Top Banner
Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City
14

Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

Dec 25, 2015

Download

Documents

Victoria Harper
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

Branden SudduthDirector, Reliability Assessment and

Performance Analysis

Planning Coordinator Gap UpdateMarch 25, 2014

PCC Meeting – Salt Lake City

Page 2: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

2

• Perceived reliability risk because:o Several entities do not know who their Planning

Coordinator is or mistakenly assume another entity is performing this function for them

o There is a lack of clarity in Functional Model around who should be a Planning Coordinator

o There is no clear definition of a Planning Coordinator Area

o There may be reliability functions not being performed

Planning Coordinator Gaps Issue

Page 3: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

3

• MOD-032 Standard Developmento Passed final ballot in December 2013o NERC Board approval February 2014o Requires data providers to submit power flow,

dynamics, and short-circuit data to their Planning Coordinator and Transmission Planner

Events Creating Urgency

Page 4: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

4

Base Case Data Submittal Process (current and general)

Generator Owner

Transmission Owner

Resource Planner

Transmission Planner

Area Coordinator WECC

Page 5: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

5

Base Case Data Submittal Process (MOD-032)

Page 6: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

6

• October 2013: PCC asks WECC staff to develop a list mapping Transmission Owners and Generator Owners to Planning Coordinators

• December 2013: System Review Work Group survey conducted to identify facilities not in a Planning Coordinator Areao PCs asked to respond to surveyo Still collecting and compiling responses

Planning Coordination Committee (PCC) Effort

Page 7: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

7

Planning Coordinator PreliminarySurvey Results as of 3-11-14

Page 8: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

8

“Arizona” Area Unclaimed Buses

91

59

35

1 1

Generator OwnedSWTCFEUNMIID

Page 9: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

9

“Northwest” Area Unclaimed Buses

115

4

8

12

121 20

Generator OwnedCity of CentraliaAvistaJCPUDMFROTC IdahoFirst WindOP&L

Page 10: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

10

“Montana/WAPA UM” Area Unclaimed Buses

9

4

1

Generator ownedNorthwesternHill Co Elec

Page 11: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

11

“PSCo/WAPA RM” Area Unclaimed Buses

9

420

711

128

8

94

27

16 237 9

Generator Owned Tri StateWest PlainsEMAPAC EWAPA LMWapa UCBlack HillsPSCOIMPlatte RiverBasin

Page 12: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

12

“California” Area Unclaimed Buses

33

60

46

2226

4

2312

33

4

87

3Metro WD

Redding

Silicon VP

USBR

Roseville

CA-OR Trans

NCPA

NextEra

Calpine

San Francisco

Shasta Lake

Modesto

Merced ID

Page 13: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

13

• CAISO, BPA, and Rocky Mountain Region entities present

• Topics of discussion:o Interconnection-wide methodology ideal

(recommendation)o Need to create a common understanding of PCo Issues around the Transmission Planner functiono MOD-032 (Area Coordinator role)o Compliance concernso Entity-level discussion of topic (BPA, CAISO, Xcel)o Processes for coordination

Rocky Mountain Meeting To Discuss Planning Coordinator Gaps

Page 14: Branden Sudduth Director, Reliability Assessment and Performance Analysis Planning Coordinator Gap Update March 25, 2014 PCC Meeting – Salt Lake City.

Branden Sudduth

WECC

[email protected]

801.883.6888

Questions?