KOP PERUSAHAAN REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAA N : REHABI LI TA SI BANGUNAN GEDUNG NEGA RA PADA BALI NGTA N PATI LOKASI : KABUPATEN PATI TAHUN : 2014 NO. URAIAN PEKERJAAN B I A Y A I REHABILITASI BANGUNAN GEDUNG NEGARA a. RENOVASI MESS 1 LA NT AI Rp. b. RENOVASI RUA NG PERTE MUAN GEDUNG P ENEL ITI Rp. c. RENOVASI BAN GUNAN K ANT OR ( R . MAKAN ME SS ) Rp. d. RENOVASI RUANG PERT EMUA N GEDUNG KEB UN PERC OBA AN Rp. e. REN OVASI PAGAR DEP AN KP Rp. f. LANDSCAPIN G ( TAMA N A IR GEDUNG UTAMA ) Rp. g. REH ABILITASI POS S AT PAM Rp. Rp. JUMLAH TOTAL Rp. …………….,…………………20…  Yang men awar, PT/CV…………………….. (…………………………….) Direktur 
20

BQ Rehabilitasi

Jul 06, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 1/20

KOP PERUSAHAAN

REKAPITULASI

RENCANA ANGGARAN BIAYA

PEKERJAAN : REHABILITASI BANGUNAN GEDUNG NEGARA PADA BALINGTAN PATI

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO. URAIAN PEKERJAAN B I A Y A

I REHABILITASI BANGUNAN GEDUNG NEGARA

a. RENOVASI MESS 1 LANTAI Rp.

b. RENOVASI RUANG PERTEMUAN GEDUNG PENELITI Rp.

c. RENOVASI BANGUNAN KANTOR ( R. MAKAN MESS ) Rp.

d. RENOVASI RUANG PERTEMUAN GEDUNG KEBUN PERCOBAAN Rp.

e. RENOVASI PAGAR DEPAN KP Rp.

f. LANDSCAPING ( TAMAN AIR GEDUNG UTAMA ) Rp.

g. REHABILITASI POS SATPAM Rp.

Rp.

JUMLAH TOTAL Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)

Direktur 

Page 2: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 2/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI MESS 1 LANTAI

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN

1 Uitzet / bouwplank 128.00 m'

2 Barak Kerja 28.00 m2

3 Administrasi & Dokumentasi 1.00 set

4 Listrik & Air Kerja 1.00 set

II PEKERJAAN TANAH

1 Galian Tanah Pondasi Batu Belah & Rolaag 299.42 m3

2 Urugan Tanah Kembali 237.48 m3

3 Urugan Sirtu Dibawah Lantai t : 15cm 80.75 m3

4 Urugan Sirtu Dibawah Pondasi Batu Belah t : 20cm 61.94 m3

5 Urugan Pasir Dibawah Rolaag Batu Belah t : 5cm 0.78 m3

6 Urugan Tanah Dipadatkan utk Peninggian Lantai t : 25cm 134.58 m3

III PEKERJAAN PASANGAN

1 Aanstamping 61.94 m3

2 Pasangan Batu Belah 1 : 6 130.07 m3

3 Pasangan Batu Belah Rolaag 1 : 6 7.80 m34 Pasangan Batu Bata 1: 5 461.14 m2

5 Pasangan Batu Bata 1: 3 120.60 m2

6 Plesteran Dinding 1: 5 922.27 m2

7 Plesteran Dinding Trasraam 1: 3 241.20 m2

8 Plesteran Beton 67.50 m2

9 Plesteran Sudut 1157.94 m'

10 Acian Dinding 1230.97 m2

IV PEKERJAAN BETON BERTULANG

Mutu Beton Struktur K250

Mutu Beton Non Struktur K175

a Sloof  

1 Sloof Praktis 12x20 2.93 m3

2 Sloof Struktur 15x30 146 kg/m3 13.03 m3

b Kolom

1 Kolom Praktis 2.76 m3

2 Kolom Type K1 30x30 316 kg/m3 0.72 m3

3 Kolom Type K2 25x30 374 kg/m3 0.60 m34 Kolom Type K3 20x30 189 kg/m3 5.28 m3

5 Kolom Type K4 15x40 195 kg/m3 6.96 m3

6 Kolom Type K5 25x25 118 kg/m3 0.50 m3

c Balok Atap

1 Balok Atap Type B1 25x50 184 kg/m3 1.88 m3

2 Balok Atap Type B2 25x60 232 kg/m3 2.25 m3

3 Balok Atap Type B3 15x30 209 kg/m3 5.04 m3

4 Balok Atap Type B4 15x30 255 kg/m3 6.73 m3

5 Balok Atap Type B5 15x30 255 kg/m3 0.18 m3

6 Balok Atap Type B6 15x30 186 kg/m3 1.62 m3

d Plat Atap

1 Beton Plat Lantai 1 ht : 6cm 32.30 m3

2 Beton Plat Atap ht : 10cm 57.18 m3

3 Beton Plat Level 3.03 m3

e Ringbalk

1 Ringbalk Praktis & Balok Latei 4.89 m3

V PEKERJAAN PLAFON1 Plafond Gypsumboard 9mm rk Hollow Metal GB 299.80 m2

2 Plafond Calsiboard 4.5mm rk Hollow Metal KSB 145.15 m2

3 Plafond Beton Ekspose BE 69.49 m2

4 Polycarbonate Rangka Besi Hollow PC 14.70 m2

5 Plafond Drop Ceiling Gypsumboard 9mm rk Hollow Metal 26.80 m'

6 List Tepi Plafon Gypsum Profil 550.10 m'

Page 3: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 3/20

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

VI PEKERJAAN PINTU & JENDELA

1 Kusen & Pintu Jendela + Ass Terpasang - Type PJ1 8.00 unit

2 Kusen & Pintu Jendela + Ass Terpasang - Type PJ2 1.00 unit

3 Kusen & Pintu + Ass Terpasang - Type P1 9.00 unit

4 Kusen & Pintu + Ass Terpasang - Type P2 3.00 unit

5 Kusen & Pintu UPVC + Ass Terpasang - Type P3 9.00 unit

6 Kusen & Pintu + Ass Terpasang - Type Ps 8.00 unit

7 Kusen & Pintu + Ass Terpasang - Type Pt 8.00 unit

8 Kusen & Pintu + Ass Terpasang - Type P 8.00 unit

9 Kusen & Jendela Loket & Counter + Meja + Ass Terpasang - Type Lk 1.00 unit

10 Kusen & Jendela + Ass Terpasang - Type J1 1.00 unit

11 Kusen & Jendela + Ass Terpasang - Type J2 1.00 unit

12 Grill Besi + Ass Terpasang - Type G1 2.00 unit

13 Grill Besi + Ass Terpasang - Type G2 2.00 unit

14 Grill Besi + Ass Terpasang - Type G3 1.00 unit

15 Grill Besi + Ass Terpasang - Type G4 1.00 unit

16 Grill Besi + Ass Terpasang - Type G5 1.00 unit

17 Grill Besi + Ass Terpasang - Type G6 1.00 unit

18 Grill Besi + Ass Terpasang - Type G7 10.00 unit

19 Kusen + Kaca Sekat Kamar Mandi 10.00 unit

VII PEKERJAAN LANTAI & PELAPIS

1 Granite Tile 60x60 Polished ( A ) 208.80 m2

2 Granite Tile 60x60 Un Polished ( B ) 129.28 m2

3 Granite Tile 60x60 Un Polished Pasang Pola Khusus ( C ) 73.00 m2

4 Border Granite Tile 20x60 ( D ) 5.20 m25 Granite Tile 30x60 Dengan Alur Mesin ( Bevel ) ( E ) 33.00 m2

6 Trap Granite Tile 30x60 Un Polished ( F ) 11.64 m2

7 Keramik 40x40 ( G ) 32.25 m2

8 Keramik 40x40 Texture ( H ) / ( KT ) 89.48 m2

9 Pav ing Type Holland Pasang Model Sirip Ikan + Border Pav ing ( I ) 175.20 m2

10 Keramik Dinding 25x40 ( KD ) 197.35 m2

11 Border Keramik Aksen Warna 25x40 ( BK ) 72.30 m2

11 Plint Lantai Granite Tile 10x60 ( A ) 240.20 m'

12 Plint Lantai Keramik 10x40 ( B ) 75.30 m'

13 Kansteen Beton 72.90 m'

14 Rabat Beton 58.20 m2

15 Plat Beton Bawah Lantai 1 tebal 10cm 58.26 m3

VIII PEKERJAAN CAT-CATAN

1 Pekerjaan Cat Dinding Dalam / Interior 800.13 m2

2 Pekerjaan Cat Dinding Luar / Exterior 430.84 m2

3 Pekerjaan Cat Plafon Gypsumboard, Kalsiboard & Beton Ekspose 527.84 m2

4 Pekerjaan Waterproofing Atap & KM/WC Lantai 2 38.40 m2

IX PEKERJAAN MEKANIKAL & ELEKTRIKAL

a PEKERJAAN LISTRIK

1 Titik lampu dan stop kontak+ konduit 134.00  titik

2 Lampu TL 2x36 armature RM,300 2.00  bh

3 DL .D 175-ESS.18 W 51.00  bh

4 Lampu TL 1x18 armature 8.00  bh

5 Lampu baret 22 W 4.00  bh

6 Exhaust ceilling fan 9.00  bh

7 Stop kontak, 1 p 60.00  bh

8 Saklar tunggal 14.00  bh

9 Saklar ganda 20.00  bh

b PEKERJAAN PANEL

PANEL PP 1

1 Box Panel PP.1 Lt. 1,( 80x60x25cm) 1.00  unit

2 MCCB 50A/10kA/3p 1.00  bh

3 MCB 6A/5kA/1p 5.00  bh

4 MCB 10A/5kA/1p 10.00  bh

5 MCB 16A/6kA/3p 1.00  bh

6 MCB 20A/6kA/3p 1.00  bh

7 Pilot lamp 3.00  bh

8 petanahan/arde 2 Ohm 1.00  ls

9 kabel NYY 4x16 mm2 dari SDP Asrama 6.00  m

10 Kabel try stu 300x50 66.00  m

Page 4: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 4/20

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

PANEL SDP

1 Box Panel SDP.Asrama 1.00  unit

2 MCCB 200A/25kA/3p 1.00  bh

3 MCCB 50A/10kA/3p 2.00  bh

4 MCCB 25A/10kA/3p 2.00  bh

5 MCB 25A/5kA/1p 3.00  bh

6 Pilot lamp 3.00  bh

7 petanahan/arde 2 Ohm 1.00  ls

8 kabelLVTC 3X70mm2+50 mm2 dari MDP2 145.00  m9 Kabel try stu 300x50 30.00  m

PANEL AC

1 Box Panel P.AC.1 Lt. 1,( 70x50x25cm) 1.00  unit

2 MCCB 25A/10kA/3p 1.00  bh

3 MCB 10A/5kA/1p 4.00  bh

4 MCB 16A/5kA/1p 8.00  bh

5 Pilot lamp 3.00  bh

6 petanahan/arde 2 Ohm 1.00  ls

7 Instalasi kabel NYM 3x2.5mm2 19.00  ttk

8 kabel NYY 4x16 mm2 dari SDP Asrama 6.00  m

c PEKERJAAN TATA UDARA

 ACSplit Unit lengkap pipa refrigerant,pipa drain

bracket,kabel, bobokan dan testing

1 Wall type (1 pk) 1.00  unit

2 Wall type (1.5 pk) 8.00  unit

d PEKERJAAN TELEPHONE & LAN

1 instalasi kabel telphone utp cat 6 +konduit 8.00  ttk

2 socket telephone,RJ11 8.00  bh

3 pesawat telp. Analog 1.00  bh

4 Instalasi kabel datautp cat6 +konduit 1.00  ttk

5 socket LAN,RJ45 10.00  unit

X PEKERJAA PLUMBING

Instalasi Pipa ,lengkap sleave, penggantung,

dudukan dan testing

1 Pipa Air Bersih PVC-AW ( 10 kg/cm2)

- dia 1.5'' 65.00  m

- dia 1'' 65.00  m

- dia 1/2'' 220.00  ls

- fitting 1.00  bh

- ball valve 1.5'' 1.00  bh

2 Pipa Air Bekas, Air Kotor dan Vent,PVC-AW

- dia 6'' 65.00  m

- dia 4'' 70.00  m

- dia 3'' 110.00  m

- dia 2'' 40.00  m

- fitting 1.00  ls

- CO 4'' 4.00  bh

3 Pompa Transfer/dist ribusi ais listrik otomatis 1.00  unit

H=40m,kap.35 lpm,setara Shimizu PS130BT

4 WLC dan kabel kontrol setara Radar 1.00  unit

5 foot valve 1'' 1.00  bh

6 pipa PVC-AW dia. 1'' dari r.pompa ke tower 30.00  m

7 PAH (Pipa Air Hujan)

- RD (Roof Drain) dia 3'' 16.00  bh

- PVC -AW 3'' 130.00  m

8 Tangki atas kap 3 m3 2.00  bh

9 Ground Tank Kapasitas 24m3 1.00 unit10 Septicktank & Peresapan 2.00 unit

XI PEKERJAAN SANITAIR

1 Kloset Duduk ex TOTO CW 661 JT1/SW 661 JP + Ass Terpasang 9.00 unit

2 Washtafel Gantung ex TOTO LW 230 CJ + assesories terpasang 9.00 unit

Page 5: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 5/20

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

3 Kran Air 9.00 unit

4 Jet Washer 9.00 unit

5 Floor Drain 9.00 unit

6 Kaca Cermin 60x100 9.00 unit

XII PEK. SALURAN KELILING & BAK PENAMPUNG AIR KAP 64 m3

1 Saluran Keliling U30 138.00 m'

2 Bak Kontrol 6.00 bh

3 Galian Tanah 124.36 m34 Urugan Tanah Kembali 33.81 m3

5 Urugan Pasir 3.70 m3

6 Lantai Kerja Beton K100 1.85 m3

7 Balok Beton Tutup - B1 20x35 243 kg/m3 0.29 m3

8 Balok Beton Tutup - B2 20x30 168 kg/m3 1.51 m3

9 Balok Beton Lantai - B3 20x35 243 kg/m3 0.29 m3

10 Balok Beton Lantai - B4 20x30 168 kg/m3 1.51 m3

11 Kolom Beton - 25x25 266 kg/m3 0.90 m3

12 Plat Lantai Beton - tebal 20cm 102 kg/m3 6.89 m3

13 Plat Dinding Beton - tebal 15cm 133 kg/m3 7.44 m3

14 Plat Tutup Beton - tebal 12cm 138 kg/m3 8.06 m3

15 Tutup Lubang Manhole - Plat Besi Stainless Steel 1.00 unit

16 Tangga Baja Mantenance - Pipa dia 1" Stainless Steel 1.00 unit

17 Lapis Waterproofing 80.00 m3

JUMLAH

PPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 6: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 6/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI MESS 1 LANTAI

LOKASI : KABUPATEN PATITAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN TANAH Rp.

III PEKERJAAN PASANGAN Rp.

IV PEKERJAAN BETON BERTULANG Rp.

V PEKERJAAN PLAFON Rp.

VI PEKERJAAN PINTU & JENDELA Rp.

VII PEKERJAAN LANTAI & PELAPIS Rp.

VIII PEKERJAAN CAT-CATAN Rp.

IX PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp.

X PEKERJAA PLUMBING Rp.

XI PEKERJAAN SANITAIR Rp.

XII PEK. SALURAN KELILING & BAK PENAMPUNG AIR KAP 64 m3 Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,PT/CV……………………..

(…………………………….)

Direktur 

NO URAIAN PEKERJAAN H A R G A

Page 7: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 7/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI RUANG PERTEMUAN GEDUNG PENELITI

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN1 Listrik & Air Kerja 1.00 set

II PEKERJAAN BONGKARAN

1 Bongkar Plafond Existing 41.00 m2

2 Pembersihan dan Buang Puing 1.00 ls

III PEKERJAAN PLAFON

1 Plafond Gypsumboard 9mm rk metal furing full system 41.00 m2

2 List Tepi Plafon Gypsum Profil 28.20 m'

IV PEKERJAAN CAT-CATAN

1 Pekerjaan Cat Plafon Gypsumboard 41.00 m2

V PEKERJAAN ELEKTRIKAL

1 Bongkar dan Pasang Kembali Lampu Existing 1.00 ls

JUMLAH

PPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 8: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 8/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI RUANG PERTEMUAN GEDUNG PENELITI

LOKASI : KABUPATEN PATI

TAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN BONGKARAN Rp.

III PEKERJAAN PLAFON Rp.

IV PEKERJAAN CAT-CATAN Rp.

V PEKERJAAN ELEKTRIKAL Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)Direktur 

NO URAIAN PEKERJAAN H A R G A

Page 9: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 9/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI BANGUNAN KANTOR ( R. MAKAN MESS )

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN

1 Uitzet / bouwplank 59.00 m'

II PEKERJAAN BONGKARAN

1 Bongkaran Bangunan Lama 138.00 m2

2 Pembersihan & Buang Puing Bongkaran 1.00 ls

III PEKERJAAN TANAH

1 Galian Tanah Pondasi Batu Belah 49.80 m3

2 Urugan Tanah Kembali 14.15 m3

3 Urugan Pasir Dibawah Lantai 9.88 m3

4 Urugan Sirtu Dibawah Pondasi Batu Belah 9.31 m3

5 Urugan Tanah Dipadatkan untuk Peninggian Lantai 39.51 m3

IV PEKERJAAN PASANGAN

1 Aanstamping 7.45 m3

2 Pasangan Batu Belah 1 : 6 17.67 m3

3 Pasangan Batu Bata 1: 5 97.96 m2

4 Pasangan Batu Bata 1: 3 14.10 m2

5 Plesteran Dinding 1: 5 195.91 m2

6 Plesteran Dinding Trasraam 1: 3 28.20 m2

7 Plesteran Beton 12.00 m2

8 Plesteran Sudut 151.65 m'

9 Acian 120.74 m2

V PEKERJAAN BETON BERTULANG

Mutu Beton Struktur K250

Mutu Beton Non Struktur K175

1 Sloof Praktis 12x20 1.22 m3

2 Kolom Praktis 1.16 m3

3 Kolom Type K1 20x20 1.55 m3

4 Beton Plat Atap KM/WC 0.40 m3

5 Beton Plat Level 0.19 m3

6 Beton Plat Meja Pantry & Washtafel 0.48 m3

7 Ringbalk Praktis & Balok Latei 3.38 m3

V PEKERJAAN BESI

1 Rangka Atap Baja Ringan 194.31 m2

2 Railing Besi Hollow Finish Cat 19.50 m'

VI PEKERJAAN ATAP

1 Penutup Atap Zincalume 194.31 m2

2 Bubungan/Nok Atap Zincalume 19.50 m'

3 Insulation System 194.31 m2

4 Penutup Atap Kanopy Polycarbonat Rangka Hollow 57.02 m2

5 Listplank Atap GRC Termasuk Rangka Finish Cat Exterior 151.20 m2

6 Flashing Atap Zincalume t : 0.4mm 19.20 m'

7 Atap Seng Penutup Belakang Listplank GRC 94.50 m2

8 Talang Atap 41.00 m'

VII PEKERJAAN PLAFON

1 Plafond Gypsumboard 9mm rk metal furing full system 154.16 m2

2 Plafond Calsiboard 4mm rk metal furing full system 7.50 m2

3 Plafond Drop Ceiling Gypsumboard 9mm rk metal furing full system 20.56 m'

4 List Tepi Plafon Gypsum Profil 118.50 m'

Page 10: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 10/20

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

VIII PEKERJAAN PINTU & JENDELA

1 Kusen & Pintu Jendela + Ass Terpasang - Type PJ1 1.00 unit

2 Kusen & Pintu + Ass Terpasang - Type P1 1.00 unit

3 Kusen & Pintu + Ass Terpasang - Type P2 1.00 unit

4 Kusen & Pintu + Ass Terpasang - Type P2' 1.00 unit

5 Kusen & Pintu UPVC + Ass Terpasang - Type P3 2.00 unit

6 Kusen & Pintu Besi + Ass Terpasang - Type P4 1.00 unit

7 Kusen & Pintu Besi + Ass Terpasang - Type P5 1.00 unit

8 Kusen & Jendela + Ass Terpasang - Type J1 1.00 unit

9 Kusen & Jendela + Ass Terpasang - Type J2 2.00 unit

10 Kusen & Jendela + Ass Terpasang - Type BV1 2.00 unit

11 Kusen & Jendela + Ass Terpasang - Type BV2 1.00 unit

IX PEKERJAAN PELAPIS LANTAI & DINDING

1 Rabat Beton Bawah Lantai 197.13 m2

2 Keramik 40x40 Polished 182.16 m2

3 Keramik 40x40 Motif kayu 7.47 m2

4 Keramik 40x40 Texture 7.50 m2

5 Keramik 25x40 Meja Pantry 6.37 m2

6 Keramik Dinding 25x40 56.18 m2

7 Border Keramik Aksen Warna 25x40 8.50 m2

8 Plint Lantai Keramik 10x40 17.40 m'

9 Plint Lantai Granit Tile 10x60 39.80 m'

10 Batu Andesit 44.97 m2

11 Rabat Beton 8.33 m3

X PEKERJAAN CAT-CATAN

1 Pekerjaan Cat Dinding Dalam / Interior 308.69 m2

2 Pekerjaan Cat Dinding Luar / Exterior 154.75 m2

3 Pekerjaan Cat Plafon Gypsumboard & Kalsiboard 174.00 m2

4 Pekerjaan Waterproofing 78.19 m2

XI PEKERJAAN MEKANIKAL & ELEKTRIKAL

A PEKERJAAN LISTRIK

1 Titik lampu dan stop kontak+ konduit 47.00 titik

2 Lampu TL 2x36 armature RM,300 2.00 bh

3 DL .D 175-ESS.18 W 32.00 bh

4 Exhaust ceilling fan 3.00 bh

5 Stop kontak, 1 p 10.00 bh

6 Saklar tunggal 6.00 bh

7 Saklar ganda 6.00 bh

B PEKERJAAN PANEL

1 Box MCB R.Makan 1.00 unit

2 MCB 6A/5kA/1p 3.00 bh

3 MCB 10A/5kA/1p 3.00 bh

4 MCB 16A/5kA/1p 1.00 bh

5 MCB 20A/5kA/1p 1.00 bh

6 Pilot lamp 1.00 bh

7 petanahan/arde 2 Ohm 1.00 ls

8 kabel LVTC 2x10 mm2 125.00 m

XII PEKERJAAN PLUMBING

Instalasi Pipa ,lengkap sleave, penggantung,

dudukan dan testing

1 Pipa Air Bersih PVC-AW ( 10 kg/cm2)- dia 1.5'' 10.00 m

- dia 1'' 25.00 m

- dia 1/2'' 12.00 ls

- fitting 1.00 bh

Page 11: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 11/20

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

- ball valve 1.5'' 1.00 bh

2 Pipa Air Bekas, Air Kotor dan Vent,PVC-AW

- dia 6'' 4.00 m

- dia 4'' 4.00 m

- dia 3'' 4.00 m

- dia 2'' 8.00 m

- fitting 1.00 ls

- CO 4'' 2.00 bh

3 Pompa Transfer/distribusi ais listrik otomatis 1.00 unitH=40m,kap.35 lpm,setara Shimizu PS130BT

4 WLC dan kabel kontrol setara Radar 1.00 unit

5 foot valve 1'' 1.00 bh

6 pipa PVC-AW dia. 1'' dari r.pompa ke tower 10.00 m

7 Ground Tank Kapasitas 6m3 1.00 unit

8 Septicktank & Peresapan 1.00 unit

XIII PEKERJAAN SANITAIR

1 Kloset Duduk ex TOTO CW 661 JT1/SW 661 JP + Assesories Terpasang 2.00 unit

2 Washtafel Gantung ex TOTO LW 230 CJ + assesories terpasang 2.00 unit

3 Kran Air 2.00 unit

4 Jet Washer 2.00 unit

5 Floor Drain 2.00 unit

6 Kaca Cermin 60x100 2.00 unit

XIV PEKERJAAN LAIN-LAIN

1 Saluran Drainase

- Saluran U30 Terbuka 44.00 m'

2 Tanaman

- Gebalan Rumput Gajah Mini 37.44 m2

- Urugan tanah Merah + Pupuk 3.74 m3

3 Counter Saji 6.00 m'

JUMLAH

PPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 12: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 12/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI BANGUNAN KANTOR ( R. MAKAN MESS )

LOKASI : KABUPATEN PATI

TAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN BONGKARAN Rp.

III PEKERJAAN TANAH Rp.

IV PEKERJAAN PASANGAN Rp.

V PEKERJAAN BETON BERTULANG Rp.

V PEKERJAAN BESI Rp.

VI PEKERJAAN ATAP Rp.

VII PEKERJAAN PLAFON Rp.

VIII PEKERJAAN PINTU & JENDELA Rp.

IX PEKERJAAN PELAPIS LANTAI & DINDING Rp.

X PEKERJAAN CAT-CATAN Rp.

XI PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp.

XII PEKERJAAN PLUMBING Rp.

XIII PEKERJAAN SANITAIR Rp.

XIV PEKERJAAN LAIN-LAIN Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)

Direktur 

NO URAIAN PEKERJAAN H A R G A

Page 13: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 13/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI RUANG PERTEMUAN GEDUNG KEBUN PERCOBAAN

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN

1 Uitzet / bouwplank 1.00 ls

II PEKERJAAN BONGKARAN

1 Bongkaran Dinding Lama 73.50 m2

2 Bongkar Kusen Pintu & Jendela Existing 1.00 ls

3 Pembersihan & Buang Puing Bongkaran 1.00 ls

III PEKERJAAN PASANGAN

1 Pasangan Batu Bata (Eks. Kusen Existing) 1: 5 11.61 m2

2 Plesteran Dinding 1: 5 23.22 m2

3 Plesteran Sudut 173.80 m'

4 Acian Dinding 23.22 m2

IV PEKERJAAN PINTU & JENDELA

1 Kusen & Pintu + Ass Terpasang - Type P1 1.00 unit

2 Kusen & Pintu + Ass Terpasang - Type P2 2.00 unit

3 Kusen & Pintu UPVC + Ass Terpasang - Type P3 1.00 unit4 Kusen & Jendela + Ass Terpasang - Type J1 2.00 unit

5 Kusen & Jendela + Ass Terpasang - Type J2 4.00 unit

6 Kusen & Jendela + Ass Terpasang - Type J3 2.00 unit

7 Kusen & Bouvenligt + Ass Terpasang - Type BV1 1.00 unit

V PEKERJAAN LANTAI & PELAPIS

1 Keramik 30x30 Polished 118.40 m2

2 Keramik 20x20 Texture 3.00 m2

3 Keramik Dinding 20x25 10.85 m2

4 Border Keramik Aksen Warna 10x20 0.62 m2

VI PEKERJAAN CAT-CATAN

1 Pekerjaan Cat Dinding Dalam / Interior 210.43 m2

VII PEKERJAAN SANITAIR

1 Kloset Jongkok ex TOTO + Ass Terpasang 1.00 unit

2 Kran Air 1.00 unit

3 Jet Washer 1.00 unit4 Floor Drain 1.00 unit

JUMLAH

PPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 14: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 14/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI RUANG PERTEMUAN GEDUNG KEBUN PERCOBAAN

LOKASI : KABUPATEN PATI

TAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN BONGKARAN Rp.

III PEKERJAAN PASANGAN Rp.

IV PEKERJAAN PINTU & JENDELA Rp.

V PEKERJAAN LANTAI & PELAPIS Rp.

VI PEKERJAAN CAT-CATAN Rp.

VII PEKERJAAN SANITAIR Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)

Direktur 

NO URAIAN PEKERJAAN H A R G A

Page 15: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 15/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI PAGAR DEPAN KP

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN1 Listrik & Air Kerja 1.00 set

II PEKERJAAN TANAH

1 Galian Tanah Pondasi Batu Belah 7.00 m3

2 Urugan Tanah Kembali 3.09 m3

3 Urugan Sirtu Dibawah Pondasi Batu Belah 1.40 m3

III PEKERJAAN PASANGAN

1 Pasangan Batu Belah 1 : 6 2.35 m3

2 Pasangan Batu Bata 1: 5 9.60 m2

3 Plesteran Dinding 1: 5 19.20 m2

4 Plesteran Beton 0.90 m2

5 Plesteran Sudut 43.20 m'

6 Acian Dinding 20.10 m2

IV PEKERJAAN BETON BERTULANG

1 Sloof Praktis 12x20 0.15 m3

2 Kolom Praktis 0.23 m3

3 Beton Plat 0.05 m3

V PEKERJAAN BESI

1 Pintu Pagar Besi Tempa Finish Cat 2.00 unit

VI PEKERJAAN PELAPIS

1 Pasang Batu Andesit 7.48 m2

VII PEKERJAAN CAT-CATAN

1 Pekerjaan Cat Dinding Luar / Exterior 3.70 m2

VIII PEKERJAAN LAIN-LAIN

1 Pasang Logo 2.00 unit

JUMLAHPPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 16: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 16/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : RENOVASI PAGAR DEPAN KPLOKASI : KABUPATEN PATI

TAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN TANAH Rp.

III PEKERJAAN PASANGAN Rp.

IV PEKERJAAN BETON BERTULANG Rp.

V PEKERJAAN BESI Rp.

VI PEKERJAAN PELAPIS Rp.

VII PEKERJAAN CAT-CATAN Rp.

VIII PEKERJAAN LAIN-LAIN Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)

Direktur 

NO URAIAN PEKERJAAN H A R G A

Page 17: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 17/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : LANDSCAPING ( TAMAN AIR GEDUNG UTAMA )

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN1 Uitzet / bouwplank 26.00 m'

2 Listrik & Air Kerja 1.00 set

II PEKERJAAN TANAH

1 Galian Tanah 38.24 m3

2 Urugan Tanah Kembali 9.56 m3

3 Urugan Pasir Dibawah Plat Lantai tebal 5cm 3.48 m3

III PEKERJAAN PASANGAN

1 Pasangan Batu Belah 1 : 6 4.82 m3

IV PEKERJAAN BETON BERTULANG

Mutu Beton Struktur K250

Mutu Beton Non Struktur K175

1 Lantai Kerja Beton K100 3.48 m3

2 Beton Plat Lantai tebal 10cm 83 kg/m3 6.95 m3

3 Beton Plat Dinding tebal 13cm 78 kg/m3 3.13 m3

V PEKERJAAN LANTAI & PELAPIS

1 Granite Tile Un Polish 60x60 46.98 m2

2 Batu Andesit ( Kasar ) 30x30 11.34 m2

3 Floor Hardener 3.48 m2

4 Batu Koral Sikat Halus 16.13 m2

5 Pekerjaan Waterproofing 77.85 m2

VI PEKERJAAN AIR MUNCRAT

1 Nozzle Jet Spray ( Air Muncrat ) Type I 15.00 bh

2 Nozzle ( Air Muncrat ) Type 2 + Lampu 5.00 bh

3 Spraying gardens pump lengkap accessories strainer, 1.00 unit

house coupling, pipe, kapasitas 8 Lpm, head 30 kg/cm2

daya 3/4 HP, 220 V, 1420rpm,50 Hz,1p, LS906

4 Instalasi Plumbing / Pipa PPR-PN10 dia 1/2" 30.00 m'

5 Instalasi Listrik Kabel NYYHY 30.00 m'

6 Saluran Sirkulasi 24.00 m'

7 Bak Kontrol 1.00 unit8 Bak Tandon / Balance Tank 1.00 unit

JUMLAH

PPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 18: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 18/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : LANDSCAPING ( TAMAN AIR GEDUNG UTAMA )

LOKASI : KABUPATEN PATI

TAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN TANAH Rp.

III PEKERJAAN PASANGAN Rp.

IV PEKERJAAN BETON BERTULANG Rp.

V PEKERJAAN LANTAI & PELAPIS Rp.

VI PEKERJAAN AIR MUNCRAT Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)

Direktur 

NO URAIAN PEKERJAAN H A R G A

Page 19: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 19/20

RENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : REHABILITASI POS SATPAM

LOKASI : KABUPATEN PATI

TAHUN : 2014

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT. H A R G A JUMLAH HARGA

Rp. Rp. Rp.

I PEKERJAAN PERSIAPAN1 Listrik & Air Kerja 1.00 set

II PEKERJAAN PLAFON

1 Plafond Calsiboard 4mm rk metal furing full system 18.02 m2

- R. Ganti, Dapur, R. Sholat, KM/WC

2 Pekerjaan Cat Plafon Gypsumboard, Kalsiboard & Beton Ekspose 18.02 m2

I II PEKERJAAN LANTAI & PELAPIS

1 Keramik 40x40 Polished 46.52 m2

2 Keramik 20x20 Texture 2.31 m2

JUMLAH

PPN 10%

JUMLAH TOTAL

JUMLAH ( DIBULATKAN )

Page 20: BQ Rehabilitasi

8/18/2019 BQ Rehabilitasi

http://slidepdf.com/reader/full/bq-rehabilitasi 20/20

KOP PERUSAHAAN

REKAPITULASIRENCANA ANGGARAN BIAYA

PAKET : REHABILITASI BANGUNAN GEDUNG NEGARA

PEKERJAAN : REHABILITASI POS SATPAM

LOKASI : KABUPATEN PATI

TAHUN : 2014

I PEKERJAAN PERSIAPAN Rp.

II PEKERJAAN PLAFON Rp.

III PEKERJAAN LANTAI & PELAPIS Rp.

JUMLAH Rp.

PPN 10% Rp.

JUMLAH TOTAL Rp.

JUMLAH DIBULATKAN Rp.

…………….,…………………20…

 Yang menawar,

PT/CV……………………..

(…………………………….)

Direktur 

NO URAIAN PEKERJAAN H A R G A