Top Banner
BP/MODEC – PSVM FPSO ACCOMMODATION LOOKING UP TO THE… GODS The PSVM development area, situated in the north-eastern sector of Block 31 roughly 400km from Luanda, is composed of the Plutao, Saturno, Venus and Marte (PSVM) fields, located in water depths of about 2,000m. FPSO PSVM is fitted with an external turret mooring system comprising of 12 mooring lines. Permanently connecting a DP3 accommodation vessel to support the Hook-up operations of the Turret Moored FPSO has been a challenge. ANGOLA www.telfordoffshore.com
2

BP/MODEC – PSVM FPSO ACCOMMODATION · FPSO PSVM is fitted with an external turret mooring system comprising of 12 mooring lines. Permanently connecting a DP3 accommodation vessel

May 13, 2018

Download

Documents

lenhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BP/MODEC – PSVM FPSO ACCOMMODATION · FPSO PSVM is fitted with an external turret mooring system comprising of 12 mooring lines. Permanently connecting a DP3 accommodation vessel

BP/MODEC – PSVM FPSO

ACCOMMODATIONLOOKING UP TO THE… GODSThe PSVM development area, situated in the north-eastern sector of Block 31 roughly 400km from Luanda, is composed of the Plutao, Saturno, Venus and Marte (PSVM) fields, located in water depths of about 2,000m. FPSO PSVM is fitted with an external turret mooring system comprising of 12 mooring lines. Permanently connecting a DP3 accommodation vessel to support the Hook-up operations of the Turret Moored FPSO has been a challenge.

ANGOLA

www.telfordoffshore.com

Page 2: BP/MODEC – PSVM FPSO ACCOMMODATION · FPSO PSVM is fitted with an external turret mooring system comprising of 12 mooring lines. Permanently connecting a DP3 accommodation vessel

Angola

Telford Offshore Ltd • Reef Tower Floor 31 P.O. Box 500 3365 Jumeirah Lakes Towers Dubai – United Arab Emirates • Tel : +971 4 350 76 00 telfordoffshore.com

real challenge. It was managed by tuning the DP system for “enhanced follow target mode” with the assistance of Kongsberg.

Telford 31 accommodated more than 400 personnel in addition to the marine and catering personnel. The accommodation facilities included public areas, catering areas, recreation areas, offices, galley and other self contained facilities and was equipped to allow the passengers access to email and satellite television.

On 31 January 2013, BP Group Chief Executive was able to announce production has just started and “PSVM is one of the largest subsea developments in the world and was one of BP’s key project start-ups for 2012”.

The work scope included:

• Fleet management and coordination • Vessel maintenance • Operating policies and procedures • Personnel management,

development and training • Accommodation services.

Permanently connecting a DP3 vessel to a Turret Moored FPSO has been a

PROJECT OVERVIEW

BP/Modec

FPSO PSVM

Block 31, Angola

Accommodation and Hook-up

February – November 2012

TELFORD 31

CLIENT

PROJECT

LOCATION

PROJECT TYPE

CONTRACT PERIOD

VESSEL

BP/MODEC – PSVM FPSO

Over 10 months in 2012, the Telford 31 (ex Jascon 31) was deployed on Block 31 to support PSVM FPSO to be hooked-up to start production asap.