    Facilities Services

    Facilities Management

    Maintenance PlanningFY 10-FY14

    John Kiefer, Director

    Facilities Management

    James Gibbs, Director

    Maintenance Management

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    2/52

    Agenda

    Maintenance Strategies

    Projects, Benchmarks, and Funding

    Emerging Issues

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    3/52

    50+ professionals serving institutions in over 30 states

    3

    Common vocabulary

    Consistent analytical methodology

    Credibility through benchmarking

    Over 250 Campuses

    Evenly Split between Public and Private

    7 State Systems

    Database of over 750M GSF

    Established in 2001

    Developed a tool based on

    ID

    WA

    OR

    CA

    NV

    CO

    TX

    OK

    MI

    WI

    TN

    AK

    FL

    ME

    IL INOH

    PA

    NY

    NC

    VAWV

    SC

    KY

    LA

    MS ALGA

    NDMT

    SD

    NMAZ

    WY

    UT

    NE

    MN

    IA

    MOKS

    AR

    DC

    MD

    NJ

    RI

    MA

    NH

    VT

    CT

    DE

    HI

    0 1-5 6-11 12-27 18-23 24+

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    4/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    5/52

    Sightlines 2010

    Density Factor

    Increased density increases wear and tear and operational demands

    5

    Cornell User/100,000GSFPeers User/100,000GSF

    SightlinesDistribution

    Liberal ArtsInstitution

    ComprehensiveUniversity

    Urban / CityInstitution Community

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    6/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    7/52 Sightlines 2010

    Endowed campus cleaner than Contract Colleges

    7

    Campus Cleanliness ScoreEndowed Composite 4.5

    Contract Colleges 4.2

    Peers 4.3

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    8/52 Sightlines 2010

    Shops being sized to support maintenance activities

    8

    0

    50

    100

    150

    200

    250

    300

    350

    400

    2004 2005 2006 2007 2008 2009 2010 2011

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    9/52 Sightlines 2010

    Endowed considerably younger than Contract Colleges

    9

    0%

    5%

    10%

    15%

    20%

    25%

    30%

    35%

    40%

    45%

    50%

    0 to 10 10 to 25 25 to 50 50+

    Endowed Contract Colleges

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    10/52

    MAINTENANCE:

    The activity to offset facilities deteriorationcaused by the elements and by wear and

    tear.

    MAINTENANCE is NOT:

    - Installation of systems or building

    elements that do not already exist

    (for example adding air conditioning).

    - Modifications for change of space use

    (program changes).

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    11/52

    Scheduled activity to extend life and increasereliability.

    Inspections, lubrications, filters, etcPREVENTIVE

    Scheduled projects which arrest deterioration orrestore facilities.

    Roof replacements, equipment renewal, etcPLANNED

    Unscheduled day-to-day repairs to restore iteminto operable condition.

    Can be used as a barometer of the efficacy ofPreventive & Planned programs.

    CORRECTIVE

    The maintenance allocation is divided between three distinct types

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    12/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    13/52

    Maintenance Management Tools

    Building cost report Expenditures are captured by maintenance type, facility,

    and system type

    Maximo

    Preventive maintenance scheduling and tracking Job plans and schedule review underway

    Corrective maintenance work requests and tracking

    Implementation of KPIs underway- response time, uniformapplication of labor etc.

    Facilities assessment process and database (FPNMS) Conversion from legacy Filemaker system complete

    Consider functionality in addition to condition

    New database allows easier tracking and forecasting

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    14/52

    Planned Maintenance needs identification

    Deficiencies are added to the list based on:

    Building assessments,

    Corrective maintenance requests,

    Facilities users and support staff discussions,

    Life safety system inspections,

    Unit-driven planning efforts.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    15/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    16/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    17/52

    Maintenance needs prioritization

    Individual projects are assigned a likelihood scoreand an impact score.

    Likelihood scores range from 1 to 5 with 5 beingalmost certain.

    Impact scores also range from 1 to 5 with 5 beingcatastrophic.

    These two scores are multiplied to arrive at a riskscore.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    18/52

    Level Definition Score

    Catastrophic Imminent or certain life safety risk; large area may require shutdown;long recovery time; severe financial consequences; compromise

    institutions image.

    5

    MajorPotentially major safety risk; significant failure requiring a building

    or system shutdown with a long recovery period; major financial

    consequences; financial hardship for the institution.

    4

    Moderate A significant failure requiring non-routine activity; closing a floor orsection of a building; moderate financial consequences such as budget

    reallocations or increased borrowing.

    3

    Minor Can be managed under routine activity; requires closing of a smallarea; handled within existing budgets. 2

    Insignificant A failure not requiring a shutdown or closure; minor occupantdiscomfort; poor appearance; failure would have little financial

    consequences.

    1

    Impact of loss or failure

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    19/52

    Likelihood/Frequency of loss or failure

    Level Definition Score

    Almost certain Extremely likely to occur (at least once a year). Failure or dealingwith the situation a daily consideration.

    5

    Likely Likely to occur, has occurred previously and could reasonably occuragain. Failure or dealing with the situation a monthly consideration.

    4

    Periodic Periodically has occurred in the past. Failure or dealing with thesituation a consideration in 1-2 years.

    3

    Unlikely Has happened in the past. Failure or dealing with the situation aconsideration in 3-5 years.

    2

    Rare Extremely rare or has not occurred in the past. Requires attention in

    5-10 years.

    1

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    20/52

    Planned Maintenance funding benchmarks

    Whitestone Research

    Stanford Predictive Model

    Ohio State Life-cycle ModelBuilding Research Board

    Sightlines

    APPAs Buildings The Gifts

    That Keep on Taking

    Suggested funding levels*

    1.2% - 2.6%

    1.5% - 2.6%

    2.2% - 3.8%2% - 4%

    1.5% - 3%

    1.1% - 1.8%

    *percent of currentreplacement value

    20

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    21/52

    The current replacement value of the Ithaca

    Campus is approximately $5 Billion.

    If we are to maintain functional facilities in perpetuity, we

    must reinvest at the rate of 1.5% -3% per year.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    22/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    23/52 Sightlines 2010

    $2.8 $2.4 $2.9 $2.1 $2.1

    $28.1 $32.3$27.8 $26.5

    $37.9

    $0.0

    $5.0

    $10.0

    $15.0

    $20.0

    $25.0

    $30.0

    $35.0

    $40.0

    $45.0

    2005 2006 2007 2008 2009

    $inMillions

    Departmental and Capital Funds Planned and Preventative Maintenance

    Annual Investment Equilibrium, Target, and Actual Expenditures

    Total spending compared to equilibrium and target need

    23

    FunctionalObsolescence Need

    Equilibrium Need

    Contract

    Colleges

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    24/52

    Sightlines 2010

    $12.1 $11.7 $11.7 $10.8$7.0 $7.1

    $14.3$8.6

    $19.8 $19.6$29.0 $17.4

    $0.0

    $5.0

    $10.0

    $15.0

    $20.0

    $25.0

    $30.0

    $35.0

    $40.0

    $45.0

    2005 2006 2007 2008 2009 2010

    $inMillions

    Departmental and Capital Funds Planned and Preventative Maintenance

    Annual Investment Equilibrium, Target, and Actual Expenditures

    Total spending compared to equilibrium and target need

    24

    FunctionalObsolescence Need

    Equilibrium Need

    Endowed

    Campus

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    25/52

    Sightlines 2010

    Percent of target funded is quickly losing pace with peers

    25

    Nearly 50% decrease in FY09

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    26/52

    Sightlines 2010

    $15.1$12.7

    $11.3 $11.0 $10.8 $10.3

    $6.6 $6.6

    $11.7

    $0.4

    $0.8 $0.7 $1.0 $0.9

    $0.4 $0.4

    $0.0

    $5.0

    $10.0

    $15.0

    $20.0

    $25.0

    $30.0

    FY 09Functional

    Obsol. Need

    2004 2005 2006 2007 2008 2009 2010

    $in

    Millions

    Space/Program Envelope/Mech

    Target Need

    Annual Investment Equilibrium, Target, and Actual Expenditures

    FY04-FY09 actual spending declines by 47%

    EndowedCampus

    Total $ $26.8 M $13.1M $12.1M $11.7M $11.8M $11.2M $7.0M $7.0M Average

    % of target N/A 64% 58% 55% 52% 48% 25% 25% 50%

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    27/52

    Endowed Planned Maintenance Projects

    funded and underway:

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    28/52

    A.D. White House: EPDM

    roof ripping off.

    7 chimneys need

    comprehensive repair or

    rebuilding

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    29/52

    Base of Sibley Dome:

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    30/52

    Base of Sibley Dome:

    114 patches visible in

    this one photo alone

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    31/52

    McGraw Hall:

    Structural degradation from

    leaking roof.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    32/52

    Sightlines 2010

    $0.0

    $5.0

    $10.0

    $15.0

    $20.0

    $25.0

    $30.0

    $35.0

    $40.0

    $45.0

    $50.0

    2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

    Preventative and Planned Maintenance Departmental and Capital Funds Investment Target Total $

    Assumptions:FY10 Planned Maintenance: $4.8M; Preventative Maintenance: $2.3MFY10 YTD One-Time Capital total: $17.3M (excluding new space investment)FY11 Planned Maintenance: $6.4M; Capital Funds: $12.7MFY12 Planned Maintenance: $6.1M; Capital Funds: $11.7MFY13 Planned Maintenance: $5.6M; Capital Funds: $11.5MFY14 Planned Maintenance: $8.5M; Capital Funds: $12.0MFY15 Planned Maintenance: $8.3M; Capital Funds: $14.5MPreventative Maintenance inflated at 2% per year from FY10 LevelsCapital Funds amounts exclude new space investment

    Scenario # 1

    EndowedCampus

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    33/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    34/52

    Sightlines 2010

    Backlog currently below peer level

    34

    EndowedCampus

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    35/52

    What does it mean for our buildings?

    There is a growing backlog of life safety and envelope problems

    Deterioration is increasingly visible

    Water infiltration increasing damage, especially to timber frame structures

    Following are examples of projects we are unable to fund:

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    36/52

    Elevation

    Enlarged

    Section

    CORNE

    R PIER

    1

    ADJACENT

    WALL PIER

    2

    McGraw Hall:

    Masonry degradation is allowing many areas

    of the structural stone faade to buckle and

    shift. Critical roof replacement work had to

    be postponed to summer 11 to study the

    severity of the structural weakness.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    37/52

    Probe Inside Wall of Room 350

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    38/52

    Sage House:

    Lack of painting the exterior wood elements, and a leaking slate roof at end of its life, have both

    contributed to severe, systemic rot.

    Sage House:

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    39/52

    Sage House:

    Exterior Rot

    West End: inner and3 old caulk lines track movement.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    40/52

    Sibley Hall has a multitude of serious structural issues

    West End: inner and

    outer wythes of masonry

    are delaminating.

    Exterior wythe has

    shifted out several

    inches, and is unstable.Interior floor framing

    relies on this wall for

    support.

    Mortar used to

    close the gap,

    but it continuesto open further

    Rand Hall:

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    41/52

    Rand Hall:

    Structural failure throughout exterior

    masonry. Open holes allowing water,

    and accelerating deterioration.

    S Ch l

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    42/52

    Sage Chapel:

    Masonry

    deterioration.

    Note bricks

    heaved outward

    1-2 allowing

    water into the

    wall assembly.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    43/52

    Jennie McGraw Tower:Roof is leaking. Note water running

    down wood roof decking and ponding at base of steel structural support.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    44/52

    Schoellkopf Crescent Rehabilitation:

    Currently holding on start of phase 5.

    -Clay roof tiles leaking

    -Concrete/steel seating deterioration

    -Column replacement

    -Concrete coating (to protect work)

    -Failure to continue places the recent

    repairs in jeopardy of deterioration.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    45/52

    Big Red Barn:

    In 2007 a temporary

    structural

    stabilization projectbought us 5 years.

    The walls and sill

    plates continue to rot.

    Olin Library: exterior stone faade has failed, allowing water intrusion.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    46/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    47/52

    Malott Hall:

    The limestone facade appears to be moving. The amount of play in theanchor system has resulted in this condition.

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    48/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    49/52

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    50/52

    S

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    51/52

    Summary

    Increasing use of data to optimize

    preventive and corrective maintenance

    A significant increase in planned

    maintenance spending is needed to stabilize

    deferred maintenance

    Integrated facility planning is an opportunity

    to optimize facilities spending

  • 8/12/2019 B+P_Maintenance Strategies Update_17-June-10_FINAL

    52/52