BRESD Alterations and Additions to Gymnasium/Kitchen (Increment 1) and Gym Additions/Classroom/Fire Suppression (Increment 2) Mold Rehabilitation Project – BID PACKAGE BR2018.1-2.17 INTERIOR PAINT Scope Clarification BR2018.1-2.17: Interior Paint General Notes: 1. The following scope is offered as assistance to complete a thorough scope letter. Bids and budget breakout shall include a scope letter prepared by the contractor 2. This work shall be completed per plans and specifications 3. Pre-bid RFI’s should be submitted if the plans are not thorough, lack dimensions, or if you have questions pertaining to this bid 4. Review all pages of the plans 5. Budget breakout (itemized bid sheet) is required for all scopes 6. Bidders shall submit a schedule (number of days) required to complete the work contained in this scope to assist with overall planning and scheduling General Interior Painting Notes: 1. Paint to be Dunn Edward, Sherwin Williams, or equal per plan and spec. 2. Contractor to provide Caulking, Primer, Base and Finish coats. 3. Contractor shall protect all areas not scheduled for paint from spills, overspray, and any other incident that would affect existing or future finishes. 4. Contractor shall provide (3) each 12” x 12” brush outs of colors for District verification and approval before “any interior paint is applied”. 5. Contractor shall inspect all surfaces to be painted and bring any issues to District Project Manager before commencement of painting. If no issues are recorded prior to commencement of painting, District will assume building is 100% ready and contractor will assume any liability i.e. panel gaps not correct, nailing depth too deep, gaps too large for caulking etc. Interior Colors: 1. Interior Wall Color shall be equivalent color to: color to be determined by owner 2. Interior Ceilings including bathrooms shall be equivalent color to: color to be determined by owner 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door Frames and Door Face shall be equivalent color to: color to be determined by owner 5. Caulking at HM Frames, Casework, Ceiling edges, etc. as needed – to match Interior Wall Color
5

BRESD Alterations and Additions to Gymnasium/Kitchen ... · 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door

Oct 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BRESD Alterations and Additions to Gymnasium/Kitchen ... · 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door

BRESD Alterations and Additions to Gymnasium/Kitchen (Increment 1) and Gym Additions/Classroom/Fire Suppression (Increment 2)

Mold Rehabilitation Project –

BID PACKAGE BR2018.1-2.17 INTERIOR PAINT

Scope Clarification BR2018.1-2.17: Interior Paint

General Notes:

1. The following scope is offered as assistance to complete a thorough scope letter. Bids and budget

breakout shall include a scope letter prepared by the contractor

2. This work shall be completed per plans and specifications

3. Pre-bid RFI’s should be submitted if the plans are not thorough, lack dimensions, or if you have

questions pertaining to this bid

4. Review all pages of the plans

5. Budget breakout (itemized bid sheet) is required for all scopes

6. Bidders shall submit a schedule (number of days) required to complete the work contained in this

scope to assist with overall planning and scheduling

General Interior Painting Notes:

1. Paint to be Dunn Edward, Sherwin Williams, or equal per plan and spec.

2. Contractor to provide Caulking, Primer, Base and Finish coats.

3. Contractor shall protect all areas not scheduled for paint from spills, overspray, and any other

incident that would affect existing or future finishes.

4. Contractor shall provide (3) each 12” x 12” brush outs of colors for District verification and

approval before “any interior paint is applied”.

5. Contractor shall inspect all surfaces to be painted and bring any issues to District Project Manager

before commencement of painting. If no issues are recorded prior to commencement of painting,

District will assume building is 100% ready and contractor will assume any liability i.e. panel gaps not

correct, nailing depth too deep, gaps too large for caulking etc.

Interior Colors:

1. Interior Wall Color shall be equivalent color to: color to be determined by owner

2. Interior Ceilings including bathrooms shall be equivalent color to: color to be determined by owner

3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by

owner

4. Interior Door Frames and Door Face shall be equivalent color to: color to be determined by owner

5. Caulking at HM Frames, Casework, Ceiling edges, etc. as needed – to match Interior Wall Color

rro65
Typewriter
6. Exposed GLB's shall be equivalent color to: color to be determined by owner
Page 2: BRESD Alterations and Additions to Gymnasium/Kitchen ... · 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door

Interior Paint Schedule

1. All interior rooms have painted ceilings.

2. Bathrooms have FRL/FRP on walls. Lids ONLY, get painted at all bathroom locations.

3. Kitchen and prep/storage rooms have FRL/FRP on walls. Lids ONLY, get painted in kitchen and

associated rooms.

4. All hard lids shall be painted.

5. Where FRL occurs, contractor shall bring finish paint down to minimum 7’ 6” AFF.

a. All gym walls get FRL to 8’.

6. Gym ceiling has extensive tectum panels. See attached pdf. Finish paint shall extend 6” minimum in

behind tectum panel at all sides/ all locations.

7. Gym walls get scattered tectum panels. All gym walls shall get finish paint.

This document shall be used only as a clarification of the intent of the DSA Approved Plans

and Project Manual. While this document is not meant to add to the design of the project, it

is formal and the contractor shall be responsible for its content.

Page 3: BRESD Alterations and Additions to Gymnasium/Kitchen ... · 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door

DN

74'-0"

42'-0"

4'-0"

3'-0"

1'-0"

3'-0"

0'-2"

3'-0"3'-0"

15'-0"

12'-0"

19'-0"

19'-9"

3'-0"

1'-0"

3'-0"

0'-2"

3'-0" 3'-0"

15'-0"12'-0"

19'-9"

R6'-0"

R2'-0" R0'-9"

3'-0"

18'-7"18'-7"

18'-7"18'-7"

12'-0"

12'-0"

5'-5"5'-5"

14'-10"14'-10"

12'-6" 12'-4" 12'-4" 12'-0" 12'-6"

2" C

EN

TE

R L

INE

60'-0"

30'-0"10'-0"10'-0"

36'-0" 20'-0"20'-0"

NE

T L

EN

GT

H

2" C

EN

TE

R L

INE

NE

T H

EIG

HT

: 8'

HIG

H F

OR

BO

YS

7'4

" HIG

H F

OR

GIR

LS

SE

RV

ING

AR

EA

PO

ST

S A

RE

PL

AC

ED

36

'C

EN

TE

R T

O C

EN

TE

R

36

21

(4)3

6 2

1(4)

36

21

(4)3

6 2

1(4)

48 21(4)48 21(4)

P

42 24(4)42 24(4)

54

24

(4)

60

24

(4)

20x20

A.5 B.4

B.4

B.7 B.8

.1

.3

B.

B.

A.

A.

C.

.2

Z.

Z.

Y.

Y.

X.

X.

.4

(E) KITCHEN

2STORAGE

11

(E) STOR.

9

(E)COOLER/FREZER

8

(E) MECH

10

(E) CUST.

4

(E) GIRLS

6

(E) BOYS

5

MULTI-PURPOSE

7

LADDER

60" LANDING

60" LANDING

WH

IDFW/D

.G

.H

.I .J

30' - 0"

32

' - 0

"

32

' - 0

"

6' -

5"

12

CLR. @ LANDING2' - 0" MIN.

34C

CLASSROOM

34

TRUE NORTH

PLAN NORTH

KEY PLAN

CHECKED BY:

REVISIONS

DRAWN BY:

DATE:

PROJECT NUMBER

CLIENT

BC

DA

ARCHITECTURE

CIVIL

MECHANICAL & PLUMBING

TRINITY VALLEY CONSULTING ENGINEERS INC.67 WALNUT WAY/P.O. BOX 1567

WILLOW CREEK, CA 95573(530) 629-3000

FRONTIER CONSULTING ENGINEERSPO BOX 492174

REDDING, CA 96002(530) 232-2770

PACE ENGINEERING1730 SOUTH STREETREDDING, CA 96001

(530) 244-0202

ELECTRICAL

STRUCTURE

POINT 2 STRUCTURAL ENGINEERS INC.3701 BUSINESS DRIVE SUITE 100

SACRAMENTO, CA 95820(916) 452-8200

251

BU

RN

T R

AN

CH

SC

HO

OL

RD

., B

UR

NT

RA

NC

H,

CA

95

527

2520 Venture Oaks Way, Suite 440Sacramento, CA 95833

916-682-9494 P916-682-0990 F

PBK.COM

SACRAMENTO

FILE N0. 12-58

IDENTIFICATION STAMPVID. OF THE STATE ARCHITECT

APPL. 02-116159

ACS________FLS_______SS________

DATE____________________________

5/1

8/2

01

8 1

0:3

0:4

5 A

M

C:\U

se

rs\m

ho

ste

tle

r\D

ocum

en

t s\1

71

42.2

Burn

t R

anch E

lem

enta

ry S

chool C

entr

al IN

C 2

_A

17_m

ily.h

oste

t le

r.rv

t

A2.06-I2

ENLARGEDSTRIPPED DOWN

FLOOR PLAN

Checker

Author

APRIL 17, 2018

17142

BURNT RANCH JOINT SCHOOL DISTRICT

CONSTRUCTION DOCUMENTS

CO

NS

TR

UC

TI O

N D

OC

UM

EN

TS

No. Description Date

3/16" = 1'-0"1 FLOOR PLAN MULTIPURPOSE - BUILDING B

1/4" = 1'-0"2 FLOOR PLAN - BUILDING C

BU

RN

T R

AN

CH

EL

EM

EN

TA

RY

SC

HO

OL

AL

TE

RA

TIO

NS

& A

DD

ITIO

N T

O

MU

LT

I-P

UR

PO

SE

BU

ILD

ING

/ C

LA

SS

RO

OM

-IN

CR

EM

EN

T 2

Dave
Highlight
Dave
Highlight
Dave
Textbox
All interior rooms have hard lids that get paint. 1. Kitchen and prep/storage walls get FRL 2. Bathroom walls get FRP 3. Gym walls get FRL to 8', paint above to ceiling.
Page 4: BRESD Alterations and Additions to Gymnasium/Kitchen ... · 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door
rro65
Polygon
0.00
rro65
Polygon
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Polygon
rro65
Line
rro65
Line
rro65
Typewriter
4' x 8' Tectum
rro65
Typewriter
4' x 8' Tectum
rro65
Typewriter
4' x 8' Tectum
rro65
Typewriter
4' x 8' Tectum
rro65
Rectangle
rro65
Distance Measurement
Distance:7.87 ft
rro65
Typewriter
8'
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Highlight
rro65
Highlight
rro65
Polygon
0.00
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Distance Measurement
Distance: 2.18 ft
rro65
Distance Measurement
Distance: 2.18 ft
rro65
Distance Measurement
Distance:2.18 ft
rro65
Distance Measurement
Distance:1.93 ft
rro65
Line
rro65
Typewriter
CL
rro65
Rectangle
rro65
Rectangle
rro65
Polygon
0.00
rro65
Polygon
0.00
rro65
Polygon
rro65
Rectangle
rro65
Line
rro65
Line
rro65
Rectangle
rro65
Rectangle
rro65
Line
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Line
rro65
Typewriter
4' x 8' Tectum 4' x 8' Tectum
rro65
Callout
Scoreboard Location
rro65
Distance Measurement
Distance: 2.02 ft
rro65
Distance Measurement
Distance:2.66 ft
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
FRL To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Polygon
0.00
rro65
Line
rro65
Line
rro65
Line
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Rectangle
rro65
Rectangle
rro65
Highlight
rro65
Rectangle
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Polygon
rro65
Rectangle
rro65
Distance Measurement
Distance:2.05 ft
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Typewriter
2' Typ
rro65
Line
rro65
Line
rro65
Line
rro65
Line
rro65
Line
rro65
Line
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Line
rro65
Line
rro65
Line
rro65
Line
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Line
rro65
Rectangle
rro65
Rectangle
rro65
Line
rro65
Line
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Between Beams
rro65
Typewriter
4' x 8' Tectum Centered In Opening
rro65
Typewriter
4' x 8' Tectum Centered In Opening
rro65
Typewriter
4' x 8' Tectum Centered In Opening
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Typewriter
Painted Gyp Board
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Typewriter
FRL Over 5/8" Gyp Board To 8' Aff
rro65
Polygon
rro65
Polygon
rro65
Polygon
rro65
Callout
A/V Projector Screen Location
rro65
Typewriter
FRL to 8' AFF
Dave
Callout
Level 4 finish and paint to extend down to 7'6" AFF (6" into area covered by VCTB) at all locations
Dave
Callout
Level 4 finish and paint to extend down to 7'6" AFF (6" into area covered by VCTB) at all locations
Dave
Callout
Level 4 finish and paint to extend down to 7'6" AFF (6" into area covered by VCTB) at all locations
Dave
Callout
Level 4 finish and paint to extend down to 7'6" AFF (6" into area covered by VCTB) at all locations
Page 5: BRESD Alterations and Additions to Gymnasium/Kitchen ... · 3. Interior HM Frame and Glazing Stop Color shall be equivalent color to: color to be determined by owner 4. Interior Door
rro65
Line
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Highlight
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Rectangle
rro65
Distance Measurement
Distance:2.03 ft
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Line
rro65
Line
rro65
Line
rro65
Line
rro65
Line
rro65
Distance Measurement
Distance:24.23 ft
rro65
Distance Measurement
Distance:14.32 ft
rro65
Typewriter
14'
rro65
Typewriter
24'
rro65
Distance Measurement
Distance:19.55 ft
rro65
Typewriter
20'
rro65
Distance Measurement
Distance:7.89 ft
rro65
Typewriter
8'
rro65
Typewriter
3'
rro65
Typewriter
2'
rro65
Typewriter
3'
rro65
Typewriter
2'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
4' x 8'
rro65
Typewriter
4' x 8'
rro65
Typewriter
4' x 8'
rro65
Typewriter
4' x 8'
rro65
Typewriter
4' x 4' 4' x 4'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Rectangle
rro65
Polyline
rro65
Rectangle
rro65
Polyline
rro65
Line
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
2'
rro65
Typewriter
3'
rro65
Typewriter
3'
rro65
Typewriter
BRESD Inc. 1-2 Gym Ceiling Tectum Layout. Total of - (48) 4'x8' Panels Total of - (24) 4'x4' Panels
rro65
Rectangle
rro65
Polygon
0.00
rro65
Polyline
rro65
Polyline
rro65
Polyline
rro65
Line
rro65
Line
rro65
Typewriter
(E) Rafter or Purlin
rro65
Callout
5/8" Drywall - Typical attachment
rro65
Polyline
rro65
Polyline
rro65
Distance Measurement
Distance:18.56 ft
rro65
Distance Measurement
Distance:18.13 ft
rro65
Distance Measurement
Distance:18.36 ft
rro65
Distance Measurement
Distance: 16.57 ft
rro65
Callout
1 1/4" RC attached to (e) rafter or purlin @ 12 OC typical
rro65
Arrow
rro65
Arrow
rro65
Arrow
rro65
Arrow
rro65
Typewriter
12"
rro65
Typewriter
12"
rro65
Typewriter
12"
rro65
Typewriter
12"
rro65
Callout
Additional 1 1/4" RC to Rafters to support Tectum layout may be required at the lower end of Tectum layout if Tectum doesnt land on 12" RC layout
rro65
Distance Measurement
Distance: 3.28 ft
rro65
Typewriter
2"
rro65
Line
rro65
Callout
Longer self tapping screw through Tectum and gyp into RC
rro65
Polyline
rro65
Distance Measurement
Distance:17.48 ft
rro65
Typewriter
12"
rro65
Distance Measurement
Distance: 35.47 ft
rro65
Typewriter
24"
rro65
Callout
Center Of Roof Line In Gym Ceiling
rro65
Line
rro65
Line
rro65
Distance Measurement
Distance:39.62 ft
rro65
Typewriter
26"
rro65
Line
rro65
Callout
4' x8' x 1" Tectum Panel
rro65
Arrow
rro65
Line
rro65
Line
rro65
Line
User
Rectangle
User
Typewriter
This area new hardlid with level 4 finish and paint. Walls to be smooth level 2 finish - covered by FRP/FRL