Page 1 of 37 Date of issue 22.6.2007 Pre-commissioning Check List for Single-Section Digital Axle Counter (ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL (Updated on 22.6.2007) SIG 0605 Ver 1 SSDAC Unit Sl. No (Entry end ) ---------------- (Exit end ) -------------- 0 General Information: 0.1 Station/Section Name 0.2 Division/Zonal Railway 0.3 Contact Details of Railways at site 0.4 Contact Details of Railways at HQr/Division 0.5 Total No of detection point/Section 0.6 Contract No. / PO No. 0.7 Date of Pre commissioning inspection 0.8 Name of firm’s authorized Rep Note : 1. System should be installed and commissioned by authorized technical staff of manufacturer only. 2. Installation practices of SSDAC model DACF 710P for Phase Reversal/ DACF 710A for AM should be strictly adhered to and checked before commissioning covering all points in the following document 1 Out door (Location Box) Sl . No . Item Required Observed Remarks Entry end Exit end OK /Not OK 1. 1 Relay used at location of PR circuit Q type, 24V, 1000 Ohm 1. 2 Diode across each relay coil in reverse bias. Should be provided with BY127/IN4007/IN5408 1. 3 Unused Quad pair To be cut in such a way that none of the Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
SSDAC Unit Sl. No (Entry end ) ---------------- (Exit end ) --------------0 General Information:
0.1Station/Section Name0.2Division/Zonal Railway0.3Contact Details of Railways at site0.4Contact Details of Railways at HQr/Division0.5Total No of detection point/Section0.6Contract No. / PO No.0.7Date of Pre commissioning inspection0.8Name of firm’s authorized Rep
Note : 1. System should be installed and commissioned by authorized technicalstaff of manufacturer only.2. Installation practices of SSDAC model DACF 710P for PhaseReversal/ DACF 710A for AM should be strictly adhered to and checkedbefore commissioning covering all points in the following document
1 Out door (Location Box)
Sl.No.
Item RequiredObserved Remarks
Entry end
Exit end OK /Not OK
1.1 Relay used at location of PRcircuit
Q type, 24V, 1000 Ohm
1.2 Diode across eachrelay coil inreverse bias.
Should be provided withBY127/IN4007/IN5408
1.3 Unused Quad pair
To be cut in such a way that none of the conductors remains exposed.
1.4 Dressing of Quadpair
To be properly dressed withinsulated tape.
1.5 Spiral beforetermination.
No individual conductor to bemade spiral
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 2 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
2 Outdoor (track device)
Sl.No.
Item RequiredObserved
Remarks
Entry end
Exit endOK /Not
OK2.1 Wiring of Tx/Rx
coils& MS coupler cables
Wired on approvedWAGO/Phoenix terminals
2.2 Condition of worn outof Rail60 Kg - 13 mm52 Kg - 8 mm90 R - 5 mm
Should be within vertical limit ofworn out159-172 mm148-156 mm138-143 mm
2.3 Marking of holes onrail(From top of the rail)
60 Kg 88 mm52 Kg 88 mm90 R 86 mm
2.4 Drilling of holes in theweb of rail
Should be of 14mm dia as perdrawing No. A008076, page no.– D22 of installation’s manualVersion 1.0 (Document No. –CEL/DAC/IM-02) for PhaseModulation and Version 1.0(Document No. – CEL/DAC/IM-03) Amplitude Modulation,Should be square (perpendicular) , should not be oblong.
2.5 Torque applied to fixtrack device usingTorque wrench
Jaicom make JPR65 orequivalent - 88 Nm.
2.6 Fixing of Tx Outside the rail2.7 Fixing of Rx Inside the rail
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 3 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
2.8 Fixing of axledetectors at entry & exit end
On the same rail as per drawing no.-I008072A4, page no.D28 of installation’s manual Version 1.0 (Document No. – CEL/DAC/IM-02) for Phase Modulation and Version 1.0(Document No. – CEL/DAC/IM-03) Amplitude Modulation.
(b) Laying of axledetector cableIn corrugated/HDPE pipe as per drawing no. L007489A3 atpage D3 of installation’s
manual Ver. 1.5 a. for Phase &Ver. 1.6 a. for AM Version 1.0(Document No. – CEL/DAC/IM-02) for Phase Modulation andVersion 1.0 (Document No. –CEL/DAC/IM-03) AmplitudeModulation.
Sl.No.
Item RequiredObserved
Remarks
Entry end
Exit endOK /Not
OK2.10
Screen of axledetector cable
Should be earthed
2.11
Fixing of deflectorPlates
As per drawing no. L007489A3at page D2 & D3 of manualVersion 1.0 (Document No. –CEL/DAC/IM-02) for PhaseModulation and Version 1.0(Document No. – CEL/DAC/IM-03) Amplitude Modulation.
2.12
Type of push trolleyused in the section.
4 spoke/ 6 spoke
2.13
Rail section 60 Kg/ 52 Kg /90 R
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 4 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
2.14
Nuts, bolts &washers for fixing railcontacts
Insertion of bolt from Rx coilside i.e. inside of the rail
2.15
Position of deflector
30 cm away from Tx/Rx coils inthe next sleeper
2.16
Height of deflector
Should not be higher than therail top
2.17
Clearance betweensleepers
400 mm between sleepers(Refer Drg No. D2 & D3 ofManual Version 1.0 (DocumentNo. – CEL/DAC/IM-02) forPhase Modulation and Version1.0 (Document No. –CEL/DAC/IM-03) AmplitudeModulation
2.18
Embossing on rail Should not be covered by Trackdevice
For amplitude detection only
Sl.No.
Item RequiredObserved
Remarks
Entry end
Exit endOK /Not
OK2.19
Length of TrolleyProtection circuit
(a) In Single line 5RL(b) In Double line 3RL
2.20
Fixing of AxleDetectors
(a) In Single line Should be fixed in centre of 5RL.(b) In Double line Should be fixed at 33 mtrs from block joint inthe direction of movement.
3 Outdoor Quad Cable
3. Outdoor (Quad Cable/PIJF twisted pairs telecom cable for Axle counter system working in station area, As per RDSO letter no. STS/E/SSDAC/SPN/177 dated-28/30.08.2006)
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 5 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
3.1 Test format for testing of QUAD cable/PIJF twisted pair telecom cable before commissioning of SSDAC in Station area
Sl.No.
Item RequiredObserved
Remarks
Entry end
Exit endOK /Not
OK3.1.1 Communication
MediaType of Cable
Only Quad cable / PIJF twistedpair telecom cable is to be usedbetween field units.No Signalling Cable is to be usedin totality/parts.
3.1.2 Use of pair Proper pair of wires to be used forconnectivity.Annex-1 for Quad cable may beReferred
3.1.3 Duplication ofWires
No wires to be paralleled forreducing conductor resistance.
3.1.4 InsulationResistance ofQuad cable
Shall be greater than /equal to 10M ohm.
3.1.5 Loop Resistanceof designatedpair
Not to exceed 56 ohm/Kms forQuad Cable at 200 C & __*__ohms/Kms for PIJF telecomcable.See Annexure -2 for correctionfactor.
3.1.6 Attenuation lossmeasured at 2 KHz
Shall not be greater than 30.0 dBfor full length of the cable used.
3.1.7 Near End CrossTalk (NEXT)
Shall be better than 55 dB forQuad cable.
3.1.8 Far End CrossTalk (FEXT)
Shall be better than 55 dB forQuad cable.
3.1.9 Continuity ofcable armour
Continuity shall be there
3.1.10
Separate Earth ofQuad/PIJFtelecom cable
Shall be less than One ohm
3.1.11
Cable allocationtable
Shall be filled up & attached
3.1.12
Unused Quad pair
To be terminated on terminals.
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 6 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
Sl.No.
Item Required ObservedRemarks
OK /Not OK3.1.13
Dressing of Quad Pair
To be properly dressed with insulated tape
3.1.14
Spiral before Termination
No individual conductor to be made spiral
3.2 Test format for testing of QUAD cable before commissioning of
SSDAC/ BPAC/ SSBPAC (D) used in between Station to station
Sl.No.
Item Required ObservedRemarks
OK /Not OK3.2.1 1 Block section
length limit≤ 12 Km.
3.2.2 CommunicationMediaType of Cable
Only Quad cable is to beused between field units.No Signaling Cable is to beused in totality/parts.
3.2.3 Use of pair Proper pair of wires to beused for connectivity.Annex-1 may be referred
3.2.4 Duplication ofWires
No wires to be paralleled forreducing conductorresistance.
3.2.5 InsulationResistance ofQuad cable
Shall be greater than /equal to 10 M ohm. 3.2.6 Loop Resistance of designated pair Not to exceed 56 ohm/Kms at 200 C.See Annexure -2 for correction factor.
3.2.6 Loop Resistance of Designated Pair
Not to Exceed 56Ω/Kms at 20ºCSee Annexure -2 for correction factor.
3.2.7 Attenuation lossmeasured at 2KHz
Shall not be greater than 30.0dB for full length of the cableused.
3.2.8 Near End CrossTalk (NEXT)
Shall be better than 55 dB.
3.2.9 Far End CrossTalk (FEXT)
Shall be better than 55 dB.
3.2.10
Continuity of cablearmour
Continuity shall be there
3.2.11
Separate Earth ofQuad cable
Shall be less than One ohm
3.2.12
Cable allocation Table
Shall be filled up & attached
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 7 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
3.2.13
Unused Quad Pair To be terminated on terminals.
3.2.14
Dressing ofQuad pair
To be properly dressedwith insulated tape
3.2.15
Spiral beforetermination.
No individual conductor tobe made spiral
3.3 Test format for testing of local QUAD / PIJF twisted pair telecom cable & OFC beforecommissioning of SSDAC/BPAC/SSBPAC (D) on OFC in between station to station.
Sl.No.
Item Required ObservedRemarks
OK /Not OK3.3 QUAD/PIJF3.3.1.1 Communication
MediaType of Cable
Jelly filled telecom cable/Quad cable to be used3.3.1between field units &OFC Equipment room.Signaling Cable shall notbe used at all.
3.3.1.2 Use of pair Proper pair of wires to beused for connectivity.Annex-1 may be referred
3.3.1.3 Duplication ofWires
No wires to be paralleledfor reducing conductorresistance.
3.3.1.4 Insulation resistance ofQuad cable
Shall be greater than /equal to 10 M ohm.
3.3.1.5 LoopResistance ofdesignated pair
Not to exceed 56 ohm/Kms at 200 C for Quad cable & * ohm/Kms for PIJF telecom cable.See Annexure -2 for correction factor.
3.3.1.6 Earth of Quad Cable Shall be less than One Ohm3.3.1.7 Cable allocation
tableShall be filled up & Attached
3.3.1.8 Unused Quad pair To be terminated on Terminals
3.3.1.9 Dressing of Quad pair
To be properly dressedwith insulated tape.
3.3.1.10
Spiral before termination.
No individual conductor to be made spiral
3.3.2 OFC3.3.2.1 Channel line up For 0 dB Trans signal level, the
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 8 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
received signal level at other end shall not be more than -15dB.
*PIJF telecom cable is available with three types of Conductor dia-S. Condr Dia used in PIJF cable No Resce at 200 C Resce /KM1. 0.50 mm 86 ohm +/- 6 172 ohm / Kms2. 0.63 mm 58 ohm +/- 4 116 ohm / Kms3. 0.90 mm 28 ohm +/- 2 56 ohm / Kms
Note: Procedure for test-
Attenuation Loss: The output/Input impedance of signal generator/dB meter shall be 600 ohm.Near End Crosstalk: Test tone of 150 KHz to be fed in the adjacent pair of the same Quad
& NEXT to be measured at the same end on the other pair of the same Quad.
Far End Cross talk: Test tone of 150 KHz to be fed in the adjacent pair of the same Quad &FEXT to be measured at the far end on the other pair of the same Quad.
4 Outdoor electronics
Sl.No.
Item RequiredObserved
Remarks
Entry end
Exit end
OK /Not OK
4.1 a. Sl. No. of SSDAC unitsb. Details of Track Cct.
Same serial no pairs. Example :015A entry, 015B (exit) Track circuit no.
4.2 Placement of Cards / modules
Should be in proper position
4.3 Firmness of card/Modules Should be tightened with screw / clip provided
4.4 MS Couplers Should be tightened properly4.5 MS coupler cables Wired properly as per colour
code4.6 Earthling of SSDAC units Should be provided firmly
through copper strips or other standard copper cable. Value < 1 Ohms
4.7 Earthing of Vital Relay Box Should be provided firmly through copper strips or other standard copper cable. Value < 1 Ohms
4.8 Fixing of SSDAC unit Should be firmly fixed using Clamp
4.9 Fixing of Vita Relay Box Should be firmly fixed using Clamp
4.10 Cable for taking 24V D.C. fromcentral location to SSDAC
2 X 25 sq. mm Al.
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 9 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
unit.4.11 External Surge Protection
Devices on input, outputand power supply lines
Indicative type, plug able or easy to install on a DIN rail. Non plug able shall be connected in parallel.
4.12 Address of SSDAC Address pair should be different from any SSDAC system working on the same station / section.
4.13 Fuse 2A4.14 Software version S0064.15 Input voltage with Charger
ON(Keep charger OFF for 15 Mts before taking the reading)
22 V to 30 V DC
4.16 Input voltage with Charger OFF (Keep charger OFF for 15 Mts before taking the reading)
22 V to 30 V DC
4.17 Ripple of Input Power Supply Less than 10 mV rms / 50 mV p to p
4.18 Relay drive output to the Vital Relay. (This may be checked across R1 & R2 of coil of relayin vital relay box).
4.18a
Section is Clear > 22V >22v
4.18b
Section Occupied < 2V < 2v
4.19 Relay drive output to the PPR (This may be checked across R1 & R2 of coil of relay ).
4.19a
When preparatory relay is picked up.
> 22V
4.19b
When preparatory relay is dropped
< 2V
4.20 Drive voltage of repeater relays in picked up condition, whencharger is OFF for 15 minutes.
4.21 VPR >22V4.22 PPR >22V
5.0 SWITCH SETTINGS FOR MODEM CARDThe modem should be configured as “ORIGINATOR” mode for Entry Unit and as “ANSWERER“ mode for Exit Unit. The selection of dip switch SW2 and SW3 should be as per table given below.
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 10 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
UnitsSW2 SW3 OK/ Not
Ok1st Way 2nd way 1st Way 2nd way1. Entry Unit ON ON ON OFF2. Exit Unit OFF ON OFF ON
5.1 MODEM OUTPUTCheck and record the modem signal output of SSDAC during normal working condition of system when gain setting is as per clause 5.0 above.S.
ITEM Measuring Limit (mV rms)
Measured Output (mV rms)
RemarksOK/Not Ok
1. TRANSLEVEL
1650 Hz
> -6Db (>400 mV)
2. 980 Hz > -6dB (>400 mV)
3. Receive LEVEL
980 Hz > -30dB (>15 mV)
4. 1650 Hz
> -30dB (>15 mV)
6.0 INDOOR POWER SUPPLY/CT RACK
Sl.No.
Item RequiredObserved
Remarks
Entry end
Exit end
OK /Not OK
6.1 PPR & VPR Relays Shall be of Q type 24V , 1000 ohms
6.2 Fuse ratings 2.0 Amps6.3 Power supply for axle
countera) Charger should be fit for axle counter use.b) There should not be anyother load on the powersupply except axle counter.c) Class B & C types surgeprotection must beprovided on 230 V mains line.
6.4 Ripple of Input Power Supply
Less than 10mV rms / 50mV peak to peak.
6.5 Glitch in Input Power Supply by putting ON/OFF the charger
No glitch should be there
6.6 Drive voltage of the VPR. (Thismay be checked across R1
>22V
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 11 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
& R2 of coil of relay ).6.7 Drive voltage of the PPR.
(Thismay be checked across R1 & R2 of coil of relay ).
Reset Box Earthling. Connected to earth properly.7.3 24 V D. C. level at Resetbox input.
22V DC to 30 V DC
Level of reset signal at resetbox O/P.
44 V to 52 V DC
Level of reset signal at SSDAC unit input.
42 V to 50V DC
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 12 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 13 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
7.6 FUNCTIONAL TESTING OF RESET BOX (RB-259)
Sl. No.
SECTION
STATUS
TESTCONDITI
ON
ACTIONS IN
RESET BOX1& 2.
LED statusRESULTS (OK/Not
OK)
LED
EXPECTEDActual (Ok /
Not OK)Expected
Actual
(OK/Not OK)
RB 1 RB 2 RB 1 RB 2
1. OCCUPAID
Put ON powerfor both SSDAC 1 & 2
Nil
CLEAR OFF OFF
System is stuck up and waiting for
reset
OCCUPAID ON ONPREP.RESET OFF OFFPOWER ON ON ON
RESET COUNTER
Should not increment
Should not increment
LCD DISPLAY *
SSDAC Ver S006
SSDAC Ver S006
ROMCRC ROMCRC
2. OCCUPAID
Apply reset in SSDAC
1 through
RB 1
INSERT KEY,
PRESS KEYACTUATOR
&PRESS RESET
BUTTON &RELEASE
BOTH
CLEAR OFF OFF
System is stuck up and waiting for
reset due to 2 nd unit is
not resetted
OCCUPAID ON ONPREP.RESET Flashing OFFPOWER ON ON ON
RESET COUNTER
Should not increment
Should not increment
LCD DISPLAY Reset accepted
3. OCCUPAID
Apply reset in SSDAC
2 through
RB 2
INSERT KEY,
PRESS KEYACTUATOR
&PRESS RESET
BUTTON &RELEASE
BOTH
CLEAR OFF OFF After reset of SSDAC 2 the system enters the
preparatory reset state.
Flashing indication
OCCUPAID ON ONPREP.RESET Flashing FlashingPOWER ON ON ON
RESET COUNTER
Should not increment
Should not increment
LCD DISPLAY Reset accepted Reset accepted
3A. OCCUPAID & System
No Action
CLEAR OFF OFFOCCUPAID ON ON
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 14 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
in preparator
y mode
PREP.RESET STEADY STEADYPOWER ON ON ON
RESET COUNTER
Incremented by 1
Incremented by 1
LCD DISPLAY 00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
*Note: When the reset box is connected for the first time, “No CRC” message will appear. For next consecutive times, if the system is resetted, the following CRC is displayed: 9F 15 49 2F FC 2A F7 37 6C 20 0D B8 E8 F0 C3 2A 71 CA 00 00 00 00 C9 68
Sl. No.
SECTION STATUS
TESTCONDITIO
N
ACTIONS IN
RESET BOX1& 2.
LED statusRESULTS (OK/Not
OK)
LEDEXPECTED
Actual (Ok / Not
OK) ExpectedActual
(OK/Not OK)
RB 1 RB 2RB 1
RB 2
4.
OCCUPAID & System in
preparatory mode.
Resetting by
pressing reset
button only
RESET BUTTON PRESSED IN BOTH RB1 & RB 2
CLEAR OFF OFF
Reset not possible
OCCUPAID ON ONPREP.RESE
TSTEADY STEADY
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
4 A. OCCUPAID & System in
preparatory mode
Resetting by
pressing SM’s Key
Only
SM’s Key Turned and in
both RB1 & RB 2
CLEAR OFF OFF Reset not possibleOCCUPAID ON ON
PREP.RESET
STEADY STEADY
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD 00- preparatory state
00- preparatory state
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 15 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
DISPLAY 00- preparatory state
00- preparatory state
4B.
OCCUPAID & System in
preparatory mode
Reset by proper means in both RB 1 & RB 2
Insert Key, Press key
actuator & press Reset
Button & release
Both RB1 & Rb
2
CLEAR OFF OFF Reset not possibleOCCUPAID ON ON
PREP.RESET
STEADY STEADY
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
4 C.
OCCUPAID & System in
preparatory mode
2 incounts in Entry
End
No Action
CLEAR OFF OFF System will
remain in occupied
and preparatory mode
OCCUPAID ON ONPREP.RESE
TSTEADY STEADY
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
Sl. No.
SECTION STATUS
TESTCONDITIO
N
ACTIONS IN
RESET BOX1& 2.
LED statusRESULTS (OK/Not
OK)
LEDEXPECTED
Actual (Ok / Not
OK) ExpectedActual
(OK/Not OK)
RB 1 RB 2RB 1
RB 2
4D. OCCUPAID & System in
2 outcounts
No Action
CLEAR ON ON System comes to OCCUPAID OFF OFF
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 16 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
preparatory mode
in Exit End
UNOCCUPIED State.
Vital Relay
Picks UP
PREP.RESET
OFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
5 A.CLEAR
( VR PICK UP)
Resetting by
pressing reset
button only
ONLY RESET
BUTTON PRESSED IN BOTH RB1 & RB 2
CLEAR ON ON
Reset not possible
OCCUPAID OFF OFFPREP.RESE
TOFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00-CLEAR 00-CLEAR00-CLEAR 00-CLEAR
5B.
CLEAR ( VR PICK
UP)
Resetting by
pressing SM’s Key
Only
ONLY SM’s Key Turned and in
both RB1 & RB 2
CLEAR ON ON Reset not possibleOCCUPAID OFF OFF
PREP.RESET
OFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00-CLEAR 00-CLEAR00-CLEAR 00-CLEAR
5C.
CLEAR ( VR PICK
UP)
Reset by proper means in both RB 1 & RB 2
Insert Key, Press key
actuator & press Reset
Button & release
Both RB1 & Rb
2
CLEAR ON ON Reset not possibleOCCUPAID OFF OFF
PREP.RESET
OFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00-CLEAR 00-CLEAR00-CLEAR 00-CLEAR
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 17 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
Sl. No.
SECTION STATUS
TESTCONDITIO
N
ACTIONS IN
RESET BOX1& 2.
LED statusRESULTS (OK/Not OK)
LEDEXPECTED
Actual (Ok / Not
OK) ExpectedActual
(OK/Not OK)RB 1 RB 2
RB 1
RB 2
6.CLEAR
( VR PICK UP)
Give 2 in counts to
bring system in occupied
state
No Action
CLEAR OFF OFF
System enters in
OCCUPIED state
OCCUPAID ON ONPREP.RESE
TOFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- occupied 00- occupied
00- occupied 00- occupied
6B.OCCUPAID
( VR DROPPED)
Resetting by
pressing reset
button only
ONLY RESET
BUTTON PRESSED IN BOTH RB1 & RB 2
CLEAR OFF OFF
Reset not possible
OCCUPAID ON ONPREP.RESE
TOFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- occupied 00- occupied
00- occupied 00- occupied
6 C
OCCUPAID ( VR
DROPPED)
Resetting by
pressing SM’s Key
Only
ONLY SM’s Key Turned and in
both RB1 & RB 2
CLEAR OFF OFF Reset not possibleOCCUPAID ON ON
PREP.RESET
OFF OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00- occupied 00- occupied
00- occupied 00- occupied
6 D. OCCUPAID ( VR
Reset by proper
Insert Key,
CLEAR OFF OFF Reset not possibleOCCUPAID ON ON
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 18 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
DROPPED) means in both RB 1 & RB 2
Press key
actuator & press Reset
Button & release
Both RB1 & Rb
2
PREP.RESET
Flashing stars and OFF
Flashing stars and OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
LCD DISPLAY
00-CLEAR 00-CLEAR00-CLEAR 00-CLEAR
Sl. No.
SECTION STATUS
TESTCONDITIO
N
ACTIONS IN
RESET BOX 1
& 2.
LED statusRESULTS (OK/Not OK)
LEDEXPECTED
Actual (Ok / Not
OK) ExpectedActual
(OK/Not OK)
RB 1 RB 2 RB 1 RB 2
6E.OCCUPAID
( VR DROPPED)
Give 1 out counts
and Reset by proper
means
Insert Key, Press key
actuator & press Reset
Button & release
Both RB1 & Rb
2
CLEAR OFF OFF Reset is possible due to 1
out count, system enters
the preparatory reset
state and resets
counter increment
s by 1
OCCUPAID ON ONPREP.RESE
TFlashing & then Steady
Flashing & then Steady
POWER ON ON ONRESET COUNTER
Incremented by 1
Incremented by 1
LCD DISPLAY
00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
7.Bring system into OCCUPIED state with at least 1 out count before the following tests.( Reset Voltage
window test)7. OCCUPAID
( VR DROPPED)
Reset Voltage range at
SSDAC 1 & SSDAC 2
CLEAR OFF OFFInsert Key,
Press key actuator
OCCUPAID ON ON Reset not possiblePREP.RESE
TON ON
POWER ON ON ON
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 19 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
end is made 42V to 50 V DC
& press Reset
Button & release
RESET COUNTER
Incremented by 1
Incremented by 1
LCD DISPLAY
00- preparatory state
00- preparatory state
00- preparatory state
00- preparatory state
8.Bring System into OCCUPIED state with at least 1 out count before the following tests (Timing window test)
Sl. No.
SECTION STATUS
TESTCONDITION
ACTIONS INRESET BOX1
& 2.
LED statusRESULTS (OK/Not OK)
LEDEXPECTED
Actual (Ok / Not
OK) ExpectedActual
(OK/Not OK)
RB 1 RB 2RB 1
RB 2
8A. OCCUPAID ( VR
DROPPED)
Timing Window Test
CLEAR OFF OFFInsert Key, Press key actuator & press Reset
Button &
OCCUPAID ON ON Reset not possiblePREP.RESE
TFlashing starts & OFF
Flashing starts & OFF
POWER ON ON ONRESET
COUNTERShould not increment
Should not increment
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 20 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
release Both ( for LESS
than 0.2
LCD DISPLAY
00- occupied State 00- occupied State00- occupied State 00- occupied State
8 B. OCCUPAID ( VR
DROPPED)
Timing Window Test
CLEAR OFF OFFInsert Key, Press key actuator & press Reset
Button & release Both
( for MORE than 10 Secs at both RB1 & Rb 2)
OCCUPAID ON ON Reset not possiblePREP.RESET Flashing starts
& OFFFlashing starts
& OFFPOWER ON ON ON
RESET COUNTER
Should not increment
Should not increment
LCD DISPLAY
00- occupied State 00- occupied State00- occupied State 00- occupied State
8 C. OCCUPAID ( VR
DROPPED)
Timing Window Test
CLEAR OFF OFFInsert Key, Press key actuator & press Reset
Button & release Both ( for 0.2 secs to 10
Secs at both )
OCCUPAID ON ON Reset is possible
and system enters
preparatory reset
state
PREP.RESET Flashing & Steady
Flashing & Steady
POWER ON ON ONRESET
COUNTERIncremented
by 1Incremented
by 1LCD
DISPLAY 00- Preparatory
reset state00- Preparatory reset state
00- Preparatory reset state
00- Preparatory reset state
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 21 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
8.0 COMMISSIONING8.1 Commissioning Log sheet of SSDAC [AM detection Type]model: DACF 710A, version : D01 S006 H04: The following card version should be checked:
8.2 Commissioning Log sheet of SSDAC [Phase reversal detection Type] model:DACF-710P, Version: D01 S006 H05 The following card version should be checked:
8.3 CommissioningSystem should be installed &commissioned by persons trained by the manufacturer.
8.4 TrainingRailway personnel should be trainedbefore commissioning.
8.5Verification of
working
After complying all items as per pre commissioning checklist, system tobe monitored for 72 hours for troublefree operation before commissioning.During this period, effect of varioustrolley wheels used in the sectionshould be checked as per Annexure ‘III’
Annexure-IPrecautions to be taken care during the wiring/connections are to be done at the time of commissioning ofSSDAC/BPAC/SSBPAC (D)
Position of One Quad in Quad cable:White (A) X
Red (C) X X (D) Grey X (B)
Signature of Railway Rep. Signature of Railway Rep. With Name, Designation & Date With Name, Designation & Date
Page 23 of 29
Date of issue22.6.2007
Pre-commissioning Check List for Single-Section Digital Axle Counter(ver: D01S006 H04 for AM, & D01S006 H05 for Phase ) of M/s CEL
(Updated on 22.6.2007)
SIG 0605
Ver 1
Quad colour1st pair = White & Quad colour i.e A & B Wires2nd pair= Red & Grey colour i.e C & D Wires of designated colour of Quad.Each Quad is binded by the respective Quad colour binder
Table-1COLOUR CODE OF INSULATED QUADS
Quad Colour
Quad Pair A-Wire B Wire Pair C- Wire D wireOrange 1. 1 A White Orange 1 B Red Grey
Blue 2. 2 A White Blue 2 B Red GreyBrown 3. 3 A White Brown 3 B Red GreyGreen 4. 4 A White Green 4 B Red GreyYellow 5. 5 A White Yellow 5 B Red GreyBlack 6. 6 A White Black 6 B Red Grey
Precautions to be taken for using QUAD Cable:
Designated pair of wire of the same Quad (mentioned in Table -1) should be used. Do not use one wire from one Quad and another wire from some other Quad. If any wire of a pair of the Quad is broken/Non functional, then use fresh pair of wire. Do not parallel wires of Quad cable.
Annexure-IITEMPERATURE CORRECTION FACTOR FOR CONDUCTOR RESISTANCE FOR ANNEALED HIGH CONDUCTIVITY COPPER