88 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Sand Hill Road over Brook, Br. #154/129 (Municipal Managed Project)

$0.00 $80,000.00 $20,000.00$100,000.00Newport

20006

43.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bow Lake Road over Shelburne Brook, Br. #095/113 (Municipal Managed Project)

$0.00 $484,800.00 $121,200.00$606,000.00Northwood

41397

Under Design

26.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Shaw Road over Kelly Brook, Br. #089/135 (Municipal Managed Project)

$0.00 $468,240.00 $117,060.00$585,300.00Pittsfield

14972

Under Design

75.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Westville Road over Little River, Br. #122/072 (Municipal Managed Project)

$0.00 $822,449.10 $205,612.27$1,108,061.37Plaistow $80,000.00

23117

Bid Stage

71.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2019 Page 2

(Page 28 of 46)Report Date: 9/4/2018 8:11:57 AM

With Bridge Detail

Page 29: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, South Policy Street over Porcupine Brook, Br. #083/062 (Municipal Managed Project)

$0.00 $512,571.19 $128,142.80$748,149.66Salem $107,435.67

15989

Complete/Final Audit

8/2/2018

Br. Inspected 2/14/12- FV36.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Quaker Whiteface Road over Whiteface River, Br. #203/138 (Municipal Managed Project)

$0.00 $434,169.60 $108,542.40$542,712.00Sandwich

16014

Bid Stage

PO #400379337.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Huckins Road over Brook, Br. #125/090 (Municipal Managed Project)

$0.00 $244,000.00 $61,000.00$305,000.00Strafford

14790

97.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Rabbitt Hollow Road over Perry Brook, Br. #120/072

$0.00 $530,800.00 $132,700.00$663,500.00Swanzey

41696

Awaiting Town Action

85.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Covered Bridge Road over Mill Brook, Br. #183/107 (Municipal Managed Project)

$0.00 $540,784.80 $135,196.20$675,981.00Thornton

15938

Under Construction

43.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Hazen Road over Johns River, Br. #159/098 (Municipal Managed Project)

$0.00 $140,000.00 $35,000.00$175,000.00Whitefield

16025

40.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, King Brook Road over King Brook, Br. #074/060 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Wilton

15767

Under Design

41.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Castle Hill Road over Beaver Brook, Br. #057/051 (Municipal Managed Project)

$0.00 $640,000.00 $160,000.00$800,000.00Windham

41632

Under Design

38.8 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Pleasant Valley Road over Heath Brook, Br. #116/072 (Municipal Managed Project)

$0.00 $885,345.60 $221,336.40$1,106,682.00Wolfeboro

40617

Bid Stage

38.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2019 Page 3

(Page 29 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 30: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2019 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2019 Programmed Total

FY 2018 Balance $0.00 $14,199,714.67

$4,000,000.00 $6,804,000.00

$6,144,000.00 $18,829,857.31 $6,137,744.32

FY 2019 Appropriation

FY 2019 Funds Available $4,000,000.00 $21,003,714.67

Minus FY 2019 Programmed Total $4,680,000.00 $19,778,839.73

($680,000.00) $1,224,874.94Sub-total

$0.00

$0.00

($680,000.00) $1,224,874.94FY 2019 Balance

$31,922,257.30

Federal Adjustment:Exceeded Appropriation, Balance Forward to 2020.

$810,655.67

Number of Projects for FY 2019 By Funding Source

Funding or Managed By Tally

Federal/State/Municipal 1

State/Municipal 29

State/Municipal/Other 1

31Total Number of projects

Managed By Tally

Number of Projects for FY 2019 By Managing Lead

Municipality 30

Not Applicable to Date 1

31Total Number of projects

FY 2019 Page 4

(Page 30 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 31: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2020 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, West Street over Great Brook, Br. #173/075 (Municipal Managed Project)

$0.00 $717,879.60 $179,469.90$906,670.50Antrim $9,321.00

29468

Under Construction

44.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Hannah Nutter Road over Big River, Br. #149/073 (Municipal Managed Project)

$0.00 $815,280.00 $203,820.00$1,019,100.00Barnstead

16020

Under Design

81.9 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Cider Mill Road over McQuade Brook, Br. #079/128 (Municipal Managed Project)

$0.00 $543,507.20 $135,876.80$679,384.00Bedford

21193

Under Construction

MJ Estimate64.5 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Catesby Lane over McQuade Brook, Br. #102/098(New) (Municipal Managed Project)

$0.00 $480,000.00 $120,000.00$600,000.00Bedford

21684

Under Negotiations

Culvert replacementRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Church Street over Tioga River, Br. #103/072 (Municipal Managed Project)

$0.00 $97,600.00 $24,400.00$122,000.00Belmont

22872

Awaiting Town Action

Town Repair Bridge/Town will replace in 202068.3 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Potato Road over Indian River, Br. #147/055 (Municipal Managed Project)

$0.00 $496,000.00 $124,000.00$620,000.00Canaan

41399

Under Design

48.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, North Pembroke Road over Soucook River, Br. #183/156(J-Owned) (Municipal Managed Project)

$0.00 $520,000.00 $130,000.00$650,000.00Concord

14841A

Under Design

Concord-Pembroke Project55.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Hooksett Turnpike over Bela Brook, Br. #200/015 (Municipal Managed Project)

$0.00 $496,000.00 $124,000.00$620,000.00Concord

15877

Under Design

30.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Birchdale Road over Bela Brook, Br. #193/027 (Municipal Managed Project)

$0.00 $496,000.00 $124,000.00$620,000.00Concord

15878

60.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, So. New Boston Road over So. Br. Piscataquog River, Br. #149/058 (Municipal Managed Project)

$0.00 $1,069,600.00 $267,400.00$1,337,000.00Francestown

15765

Under Design

FY 2016>2047.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2020 Page 1

(Page 31 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 32: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2020 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Crystal Lake Road over Nelson Brook, Br. #174/094 (Municipal Managed Project)

$0.00 $1,257,600.00 $314,400.00$1,572,000.00Gilmanton

16234

Under Design

50.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Bunker Hill Road over Needle Shop Brook, Br. #140/099 (Municipal Managed Project)

$0.00 $265,000.00 $70,000.00$335,000.00Hill

41661

Under Negotiations

58.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Academy Street over Durkee Brook, Br. #121/037 (Municipal Managed Project)

$0.00 $540,000.00 $135,000.00$675,000.00Laconia

26706

Under Negotiations

37.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Townhouse Road over Northeast Pond, Br. #168/152 (Municipal Managed Project)

$0.00 $560,000.00 $140,000.00$1,400,000.00Milton $700,000.00

40658

Under Negotiations

Owned by Milton, NH and ME DOT, NHDOT managing9.1 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Coon Brook Road over South Branch Sugar River, Br. #147/036 (Municipal Managed Project)

$0.00 $471,135.20 $117,783.80$588,919.00Newport

29763

Under Construction

Substituted w/ #14969-Awaiting Notice of Award73.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Main Street over Contoocook River, Br. #092/089 (Municipal Managed Project)

$4,000,000.00 $501,600.00 $1,125,400.00$5,627,000.00Peterborough

14933

Under Design

Also see #14772A15.0 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Wellington Road over Converseville Brook, Br. #154/069 (Municipal Managed Project)

$0.00 $584,000.00 $146,000.00$730,000.00Rindge

22652

In Process

69.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bluff Street Extension over Widow Harris Brook, Br. #116/116 (Municipal Managed Project)

$0.00 $646,724.00 $161,681.00$808,405.00Salem

20228

Bid Stage

PO#400360638.4 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bluff Street over Hittytity Brook, Br. #094/119 (Municipal Managed Project)

$0.00 $83,035.90 $20,758.98$103,794.88Salem

20229

Complete/Final Audit

5/8/2014

Only paying PE. Received Form 4 and Mylars-FV45.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Frescoln Road over Rocky Branch, Br. #108/070 (Municipal Managed Project)

$0.00 $616,000.00 $154,000.00$770,000.00Wentworth

40648

59.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2020 Page 2

(Page 32 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 33: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2020 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2020 Programmed Total

FY 2019 Balance ($4,004,988.00) $1,224,874.94

$4,000,000.00 $6,804,000.00

$4,000,000.00 $11,256,961.90 $3,817,990.48

FY 2020 Appropriation

FY 2020 Funds Available ($4,988.00) $8,028,874.94

Minus FY 2020 Programmed Total $0.00 $6,072,835.90

($4,988.00) $1,956,039.04Sub-total

$0.00

$0.00

($4,988.00) $1,956,039.04FY 2020 Balance

$19,784,273.38

Federal Adjustment:Exceeded Appropriation, Balance Forward to 2021.

$709,321.00

Number of Projects for FY 2020 By Funding Source

Funding or Managed By Tally

State/Municipal 10

State/Municipal/Other 1

11Total Number of projects

Managed By Tally

Number of Projects for FY 2020 By Managing Lead

Municipality 11

11Total Number of projects

FY 2020 Page 3

(Page 33 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 34: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2021 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Hill Road over Darby Brook, Br. #059/134 (Municipal Managed Project)

$0.00 $184,000.00 $46,000.00$230,000.00Alstead

40649

27.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Drewsville Road over Darby Brook, Br. #058/132 (Municipal Managed Project)

$0.00 $136,000.00 $34,000.00$170,000.00Alstead

40650

Under Negotiations

72.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Jenkins Road over McQuade Brook, Br. #136/066(New) (Municipal Managed Project)

$0.00 $117,479.82 $29,369.95$146,849.77Bedford

21685

Complete/Final Audit

12/4/2013

Culvert replacement - Br. Inspection 1/15/2013Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Harvey Swell Road over East Branch, Br. #190/109 (Municipal Managed Project)

$0.00 $177,549.60 $44,387.40$221,937.00Colebrook

40651

Under Design

69.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Bear Rock Road over West Branch Mohawk River, Br. #167/120 (Municipal Managed Project)

$0.00 $457,573.60 $114,393.40$571,967.00Colebrook

40652

Under Design

40.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Province Road over South Branch of Baker River, Br. #156/053(New) (Municipal Managed Project)

$0.00 $184,000.00 $46,000.00$920,000.00Dorchester $690,000.00

42092

New BridgeRemarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Martin Road over Piscassic River, Br. #155/133 (Municipal Managed Project)

$0.00 $416,000.00 $104,000.00$520,000.00Fremont

23793

Under Design

Transdate 7/6/201116.1 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Nutting Road over Contoocook River, Br. #159/094 (Municipal Managed Project)

$0.00 $540,000.00 $135,000.00$675,000.00Jaffrey

41401

Under Negotiations

46.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Nute Road over Bellamy River, Br. #056/072 (Municipal Managed Project)

$0.00 $592,000.00 $148,000.00$740,000.00Madbury

24226

Under Design

38.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Ramp E (Canal St) over BMRR, Br. #107/071 (Municipal Managed Project)

$0.00 $340,000.00 $85,000.00$425,000.00Manchester

24211

Transdate9/11/1274 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2021 Page 1

(Page 34 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 35: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2021 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Rehabilitation, Salmon Street EB over RD, BMRR, Merrimack River Ramp-Amoskeag Bridge, Br. #107/072 (Municipal Managed Project)

$0.00 $508,000.00 $127,000.00$635,000.00Manchester

24212

Under Negotiations

Transdate 9/11/1267.6 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Queen City Bridge (US 3, NH 3A) over I-293, BMRR, Merrimack River, Br. #151/065 (Municipal Managed Project)

$4,680,000.00 $520,000.00 $1,300,000.00$6,500,000.00Manchester

28336

Under Design

MOBRR Funded 80% Fed 20% City73.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Archertown Road over Jacobs Brook, Br. #080/120 (Municipal Managed Project)

$0.00 $992,000.00 $248,000.00$1,240,000.00Orford

41151

Under Design

49.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Shannon Road over Providence Hill Brook, Br. #122/160 (Municipal Managed Project)

$0.00 $91,517.86 $22,879.46$114,397.32Salem

26486

Complete/Final Audit

5/28/2014

Br. Inspected 10/30/14-FV66.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Christian Hill Road over NHRR, Br. #098/122 (Municipal Managed Project)

$0.00 $1,280,000.00 $320,000.00$1,600,000.00Swanzey

41403

16.0 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Stage Coach Road over Burton Pond Outlet, Br. #086/142 (Municipal Managed Project)

$0.00 $171,600.00 $42,900.00$214,500.00Wilton

26201

29.2 03P Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2021 Page 2

(Page 35 of 46)Report Date: 9/4/2018 8:11:58 AM

With Bridge Detail

Page 36: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2021 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2021 Programmed Total

FY 2020 Balance ($4,988.00) $1,956,039.04

$4,000,000.00 $6,804,000.00

$4,680,000.00 $6,707,720.88 $2,846,930.21

FY 2021 Appropriation

FY 2021 Funds Available $3,995,012.00 $8,760,039.04

Minus FY 2021 Programmed Total $0.00 $6,628,203.02

$3,995,012.00 $2,131,836.02Sub-total

$0.00

$0.00

$3,995,012.00 $2,131,836.02FY 2021 Balance

$14,924,651.09 $690,000.00

Number of Projects for FY 2021 By Funding Source

Funding or Managed By Tally

State/Municipal 14

State/Municipal/Other 1

15Total Number of projects

Managed By Tally

Number of Projects for FY 2021 By Managing Lead

Municipality 14

Not Applicable to Date 1

15Total Number of projects

FY 2021 Page 3

(Page 36 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 37: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2022 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Comstock Road over Darby Brook, Br. #046/141 (Municipal Managed Project)

$0.00 $744,000.00 $186,000.00$930,000.00Alstead

40661

52.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Mont Vernon Rd over Ceasars Brook, Br. #112/071 (Municipal Managed Project)

$0.00 $732,000.00 $183,000.00$915,000.00Amherst

40654

Under Design

86.0 NPR Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Craig Road over Brook, Br. #117/093 (Municipal Managed Project)

$0.00 $176,000.00 $44,000.00$220,000.00Antrim

14942

Under Negotiations

FY13>14>2249.9 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Griffin Mill Road over Maple Falls Brook, Br. #095/127 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Auburn

29316

Under Negotiations

20.5 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Greenhill Rd over Isinglass River, Br. #109/162 (Municipal Managed Project)

$0.00 $1,597,821.60 $399,455.40$1,997,277.00Barrington

26722

Under Design

69.1 C2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Beals Road over Baboosic Brook, Br. #105/055 (Municipal Managed Project)

$0.00 $672,908.92 $168,227.23$841,136.15Bedford

24217

Under Design

Need design exception letter35.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Lashua Road over Macoma River, Br. #122/136 (Municipal Managed Project)

$0.00 $0.00 $0.00$0.00Canaan

26703

Transdate 4/26/13-Replaced with new project23.90 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Clark Pond Road over Clark Pond Brook, Br. #101/152 (Municipal Managed Project)

$0.00 $285,444.00 $71,361.00$356,805.00Canaan

26704

Transdate 4/26/13Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Pleasant Street over Mohawk River, Br. #050/099 (Municipal Managed Project)

$0.00 $320,000.00 $80,000.00$400,000.00Colebrook

40655

88.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Province Road over Bucks Brook, Br. #151/055 (Municipal Managed Project)

$0.00 $136,000.00 $34,000.00$680,000.00Dorchester $510,000.00

42091

FEMA55.4 06 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2022 Page 1

(Page 37 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 38: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2022 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, George Street over Beaver Brook, Br. #142/092 (Municipal Managed Project)

$0.00 $552,000.00 $138,000.00$690,000.00Keene

40653

Under Negotiations

26.6 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Court Street over Durkee Brook, Br. #113/036 (Municipal Managed Project)

$0.00 $640,000.00 $160,000.00$800,000.00Laconia

40656

Under Design

53.1 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Trues Brook Road over Bloods Brook, Br. #066/059 (Municipal Managed Project)

$0.00 $1,035,931.80 $258,982.95$1,294,914.75Lebanon

24221

Under Design

31 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Old Bridge Street over Beaver Brook, Br. #109/081 (Municipal Managed Project)

$0.00 $756,000.00 $189,000.00$945,000.00Pelham

29450

Under Design

37.7 10 Remarks:Red List: FSR: WT: No Outlet: NoYes

Repair/Replacement of Bridge, Tully Brook Road over Tully Brook, Br. #155/066 (Municipal Managed Project)

$0.00 $520,000.00 $130,000.00$650,000.00Richmond

29056

Once we receive est. from Br. Design, send est. to Town-Sent to BD 2/27/1476.63 15 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Buffalo Road over Brook, Br. #093/082 (Municipal Managed Project)

$0.00 $360,000.00 $90,000.00$450,000.00Rumney

27162

52.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Crane Hill Road over Gale River, Br. #202/128 (Municipal Managed Project)

$0.00 $692,000.00 $173,000.00$865,000.00Sugar Hill

24218

Under Design

Estimated FY12 Update Est. 3/22/1234.5 6 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2022 Page 2

(Page 38 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 39: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2022 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2022 Programmed Total

FY 2021 Balance $0.00 $2,131,836.02

$4,000,000.00 $6,804,000.00

$0.00 $9,460,106.32 $2,365,026.58

FY 2022 Appropriation

FY 2022 Funds Available $4,000,000.00 $8,935,836.02

Minus FY 2022 Programmed Total $0.00 $9,460,106.32

$4,000,000.00 ($524,270.30)Sub-total

$0.00

$0.00

$4,000,000.00 ($524,270.30)FY 2022 Balance

$12,335,132.90 $510,000.00

Number of Projects for FY 2022 By Funding Source

Funding or Managed By Tally

State/Municipal 16

State/Municipal/Other 1

17Total Number of projects

Managed By Tally

Number of Projects for FY 2022 By Managing Lead

Municipality 17

17Total Number of projects

FY 2022 Page 3

(Page 39 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 40: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2023 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Thornton Ferry Rd over Beaver Brook, Br. #145/106 (Municipal Managed Project)

$0.00 $1,320,000.00 $330,000.00$1,650,000.00Amherst

40657

Under Design

85.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Grist Mill Hill Road over Indian River, Br. #172/070 (Municipal Managed Project)

$0.00 $400,000.00 $100,000.00$500,000.00Canaan

41406

Under Design

71.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Washington Street over Swift River, Br. #164/063 (Municipal Managed Project)

$0.00 $1,360,000.00 $340,000.00$1,700,000.00Conway

41402

94.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Potter Road over Snow Brook, Br. #058/130 (Municipal Managed Project)

$0.00 $498,784.00 $124,696.00$623,480.00Eaton

41404

Under Design

Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, NH 120 Parking Lot, ped over NHRR(ABD), Br. #121/117 (Municipal Managed Project)

$0.00 $897,280.00 $224,320.00$1,121,600.00Lebanon

24222

66.1 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, US 3 over Baboosic Brook, Br. #118/135 (Municipal Managed Project)

$0.00 $2,656,000.00 $664,000.00$3,320,000.00Merrimack

29174

Under Negotiations

50.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Tucker Mill Road over Mid Br Piscataquog River, Br. #087/150 (Municipal Managed Project)

$0.00 $460,000.00 $115,000.00$575,000.00New Boston

15505

FY 2013>2389 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Clothespin Bridge Road over Blackwater River, Br. #121/103 (Municipal Managed Project)

$0.00 $1,476,000.00 $369,000.00$1,845,000.00Webster

40810

Under Negotiations

41.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2023 Page 1

(Page 40 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 41: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2023 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2023 Programmed Total

FY 2022 Balance $0.00 ($524,270.30)

$4,000,000.00 $6,804,000.00

$0.00 $9,068,064.00 $2,267,016.00

FY 2023 Appropriation

FY 2023 Funds Available $4,000,000.00 $6,279,729.70

Minus FY 2023 Programmed Total $0.00 $9,068,064.00

$4,000,000.00 ($2,788,334.30)Sub-total

$0.00

$0.00

$4,000,000.00 ($2,788,334.30)FY 2023 Balance

$11,335,080.00

Number of Projects for FY 2023 By Funding Source

Funding or Managed By Tally

State/Municipal 8

8Total Number of projects

Managed By Tally

Number of Projects for FY 2023 By Managing Lead

Municipality 8

8Total Number of projects

FY 2023 Page 2

(Page 41 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 42: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2024 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Lawrence Road over Blackwater River, Br. #098/093 (Municipal Managed Project)

$0.00 $1,948,000.00 $487,000.00$2,435,000.00Andover

41407

Under Design

47.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Bond Street over Nissitissit River, Br. #088/074 (Municipal Managed Project)

$0.00 $352,000.00 $88,000.00$440,000.00Brookline

41408

Under Negotiations

71.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, Mount Orne Road over Connecticut River; Mount Orne Covered Bridge, Br. #039/105 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Lancaster

22192

Under Construction

Completed repairs in March 20122.0 BRC Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Freshet Road over Johnson Creek, Br. #160/086 (Municipal Managed Project)

$0.00 $480,000.00 $120,000.00$600,000.00Madbury

41462

Under Negotiations

73.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Rehabilitation, Salmon Street WB over RD, BMRR, Merrimack River-Amoskeag Bridge, Br. #106/072 (Municipal Managed Project)

$0.00 $420,000.00 $105,000.00$525,000.00Manchester

24206

Transdate9/11/201267.2 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Brooklyn Street over Roaring Brook, Br. #108/114(Closed) (Municipal Managed Project)

$0.00 $126,055.55 $31,513.89$157,569.44Northumberland

14234

Complete/Final Audit

4/4/2017

Project cancelled-did not move forward with construction-FV37 BRC Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Lull Road over Peacock Brook, Br. #082/045 (Municipal Managed Project)

$0.00 $236,000.00 $59,000.00$295,000.00Weare

14338

Under Design

54.2 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2024 Page 1

(Page 42 of 46)Report Date: 9/4/2018 8:11:59 AM

With Bridge Detail

Page 43: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2024 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

FY 2024 Programmed Total

FY 2023 Balance $0.00 ($2,788,334.30)

$0.00 $0.00

$0.00 $3,802,055.55 $950,513.89

FY 2024 Appropriation

FY 2024 Funds Available $0.00 ($2,788,334.30)

Minus FY 2024 Programmed Total $0.00 $4,204,380.80

$0.00 ($6,992,715.10)Sub-total

$0.00

$0.00

$0.00 ($6,992,715.10)FY 2024 Balance

$4,752,569.44

Number of Projects for FY 2024 By Funding Source

Funding or Managed By Tally

State/Municipal 7

7Total Number of projects

Managed By Tally

Number of Projects for FY 2024 By Managing Lead

Municipality 7

7Total Number of projects

FY 2024 Page 2

(Page 43 of 46)Report Date: 9/4/2018 8:12:00 AM

With Bridge Detail

Page 44: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2025 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Old Canaan Road over Spruce Brook, Br. #052/059(New) (Municipal Managed Project)

$0.00 $528,380.80 $132,095.20$660,476.00Barrington

41410

Under Negotiations

Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Page Road over Bela Brook, Br. #065/140 (Municipal Managed Project)

$0.00 $628,000.00 $157,000.00$785,000.00Bow

24223

Bid Stage

52.5 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Birchdale Road over White Brook, Br. #092/136 (Municipal Managed Project)

$0.00 $686,442.80 $171,610.70$858,053.50Bow

24225

Under Construction

69.7 E2 Remarks:Red List: FSR: WT: No Outlet: NoYes

Bridge Replacement, Center Street over Harry Brook, Br. #129/116 (Municipal Managed Project)

$0.00 $636,000.00 $159,000.00$795,000.00Goffstown

41597

84.9 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Old County Farm Road over Blood Brook, Br. #060/118 (Municipal Managed Project)

$0.00 $176,000.00 $44,000.00$220,000.00Wilton

15768

Sent to Bridge Design 5/3/165.3 03F Remarks:Red List: FSR: WT: No Outlet: NoYes

FY 2025 Programmed Total

FY 2024 Balance $0.00 ($6,992,715.10)

$0.00 $0.00

$0.00 $2,654,823.60 $663,705.90

FY 2025 Appropriation

FY 2025 Funds Available $0.00 ($6,992,715.10)

Minus FY 2025 Programmed Total $0.00 $176,000.00

$0.00 ($7,168,715.10)Sub-total

$0.00

$0.00

$0.00 ($7,168,715.10)FY 2025 Balance

$3,318,529.50

Number of Projects for FY 2025 By Funding Source

Funding or Managed By Tally

State/Municipal 1

1Total Number of projects

Managed By Tally

Number of Projects for FY 2025 By Managing Lead

Municipality 1

1Total Number of projects

FY 2025 Page 1

(Page 44 of 46)Report Date: 9/4/2018 8:12:00 AM

With Bridge Detail

Page 45: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2026 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, River Road over Bow Bog Brook, Br. #184/127 (Municipal Managed Project)

$0.00 $728,240.00 $182,060.00$910,300.00Bow

24224

Under Design

96.8 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Phase I & II: Shaker Blvd over Knox River, Br. #120/115 (Municipal Managed Project)

$0.00 $240,000.00 $60,000.00$300,000.00Enfield

13592

Moved from FY02>04>08>10>11>12>2631.8 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Rehabilitation, US 3 (Elm Street) over B&MRR, Br. #144/075 (Municipal Managed Project)

$0.00 $640,000.00 $160,000.00$800,000.00Manchester

15837

63.2 NPR Remarks:Red List: FSR: WT: No Outlet: NoNo

Bridge Replacement, Gregg Mill Road over South Branch Piscataquog River, Br. #132/138 (Municipal Managed Project)

$0.00 $620,000.00 $155,000.00$775,000.00New Boston

14771

FY 2012>14>2662.4 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2026 Programmed Total

FY 2025 Balance $0.00 ($7,168,715.10)

$0.00 $0.00

$0.00 $2,228,240.00 $557,060.00

FY 2026 Appropriation

FY 2026 Funds Available $0.00 ($7,168,715.10)

Minus FY 2026 Programmed Total $0.00 $2,228,240.00

$0.00 ($9,396,955.10)Sub-total

$0.00

$0.00

$0.00 ($9,396,955.10)FY 2026 Balance

$2,785,300.00

Number of Projects for FY 2026 By Funding Source

Funding or Managed By Tally

State/Municipal 4

4Total Number of projects

Managed By Tally

Number of Projects for FY 2026 By Managing Lead

Municipality 4

4Total Number of projects

FY 2026 Page 1

(Page 45 of 46)Report Date: 9/4/2018 8:12:00 AM

With Bridge Detail

Page 46: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

FiscalYear: 2027 Projects Authorized for Construction

Project Name/Num.

Description / Improvement CurrentEstimate

FederalShare

StateShare

Town / City Share

ClosedProjects

OtherShare

Status /Completion Date

Bridge Replacement, Hartshorn Road over Hartshorn Brook, Br. #102/165

$0.00 $532,000.00 $133,000.00$665,000.00Milford

42087

Under Negotiations

97.0 E2 Remarks:Red List: FSR: WT: No Outlet: NoNo

FY 2027 Programmed Total

FY 2026 Balance $0.00 ($9,396,955.10)

$0.00 $0.00

$0.00 $532,000.00 $133,000.00

FY 2027 Appropriation

FY 2027 Funds Available $0.00 ($9,396,955.10)

Minus FY 2027 Programmed Total $0.00 $0.00

$0.00 ($9,396,955.10)Sub-total

$0.00

$0.00

$0.00 ($9,396,955.10)FY 2027 Balance

$665,000.00

FY 2027 Page 1

(Page 46 of 46)Report Date: 9/4/2018 8:12:00 AM

With Bridge Detail

Page 47: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

Bridge Estimates Issued to Municipalities - Awaiting Town Action to Raise Funds and Request Construction Aid 152 Projects Awaiting Town Action

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Grout Hill Road over Cold River, Br. #147/067

Acworth $0.00 $480,000.00 $120,000.00$600,000.002 Projects

2/24/2005

Bridge Replacement, Allen Road over Cold River, Br. #164/114

$0.00 $900,000.00 $225,000.00$1,125,000.005/26/2017

Bridge Replacement, Drake Hill Road over Meadow Brook, Br. #213/094

Albany $0.00 $603,200.00 $150,800.00$754,000.001 Project

7/1/2023

Bridge Replacement, Brock Road over Brock Brook, Br. #100/116

Alexandria $0.00 $280,000.00 $70,000.00$350,000.001 Project

8/7/2002

Bridge Replacement, Hill Road over Bradley Brook, Br. #104/078

Andover $0.00 $196,000.00 $49,000.00$245,000.005 Projects

7/30/1996

Bridge Rehabilitation, Last Street over Sucker Brook, Br. #216/139

$0.00 $116,000.00 $29,000.00$145,000.007/30/1996

Bridge Replacement, Hoyt Road over Sucker Brook, Br. #197/146(Closed)

$0.00 $120,000.00 $30,000.00$150,000.007/30/1996

Repair/Replacement of Bridge, Tucker Mountain Road over Sucker Brook, Br. #180/147

$0.00 $140,000.00 $35,000.00$175,000.007/30/1996

Bridge Replacement, Taunton Hill Road over Mountain Brook, Br. #125/129

$0.00 $180,000.00 $45,000.00$225,000.007/30/1996

Bridge Replacement, Auburn-Preston Brook Culvert on Raymond Road, Br. #118/136(New)

Auburn $0.00 $196,000.00 $49,000.00$245,000.001 Project

3/19/1998

22872

Bridge Replacement, Church Street over Tioga River, Br. #103/072(Municipal Managed Project)

Belmont

1 Project

7/1/2019

Page 1 of 11Printed: 9/4/2018 8:14:01 AM Awaiting Town Action

Page 48: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Johnson Hill Road over West Branch Brook, Br. #104/141

Bradford $0.00 $260,000.00 $65,000.00$325,000.004 Projects

9/14/2004

Bridge Replacement, Blaisdell Lake Road over stream, Br. #168/165, 168/162

$0.00 $344,000.00 $86,000.00$430,000.009/14/2004

Bridge Replacement, West (Meadow) Road over Hoyt Brook, Br. #098/117

$0.00 $240,000.00 $60,000.00$300,000.006/23/2009

Bridge Replacement, Water Street over West Branch Brook, Br. #126/150

$0.00 $704,000.00 $176,000.00$880,000.005/26/2017

Bridge Replacement, Dupaw Gould Road over Lancy Brook, Br. #065/085

Brookline $0.00 $896,000.00 $224,000.00$1,120,000.001 Project

5/26/2017

Bridge Replacement, Miclon Road over Conner Brook, Br. #112/116

Campton $0.00 $276,000.00 $69,000.00$345,000.002 Projects

7/20/2000

Bridge Replacement, Miclon Road over Conner Brook, Br. #114/121

$0.00 $296,000.00 $74,000.00$370,000.007/20/2000

Repair/Replacement of Bridge, Transfer Station Road over Orange Brook, Br. #191/080

Canaan $0.00 $452,000.00 $113,000.00$565,000.001 Project

7/1/2020

Bridge Replacement, Chestnut Flat Road over Little Sugar River, Br. #071/115(CLOSED)

Charlestown $0.00 $420,000.00 $105,000.00$525,000.001 Project

11/17/1998

Bridge Rehabilitation, Plains Road over Sugar River, Br. #091/118

Claremont $0.00 $508,000.00 $127,000.00$635,000.002 Projects

5/26/2017

Bridge Replacement, Myrtle Street over Concord-Claremont R W, Br. #123/090

$0.00 $916,000.00 $229,000.00$1,145,000.005/31/2017

Bridge Replacement, Little Blakely Road over Mohawk River, Br. #125/069

Colebrook $0.00 $332,000.00 $83,000.00$415,000.001 Project

12/4/2002

Repair/Replacement of Bridge, Bungy Road over East Branch Summers Stream, Br. #228/109

Columbia $0.00 $220,000.00 $55,000.00$275,000.002 Projects

11/30/1999

Repair/Replacement of Bridge, Meriden Hill Road over Lyman Brook, Br. #054/032

$0.00 $508,000.00 $127,000.00$635,000.009/18/2013

Bridge Replacement, Clark Camp Road over Mill Brook, Br. #151/122

Cornish $0.00 $280,000.00 $70,000.00$350,000.001 Project

10/8/2008

Page 2 of 11Printed: 9/4/2018 8:14:02 AM Awaiting Town Action

Page 49: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Hurlburt Road over Brook, Br. #125/130

Dalton $0.00 $260,000.00 $65,000.00$325,000.001 Project

10/18/2011

Bridge Replacement, Phase II: Forbes Mountain Road over Wild Meadow Brook, Br. #103/100

Danbury $0.00 $700,000.00 $175,000.00$875,000.001 Project

5/30/2006

Repair/Replacement of Bridge, NH 28 (Rockingham Road) over Tributary G to Beaver Brook, Br. #078/090(New)

Derry $0.00 $548,000.00 $137,000.00$685,000.003 Projects

8/24/2012

Bridge Replacement, North High Street over Shields Brook, Br. #053/110(New)

$0.00 $588,000.00 $147,000.00$735,000.008/24/2012

Bridge Replacement, North Shore Road over Taylor Brook, Br. #163/080(New)

$0.00 $390,701.60 $97,675.40$488,377.007/1/2017

Bridge Replacement, Durham Point Road over Crommet Creek, Br. #150/065

Durham $0.00 $684,000.00 $171,000.00$855,000.001 Project

10/14/2003

Bridge Rehabilitation, Granite Road over South River, Br. #166/082

Effingham $0.00 $480,000.00 $120,000.00$600,000.002 Projects

6/25/2008

Bridge Replacement, Stevens Road over Brook, Br. #181/072

$0.00 $336,000.00 $84,000.00$420,000.006/25/2008

Bridge Replacement, Boy's Camp Road over Bicknell Brook, Br. #172/112

Enfield $0.00 $640,000.00 $160,000.00$800,000.001 Project

12/9/2004

Repair/Replacement of Bridge, Main Street over Lamprey River, Br. #109/055

Epping $0.00 $520,000.00 $130,000.00$650,000.002 Projects

7/1/2010

Bridge Replacement, Blake Road over Lamprey River, Br. #059/054

$0.00 $844,000.00 $211,000.00$1,055,000.007/6/2010

Bridge Replacement, Cass Road over Little Suncook River, Br. #128/120, 128/121

Epsom $0.00 $524,000.00 $131,000.00$655,000.002 Projects

5/9/2002

Bridge Replacement, River Road over Deer Brook, Br. #065/072

$0.00 $460,000.00 $115,000.00$575,000.0011/10/2010

Bridge Rehabilitation, Phase II: Templeton Turnpike over Priest Brook, Br. #147/054

Fitzwilliam $0.00 $276,000.00 $69,000.00$345,000.001 Project

6/30/2003

Page 3 of 11Printed: 9/4/2018 8:14:02 AM Awaiting Town Action

Page 50: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Old County Road over Collins Brook, Br. #091/142

Francestown $0.00 $740,000.00 $185,000.00$925,000.001 Project

5/30/2017

Bridge Rehabilitation, Scribner Road over Exeter River, Br. #106/076

Fremont $0.00 $468,000.00 $117,000.00$585,000.001 Project

7/6/2011

Bridge Replacement, MummeryRoad East over Cold Brook, Br. #083/090

Goshen $0.00 $528,000.00 $132,000.00$660,000.001 Project

5/30/2017

Bridge Rehabilitation, Wild Meadows Road over Brook, Br. #210/107(Municipal Managed Project)

Grafton $0.00 $368,000.00 $92,000.00$460,000.001 Project

10/26/2011

Bridge Replacement, Olde Farm Road over Skinner Brook, Br. #107/113

Grantham $0.00 $796,000.00 $199,000.00$995,000.004 Projects

7/30/2008

Bridge Replacement, Olde Farms Road over Sawyer Brook, Br. #083/108

$516,000.00 $0.00 $129,000.00$645,000.007/30/2008

Bridge Rehabilitation, Miller Pond Rd/Skinner Brook, Br. #105/128

$0.00 $96,000.00 $24,000.00$120,000.007/30/2008

Bridge Replacement, Frye Lane over Stony Brook, Br. #108/147

$0.00 $320,000.00 $80,000.00$400,000.007/6/2010

Repair/Replacement of Bridge, Wilton Road over Souhegan River, Br. #075/114

Greenville $0.00 $2,576,000.00 $644,000.00$3,220,000.001 Project

7/17/2013

Bridge Replacement, Old Stage Road over Taylor River, Br. #086/123(CLOSED)

Hampton $0.00 $332,000.00 $83,000.00$415,000.001 Project

10/25/1995

Bridge Replacement, Mill Road over Moose Brook, Br. #121/116(CLOSED)

Hancock $0.00 $216,000.00 $54,000.00$270,000.003 Projects

9/9/1998

Bridge Replacement, Middle Road over Small Brook, Br. #107/074

$0.00 $68,000.00 $17,000.00$85,000.003/2/2007

Bridge Replacement, Old Dublin Rd #62 over Hosley Brook, Br. #095/090(Municipal Managed Project)

$0.00 $524,000.00 $131,000.00$655,000.0011/29/2011

Bridge Rehabilitation, School House Lane over Mink Brook, Br. #108/066

Hanover $0.00 $80,000.00 $20,000.00$100,000.001 Project

5/6/1998

Page 4 of 11Printed: 9/4/2018 8:14:02 AM Awaiting Town Action

Page 51: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Bunker Hill Road over Needle Shop Brook

Hill $0.00 $596,000.00 $149,000.00$745,000.001 Project

5/31/2017

Bridge Replacement, Stowe Mountain Road over Shedd Brook, Br. #053/103(New)

Hillsborough $0.00 $872,000.00 $218,000.00$1,090,000.002 Projects

7/1/2019

Bridge Replacement, Bog Road (Melody Rd) over Sand Brook, Br. #152/095

$0.00 $776,000.00 $194,000.00$970,000.007/16/2013

Bridge Replacement, Stickney Hill Road over Boutwell Mill Brook, Br. #178/039

Hopkinton $0.00 $392,000.00 $98,000.00$490,000.002 Projects

7/1/2020

Bridge Rehabilitation, East Penacook Road over Blackwater River, Br. #134/166

$0.00 $480,000.00 $120,000.00$600,000.005/31/2017

Bridge Replacement, Dundee Road over Mill Brook, Br. #198/046

Jackson $0.00 $468,000.00 $117,000.00$585,000.003 Projects

7/22/2004

Bridge Rehabilitation, Wilson Road over Great Brook, Br. #157/079

$0.00 $420,000.00 $105,000.00$525,000.005/11/2009

Bridge Rehabilitation, Melloon Road over Wildcat Brook, Br. #135/122

$0.00 $280,000.00 $70,000.00$350,000.005/11/2009

Bridge Replacement, Beaver Street over Beaver Brook, Br. #140/079(Municipal Managed Project)

Keene $0.00 $524,000.00 $131,000.00$655,000.001 Project

7/1/2018

Bridge Rehabilitation, Messer Street over Winnpesaukee River, Br. #122/058

Laconia $0.00 $760,000.00 $190,000.00$950,000.002 Projects

8/18/2010

Bridge Replacement, Hilliard Road over Pickerel Cove Brook, Br. #112/147(New)

$0.00 $448,800.00 $96,000.00$544,800.001/7/2024

Bridge Replacement, McGary Hill Road over Otter Brook, Br. #218/076

Lancaster $0.00 $240,000.00 $60,000.00$300,000.001 Project

11/3/2005

Bridge Rehabilitation, Riverside Drive over Mascoma River, Br. #154/113

Lebanon $0.00 $655,520.00 $163,880.00$819,400.001 Project

5/26/2017

Page 5 of 11Printed: 9/4/2018 8:14:02 AM Awaiting Town Action

Page 52: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Schrenk Road over Cold Brook, Br. #117/156

Lempster $0.00 $224,000.00 $56,000.00$280,000.003 Projects

6/17/1996

Bridge Replacement, Mountain Road over Ashuelot River, Br. #148/067

$0.00 $640,000.00 $160,000.00$800,000.0011/10/2010

Bridge Replacement, Keyes Hollow Road over Cold River, Br. #055/151

$0.00 $540,000.00 $135,000.00$675,000.0011/10/2010

Bridge Replacement, East Madison Road over Frost Brook, Br. #111/082

Madison $0.00 $552,000.00 $138,000.00$690,000.001 Project

1/21/2011

Bridge Replacement, Bodwell Road over Cohas Brook, Br. #209/155

Manchester $0.00 $696,000.00 $174,000.00$870,000.001 Project

11/1/2012

Bridge Replacement, Lewis Road over Ashuelot River, Br. #104/039

Marlow $0.00 $580,000.00 $145,000.00$725,000.001 Project

12/6/2005

Bridge Rehabilitation, US 3 over Souhegan River - Chamberlain Bridge, Br. #116/120

Merrimack $0.00 $172,000.00 $43,000.00$215,000.001 Project

7/1/2017

Bridge Replacement, Ridge Road over Jones Brook, Br. #082/109

Middleton $0.00 $360,000.00 $90,000.00$450,000.002 Projects

11/20/1998

Bridge Replacement, Silver Street Road over Outlet of Sunrise Lake, Br. #058/033

$0.00 $292,000.00 $73,000.00$365,000.0011/20/1998

Bridge Replacement, Mason Road over Great Brook, Br. #089/106

Milford $0.00 $548,000.00 $137,000.00$685,000.001 Project

5/26/2017

Bridge Replacement, Hopper Road over Salmon Falls River, Br. #064/167

Milton $0.00 $360,000.00 $90,000.00$450,000.004 Projects

11/13/1998

Bridge Rehabilitation, Church Street over Salmon Falls River, Br. #077/163

$0.00 $404,000.00 $101,000.00$505,000.0011/23/1998

Bridge Replacement, Allen Hastings Way over Jones Brook, Br. #104/109(Closed)

$0.00 $312,000.00 $78,000.00$390,000.0011/13/1998

Bridge Replacement, Winding Road over Lyman Brook, Br. #190/101

$0.00 $864,000.00 $216,000.00$1,080,000.005/30/2017

Bridge Replacement, Murdough Hill Road over brook, Br. #073/098

Nelson $0.00 $288,000.00 $72,000.00$360,000.001 Project

9/9/1998

Page 6 of 11Printed: 9/4/2018 8:14:03 AM Awaiting Town Action

Page 53: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Rehabilitation, Coolidge Woods Road over Blake Brook, Br. #055/074

New Hampton $0.00 $180,000.00 $45,000.00$225,000.003 Projects

12/26/2006

Bridge Replacement, Coolidge Woods Road over Wallace Brook, Br. #035/051

$0.00 $344,000.00 $86,000.00$430,000.0011/8/2006

Bridge Replacement, Brook Road over Blake Brook, Br. #061/069

$0.00 $380,000.00 $95,000.00$475,000.0012/14/2009

Bridge Replacement, Mountain Road over Andrew Brook, Br. #094/080

Newbury $0.00 $212,000.00 $53,000.00$265,000.003 Projects

9/4/1998

Bridge Replacement, Mountain Road over unnamed brook, Br. #078/039

$0.00 $132,000.00 $33,000.00$165,000.009/4/1998

Bridge Replacement, Mountain Road over Andrew Brook, Br. #100/090

$0.00 $260,000.00 $65,000.00$325,000.009/4/1998

Bridge Replacement, New Road over Boston and Maine RR, Br. #130/083

Newfields $0.00 $672,000.00 $168,000.00$840,000.001 Project

10/19/2011

Bridge Replacement, Greenwood Road over Dodge Brook, Br. #097/139(Closed)

Newport $0.00 $300,000.00 $75,000.00$375,000.001 Project

12/26/2006

Repair/Replacement of Bridge, Old Canterbury Road over Narrows Brook, Br. #045/100

Northwood $0.00 $104,000.00 $26,000.00$130,000.001 Project

5/26/2017

Repair/Replacement of Bridge, Town Road #100 over Archertown Brook, Br. #114/113(Culvert)

Orford $0.00 $611,200.00 $152,800.00$764,000.002 Projects

5/24/2018

Bridge Replacement, Grimes Hill Road over Indian Pond Brook, Br. #120/173

$0.00 $456,000.00 $114,000.00$570,000.005/31/2017

Bridge Replacement, Bean Mountain Road over Lovell River, Br. #075/262(Force Acct DOT-Br. Maint)

Ossipee $0.00 $80,000.00 $20,000.00$100,000.003 Projects

5/28/1999

Bridge Replacement, Paddy Acre Road over Brook, Br. #147/233

$0.00 $152,000.00 $38,000.00$190,000.009/11/2002

Bridge Replacement, Valley Road over Dan Hole River, Br. #123/233

$0.00 $204,000.00 $51,000.00$255,000.005/14/2004

Bridge Replacement, Moeckel Road over Golden Brook, Br. #124/131(CLOSED)

Pelham $0.00 $268,000.00 $67,000.00$335,000.001 Project

8/8/2000

Page 7 of 11Printed: 9/4/2018 8:14:03 AM Awaiting Town Action

Page 54: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Rehabilitation, Buck Street over Hartford Brook, Br. #182/106

Pembroke $0.00 $140,000.00 $35,000.00$175,000.001 Project

12/20/2005

Bridge Rehabilitation, Cate Street over Hodgson Brook, Br. #198/107

Portsmouth $0.00 $260,000.00 $65,000.00$325,000.005 Projects

9/18/2000

Bridge Rehabilitation, Woodbury Ave over Hodgson Brook, Br. #204/101

$0.00 $228,000.00 $57,000.00$285,000.009/20/2000

Repair/Replacement of Bridge, Pierces Island Road over Little Harbor, Br. #241/069

$0.00 $2,000,000.00 $500,000.00$2,500,000.0011/28/2000

Repair/Replacement of Bridge, Maplewood Ave over North Mill Road, Br. #231/103

$0.00 $880,000.00 $220,000.00$1,100,000.0011/2/2000

Bridge Rehabilitation, Coakley Road over Hodgson Brook, Br. #191/110

$0.00 $132,000.00 $33,000.00$165,000.009/18/2000

29055

Bridge Replacement, Whipple Hill Road over Roaring Brook, Br. #065/083(Municipal Managed Project)

Richmond $0.00 $892,000.00 $223,000.00$1,115,000.001 Project

7/1/2020

Bridge Rehabilitation, Converseville Road over Converseville Brook, Br. #153/073

Rindge $0.00 $180,000.00 $45,000.00$225,000.001 Project

10/3/2003

Repair/Replacement of Bridge, Rochecter Neck Road over Isinglass River, Br. #225/139

Rochester $0.00 $0.00 $0.00$0.001 Project

5/31/2017

Bridge Replacement, Old Mill Lane over Rollins Brook, Br. #090/052

Rollinsford $0.00 $772,000.00 $193,000.00$965,000.001 Project

5/30/2017

Bridge Replacement, Old Route 25 over Creamery Brook, Br. #076/087(6/12/06)

Rumney $0.00 $300,000.00 $75,000.00$375,000.005 Projects

1/30/2007

Bridge Rehabilitation, Old Route 25 over Emerald Brook, Br. #100/060

$0.00 $80,000.00 $20,000.00$100,000.003/2/2007

Bridge Replacement, East Rumney Road over Brook, Br. #202/100(6/12/06)

$0.00 $240,000.00 $60,000.00$300,000.001/30/2007

Bridge Replacement, Old Route 25 over Stewart Brook, Br. #077/085(6/12/06)

$0.00 $308,000.00 $77,000.00$385,000.001/30/2007

Bridge Rehabilitation, Sand Hill Road over Baker River, Br. #079/092

$0.00 $200,000.00 $50,000.00$250,000.002/4/2009

Page 8 of 11Printed: 9/4/2018 8:14:03 AM Awaiting Town Action

Page 55: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Repair/Replacement of Bridge, Bridge Street over Spicket River, Br. #115/097(Municipal Managed Project)

Salem

1 Project

Bridge Replacement, Chapman Road over Patterson Brook, Br. #219/072

Sanbornton $0.00 $280,000.00 $70,000.00$350,000.001 Project

6/23/2009

Bridge Rehabilitation, Durgin Bridge Road over Cold River, Br. #226/119

Sandwich $0.00 $64,000.00 $16,000.00$80,000.002 Projects

11/20/2009

Bridge Rehabilitation, Basket Street over Bearcamp River, Br. #157/101

$0.00 $160,000.00 $40,000.00$200,000.005/16/2011

Bridge Rehabilitation, Whitehall Road over Powwow River, Br. #099/062

South Hampton $0.00 $204,000.00 $51,000.00$255,000.002 Projects

10/5/1999

Bridge Replacement, Hilldale Ave over Powwow River, Br. #069/066

$0.00 $1,260,000.00 $315,000.00$1,575,000.005/30/2017

Bridge Replacement, Star Lake Road over Star Lake Outlet, Br. #092/052

Springfield $0.00 $260,000.00 $65,000.00$325,000.003 Projects

7/7/2008

Bridge Replacement, George Hill Road over Gove Brook, Br. #071/138

$0.00 $300,000.00 $75,000.00$375,000.007/7/2008

Bridge Rehabilitation, George Hill Road over Bog Brook, Br. #064/152

$0.00 $140,000.00 $35,000.00$175,000.007/7/2008

Bridge Replacement, Barn Door Gap Road over Big River, Br. #057/135

Strafford $0.00 $940,000.00 $235,000.00$1,175,000.001 Project

5/30/2017

Bridge Replacement, Tetu Road over Stratford Bog Brook, Br. #124/086

Stratford $0.00 $228,000.00 $57,000.00$285,000.001 Project

3/15/2005

Bridge Replacement, Joslyn Road over Merriam Brook, Br. #090/090

Surry $0.00 $552,000.00 $138,000.00$690,000.001 Project

7/6/2010

41696

Bridge Rehabilitation, Rabbitt Hollow Road over Perry Brook, Br. #120/072

Swanzey

1 Project

7/1/2018

Page 9 of 11Printed: 9/4/2018 8:14:04 AM Awaiting Town Action

Page 56: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Chocura Lake Road over Chocura Lake Outlet, Br. #069/157(Municipal Managed Project)

Tamworth $0.00 $360,000.00 $90,000.00$450,000.002 Projects

12/30/1998

Bridge Rehabilitation, Bryant Road over Mill Brook, Br. #145/118

$0.00 $180,000.00 $45,000.00$225,000.0012/30/1998

Bridge Replacement, Powers Road over Blood Brook, Br. #107/117

Temple $0.00 $368,000.00 $92,000.00$460,000.002 Projects

11/3/2008

Bridge Replacement, North Road over Brook, Br. #110/143

$0.00 $432,000.00 $108,000.00$540,000.0011/4/2008

Bridge Replacement, Sodom Road over Melvin River, Br. #134/089

Tuftonboro $0.00 $188,000.00 $47,000.00$235,000.002 Projects

5/30/2017

Bridge Replacement, Tuftonboro Neck Road over Winter Harbor, Br. #241/099

$0.00 $724,000.00 $181,000.00$905,000.005/31/2017

Bridge Replacement, Neal Mine Road over Little Sugar River, Br. #062/046

Unity $0.00 $536,000.00 $134,000.00$670,000.005 Projects

7/1/2013

Bridge Rehabilitation, Cold Pond Rd over Little Suger River, Br. #092/040

$0.00 $284,000.00 $71,000.00$355,000.007/5/2011

Bridge Replacement, South Slack Rd over Little Sugar River, Br. #101/046

$0.00 $580,000.00 $145,000.00$725,000.0010/31/2012

Bridge Replacement, Quaker City Rd over Little Suger River, Br. #086/039

$0.00 $584,000.00 $146,000.00$730,000.0010/31/2012

Bridge Replacement, Stage Road over Little Sugar River(Municipal Managed Project)

$0.00 $820,000.00 $205,000.00$1,025,000.0010/31/2012

Bridge Rehabilitation, Canal Road over Great East Lake Outlet, Br. #186/118(Municipal Managed Project)

Wakefield $0.00 $360,000.00 $90,000.00$450,000.003 Projects

2/19/2010

Bridge Replacement, Old Walefield Road over Pine Brook, Br. #096/032

$0.00 $756,000.00 $189,000.00$945,000.001/21/2011

Bridge Replacement, Maple Street over Branch River, Br. #290/064

$0.00 $704,000.00 $176,000.00$880,000.008/1/2013

Page 10 of 11Printed: 9/4/2018 8:14:04 AM Awaiting Town Action

Page 57: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAMEPROJ #

DESCRIPTION / IMPROVEMENT CURRENT ESTIMATE

FEDERAL SHARE

STATE SHARE TOWN / CITY SHARE

TRANDATE

Bridge Replacement, Wentworth Road over Houghton Brook, Br. #213/076

Walpole $0.00 $308,000.00 $77,000.00$385,000.001 Project

10/13/2003

Bridge Replacement, Breezy Point Road over Baker River, Br. #154/122

Warren $0.00 $500,000.00 $125,000.00$625,000.002 Projects

6/27/2000

Bridge Replacement, Studio Road over Brook, Br. #134/100

$0.00 $212,000.00 $53,000.00$265,000.006/27/2000

Bridge Replacement, Smith Pond Road over Shedd Brook, Br. #180/046(Municipal Managed Project)

Washington $0.00 $456,000.00 $114,000.00$570,000.001 Project

11/29/2011

Repair/Replacement of Bridge, West Branch Road over Mad River, Br. #126/123(Municipal Managed Project)

Waterville Valley $0.00 $360,000.00 $90,000.00$450,000.001 Project

1/21/2011

Bridge Replacement, Rowentown Road over Rocky Branch, Br. #111/068

Wentworth $0.00 $636,000.00 $159,000.00$795,000.001 Project

7/1/2019

Bridge Rehabilitation, Makinen Road over Mill Brook, Br. #151/125

Westmoreland $0.00 $380,000.00 $95,000.00$475,000.004 Projects

3/8/2006

Bridge Replacement, Spofford Road over Partridge Brook, Br. #138/038

$0.00 $248,000.00 $62,000.00$310,000.001/4/2006

Bridge Replacement, South Village Road over Mill Brook, Br. #167/120

$0.00 $220,000.00 $55,000.00$275,000.003/8/2006

Bridge Replacement, River Road South over Partridge Brook, Br. #089/100

$0.00 $1,040,000.00 $260,000.00$1,300,000.001/21/2011

Bridge Replacement, Frye Mill Road over Burton Pond Outlet, Br. #080/145

Wilton $0.00 $252,000.00 $63,000.00$315,000.001 Project

3/2/2007

Bridge Replacement, Bridge Street over Ashuelot River, Br. #122/096

Winchester $0.00 $800,000.00 $200,000.00$1,000,000.002 Projects

9/15/2004

Bridge Replacement, Burt Hill Road over Pouchaug Brook, Br. #081/022

$0.00 $704,000.00 $176,000.00$880,000.007/1/2021

152 Projects Awaiting Town Action $516,000.00 $66,317,421.60 $16,692,155.40$83,525,577.00EstimateTotal For

Page 11 of 11Printed: 9/4/2018 8:14:04 AM Awaiting Town Action

Page 58: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAME DESCRIPTION / IMPROVEMENT REMARKS

REQUESTS FOR ESTIMATES - WORK IN PROGRESS

Sent to BD 10/20/14-Est.send to PCA dated 11/6/14Repair/Replacement of Bridge, Forest Road over Great Brook, Br. #105/035Acworth

Sent to BD 1/25/17Repair/Replacement of Bridge, Brook Road over Joe English Brook, Br. #063/118Amherst

Sent to BD 12/12/17Repair/Replacement of Bridge, Antrim Road over Monadnock Mill Canal, Br. #095/093

Bennington

Sent to BD 2/10/17Repair/Replacement of Bridge, Iron Works Road over Turkey River, Br. #190/067Concord

Sent BD 2/10/17Repair/Replacement of Bridge, Washington Street over Canal Inlet, Br. #048/082Concord

Sent to BD 2/7/17Repair/Replacement of Bridge, Walker Brook Road over Frazier Brook, Br. #178/057

Danbury

Sent to BD 2/7/17Repair/Replacement of Bridge, Bohonnon Road over Wild Meadow Brook, Br. #112/108

Danbury

Req to BD to update estimate on 11/7/14-NDYBridge Replacement, Paulson Road over Brook, Br. #101/125Farmington

Req to BD to update estimate on 11/7/14-NDYBridge Replacement, Sheepboro Road over Berry's River, Br. #142/050Farmington

Sent to BD 3/12/14-Est sent to PCA dated 11/06/14Repair/Replacement of Bridge, Russell Station Road over Rand Brook, Br. #114/062

Francestown

Sent to BD 8/4/17Repair/Replacement of Bridge, Bickford Hill Road over Ham Branch, Br. #055/101Franconia

Sent to BD 12/28/16Repair/Replacement of Bridge, Summit AvenueGilford

Sent to BD 11/10/16Repair/Replacement of Bridge, School House Road over Brook, Br. #151/089Greenfield

Sent to Bridge Design 4/18/16Repair/Replacement of Bridge, Sculptured Rocks Road over Atwell Brook, Br. #123/057

Groton

Sent to BD 9/18/13-Est. sent to PCA dated 11/3/14Repair/Replacement of Bridge, Broad Cove Road over Dolf Brook, Br. #154/136Hopkinton

Page 1 of 3Printed: 9/4/2018 8:15:50 AM

Page 59: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAME DESCRIPTION / IMPROVEMENT REMARKS

REQUESTS FOR ESTIMATES - WORK IN PROGRESS

Sent to Bridge Design 5/13/2016Repair/Replacement of Bridge, NH111 WB over MERRIMACK RIVER, Br. #109/068Hudson

Sent to Bridge Design 5/13/2016Repair/Replacement of Bridge, NH111 EB over MERRIMACK RIVER, Br. #110/068Hudson

Sent to BD 2/1/18Repair/Replacement of Bridge, Summit Road over Black Brook, Br. #091/099Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Ferry Brook Road over Ferry Brook, Br. #173/135Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Whitcomb Mills Road over White Brook, Br. #079/080

Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Church Street over Beaver Brook, Br. #140/075Keene

Sent to BD 2/1/18Repair/Replacement of Bridge, Maple Avenue over Black Brook, Br. #090/101Keene

Sent to BD 2/21/17Repair/Replacement of Bridge, Wilton Road over Souhegan River, Br. #052/135Milford

Sent to BD 2/21/17Repair/Replacement of Bridge, NH Rte 13 (Purgatory Rd) over Souhegan River, Br. #073/154

Milford

Sent to Bridge Design 4/18/16Repair/Replacement of Bridge, Old Canterbury Road over Narrows Brook, Br. #045/100

Northwood

Sent to BD 12/21/17Repair/Replacement of Bridge, Powers Bridge Road over Brook, Br. #091/067Peterborough

Sent to BD 12/21/17Repair/Replacement of Bridge, Morrison Road over Contoocook River, Br. #081/069Peterborough

Sent to BD 12/21/17Repair/Replacement of Bridge, Slab Road over Otter Brook, Br. #132/134Peterborough

Sent to BD 5/4/17Repair/Replacement of Bridge, Colby Hill Road over Bloods Brook, Br. #157/121Plainfield

Sent to BD 1/8/15-NDYRepair/Replacement of Bridge, Portland Street over Wardley Brook, Br. #121/121Rochester

Page 2 of 3Printed: 9/4/2018 8:15:50 AM

Page 60: BRIDGE AID PROGRAM STATUS REPORT As of … · As of 6/1/2018 Report prepared by NHDOT - Bureau of Planning and Community Assistance BRIDGE AID PROGRAM STATUS REPORT With Bridge Detail

PROJECT NAME DESCRIPTION / IMPROVEMENT REMARKS

REQUESTS FOR ESTIMATES - WORK IN PROGRESS

Sent to BD 1/8/15-NDYRepair/Replacement of Bridge, Lowell Street over Willow (Wardley) Brook, Br. #148/121

Rochester

Sent to BD 1/8/15-NDYRepair/Replacement of Bridge, Four Rod Road over Rickers Brook, Br. #114/046Rochester

Sent to BD 2/1/18Repair/Replacement of Bridge, Rye Harbor Road over Brook, Br. #135/075Rye

Sent to BD 4/28/15-Site visit complete, working on est.Repair/Replacement of Bridge, Bradford Road over Wenell Brook, Br. #071/052Sunapee

Sent to Bridge Design 5/3/16Repair/Replacement of Bridge, Temple Road over Blood Brook, Br. #063/105Wilton

Page 3 of 3Printed: 9/4/2018 8:15:50 AM