Top Banner
Trinity Church Branford Feasibility Study Proposal Presentation June 19, 2017 The Rev. Suzanne M. Culhane, Consultant
12

Branford final

Jan 22, 2018

Download

Design

Muhammad Ali
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Branford final

Trinity Church BranfordFeasibility Study

Proposal Presentation

June 19, 2017

The Rev. Suzanne M. Culhane, Consultant

Page 2: Branford final

Introduction: Why We’re Here

• Building Needs Identified: $1,500,000 – $2,000,000

• Desire to explore capital campaign process and

readiness

• Recognized need for professional assistance

2

Page 3: Branford final

Religious Fundraising: Building Blocks for Success

Prayer

Case

Leadership

Prospects

Plan

3

Page 4: Branford final

The Capital Campaign Process

Feasibility Study

Campaign Planning

Campaign Implementation

4

Page 5: Branford final

Feasibility Study Goals

• Develop and test a Case for Campaign support tied to parish objectives

• Build consensus around the Campaign among key leaders, top prospects, and community members

• Assess internal fundraising readiness

• Develop an understanding of potential financial support for the

Campaign

• Determine an ambitious and achievable fundraising goal

• Identify core Campaign volunteer leaders

• Begin to set prospective donors’ sights

• Identify any potential barriers to Campaign implementation

• Determine the Campaign structure, timetable, and budget

5

Page 6: Branford final

Proposed Scope of Work: Feasibility Study

1. Working Sessions (4)

2. Advisory Committee Engagement

3. Internal Capacity Assessment

4. Campaign Concept Paper

5. Constituent Conversations (Heart)

6. General Survey – mail and online

7. Report: Findings and Recommendations

6

Page 7: Branford final

Schedule and Fee

Project Duration: Three months

Project Fee: $12,800

7

Page 8: Branford final

Subsequent Phases of Work

• Campaign Planning (2-3 mos.)

• Campaign Implementation (8-12 mos.)

• Estimated Project Fee: $48,000 – $72,000

• Project fees are based on per diem rate of $800.

8

Page 9: Branford final

Vestry’s Role

• Commitment to the project’s goal

• Willingness to be interviewed

• Communicate personal giving intentions

• Answer any congregational questions

• Review Final Report and affirm next steps

9

Page 10: Branford final

About the Consultant

• Episcopal Priest and Fundraising Consultant

• 20 years professional experience

• Numerous campaigns for religious orgs and parishes

• Based in Connecticut

10

Page 11: Branford final

References

• Trinity Church Copley Square (Boston)

• The Church of the Ascension (New York)

• Capuchin Franciscans (NE Province)

• Christ Church Greenwich (Connecticut)

11

Page 12: Branford final

Thank you for this opportunity.12