Page 1: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Brazilian Power Sector

- Current Issues -

Pedro G. [email protected]

Page 2: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Agenda

Brazilian Power Sector Facts Sector’s Greenhouse Gas Emissions

Brazilian Power Sector Model

Wind Power Auction

Belo Monte Project

Renewal of Concessions

Page 3: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Brazilian Power Sector Facts

Brazilian Energy Matrix => 46% renewable

– World average is 12%

Power Sector Installed Capacity

– Now: about 103 GW (91% hydro)

– Planned for 2030: 130 GW (78% hydro)

only 2% of all carbon emissions in Brazil

Page 4: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Power Sector GHGs Emissions per capita

Brazil 1

Argentina 10

EU 40

USA 100

Page 5: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Power Sector Model (Law No. 10,848)

Brazilian - Expansion centrally controlled by the

Government

LDCs: Yearly declarations of power needs for 5 years

Auctions for projects to meet such needs

PPA with LDCs (ACR) or “reserve energy”

Preliminary Environmental License

Free consumers => 25% of the power market (ACL)

Page 6: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Exclusive Auction for Wind Power (Nov / 2009)

Estimated potential: 140 GW (or 300 GW?)

Reserve energy auction in Nov/2009

441 registered projects: ~14,000 MW

Transmission through ICGs (Shared Facilities)

20-year PPAs

Will it attract equipment manufacturers?

Is it really the best alternative at the moment?

Page 7: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Belo Monte Project

Installed capacity: 11,300 MW

Capacity factor (assured energy): ~ 5,000 MW

– virtually no reservoir

Challenges:

– Valuation (R$16 or R$30 billion?)

– Transmission (distance from load centers)

– Market (ACR / ACL / Self-Producers)

– Environmental licensing…

Page 8: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Belo Monte Project Location

Page 9: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.

Confidential Information – Property of TozziniFreire Advogados

Renewal of Concessions

Page 10: Brazilian Power Sector - Current Issues - Pedro G. Seraphim pseraphim@tozzinifreire.com.br.