REKAPITULASI RINCIAN BIAYA PEKERJAAN REHABILITASI GEDUNG ASRAMA UPI KAMPUS CIBIRU LOKASI : JALAN RAYA CIBIRU KM.15 BANDUNG a c A PEKERJAAN PERSIAPAN - Rp B PEKERJAAN TANAH DAN PONDASI - Rp C PEKERJAAN STRUKTUR - Rp D PEKERJAAN PENAMBAHAN DINDING - Rp E PEKERJAAN RANGKA ATAP - Rp F PEKERJAAN PLAPOND - Rp G PEKERJAAN LANTAI - Rp H PEKERJAAN INSTALASI LISTRIK - Rp I PEKERJAAN PLUMBING & KAMAR MANDI - Rp J PEKERJAAN KUSEN - Rp K PEKERJAAN FINISHING - Rp JUMLAH KESELURUHAN : - Rp PPN 10% : - Rp JUMLAH TOTAL : - Rp DIBULATKAN : - Rp Bandung, Penyedia : CV./PT. ……………………………. Nama Pimpinan Jabatan b TERBILANG : NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)
33

Bq Gd Asrama Upi Kampus Cibiru

Nov 23, 2015

Download

Documents

Asep Arus
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • REKAPITULASI RINCIAN BIAYAPEKERJAAN REHABILITASI GEDUNG ASRAMA UPI KAMPUS CIBIRU

    LOKASI : JALAN RAYA CIBIRU KM.15 BANDUNG

    a c

    A PEKERJAAN PERSIAPAN -Rp

    B PEKERJAAN TANAH DAN PONDASI -Rp

    C PEKERJAAN STRUKTUR -Rp

    D PEKERJAAN PENAMBAHAN DINDING -Rp

    E PEKERJAAN RANGKA ATAP -Rp

    F PEKERJAAN PLAPOND -Rp

    G PEKERJAAN LANTAI -Rp

    H PEKERJAAN INSTALASI LISTRIK -Rp

    I PEKERJAAN PLUMBING & KAMAR MANDI -Rp

    J PEKERJAAN KUSEN -Rp

    K PEKERJAAN FINISHING -Rp

    JUMLAH KESELURUHAN : -Rp

    PPN 10% : -Rp

    JUMLAH TOTAL : -Rp

    DIBULATKAN : -Rp

    Bandung,

    Penyedia :

    CV./PT. .

    Nama Pimpinan

    Jabatan

    b

    TERBILANG :

    NO. URAIAN PEKERJAAN JUMLAH HARGA

    (Rp)

  • RINCIAN BIAYAPEKERJAAN REHABILITASI GEDUNG ASRAMA UPI KAMPUS CIBIRU

    LOKASI : JALAN RAYA CIBIRU KM.15 BANDUNG

    VOLUME

    (Rp)

    a c d e f g = d x f

    A PEKERJAAN PERSIAPAN

    1 Pek. Pembuatan Papan Nama Rangka Kayu kaso Lokal penutup kanvas printing 1,00 unit Rp - -Rp

    2 Pek. Bongkaran Bangunan Atap & kusen lama tidak dipakai 1,00 ls Rp - -Rp

    3 Pek. Pembersihan Lapangan pembersihan dari sampah proyek sampai akhir pekerjaan 337,00 m2 Rp - -Rp

    4 Pek. Pengukuran Kembali dan Pemasangan Bouwplank papan dan kayu lokal kelas 2 85,10 m' Rp - -Rp

    Sub Jumlah Harga Pekerjaan A -Rp

    B PEKERJAAN TANAH DAN PONDASI

    1 Pek.Galian Tanah Untuk Pondasi Setempat kedalaman max 2 m 12,00 m3 Rp - -Rp

    2 Pek. Galian Tanah untuk pondasi Lajur kedalaman max 2 m 28,80 m3 Rp - -Rp

    3 Pek. Cerucuk Bambu di Bawah Pondasi Setempat dan pond.lajur Bambu ampel dia 7 cm 28,80 m2 Rp - -Rp

    4 Pek. Urugan Pasir Bawah Pondasi Setempat sirtu t = 5 cm 0,50 m3 Rp - -Rp

    5 Pek. Urugan Pasir Bawah Pondasi lajur sirtu t = 5 cm 1,44 m3 Rp - -Rp

    6 Pek. Lantai Kerja cor Tumbuk 1 : 3 : 5 Pondasi Setempat ad 1pc: 3 ps: 5 kr 10,00 m2 Rp - -Rp

    7 Pek. Pasangan Batu Kosong (aanstamping) batu kali 5,76 m3 Rp - -Rp

    8 Pek. Pasangan Pondasi Batu kali Lajur ad 1pc : 4ps 9,72 m3 Rp - -Rp

    9 Pek. Urugan Tanah Kembali Bekas galian Tanah Bekas Galian 10,20 m3 Rp - -Rp

    Sub Jumlah Harga Pekerjaan B -Rp

    C PEKERJAAN STRUKTUR

    1 Pek. Pondasi Footplat (Telapak) besi 12 - 150, beton k-200 2,72 m3 Rp - -Rp

    2 Pek. Kolom Struktur (K1) 20/20 besi 6 12 , Beton K -200 1,40 m3 Rp - -Rp

    3 Pek. Kolom Praktis (Kp) 15/15 besi 4 12 , Beton K -175 1,58 m3 Rp - -Rp

    4 Pek. Sloof 15/20 besi 4 12 , Beton K -175 1,08 m3 Rp - -Rp

    5 Pek. Balok latai (atas kusen jendela) 15/20 besi 4 10 , Beton K -175 1,84 m3 Rp - -Rp

    6 Pek. Balok latai (atas kusen pintu ) 15/20 besi 4 10 , Beton K -175 0,89 m3 Rp - -Rp

    7 Pek. Balok utama (B1) 20/30 besi 5 12 , Beton K -200 1,30 m3 Rp - -Rp

    8 Pek. Balok anak (B2) 15/30 besi 5 12 , Beton K -200 1,21 m3 Rp - -Rp

    9 Pek. Balok Gantung Selasar (B3)15/30 besi 5 12 , Beton K -200 2,06 m3 Rp - -Rp

    10 Pek. Ring Balk 15/20 besi 4 12 , Beton K -175 6,14 m3 Rp - -Rp

    11 Pek. Dak Atap teras dan T. jemur besi 10 - 150 Beton K - 175 4,52 m3 Rp - -Rp

    Sub Jumlah Harga Pekerjaan C -Rp

    D PEKERJAAN PENAMBAHAN DINDING

    1 Pek. Pasangan Bata Perbaikan dan Penambahan Dinding Bangunan depan Belakang bata merah lokal adukan 1pc : 4 ps 397,70 m2 Rp - -Rp

    2 Pek. Plesteran dan Acian ad. 1pc : 4ps adukan 1pc : 4 ps 715,85 m2 Rp - -Rp

    Sub Jumlah Harga Pekerjaan D -Rp

    JUMLAH HARGA (Rp)

    b

    NO. URAIAN PEKERJAAN SPESIFIKASI TEKNIS SATUANHARGA SATUAN

    2

  • VOLUME

    (Rp)

    a c d e f g = d x f

    JUMLAH HARGA (Rp)

    b

    NO. URAIAN PEKERJAAN SPESIFIKASI TEKNIS SATUANHARGA SATUAN

    E PEKERJAAN RANGKA ATAP

    1 Pek. Penggantian Rangka Atap Dengan Baja RinganBaja Ringan Profil Kuda - Kuda C-80 0,75 mm ,Screw # 8-18x13 -

    sek. Pryda 403,60 m2 Rp - -Rp

    2 Pek. Instalasi Alumunium Foil 2 layer 403,60 m2 Rp - -Rp

    3 Pek. Penutup Atap Genteng metal berpasir t = 0,35 mm genteng metal chipstone t =0,35 mm sek. Sakura roof 403,60 m2 Rp - -Rp

    4 Pek. Bubung Genteng Metal berpasir t = 0,35 mmgenteng Bubung metal chipstone t =0,35 mm sek. Sakura roof

    107,00 m' Rp - -Rp

    5 Pek. Atap ZINCALUME + rangka asbes ZINCALUME t =O.35 MM rangka Hollow 4 x 4 17,50 m2 Rp - -Rp

    6 Pek. Listplank GRC sek Kalsiboard 89,80 m' Rp - -Rp

    7 Pek. Atap Polycarbonat ruang servisPolycarbonat grns 10 th t = 6 mm grey Rangka Hollow 4 x 4 cm t

    1.2 45,60 m2 Rp - -Rp

    Sub Jumlah Harga Pekerjaan E -Rp

    F PEKERJAAN PLAPOND

    1 Pek. Rangka Plafond Hollow galvanis Holow 4 x 4 dan 4 x 2 320,20 m2 Rp - -Rp

    2 Pek. Plafond Gypsum t = 9mm (interior) t = 9 mm sek. Jaya board 180,00 m2 Rp - -Rp

    3 Pek. Plafond GRC (exterior & area basah) t = 5 mm sek. Kalsi board 140,20 m2 Rp - -Rp

    Sub Jumlah Harga Pekerjaan F -Rp

    G PEKERJAAN LANTAI

    1 Pek. Urugan Tanah dibawah lantai Tanah Lokal t =30 cm 120,60 m3 Rp - -Rp

    2 Pek. Urugan Pasir Bawah Lantai t = 5cm 20,10 m2 Rp - -Rp

    3 Pek. Lantai Keramik uk. 40 x 40 Putih KW 1 Untuk ruang asrama keramik 40 x 40 cm polos sek Roman 199,60 m2 Rp - -Rp

    4 Pek. Lantai Keramik uk. 40 x 40 Warna KW 1 Untuk Selasar keramik 40 x 40 cm Warna sek Roman 90,00 m2 Rp - -Rp

    5 Pek. Lantai Rabat beton Sekeliling Bangunan t= 5cm ad 1pc: 3 ps: 5 kr 84,00 m2 Rp - -Rp

    6 Pek. Lantai Keramik uk. 20 x 20 ANTI SLIP KW 1 Untuk KM/WC keramik 20 x 20 cm corak anti slip sek Roman 36,80 m2 Rp - -Rp

    7 Pek. Dinidng Keramik uk. 20 x 25 polos KW 1 Untuk KM/WC keramik 20 x 25 cm polos sek Roman 61,20 m2 Rp - -Rp

    8 Pek. Lantai Keramik uk. 20 x 20 KW 1 Untuk meja dapur keramik 20 x 20 cm sek Roman 6,00 m2 Rp - -Rp

    9 Pek. Dindng Keramik uk. 20 x 25 polos KW 1 dinding dapur keramik 20 x 25 cm polos sek Roman 12,00 m2 Rp - -Rp

    Sub Jumlah Harga Pekerjaan G -Rp

    H PEKERJAAN INSTALASI LISTRIK

    1 Pek. Instalasi Titik Lampu Kabel standar PLN sekualitas prima 48,00 ttk Rp - -Rp

    2 Pek. Instalasi Titik Stop Kontak Kabel standar PLN sekualitas prima 29,00 ttk Rp - -Rp

    3 Pek. LED ARMATUR STANDAR Armatur STANDAR LOKAL LAMPU LED 5 WATT Philips 48,00 bh Rp - -Rp

    4 Pek. Saklar Tunggal Sek. Broco 18,00 bh Rp - -Rp

    5 Pek.Sakalar Ganda Sek. Broco 15,00 bh Rp - -Rp

    6 Pek. Jet pump SEK SIMIZU 1,00 bh Rp - -Rp

    7 Pek. Stop Kontak Sek. Broco 29,00 bh Rp - -Rp

    8 Pek. Arde dan penanggak petir tembaga 2,00 ls Rp - -Rp

    9 Pek. MCB Standar PLN 4,00 bh Rp - -Rp

    10 Pek. Box mcb uk 20 x 25 bahan besi 1,00 bh Rp - -Rp

    Sub Jumlah Harga Pekerjaan H -Rp

    3

  • VOLUME

    (Rp)

    a c d e f g = d x f

    JUMLAH HARGA (Rp)

    b

    NO. URAIAN PEKERJAAN SPESIFIKASI TEKNIS SATUANHARGA SATUAN

    I PEKERJAAN PLUMBING & KAMAR MANDI

    1 Pek. Boring air tanah pipa 4 "Kedalaman max 45 pipa 4 " berikut pipa-pipa dan assesoriesnya

    45,00 m' Rp - -Rp

    2 Pek. filter air bersih dan Instalasi lokal 1,00 unit Rp - -Rp

    3 Pek. Water tank 1500 LT sek. Penguin bahan fiber 2,00 bh Rp - -Rp

    4 Pek. Instalasi Air Bersih 3/4" Pipa AW 3/4 " sek Wavin 45,00 m' Rp - -Rp

    5 Pek. Instalasi Air Bersih 1/2" Pipa AW 1/2 " sek Wavin 20,00 m' Rp - -Rp

    6 Pek. Pipa Instalasi Air Hujan Pipa 4 " Pipa AW 4 " sek Wavin 40,00 m' Rp - -Rp

    7 Pek. Pipa Instalasi Air Hujan Pipa 3 " Pipa AW 3 " sek Wavin 64,00 m' Rp - -Rp

    8 Pek. Roof Drain besi 3 " Roof Drain Besi SEK.. Lokal 4,00 bh Rp - -Rp

    9 Pek. Talang Seng BJLS bulat 1/2 dia 30 cm BJLS 30 17,50 m' Rp - -Rp

    10 Pek. Pipa Instalasi Air Kotor Padat pipa 4" Pipa AW 4 " sek Wavin 65,00 m' Rp - -Rp

    11 Pek. Pipa Instalasi Air Kotor Cair pipa 3" Pipa AW 3 " sek Wavin 15,00 m' Rp - -Rp

    12 Pek. Septiktank lihat gambar 2,00 unit Rp - -Rp

    13 Pek. Bak Kontrol dengan penutup grill pas Bata, plester, Griil Besi 4,00 unit Rp - -Rp

    14 Pek. Kloset Jongkok TOTO, SETARA 6,00 bh Rp - -Rp

    15 Pek. Kran air SEK ONDA 10,00 bh Rp - -Rp

    16 Pek. Floor Drain LOKAL Bahan besi 10,00 bh Rp - -Rp

    Sub Jumlah Harga Pekerjaan I -Rp

    J PEKERJAAN KUSEN

    1 Pek. Kusen P1 Alumunium coating Coklat 4 " t = 1.15mm, sek ALExindo 12,00 unit Rp - -Rp

    2 Pek. Kusen P2 Alumunium coating Coklat 4 " t = 1.15mm, sek ALExindo 1,00 unit Rp - -Rp

    3 Pek. Kusen P3 Alumunium coating Coklat 4 " t = 1.15mm, sek ALExindo 4,00 unit Rp - -Rp

    4 Pek. Kusen PK termasuk pintu pvc setara dolpin 6,00 unit Rp - -Rp

    5 Pek. Kusen J1 Termasuk daun dan aksesoris Alumunium coating Coklat 3 " t = 1.15mm, sek ALExindo 10,00 unit Rp - -Rp

    6 Pek. Kusen J2 Termasuk daun dan aksesoris Alumunium coating Coklat 3 " t = 1.15mm, sek ALExindo 2,00 unit Rp - -Rp

    7 Pek. Kusen J3 Termasuk daun dan aksesoris Alumunium coating Coklat 3 " t = 1.15mm, sek ALExindo 4,00 unit Rp - -Rp

    8 Pek. Bouvenligt BV 1 Alumunium coating Coklat 3 " t = 1.15mm, sek ALExindo 8,00 unit Rp - -Rp

    9 Pek. Bouvenligt BV 2 Alumunium coating Coklat 3 " t = 1.15mm, sek ALExindo 12,00 unit Rp - -Rp

    10 Pek. Daun Pintu double teakwood Rangka Kamper Banjar RangkA Kayu, finish double Teakwood 18,00 bh Rp - -Rp

    11 Pek. Handle dan kunci tanam sek. Solid 17,00 bh Rp - -Rp

    12 Pek. Slot Pintu Biasa sek. Solid 17,00 bh Rp - -Rp

    11 Pek. Engsel Pintu sek. Solid 36,00 bh Rp - -Rp

    Sub Jumlah Harga Pekerjaan J -Rp

    4

  • VOLUME

    (Rp)

    a c d e f g = d x f

    JUMLAH HARGA (Rp)

    b

    NO. URAIAN PEKERJAAN SPESIFIKASI TEKNIS SATUANHARGA SATUAN

    K PEKERJAAN FINISHING

    1 Pek. Pengecatan Dinding sek. Catylac 1.779,79 m2 Rp - -Rp

    2 Pek. Pengecatan Plafond sek. Catylac 403,60 m2 Rp - -Rp

    3 Pek. Politur daun Pintu Propan 68,00 m2 Rp - -Rp

    4 Pek. Penebalan dinding (ban) Set.lemkra 14,00 m' Rp - -Rp

    5 Pek. Plester stone paint set.lemkra 40,00 m2 Rp - -Rp

    6 Pek. Tangga Baja Besi cnp 125x50x20x2.3 , plat besi 3 mm , siku 40x40x3 2,00 unit Rp - -Rp

    7 Pek. Gravel sekeliling bangunan gravel dia 20 cm 100,50 m' Rp - -Rp

    8 Pek. Dudukan Water Tank t = 1.5 m siku 40x40x3 2,00 unit Rp - -Rp

    9 Pekerjaan Sunscreen Besi hollow 4 x 4 4,00 m2 Rp - -Rp

    Sub Jumlah Harga Pekerjaan K -Rp

    TOTAL JUMLAH HARGA PEKERJAAN PEMELIHARAAN GEDUNG ASRAMA -Rp

    5

  • DAFTAR ANALISA HARGA SATUAN PEKERJAANPEKERJAAN REHABILITASI GEDUNG ASRAMA UPI KAMPUS CIBIRU

    LOKASI : JALAN RAYA CIBIRU KM.15 BANDUNG

    (Rp)

    a c d

    A PEKERJAAN PERSIAPAN

    1 Pek. Pembuatan Papan Nama unit Rp -

    2 Pek. Bongkaran bangunan ls Rp -

    3 Pek. Pembersihan Lapangan m2 Rp -

    4 Pek. Pengukuran Kembali dan Pemasangan Bouwplank m' Rp -

    B PEKERJAAN TANAH DAN PONDASI

    1 Pek.Galian Tanah Untuk Pondasi Setempat m3 Rp -

    2 Pek. Galian Tanah untuk pondasi Lajur m3 Rp -

    3 Pek. Cerucuk Bambu di Bawah Pondasi Setempat dan pond.lajur m2 Rp -

    4 Pek. Urugan Pasir Bawah Pondasi Setempat m3 Rp -

    5 Pek. Urugan Pasir Bawah Pondasi lajur m3 Rp -

    6 Pek. Lantai Kerja cor Tumbuk 1 : 3 : 5 Pondasi Setempat m2 Rp -

    7 Pek. Pasangan Batu Kosong (aanstamping) m3 Rp -

    8 Pek. Pasangan Pondasi Batu kali Lajur m3 Rp -

    9 Pek. Urugan Tanah Kembali Bekas galian m3 Rp -

    C PEKERJAAN STRUKTUR

    1 Pek. Pondasi Footplat (Telapak) m3 Rp -

    2 Pek. Kolom Struktur (K1) 20/20 m3 Rp -

    3 Pek. Kolom Praktis (Kp) 15/15 m3 Rp -

    4 Pek. Sloof 15/20 m3 Rp -

    5 Pek. Balok latai (atas kusen jendela) 15/20 m3 Rp -

    6 Pek. Balok latai (atas kusen pintu ) 15/20 m3 Rp -

    7 Pek. Balok utama (B1) 20/30 m3 Rp -

    8 Pek. Balok anak (B2) 15/30 m3 Rp -

    9 Pek. Balok Gantung Selasar (B3)15/30 m3 Rp -

    10 Pek. Ring Balk 15/20 m3 Rp -

    11 Pek. Dak Atap teras dan T. jemur m3 Rp -

    D PEKERJAAN PENAMBAHAN DINDING

    1 Pek. Pasangan Bata Perbaikan dan Penambahan Dinding Bangunan Belakangm2 Rp -

    2 Pek. Plesteran dan Acian ad. 1pc : 4ps m2 Rp -

    E PEKERJAAN RANGKA ATAP

    1 Pek. Penggantian Rangka Atap Dengan Baja Ringan m2 Rp -

    2 Pek. Instalasi Alumunium Foil m2 Rp -

    3 Pek. Penutup Atap Genteng metal berpasir t = 0,35 mm m2 Rp -

    4 Pek. Bubung Genteng Metal berpasir t = 0,35 mm m' Rp -

    5 Pek. PENUTUP ATAP ZINCALUME + RANGKA HOLLOW m2 Rp -

    6 Pek. Listplank GRC m' Rp -

    7 Pek. Atap Polycarbonat + rangka m2 Rp -

    F PEKERJAAN PLAPOND

    1 Pek. Rangka Plafond Hollow galvanis m2 Rp -

    2 Pek. Plafond Gypsum t = 9mm m2 Rp -

    3 Pek. Plafond GRC m2 Rp -

    G PEKERJAAN LANTAI

    1 Pek. Urugan Tanah dibawah lantai m3 Rp -

    2 Pek. Urugan Pasir Bawah Lantai m2 Rp -

    3 Pek. Lantai Keramik uk. 40 x 40 Putih KW 1 Untuk ruang asrama m2 Rp -

    4 Pek. Lantai Keramik uk. 40 x 40 Warna KW 1 Untuk Selasar m2 Rp -

    5 Pek. Lantai Rabat beton Sekeliling Bangunan t= 5cm m2 Rp -

    6 Pek. Lantai Keramik uk. 20 x 20 ANTI SLIP KW 1 Untuk KM/WC m2 Rp -

    7 Pek. Dinidng Keramik uk. 20 x 25 polos KW 1 Untuk KM/WC m2 Rp -

    8 Pek. Lantai Keramik uk. 20 x 20 Polos KW 1 Untuk meja dapur m2 Rp -

    9 Pek. Dinidng Keramik uk. 20 x 25 polos KW 1 dinding dapur m2 Rp -

    b

    NO. URAIAN PEKERJAAN SATUAN HARGA SATUAN

    6

  • (Rp)

    a c db

    NO. URAIAN PEKERJAAN SATUAN HARGA SATUAN

    H PEKERJAAN INSTALASI LISTRIK

    1 Pek. Instalasi Titik Lampu ttk Rp -

    2 Pek. Instalasi Titik Stop Kontak ttk Rp -

    3 Pek. LED ARMATUR STANDAR bh Rp -

    4 Pek. Saklar Tunggal bh Rp -

    5 Pek.Sakalar Ganda bh Rp -

    6 Pek. Jet pump bh Rp -

    7 Pek. Stop Kontak bh Rp -

    8 Pek. Arde dan penanggak petir ls Rp -

    9 Pek. MCB bh Rp -

    10 Pek. Box mcb bh Rp -

    I PEKERJAAN PLUMBING & KAMAR MANDI

    1 Pek. Boring air tanah m' Rp -

    2 Pek. Instalasi filter air bersih unit Rp -

    3 Pek. Water turn 1500 LT bh Rp -

    4 Pek. Instalasi Air Bersih 3/4" m' Rp -

    5 Pek. Instalasi Air Bersih 1/2" m' Rp -

    6 Pek. Pipa Instalasi Air Hujan Pipa 4 " m' Rp -

    7 Pek. Pipa Instalasi Air Hujan Pipa 3 " m' Rp -

    8 Pek. Roof Drain besi 3 " bh Rp -

    9 Pek. Talang Seng BJLS bulat 1/2 dia 30 cm m' Rp -

    10 Pek. Pipa Instalasi Air Kotor Padat pipa 4" m' Rp -

    11 Pek. Pipa Instalasi Air Kotor Cair pipa 3" m' Rp -

    12 Pek. Septiktank unit Rp -

    13 Pek. Bak Kontrol dengan penutup grill unit Rp -

    14 Pek. Kloset Jongkok bh Rp -

    15 Pek. Kran air bh Rp -

    16 Pek. Floor Drain bh Rp -

    J PEKERJAAN KUSEN

    1 Pek. Kusen P1 unit Rp -

    2 Pek. Kusen P2 unit Rp -

    3 Pek. Kusen P3 unit Rp -

    4 Pek. Kusen PK termasuk pintu pvc unit Rp -

    5 Pek. Kusen J1 Termasuk daun dan aksesoris unit Rp -

    6 Pek. Kusen J2 Termasuk daun dan aksesoris unit Rp -

    7 Pek. Kusen J3 Termasuk daun dan aksesoris unit Rp -

    8 Pek. Bouvenligt BV 1 unit Rp -

    9 Pek. Bouvenligt BV 2 unit Rp -

    10 Pek. Daun Pintu double teakwood Rangka Kamper Banjar bh Rp -

    11 Pek. Handle dan kunci tanam bh Rp -

    12 Pek. Slot Pintu Biasa bh Rp -

    11 Pek. Engsel Pintu bh Rp -

    K PEKERJAAN FINISHING

    1 Pek. Pengecatan Dinding m2 Rp -

    2 Pek. Pengecatan Plafond m2 Rp -

    3 Pek. Politur daun Pintu m2 Rp -

    4 Pek. Penebalan dinding (ban) m' Rp -

    5 Pek. Plester stone paint m2 Rp -

    6 Pek. Tangga Baja unit Rp -

    7 Pek. Gravel sekeliling bangunan m' Rp -

    8 Pek. Dudukan Water TANKt 1.5 unit Rp -

    8 Pekerjaan Sunscreen M2 Rp -

    Bandung,

    Penyedia :

    CV./PT. .

    Nama Pimpinan

    Jabatan

    7

  • ANALISA HARGA SATUAN PEKERJAANPEKERJAAN REHABILITASI GEDUNG ASRAMA UPI KAMPUS CIBIRU

    LOKASI : JALAN RAYA CIBIRU KM.15 BANDUNG

    H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )

    A PEK. PERSIAPAN

    1 1 BH PAPAN PROYEK

    Bahan :

    Pengeprinan Baner uk 1 x 1 m 1,0000 lbr - - - -

    Kayu Kaso 5/7 Kls. II 0,1000 m3 - - - -

    Paku 5 - 7 0,1000 Kg - - - -

    Tenaga Kerja :

    Upah pasang 1,0000 ls - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    2 1 UNIT BONGKARAN BANGUNAN

    Tenaga Kerja :

    Pekerja 55,0000 oh - - - -

    Tukang kayu 18,3333 oh - - - -

    Mandor 4,5833 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    4 1 M2 PEMBERSIHAN LAPANGAN

    Tenaga Kerja :

    Pekerja 0,1000 oh - - - -

    Mandor 0,0500 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    5 1 M1 PENGUKURAN DAN PASANG BOUWPLANK

    Bahan :

    Kayu Papan Albasia 2/20 Kls.IV 0,0070 m3 - - - -

    Kayu Kaso Albasia /Kls. IV 0,0120 m3 - - - -

    Paku 5-10 cm 0,0200 kg - - - -

    Tenaga Kerja :

    Pekerja 0,1000 oh - - - -

    Tukang Kayu/batu 0,1000 oh - - - -

    Kepala tukang Kayu/batu 0,0100 oh - - - -

    Mandor 0,0050 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    B PEK. TANAH & PONDASI

    1 1 M3 GALIAN TANAH BIASA KEDALAMAN MAXS 2 meter

    Pekerja 0,9000 ls - - - -

    Mandor 0,0450 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    c

    SK SNI-T-2001

    SK SNI-T-2001

    SK SNI-T-2001

    SNI-2835 T-2008

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    8

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    2 1 M2 PEMASANGAN CERUCUK BAMBU + ANYAM 15 cm

    Bahan :

    Bambu 5 s.d 7 5,0000 btg - - - -

    Tenaga Kerja :

    Pekerja 0,4000 oh - - - -

    Tukang Kayu/batu 0,3000 oh - - - -

    Mandor 0,0300 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    3 1 M3 URUGAN PASIR URUG DIPADATKAN

    Bahan :

    Pasir Urug 1,2000 m - - - -

    Tenaga Kerja :

    Pekerja 0,3000 oh - - - -

    Mandor 0,0100 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    4 1 M2 LANTAI KERJA ( 1 PC ; 3 PSR ; 5 KR) TEBAL 5cm

    Bahan :

    Semen Portland ( PC TYPE I ) 13,8000 Kg - - - -

    Pasir Beton 0,0296 m3 - - - -

    Split/Kerikil Uk. 2/3 0,0375 m3 - - - -

    Air 10,7500 Ltr - - - -

    Tenaga Kerja :

    Pekerja 0,0825 oh - - - -

    Tukang Batu 0,0138 oh - - - -

    Kepala Tukang 0,0014 oh - - - -

    Mandor 0,0042 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    5 1 M3 PAS. BATU KOSONG (Anstamping)

    Bahan :

    Batu Belah 15/20 cm 1,2000 m - - - -

    Pasir Urug 0,4320 m - - - -

    Tenaga Kerja :

    Pekerja 0,7800 oh - - - -

    Tukang Batu 0,3900 oh - - - -

    Kepala tukang batu 0,0390 oh - - - -

    Mandor 0,0390 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    6 1 M3 PAS. PONDASI LAJUR BATU KALI ( 1 PC ; 4 PSR )

    Bahan :

    Batu Belah 15/20 cm 1,1000 m - - - -

    Semen Portland ( PC TYPE I ) 163,0000 Kg - - - -

    Pasir Pasang 0,5200 m - - - -

    Tenaga Kerja :

    Pekerja 1,5000 oh - - - -

    Tukang batu 0,7500 oh - - - -

    Kepala tukang batu 0,0750 oh - - - -

    Mandor 0,0750 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SNI - 7394 -T-2008

    SNI-2836 T-2008

    SNI-2836 T-2008

    SNI-2835 T-2008

    SNI-2835 T-2008

    9

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    7 1 M3 URUGAN TANAH KEMBALI DIPADATKAN (Dihitung 1/3 Index Galian)

    Pekerja 0,2500 oh - - - -

    Mandor 0,0083 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    C PEK. STRUKTUR

    1 1 M3 PAS. PONDASI TELAPAK / PLAT BETON K.200 (150 Kg besi + Bekisting)

    Bahan :

    Kayu Klas III 0,2000 m3 - - - -

    Minyak Bekisting 0,4000 Ltr - - - -

    Paku 5 - 12 cm 1,5000 kg - - - -

    Besi Beton polos 157,5000 kg - - - -

    Kawat Beton 3,0000 kg - - - -

    Semen Portland ( PC TYPE I ) 336,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 3,9000 oh - - - -

    Tukang 2,4400 oh - - - -

    Kepala Tukang 0,2620 oh - - - -

    Mandor 0,2650 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    2 1 M3 PAS. KOLOM UK. 20 X 20 CM K.200 (150 Kg besi + Bekisting)

    Bahan :

    Kayu Klas III 0,4000 m3 - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 150,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 336,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 7,3000 oh - - - -

    Tukang 5,7000 oh - - - -

    Kepala Tukang 0,5700 oh - - - -

    Mandor 0,2500 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SNI-2835 T-2008

    SNI - 7394 -T-2008

    SNI - 7394 -T-2008

    10

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    3 1 M3 PAS. KOLOM PRAKTIS UK. 15 X 15 CM K.175 (110 Kg besi + Bekisting)

    Bahan :

    Kayu Klas III 0,4000 m3 - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 110,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 336,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 7,3000 oh - - - -

    Tukang 5,7000 oh - - - -

    Kepala Tukang 0,5700 oh - - - -

    Mandor 0,2500 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    4 1 M3 PAS. Sloof UK. 15 X 20 CM K.175 (120 Kg besi + Bekisting)

    Bahan :

    Kayu Klas III 0,2000 m3 - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 120,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 336,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 7,3000 oh - - - -

    Tukang 5,7000 oh - - - -

    Kepala Tukang 0,5700 oh - - - -

    Mandor 0,2500 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    5 1 M3 PAS. Balok Latai UK. 15 X 20 CM K.175 (120 Kg besi + Bekisting)

    Bahan :

    Kayu Klas III 0,4000 m3 - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 120,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 323,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 5,9600 oh - - - -

    Tukang 4,5500 oh - - - -

    Kepala Tukang 0,5700 oh - - - -

    Mandor 0,2500 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SNI - 7394 -T-2008

    SNI - 7394 -T-2008

    SNI - 7394 -T-2008

    11

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    6 1 M3 PAS. Balok gantung UK. 20 X 30 CM K.200 (175 Kg besi + Bekisting) (B1)

    Bahan :

    Kayu Klas III 0,4000 m3 - - - -

    Kayu Meranti Bukit Persegian 0,1500 m3 - - - -

    Kayu Dolken dia 8 cm - 4 m 5,0000 btg - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 175,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 323,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 5,9600 oh - - - -

    Tukang 4,5500 oh - - - -

    Kepala Tukang 0,4450 oh - - - -

    Mandor 0,2080 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    7 1 M3 PAS. Balok Anak UK. 15 X 30 CM K.200 (160 Kg besi + Bekisting) (B2 & B3)

    Bahan :

    Kayu Klas III 0,3000 m3 - - - -

    Kayu Meranti Bukit Persegian 0,1500 m3 - - - -

    Kayu Dolken dia 8 cm - 4 m 5,0000 btg - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 160,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 323,0000 kg - - - -

    Pasir Beton 0,5400 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 5,9600 oh - - - -

    Tukang 4,5500 oh - - - -

    Kepala Tukang 0,4450 oh - - - -

    Mandor 0,2080 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    8 1 M3 PAS. Ring Balk UK. 15 X 20 CM K.175 (120 Kg besi + Bekisting)

    Bahan :

    Kayu Klas III 0,2500 m3 - - - -

    Minyak Bekisting 2,0000 Ltr - - - -

    Paku 5 - 12 cm 4,0000 kg - - - -

    Besi Beton polos 120,0000 kg - - - -

    Kawat Beton 4,5000 kg - - - -

    Semen Portland ( PC TYPE I ) 323,0000 kg - - - -

    Pasir Beton 0,5200 m3 - - - -

    Concrete Mixer 0,125 m3 0,6600 jam - - - -

    Concrete Vibrator 0,0620 jam - - - -

    Split 2/3 0,8100 m3 - - - -

    Tenaga Kerja :

    Pekerja 5,9600 oh - - - -

    Tukang 4,5500 oh - - - -

    Kepala Tukang 0,4450 oh - - - -

    Mandor 0,2080 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SNI - 7394 -T-2008

    SNI - 7394 -T-2008

    SNI - 7394 -T-2008

    12

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    9 1 M3 PLAT BETON (Komposit) ATAP DAK T = 10 cm

    Bahan :

    Kayu Terentang dihitung 2x Pakai 0,0400 m3 - - - -

    Kayu Kaso 5/7 Lokal Kls.III 0,0180 m3 - - - -

    Dolken Kayu 8 - 10 P. 4m 6,0000 btg - - - -

    Paku 2,4000 kg - - - -

    Minyak bekisting 0,2000 ltr - - - -

    Kayu stoot ( dinding 2x pakai ) 50% 0,0450 m3 - - - -

    Kayu Papan albasia ( 2X pakai ) 0,0260 m3 - - - -

    Semen Portland ( PC TYPE I ) 326,0000 Kg - - - -

    Pasir Beton 0,5429 m3 - - - -

    Split/Kerikil Uk. 2/3 0,7496 m3 - - - -

    Air 215,0000 Ltr - - - -

    Besi Beton Rata-rata 126,0000 kg - - - -

    Kawat Beton 3,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 5,9600 oh - - - -

    Tukang Kayu 4,5500 oh - - - -

    Tukang Batu 0,2750 oh - - - -

    Tukang Besi 0,4450 oh - - - -

    Kepala Tukang 0,4450 oh - - - -

    Mandor 0,2080 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    D PEK. PENAMBAHAN DINDING

    1 1 M2 PASANGAN 1/2 BATA ( 1PC ; 5 Psr)

    Bahan :

    Bata Merah Bakar 70,0000 bh - - - -

    Semen Portland ( PC TYPE I ) 9,6800 Kg - - - -

    Pasir Pasang 0,0450 m3 - - - -

    Tenaga Kerja :

    Pekerja 0,3000 oh - - - -

    Tukang batu 0,1000 oh - - - -

    Kepala tukang batu 0,0100 oh - - - -

    Mandor 0,0150 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    2 1 M2 PLESTERAN DAN ACIAN DINDING T. 20 MM ( 1 PC ; 5 PSR )

    Bahan :

    Semen Portland ( PC TYPE I ) 7,2900 Kg - - - -

    Pasir Pasang 0,0280 m3 - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,2000 oh - - - -

    Kepala tukang batu 0,0200 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    E PEK. PEKERJAAN RANGKA ATAP DAN PENUTUP

    1 1 M2 KONSTRUKSI KAP BAJA RINGAN

    Bahan / Alat / Upah :

    1,0100 m2 - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    Rangka & Kuda-kuda Atap Baja Ringan

    (Terpasang)

    SNI - 7394 -T-2008

    SNI : 6897 T-2008

    SK.SNI T-03-1991-03

    13

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    2 1 M2 ALUMUNIUM FOIL PELAPIS ATAP

    Bahan / Alat / Upah :

    1,0100 m2 - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    3 1 M2 PAS. GENTENG METAL BERBATU SETARA RAINBOU

    Bahan :

    Genteng Metal 2x4 dan atau 1x4 BERBATU 1,2400 Lbr - - - -

    Skrup, sealent, dll 1,0000 Ls - - - -

    Tenaga Kerja :

    Ongkos Pasang per-m2 1,0000 Ls - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    4 1 M1 PAS. BUBUNGAN/NOK GENTENG METAL SETARA SAKURA

    Bahan / Alat / Upah :

    Nok Genteng Metal 90 terpasang 1,0000 Lbr - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    5 1 M2 PENUTUP ATAP ZINCALUME + RANGKA HOLLOW

    Bahan / Alat / Upah :

    1,0100 m2 - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    6 1 M2 KONSTRUKSI POLY CARBONAT

    Bahan / Alat / Upah :

    1,0100 m2 - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    7 1 M1 PEKERJAAN LISPLANK GRC

    Bahan :

    Papan list plank GRC 1,1000 m' - - - -

    Paku 3 - 7 cm 0,0500 KG - - - -

    Tenaga Kerja :

    Pekerja 0,1100 oh. - - - -

    Tukang kayu 0,2200 oh. - - - -

    Kepala tukang kayu 0,0220 oh. - - - -

    Mandor 0,0050 oh. - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    Penutup Poly Carbonat (Terpasang) + rangka

    alumunium Foil Untuk Atap (terpasang)

    SK.SNI T-2001

    SK.SNI T-2001

    ATAP ZINCALUME t= 0.35 mm + RANGKA

    HOLLOW 4 x 4 cm (Terpasang)

    SK.SNI T-2001 & PKKI NI-5

    14

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    F PEKERJAAN PLAPOND

    1 1 M2 PEKERJAAN RANGKA PLAFOND HOLLOW

    Bahan :

    Hollow 40 x 40 mm x 0,3 mm (besi) - 4m 1,0000 btg - - - -

    Hollow 20 x 40 mm x 0,3 mm (besi) - 4m 1,0000 btg - - - -

    Skrup 12,0000 bh - - - -

    Kawat Gantungan 5,0000 m1 - - - -

    Tenaga Kerja :

    Pekerja 0,1500 oh - - - -

    Tukang kayu 0,2500 oh - - - -

    Kepala tukang kayu 0,0250 oh - - - -

    Mandor 0,0750 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    2 1 M2 PENUTUP RANGKA PLAFOND (GYPSUM EX. JAYA BOARD 120 x 240 TEBAL 9 MM)

    Bahan :

    GYPSUM 120x240 0,3600 lbr - - - -

    Paku Eternit 0,0250 kg - - - -

    Tenaga Kerja :

    Pekerja 0,0300 oh - - - -

    Tukang kayu 0,1000 oh - - - -

    Kepala tukang kayu 0,0150 oh - - - -

    Mandor 0,0015 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    3 1 M2 PENUTUP RANGKA PLAFOND (GRC BOARD EX. JAYA BOARD 120 x 240 TEBAL 4 MM)

    Bahan :

    GRC 120x240 0,3600 lbr - - - -

    Paku triplek 0,0250 kg - - - -

    Tenaga Kerja :

    Pekerja 0,0300 oh - - - -

    Tukang kayu 0,1000 oh - - - -

    Kepala tukang kayu 0,0150 oh - - - -

    Mandor 0,0015 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    4 1 M1 PAKERJAAN LIST PROFIL UNTUK PLAFOND GYPSUM Uk. 5

    Bahan :

    List Gypsum 1,0500 m1 - - - -

    Paku 3 s.d 5 0,0500 kg - - - -

    Semen pc (50 kg) 0,2500 kg - - - -

    Tenaga Kerja :

    Pekerja 0,0250 oh - - - -

    Tukang kayu 0,0300 oh - - - -

    Kepala tukang kayu 0,0150 oh - - - -

    Mandor 0,0000 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SK.SNI T-2001

    SK.SNI T-2001

    SK.SNI T-2001

    SK.SNI T-2001

    15

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    G PEKERJAAN LANTAI

    1 1 M3 URUGAN TANAH DIBAWAH LANTAI

    Bahan :

    Tanah urug 1,0500 m1 - - - -

    Tenaga Kerja :

    Pekerja 0,6000 oh - - - -

    Mandor 0,3000 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    2 1 M2 PAS. KERAMIK LANTAI 40 X 40 KW.I DN. Putih Ruang Asrama

    Bahan :

    Ubin Keramik Putih/Polos 40x40 KW.I 1,0100 m2 - - - -

    Pasir Pasang 0,0420 m3 - - - -

    Semen Portland ( PC TYPE I ) 11,3800 kg - - - -

    Semen Warna untuk Grouting 1,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,1250 oh - - - -

    Kepala tukang batu 0,0125 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    3 1 M2 PAS. KERAMIK LANTAI 40 X 40 KW.I DN. WARNA Ruang Asrama

    Bahan :

    Ubin Keramik Warna 40 x 40 KW.I 1,0100 m2 - - - -

    Pasir Pasang 0,0420 m3 - - - -

    Semen Portland ( PC TYPE I ) 11,3800 kg - - - -

    Semen Warna untuk Grouting 1,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,1250 oh - - - -

    Kepala tukang batu 0,0125 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    4 1 M2 RABAT BETON ( 1 PC ; 3 PSR ; 5 KR) TEBAL 5cm

    Bahan :

    Semen Portland ( PC TYPE I ) 13,8000 Kg - - - -

    Pasir Beton 0,0296 m3 - - - -

    Split/Kerikil Uk. 2/3 0,0375 m3 - - - -

    Air 10,7500 Ltr - - - -

    Tenaga Kerja :

    Pekerja 0,0825 oh - - - -

    Tukang Batu 0,0138 oh - - - -

    Kepala Tukang 0,0014 oh - - - -

    Mandor 0,0042 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SNI-2835 T-2008

    SK.SNI T-03-3976-1995

    SK.SNI T-03-3976-1995

    SNI - 7394 -T-2008

    16

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    5 1 M2 Pek. Lantai Keramik uk. 20 x 20 ANTI SLIP KW 1 Untuk KM/WC

    Bahan :

    Ubin Keramik Anti slip 20 x 20 KW.I 1,0100 m2 - - - -

    Pasir Pasang 0,0420 m3 - - - -

    Semen Portland ( PC TYPE I ) 11,3800 kg - - - -

    Semen Warna untuk Grouting 1,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,1250 oh - - - -

    Kepala tukang batu 0,0125 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    6 1 M2 Pek. Dinding Keramik uk. 20 x 25 polos KW 1 Untuk KM/WC

    Bahan :

    Ubin Keramik polos 20 x 25 KW.I 1,0100 m2 - - - -

    Pasir Pasang 0,0420 m3 - - - -

    Semen Portland ( PC TYPE I ) 11,3800 kg - - - -

    Semen Warna untuk Grouting 1,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,1250 oh - - - -

    Kepala tukang batu 0,0125 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    7 1 M2 Pek. Keramik uk. 20 x 20 polos KW 1 Untuk Meja Dapur

    Bahan :

    Ubin Keramik polos 20 x 20 KW.I 1,0100 m2 - - - -

    Pasir Pasang 0,0420 m3 - - - -

    Semen Portland ( PC TYPE I ) 11,3800 kg - - - -

    Semen Warna untuk Grouting 1,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,1250 oh - - - -

    Kepala tukang batu 0,0125 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    8 1 M2 Pek. Dinding Keramik uk. 20 x 25 polos KW 1 Untuk dapur

    Bahan :

    Ubin Keramik polos 20 x 25 KW.I 1,0100 m2 - - - -

    Pasir Pasang 0,0420 m3 - - - -

    Semen Portland ( PC TYPE I ) 11,3800 kg - - - -

    Semen Warna untuk Grouting 1,5000 kg - - - -

    Tenaga Kerja :

    Pekerja 0,2500 oh - - - -

    Tukang batu 0,1250 oh - - - -

    Kepala tukang batu 0,0125 oh - - - -

    Mandor 0,0125 oh - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    SK.SNI T-03-3976-1995

    SK.SNI T-03-3976-1995

    SK.SNI T-03-3976-1995

    SK.SNI T-03-3976-1995

    17

  • H A R G A J U M L A H

    (Rp) BAHAN / ALAT UPAH (Rp)

    a d e = (c x d) f = (c x d) g = (e + f )c

    NO. U R A I A N U M U M INDEXHARGA SATUAN

    b

    H PEKERJAAN INSTALASI LISTRIK

    1 1 BH TITIK LAMPU

    Bahan :

    Kabel NYM 0,3500 roll - - - -

    Tenaga Kerja :

    Pekerja 0,0300 oh - - - -

    Tukang Listrik 0,2700 oh - - - -

    Kepala Tukang 0,0050 oh - - - -

    Mandor 0,0025 oh. - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    2 1 BH TITIK SAKLAR/STOP KONTAK

    Bahan :

    Kabel NYM 0,2500 roll - - - -

    Pipa 1/2" 0,5000 btg - - - -

    Klem Kabel #8 0,2500 pack - - - -

    Tenaga Kerja :

    Pekerja 0,0300 oh - - - -

    Tukang instalatur M/E 0,3500 oh - - - -

    Kepala Tukang 0,0050 oh - - - -

    Mandor 0,0025 oh. - - - -

    Jumlah Harga Satuan - - -

    Keuntungan Max. 10,00% - - -

    Jumlah - - -

    Dibulatkan - - -

    3 1 UNIT PEMASANGAN LAMPU LED 5 watt ARMATURE STANDAR

    Bahan :

    Lampu led 5 Watt 1,0000 bh - - - -

    Fitting Plafond Brocco 1,0000 bh - - - -

    Tenaga Kerja :

    Tukang Listrik 0,2700 oh - - - -

    Kepala Tukang 0,0050 oh - - - -

    Mandor 0,0025 oh. - - - -