Top Banner
Water Resources Management Sector Project ADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation 7A-7037 Main Pump & Discharge Valve M o Local Remote on/off CS Local Operation Panel × COS Ready (In - Not Heav - Intake ch - Other Pu - Main Pum (Prime d Local Remote on/off CS HV Motor Feeder Panel × COS on/off Main Pump CS SCADA × OR AND on/off Remote Local open stop close CS Discharge Valve Actuator × COS open stop close CS Discharge Valve AND AND D o OR Ready (Sequ - Not Heavy f - Intake cham - Other Pump - Discharge V - Discharge V - Vacuum Sys - Intake Gate - Main Entran (at least on Ma Dis Seq AND Heavy Fault - Electrical Fa - Pump Beari - Motor Beari - Motor Wind - Tech.Water - Intake cham same switch Individual Sequence COS AND IND SEQ SEQ IND Emrgency Stop
32

BP-0000 Operation Flow(Master)_20140217a

Jul 10, 2016

Download

Documents

charzree

OPERATION fLOW dIAGRAM
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Main Pump & Discharge Valve

Main Pump on/off

Local

Remote

on/off

CS

Local Operation Panel

×8

COS

Ready (Individal) - Not Heavy fault - Intake chamber WL H on - Other Pump not starting - Main Pump Full water (Prime detector on)

Local

Remote

on/off

CS

HV Motor Feeder Panel

×8

COS

on/off

Main PumpCS

SCADA

×8

OR

AND

on/off

Remote

Localopenstopclose

CS

Discharge Valve Actuator

×8

COS

openstopclose

CSDischarge Valve

AND

AND

Discharge Valve open/stop/close

OR

Ready (Sequence) - Not Heavy fault - Intake chamber WL H on - Other Pump not starting - Discharge Valve not fault - Discharge Valve full close - Vacuum System Ready - Intake Gate full open - Main Entrance Gate full open (at least one Gate)

Main Pump &Discharge ValveSequence Operation

AND

Heavy Fault (Main Pump) - Electrical Fault - Pump Bearing Tempe. HH - Motor Bearing Temp. HH - Motor Winding Temp. HH - Tech.Water Non Flow - Intake chamber WL under LL - Sucton pressure sw of - Intake Gate not full open

same switch

Individual

Sequence

COS

AND

IND

SEQ

SEQ

IND

Emrgency Stop

Page 2: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

Heavy Fault (Main Pump) - Electrical Fault - Pump Bearing Tempe. HH - Motor Bearing Temp. HH - Motor Winding Temp. HH - Tech.Water Non Flow - Intake chamber WL under LL - Sucton pressure sw of - Intake Gate not full open

Page 3: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Pump Station

Main Pump on/off

Ready (Individal) - Not Heavy fault - Intake chamber WL H on - Other Pump not starting - Main Pump Full water (Prime detector on)

Discharge Valve open/stop/close

Ready (Sequence) - Not Heavy fault - Intake chamber WL H on - Other Pump not starting - Discharge Valve not fault - Discharge Valve full close - Vacuum System Ready - Intake Gate full open - Main Entrance Gate full open (at least one Gate)

Main Pump &Discharge ValveSequence Operation

Heavy Fault (Main Pump) - Electrical Fault - Pump Bearing Tempe. HH - Motor Bearing Temp. HH - Motor Winding Temp. HH - Tech.Water Non Flow - Intake chamber WL under LL - Sucton pressure sw of - Intake Gate not full open

Page 4: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 1

Heavy Fault (Main Pump) - Electrical Fault - Pump Bearing Tempe. HH - Motor Bearing Temp. HH - Motor Winding Temp. HH - Tech.Water Non Flow - Intake chamber WL under LL - Sucton pressure sw of - Intake Gate not full open

Page 5: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

GATE

Intake GATE(Intake Chamber)open/stop/close

OR

Local

Remote

openstopclose

CS

Intake GATE (Intake Chamber) Actuator

×5

COS

openstopclose

CS

SCADA

×5

Intake GATE(Main Entrance)open/stop/close

OR

Local

Remote

openstopclose

CS

Intake GATE (Main Entrance) Actuator

×3

COS

openstopclose

CS

SCADA

×3

Scour GATEopen/stop/close

OR

Local

Remote

openstopclose

CS

Scour GATE (Intake Chamber) Actuator

×3

COS

openstopclose

CS

SCADA

×3

Page 6: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

Page 7: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Pump Station

Intake GATE(Intake Chamber)open/stop/close

Intake GATE(Main Entrance)open/stop/close

Scour GATEopen/stop/close

Page 8: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 2

Page 9: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Intake Pump

Local

Remote

on/off

CS

Local Operation Panel

COS

Local

Remote

on/off

CS

LV Panel (No.1 IP)

COS

PLC logic

OR

No.1 IP

on/off

CSNo.2 IP

No.1 Intake Pump on/off

No.2 Intake Pump on/off

Local

Remote

on/off

CS

LV Panel (No.2 IP)

COS

OR

No.1

No.2

COS

AND

No.2 Intake PumpAUTO with TANK2

No.2 Intake PumpAUTO with TANK1

No.1 Intake PumpAUTO with TANK2

No.1 Intake PumpAUTO with TANK1

AND

TANK 1

TANK 2

COS

AND

AND

AND

AND

Local

Remote on/off

COS

No.1 BP

on/off

No.2 BPNo.1

COS

for Booster Pump (only Bulokboshi PS)

* no button in SCADA

Page 10: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

on/off

No.1

No.2

Page 11: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Pump Station

No.1 Intake Pump on/off

No.2 Intake Pump on/off

No.2 Intake PumpAUTO with TANK2

No.2 Intake PumpAUTO with TANK1

No.1 Intake PumpAUTO with TANK2

No.1 Intake PumpAUTO with TANK1

Page 12: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 4

Page 13: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Booster Pump Bulokboshi Pump Station

Local

Remote

on/off

CS

Intake Pump Local Operation Panel

COS

Local

Remote

on/off

CS

LV Panel (No.1 BP)

COS

PLC logic

OR

No.1 BP

on/off

CSNo.2 BP

No.1 Booster Pump on/off

No.2 Booster Pump on/off

Local

Remote

on/off

CS

LV Panel (No.2 BP)

COS

OR

No.1

No.2

COS

AND

No.2 Booster PumpAUTO with TANK2

No.2 Booster PumpAUTO with TANK1

No.1 Booster PumpAUTO with TANK2

No.1 Booster PumpAUTO with TANK1

AND

TANK 1

TANK 2

COS

AND

AND

AND

AND

* common COS with Intake Pump

* no button in SCADA

Page 14: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

Page 15: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Bulokboshi Pump Station

No.1 Booster Pump on/off

No.2 Booster Pump on/off

No.2 Booster PumpAUTO with TANK2

No.2 Booster PumpAUTO with TANK1

No.1 Booster PumpAUTO with TANK2

No.1 Booster PumpAUTO with TANK1

Page 16: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 4

Page 17: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Booster Pump Furkat-1 Pump Station

Local

Remote

on/off

CS

Drainage Pump Local Operation Panel

COS

Local

Remote

on/off

CS

LV Panel (No.1 BP)

COS

PLC logic

OR

No.1 BP

on/off

CSNo.2 BP

No.1 Booster Pump on/off

No.2 Booster Pump on/off

Local

Remote

on/off

CS

LV Panel (No.2 BP)

COS

OR

No.1

No.2

COS

AND

No.2 Booster PumpAUTO with TANK2

No.2 Booster PumpAUTO with TANK1

No.1 Booster PumpAUTO with TANK2

No.1 Booster PumpAUTO with TANK1

AND

TANK 1

TANK 2

COS

AND

AND

AND

AND* no button in SCADA

Page 18: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

Page 19: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Furkat-1 Pump Station

No.1 Booster Pump on/off

No.2 Booster Pump on/off

No.2 Booster PumpAUTO with TANK2

No.2 Booster PumpAUTO with TANK1

No.1 Booster PumpAUTO with TANK2

No.1 Booster PumpAUTO with TANK1

Page 20: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 4

Page 21: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Drainage Pump

Local

Remote

on/off

CS

Local Operation Panel

COS

Local

Remote

on/off

CS

LV Panel (No.1 DP)

COS

SCADA

OR

No.1 DP

on/off

CSNo.2 DP

No.1 Drainage Pump on/off

No.2 Drainage Pump on/off

Local

Remote

on/off

CS

LV Panel (No.2 DP)

COS

on/off

No.1 DPCS

on/off

No.2 DPCS

OR

Manual

Auto

COS

AND

OR

OR

AND

No.1 Drainage Pump Auto

No.2 Drainage Pump Auto

AND

AND

Local

Remote

on/off

COS No.1 BP

on/off

No.2 BP

No.1

COS

for Booster Pump ( F,S,K PS)

COS

Page 22: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

No.1

No.2TANK 1

TANK 2

COS

Page 23: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Pump Station

No.1 Drainage Pump on/off

No.2 Drainage Pump on/off

No.1 Drainage Pump Auto

No.2 Drainage Pump Auto

Page 24: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 4

Page 25: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Vacuum System Blokboshi Pump Station

SCADA

No.1 Vacuum Pumpon / offLocal

Remote

on/off

CS

LV Panel (No.1 Vacuum Pump)

COS

No.2 Vacuum Pumpon / offLocal

Remote

on/off

CS

LV Panel (No.2 Vacuum Pump)

COS

Individual

COS (in HV Feeder)

Sequence

No.1 Vacuum PumpSequence operation

Vacuum Valveopen / Close Local

Remote

open/close

CS

LV Panel (Vacuum Valve)

COS

AND

AND

×8

open/close

CS

OR

Vacuum ValveSequence operation

Vacuum Break Valveopen / Close Local

Remote

open/close

CS

LV Panel (Vacuum Break Valve)

COS

ANDopen/close

OR

×8

Vacuum Valve

Vacuum Break Valve CS

×8

No.2 Vacuum PumpSequence operation

on/off

No.1 VPCS

on/off

No.2 VPCS

AND

AND

OR

OR

AND

AND

No.1 No.2

COS

Page 26: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

AND

AND

Vacuum Break ValveSequence operation

×8

Page 27: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Blokboshi Pump Station

No.1 Vacuum Pumpon / off

No.2 Vacuum Pumpon / off

No.1 Vacuum PumpSequence operation

Vacuum Valveopen / Close

Vacuum ValveSequence operation

Vacuum Break Valveopen / Close

No.2 Vacuum PumpSequence operation

Page 28: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 -5

Vacuum Break ValveSequence operation

Page 29: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Submersible Pump Blokboshi Pump Station

Submersible Pump on/off

OR

Local

Remote

on / off

CS

LV Panel (Submersible Pump)

COS

on/off

CS

SCADA

Page 30: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Note) COS : Change Over Switch, CS : Control Switch

Page 31: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

Blokboshi Pump Station

Submersible Pump on/off

Page 32: BP-0000 Operation Flow(Master)_20140217a

Water Resources Management Sector ProjectADB Loan No.2492-UZB, 2493-UZB (SF) Operation Flow KUBOTA Corporation

7A-7037

BP-0000 - 6