LOT 1 DP 1208526 LOT 11 DP 236422 LOT 9 DP 236422 LOT 8 DP 236422 LOT 2 DP 1208526 SP2 DRAINAGE ZONE RE1 LAND RE1 LAND SP2 DRAINAGE ZONE LOT 37 DP 39341 LOT 11 DP 236422 LOT 39 DP 39341 LOT 38 DP 39341 Orion Consulting Engineers 78 BOUNDARY ROAD, SCHOFIELDS ROAD AND DRAINAGE DESIGN Milestone Plan Revision SITE / LOCATION (Image courtesy of Nearmap 18.01.18) Prepared by: Prepared for: LGA: Project No. DEVELOPMENT APPLICATION ISSUED FOR NOT FOR CONSTRUCTION 000 DA 01 18-03 DA: ___________ SITE BOUNDARY ROAD NORTH LOT 11, D.P. 536381 DRAWING LIST SHEET No. SHEET TITLE REV GENERAL 000 COVERSHEET 001 GENAERAL LAYOUT PLAN, NOTES & LEGEND 002 DEMOLITION PLAN 003 SITE REGRADING PLAN SEDIMENT & EROSION CONTROL 100 SEDIMENT & EROSION CONTROL PLAN 101 SEDIMENT & EROSION CONTROL NOTES & DETAILS ROADWORKS 200 ENGINEERING PLAN 300 ROAD TYPICAL CROSS SECTIONS 301 ROAD LONG SECTIONS - SHEET 01 OF 02 302 ROAD LONG SECTIONS - SHEET 02 OF 02 DRAINAGE 400 CATCHMENT PLAN 401 BASIN PLAN, SECTIONS & DETAILS 402 BIO-RETENTION DETAILS & PLANTING 01 01 01 01 01 01 01 01 01 01 01 01 01 004 SITE REGRADING SECTIONS 01
14

BOUNDARY ROAD - blacktown.nsw.gov.au › files › assets › public › public... · DP 1208526LOT 1 DP 236422LOT 11 DP 236422LOT 9 DP 236422LOT 8 DP 1208526LOT 2 DRAINAGESP2 ZONE

Jan 29, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 1-1

    1-2

    2-1

    2-2

    2-3

    2-4

    2-5

    24-1

    3-1

    3-2

    3-3

    24-2

    4-1

    4-2

    4-3

    4-4

    24-5

    5-1

    5-2

    5-3

    5-4

    5-5

    5-6

    5-7

    5-8

    5-9

    5-10

    5-11

    5-12

    6-1

    6-2

    6-3

    6-4

    6-5

    7-1

    7-2

    7-3

    7-4

    7-5

    7-6

    8-1

    9-1

    10-1

    11-112-1

    13-1

    14-1

    15-1

    15-2

    16-1

    17-1

    18-1

    19-1

    20-1

    21-1

    22-1

    22-2

    23-1

    23-2

    23-3

    23-4

    23-5

    23-6

    23-7

    23-8

    23-9

    23-10

    23-11

    LOT 1

    DP 1208526

    LOT 11

    DP 236422

    LOT 9

    DP 236422

    LOT 8

    DP 236422

    LOT 2

    DP 1208526

    SP2

    DRAINAGE

    ZONERE1LAND

    RE1LAND

    SP2

    DRAINAGE

    ZONE

    LOT 37

    DP 39341

    LOT 11

    DP 236422

    LOT 39

    DP 39341

    LOT 38

    DP 39341

    Orion

    Consulting

    Engineers

    78 BOUNDARY ROAD,SCHOFIELDS

    ROAD AND DRAINAGE DESIGN

    Milestone Plan Revision

    SITE / LOCATION (Image courtesy of Nearmap 18.01.18)

    Prepared by:

    Prepared for: LGA:

    Project No.

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    000DA 0118-03

    DA: ___________

    SITE

    BOUNDARY ROAD

    NORTH

    LOT 11, D.P. 536381DRAWING LIST

    SHEET No. SHEET TITLE REVGENERAL

    000 COVERSHEET

    001 GENAERAL LAYOUT PLAN, NOTES & LEGEND

    002 DEMOLITION PLAN

    003 SITE REGRADING PLAN

    SEDIMENT & EROSION CONTROL100 SEDIMENT & EROSION CONTROL PLAN

    101 SEDIMENT & EROSION CONTROL NOTES & DETAILS

    ROADWORKS200 ENGINEERING PLAN

    300 ROAD TYPICAL CROSS SECTIONS

    301 ROAD LONG SECTIONS - SHEET 01 OF 02

    302 ROAD LONG SECTIONS - SHEET 02 OF 02

    DRAINAGE400 CATCHMENT PLAN

    401 BASIN PLAN, SECTIONS & DETAILS

    402 BIO-RETENTION DETAILS & PLANTING

    01

    01

    01

    01

    01

    01

    01

    01

    01

    01

    01

    01

    01

    004 SITE REGRADING SECTIONS 01

  • 34.5

    35.035.5

    35.5

    35.5

    35.5

    36.0

    36.5

    36.5

    36.5

    36.537.0

    37.0

    37.5

    37.5

    37.5

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.5

    39.5

    40.0

    34.0

    34.0

    34.5

    34.5

    35.0

    35.0

    35.0

    35.0

    35.0

    35.5

    35.5

    35.5

    35.5

    35.5

    36.0

    36.0

    36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    37.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    37.5

    38.0 38.038.0

    38.5

    38.5

    38.5

    38.5

    39.0

    39.0

    39.0

    39.5

    39.5

    39.5

    40.0

    40.0

    40.0

    40.0

    40.5

    40.5

    40.5

    40.5

    41.0

    41.0

    41.0

    41.0

    41.5

    41.5

    41.5

    42.0

    42.5

    43.0

    34.0

    34.0

    34.534.5

    35.0

    35.0

    35.0

    35.0

    35.5

    35.5

    35.5

    35.5

    35.5

    35.5

    35.5

    35.5

    35.536.0

    36.0

    36.0

    36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    36.5

    37.0

    37.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    37.5

    38.0

    38.5

    39.0

    39.5

    40.0

    40.5

    41.0

    41.0

    41.5

    41.5

    42.0

    42.0

    42.5

    42.5

    43.0

    43.0

    43.043.5

    43.5

    43.5

    44.0

    44.0

    44.044.5

    44.5

    44.5

    45.0

    45.0

    45.5

    45.5

    46.0

    46.5

    37.75

    37.75

    37.50

    BAYSWATER AVENUE

    MARW

    ANAV

    ENUE

    BALF

    OUR

    STR

    EET

    WAT

    ERLO

    O ST

    REET

    MAYF

    AIR

    STRE

    ET

    MOW

    BRAY

    STR

    EET

    LOT 1DP 1208526

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    LOT 11DP 236422

    LOT 2DP 1208526

    SP2DRAINAGE

    ZONE

    RE1LAND

    RE1LAND SP2

    DRAINAGEZONE

    LOT 37DP 39341

    LOT 11DP 236422

    LOT 39DP 39341

    LOT 38DP 39341

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-25

    DA 15/01643

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    NORTH WESTERN SURVEYS REF: 17-25DA 16/14914

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD No.05

    ROAD No.04

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    15:11

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A001

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    GENERAL NOTESG1. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL'S WORKS SPECIFICATION

    CIVIL (CURRENT EDITION) AND/OR AS DIRECTED BY THEIR REPRESENTATIVE

    G2. SURVEY MARKS: - a. SURVEY MARKS SHOWN THUS SHALL BE RETAINED AT ALL TIMES. WHERE RETENTION IS NOT POSSIBLE

    THE SUPERINTENDENT MUST BE NOTIFIED AND CONSENT RECEIVED PRIOR TO THEIR REMOVAL.

    G3. THE CONTRACTOR SHALL LOCATE AND LEVEL ALL EXISTING SERVICES PRIOR TO COMMENCING CONSTRUCTIONAND MAKE ARRANGEMENTS WITH THE RELEVANT AUTHORITY TO RELOCATE OR ADJUST IF NECESSARY ATDEVELOPERS EXPENSE.

    G4. THE CONTRACTOR SHALL NOT ENTER UPON NOR DO ANY WORK WITHIN ADJACENT LANDS WITHOUT THEWRITTEN PERMISSION OF THE OWNERS. TO BE PROVIDED PRIOR TO THE APPROVAL OF THE PLANS.

    G5. THE CONTRACTOR SHALL MAINTAIN SERVICES AND ALL WEATHER ACCESS AT ALL TIMES TO ADJOININGPROPERTIES.

    G6. COUNCIL'S TREE PRESERVATION ORDER MUST BE OBSERVED AND NO TREE SHALL BE FELLED, LOPPED ORREMOVED WITHOUT THE PRIOR APPROVAL OF COUNCIL'S ENGINEER.

    G7. TREES TO BE RETAINED ON SITE SHALL BE PROTECTED BY SUITABLE STURDY APPROVED PROTECTIVE FENCINGPRIOR TO COMMENCEMENT OF SITE WORKS. NO TREES TO BE REMOVED WITHOUT COUNCIL'S WRITTENAPPROVAL.

    G8. THE CONTRACTOR SHALL CLEAR THE SITE BY REMOVING ALL RUBBISH, FENCES, EXISTING INFRASTRUCTUREAND DEBRIS ETC.

    G9. FILLING IS TO BE FROM A NOMINATED SOURCE, OF SOUND CLEAN MATERIAL, FREE FROM LARGE ROCK,STUMPS, CONTAMINATED MATTER, INDUSTRIAL AND BUILDING WASTE, ORGANIC MATTER AND OTHER DEBRIS.PLACING OF FILLING ON THE PREPARED AREAS SHALL NOT COMMENCE UNTIL THE AUTHORITY TO DO SO HASBEEN OBTAINED FROM THE COUNCIL.

    G10. SITE FILL AREAS: - THE CONTRACTOR SHALL TAKE LEVELS OF EXISTING SURFACE AFTER STRIPPING TOPSOILAND PRIOR TO COMMENCING FILL OPERATIONS.

    G11. ALL SITE FILLING TO BE COMPACTED TO 95% STANDARD COMPACTION AND SHALL BE CONTROLLED BY AREGISTERED SOIL LABORATORY IN ACCORDANCE WITH COUNCIL'S "WORKS SPECIFICATION".

    G12. ALL SITE REGRADING AREAS SHALL BE GRADED AT A MINIMUM 1% TO THE ENGINEERS REQUIREMENTS.

    G13. SURPLUS EXCAVATED MATERIAL SHALL BE PLACED WHERE DIRECTED BY THE SUPERINTENDENT.

    G14. ALL DRAINAGE LINES THROUGH LOTS SHALL BE CONTAINED WITHIN THEIR EASEMENTS AND CONFORM WITHCOUNCIL'S STANDARDS.

    G15. DRAINAGE LINES UNDER ROADS SHALL BE BACKFILLED WITH NON-COHESIVE SAND AND HAVE 3m OF SUBSOILDRAIN WRAPPED IN APPROVED FILTER SOCK, DISCHARGING INTO DOWN STREAM PITS.

    G16. VEHICULAR CROSSINGS SHALL BE CONSTRUCTED IN KERB AND GUTTER WHERE SHOWN. DRIVEWAYS &LAYBACKS ARE TO HAVE A MINIMUM 1 METRE CLEARANCE FROM POWER & LIGHT POLES & STORMWATERDRAINS AND 6 METRES CLEARANCE FROM KERB RETURN TANGENT POINTS AND TO COUNCIL STANDARDDRAWING A(BS) 102S.

    G17. PRAM CROSSINGS SHALL BE CONSTRUCTED IN KERB AND GUTTER IN ACCORDANCE WITH COUNCIL'S STANDARDDRAWING A(BS) 104M.

    G18. ALL NEW WORKS SHALL MAKE A SMOOTH JUNCTION WITH EXISTING CONDITIONS.

    G19. DIMENSIONS OF ANY DETAIL SHALL NOT BE SCALED - DIMENSIONS, IF IN DOUBT, SHALL BE VERIFIED BY THESUPERINTENDENT.

    SURVEY SET OUT INFORMATION NOTES:S1. ALL SITE SET OUT AND CONTROL POINTS ARE TO BE CERTIFIED BY A REGISTERED SURVEYOR.

    S2. THE INFORMATION DETAILED ON THE CERTIFIED CONSTRUCTION CERTIFICATE PLANS TAKES PRECEDENCE OVERALL ELECTRONIC INFORMATION PROVIDED. THE ORDER OF PRIORITY FOR USE OF ALL INFORMATION PROVIDED ISAS FOLLOWS:

    a. CERTIFIED CONSTRUCTION CERTIFICATE DRAWINGSb. 2D DRAFTING BASE (ELECTRONIC FILE)c. 3D DTM (ELECTRONIC FILE)

    S3. ANY DISCREPANCY BETWEEN ANY OF THE INFORMATION CONTAINED WITHIN THESE FILES IS TO BE BROUGHTTO THE ATTENTION OF THE SUPERINTENDENT PRIOR TO CONSTRUCTION WHO WILL SEEK CLARIFICATION ANDISSUE INSTRUCTIONS ON THE APPROPRIATE COURSE OF ACTION.

    STORMWATER DRAINAGE NOTESD1. STORMWATER DESIGN CRITERIA:

    1:100 MAJOR SYSTEM1:2 MINOR SYSTEM

    D2. PIPES TO BE INSTALLED TO TYPE HS1 SUPPORT IN ACCORDANCE WITH AS 3725 (1989) IN ALL CASES BACKFILLTRENCH WITH SAND TO 300mm ABOVE PIPE (UNO). WHERE PIPE IS UNDER PAVEMENTS BACKFILL REMAINDEROF TRENCH TO UNDERSIDE OF PAVEMENT WITH SAND OR APPROVED GRANULAR MATERIAL COMPACTED IN150mm LAYERS TO MINIMUM 98% STANDARD MAXIMUM DRY DENSITY IN ACCORDANCE WITH AS 1289 5.2.1. (OR ADENSITY INDEX OF NOT LESS THAN 75)

    D3. ALL INTERNAL WORKS WITHIN PROPERTY BOUNDARIES ARE TO COMPLY WITH THE REQUIREMENTS OF AS 35003.1 AND AS/NZS 3500 3.2 & COUNCIL'S SPECIFICATIONS.

    D4. CARE IS TO BE TAKEN WITH LEVELS OF STORMWATER LINES. GRADES SHOWN ARE NOT TO BE REDUCEDWITHOUT APPROVAL.

    D5. GRATES AND COVERS SHALL CONFORM TO AS 3996.

    D6. AT ALL TIMES DURING CONSTRUCTION OF STORMWATER PITS, ADEQUATE SAFETY PROCEDURES SHALL BETAKEN TO ENSURE AGAINST THE POSSIBILITY OF PERSONNEL FALLING DOWN PITS.

    D7. DRAINAGE LINES UNDER ROADS SHALL BE BACKFILLED WITH NON-COHESIVE SAND AND HAVE 3.0m OF SUBSOILDRAIN WRAPPED IN APPROVED FILTER SOCK, DISCHARGING INTO DOWN STREAM PITS.

    D8. ALL STORMWATER PIPES WITHIN ROADS TO BE REINFORCED CONCRETE PIPE (RCP) CLASS 2.

    D9. ALL INTERALLOTMENT DRAINAGE LINES SHALL BE LAID AT A MINIMUM GRADE OF 1% UNLESS OTHERWISEINDICATED.

    D10. DRAINAGE LINES ON PLANS ARE DIAGRAMMATIC ONLY AND PIPE CENTRELINES SHALL ENTER AND EXIT PITS ATTHE CENTRE OF THE RESPECTIVE PIT WALLS (UNO).

    D11. PRECAST KERB INLET LINTELS SHALL BE USED ON GULLY PITS. GULLY PITS SHALL BE IN ACCORDANCE WITHA(BS)106M.

    D12. PROVIDE STUB Ø100 uPVC SN4 PIPES AT INTER-ALLOTMENT DRAINAGE PITS FOR FUTURE CONNECTION. REFERTO DRAINAGE LONGSECTIONS.

    EARTHWORKS NOTESE1. EARTHWORKS ARE TO BE CARRIED OUT TO THE SATISFACTION OF THE COUNCIL. UNSUITABLE MATERIALS ARE TO BE REMOVED FROM ROADS AND LOTS PRIOR TO FILLING. THE CONTRACTOR IS TO ARRANGE AND MAKE

    AVAILABLE COMPACTION TESTING RESULTS FOR ALL AREAS THAT CONTAIN FILL IN EXCESS OF 250mm.

    E2. COMPACTION OF EARTHWORKS SHALL CONTINUE UNTIL A DRY DENSITY RATIO OF 95% FOR SITE FILLING AND 100% FOR ROAD PAVEMENT SUBGRADES HAS BEEN ACHIEVED IN ACCORDANCE WITH TEST METHOD AS1289.5.3.1 OR AS.1289.5.1.1. THE CONTROL TESTING OF EARTHWORKS SHALL BE IN ACCORDANCE WITH THE GUIDELINES IN AS3798 'GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS'. WHERE IT IS PROPOSED TO USE TEST METHOD AS1289.5.8.1 TO DETERMINE THE FIELD DENSITY, A SAND REPLACEMENT METHOD SHALL BE USED TO CONFIRM THE RESULTS.

    E3. THE SUITABLE QUALIFIED GEOTECHNICAL ENGINEER, SHALL HAVE A LEVEL 1 RESPONSIBILITY FOR ALL FILLINGAS DEFINED IN APPENDIX B AS3798 'GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL

    DEVELOPMENTS', AND AT THE END OF THE WORKS SHALL CONFIRM THE EARTHWORKS COMPLY WITH THEREQUIREMENTS OF THE SPECIFICATION AND DRAWINGS BY WRITTEN NOTIFICATION.

    E4. IN AREAS TO BE FILLED WHERE THE SLOPE OF THE NATURAL SURFACE EXCEEDS 1(V):4(H), BENCHES ARE TO BE CUT TO PREVENT SLIPPING OF THE PLACED FILL MATERIAL AS REQUIRED BY THE COUNCIL.

    E5. ALL BATTERS ARE TO BE SCARIFIED TO A DEPTH OF 50mm TO ASSIST WITH ADHESION OF TOP SOIL TO BATTERFACE.

    E6. PROVIDE MINIMUM 100mm AND MAXIMUM 250mm TOPSOIL DEPTH ON FOOTPATHS, FILLED AREAS AND ALL OTHER AREAS DISTURBED DURING CONSTRUCTION. TOPSOILED AREAS TO BE STABILISED WITH APPROVED VEGETATION A MAXIMUM OF 14 DAYS AFTER TOPSOILING AND ARE TO BE WATERED TO ENSURE GERMINATION.

    E7. THE CONTRACTOR SHALL CONTROL SEDIMENTATION, EROSION AND POLLUTION DURING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE CURRENT EDITION OF 'MANAGING URBAN STORMWATER:

    SOILS AND CONSTRUCTION' PRODUCED BY LANDCOM.

    E8. FOOTWAY AREA TO BE FULLY TURFED WITH COUCH GRASS, AND SHALL BE MAINTAINED AND REPLACED ASREQUIRED DURING THE CONSTRUCTION MAINTENANCE PERIOD, IN ACCORDANCE WITH CONDITION.

    UTILITIES SHOWN ARE DIAGRAMMATIC ONLY AND MAY NOTINCLUDE ALL SERVICES WITHIN THE LIMIT OF WORKS.

    IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY,LOCATE AND AVOID DAMAGE TO THEM AS SPECIFIED BY EACH

    UTILITIES EXCAVATION GUIDE LINES/STANDARDS.

    GENERAL NOTES (continued)G20. ALL CONSTRUCTION AND RESTORATION WORK ON COUNCIL'S ROAD AND FOOTPATH AREA ARE TO BE CARRIED

    OUT IN ACCORDANCE WITH THE APPROVED DRAWINGS AND COUNCIL'S STANDARD SPECIFICATIONS.

    G21. ALL LIGHT POLES, STREET NAME POLES AND BUS SHELTERS IN THIS SUBDIVISION WILL BE BLACK POWDERCOATED TO THE SATISFACTION OF BLACKTOWN CITY COUNCIL AND COMPLY TO COUNCIL'S SPECIFICATION.

    G22. CONDUITS TO BE PLACED WHERE REQUIRED BY RELEVANT AUTHORITIES.

    G23. PITS ARE TO HAVE STEP IRONS IF DEEPER THAN 1.2m, REFER TO COUNCIL'S STANDARD DWG A(BS)111S.

    G24. STRUCTURAL CERTIFICATION REQUIRED FOR CONSTRUCTION OF MAJOR AND NON-STANDARD STRUCTURES(PITS & RETAINING WALLS).

    G25. 100 YEAR FLOW PATHS TO BE FORMED AT TIME OF CONSTRUCTION.

    LOT NUMBER & BOUNDARY

    BUILDING / ENVELOPE

    APPROXIMATE LIMIT OF WORKSOR STAGE

    ROAD, NUMBER, CONTROL LINE,CHAINAGE & CHAINAGE MARK

    COUNCIL STANDARD KERB &GUTTER OR ROLL KERB

    COUNCIL STANDARD DISHCROSSING

    STORMWATER DRAINAGE PIPEAND STRUCTURE

    SUBSOIL DRAIN

    COUNCIL STANDARD CONCRETEFOOTPATH & KERB RAMP

    BATTER

    CONTOUR LINE & LABEL

    RETAINING WALL

    STORMWATER DRAINAGE PIPEAND STUB

    TREE - TO BE RETAINED

    LOT #LOT # LOT #

    KG

    DC

    20.010.0 30.0

    RW1

    ROAD

    RK

    CH #

    ROAD ROAD

    CH #

    CH #

    UTILITY -

    SEWERGAS

    WATER

    ELECTRICITY

    TELECOMS

    PROPOSEDEXISTING FUTURE

    NBN

    LEGEND

    TEMPORARY STORMWATERDRAINAGE PIPE

    OPTIC FIBRE

    EASEMENT (REFER LEGEND) (A) (B) (C)(A) (B) (C)

    DIVERSION SWALE

    TREE - TO BE REMOVED

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA0

    01.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    NORTH

    GENAERAL LAYOUTPLAN, NOTES &LEGEND 001

    100908070605030 4020100

    SCALE 1:1000 (A1) SCALE 1:2000 (A3)

    AutoCAD SHX Text16

    AutoCAD SHX Text145

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text148

    AutoCAD SHX Text149

    AutoCAD SHX Text154

    AutoCAD SHX Text155

    AutoCAD SHX Text156

    AutoCAD SHX Text157

    AutoCAD SHX Text158

    AutoCAD SHX Text159

    AutoCAD SHX Text160

    AutoCAD SHX Text161

    AutoCAD SHX Text162

    AutoCAD SHX Text163

    AutoCAD SHX Text183

    AutoCAD SHX Text164

    AutoCAD SHX Text180

    AutoCAD SHX Text181

    AutoCAD SHX Text182

    AutoCAD SHX Text184

    AutoCAD SHX Text153

    AutoCAD SHX Text152

    AutoCAD SHX Text151

    AutoCAD SHX Text150

    AutoCAD SHX Text165

    AutoCAD SHX Text170

    AutoCAD SHX Text166

    AutoCAD SHX Text167

    AutoCAD SHX Text168

    AutoCAD SHX Text169

    AutoCAD SHX Text174

    AutoCAD SHX Text171

    AutoCAD SHX Text173

    AutoCAD SHX Text175

    AutoCAD SHX Text179

    AutoCAD SHX Text178

    AutoCAD SHX Text177

    AutoCAD SHX Text176

    AutoCAD SHX Text104

    AutoCAD SHX Text172

    AutoCAD SHX Text110

    AutoCAD SHX Text111

    AutoCAD SHX Text112

    AutoCAD SHX Text113

    AutoCAD SHX Text114

    AutoCAD SHX Text116

    AutoCAD SHX Text117

    AutoCAD SHX Text118

    AutoCAD SHX Text119

    AutoCAD SHX Text120

    AutoCAD SHX Text122

    AutoCAD SHX Text123

    AutoCAD SHX Text124

    AutoCAD SHX Text125

    AutoCAD SHX Text126

    AutoCAD SHX Text131

    AutoCAD SHX Text130

    AutoCAD SHX Text129

    AutoCAD SHX Text128

    AutoCAD SHX Text127

    AutoCAD SHX Text137

    AutoCAD SHX Text136

    AutoCAD SHX Text135

    AutoCAD SHX Text134

    AutoCAD SHX Text133

    AutoCAD SHX Text140

    AutoCAD SHX Text141

    AutoCAD SHX Text142

    AutoCAD SHX Text143

    AutoCAD SHX Text144

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text58

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text4

    AutoCAD SHX Text3

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX Text15

    AutoCAD SHX Text11

    AutoCAD SHX Text13

    AutoCAD SHX Text14

    AutoCAD SHX Text16

    AutoCAD SHX Text17

    AutoCAD SHX Text18

    AutoCAD SHX Text19

    AutoCAD SHX Text10

    AutoCAD SHX Text9

    AutoCAD SHX Text8

    AutoCAD SHX Text12

    AutoCAD SHX Text7

    AutoCAD SHX Text25

    AutoCAD SHX Text67

    AutoCAD SHX Text26

    AutoCAD SHX Text24

    AutoCAD SHX Text68

    AutoCAD SHX Text22

    AutoCAD SHX Text21

    AutoCAD SHX Text20

    AutoCAD SHX Text23

    AutoCAD SHX Text66

    AutoCAD SHX Text31

    AutoCAD SHX Text61

    AutoCAD SHX Text30

    AutoCAD SHX Text62

    AutoCAD SHX Text29

    AutoCAD SHX Text63

    AutoCAD SHX Text28

    AutoCAD SHX Text64

    AutoCAD SHX Text27

    AutoCAD SHX Text65

    AutoCAD SHX Text36

    AutoCAD SHX Text56

    AutoCAD SHX Text35

    AutoCAD SHX Text57

    AutoCAD SHX Text34

    AutoCAD SHX Text33

    AutoCAD SHX Text59

    AutoCAD SHX Text32

    AutoCAD SHX Text60

    AutoCAD SHX Text52

    AutoCAD SHX Text39

    AutoCAD SHX Text53

    AutoCAD SHX Text38

    AutoCAD SHX Text54

    AutoCAD SHX Text37

    AutoCAD SHX Text55

    AutoCAD SHX Text43

    AutoCAD SHX Text42

    AutoCAD SHX Text41

    AutoCAD SHX Text40

    AutoCAD SHX Text49

    AutoCAD SHX Text50

    AutoCAD SHX Text51

    AutoCAD SHX Text45

    AutoCAD SHX Text44

    AutoCAD SHX Text46

    AutoCAD SHX Text47

    AutoCAD SHX Text48

  • 36.5

    36.5

    36.5

    37.5

    37.5

    37.538.0

    38.5

    38.5

    39.0

    39.5

    40.0

    34.0

    35.0

    35.5

    35.5

    36.0

    36.0

    36.5

    36.5

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0 38.0

    38.5

    38.5

    39.540.0

    40.5

    41.0

    41.5

    42.0

    42.5

    43.0

    35.0

    35.5

    35.5

    35.5

    35.536.0

    36.0 36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    36.5

    37.037.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0

    38.5

    39.0

    39.5

    40.0

    40.541.0

    41.5

    42.0

    42.5

    43.0

    43.5

    43.5

    44.0

    44.044.5

    44.5

    45.0

    45.0

    45.5

    45.5

    46.0

    46.5

    37.75

    37.75

    37.50

    BAYSWATER AVENUE

    MARW

    AN A

    VENU

    E

    BALF

    OUR

    STR

    EET

    WAT

    ERLO

    O ST

    REET

    LOT 1DP 1208526

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    LOT 11DP 236422

    SP2DRAINAGE

    ZONE

    RE1LAND

    RE1LAND

    SP2DRAINAGE

    ZONE

    LOT 37DP 39341

    LOT 39DP 39341

    LOT 38DP 39341

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-25

    DA 15/01643

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    NORTH WESTERN SURVEYS REF: 17-25DA 16/14914

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD No.05

    ROAD No.04

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    15:21

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A002

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA0

    02.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    NORTH

    DEMOLITION PLAN

    002

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    "DANGER - DEMOLITION INPROGRESS", OR SIMILARMESSAGE SHALL BE MAINTAINEDON THE FENCING ATAPPROPRIATE PLACES TO WARNTHE PUBLIC.

    SIGNS:

    EXISTING CONTOURS

    EXISTING STRUCTURES TO BEDEMOLISHED AND MATERIALS TAKENTO APPROVED WASTE FACILITY

    SITE SECURITY FENCE

    LEGEND1. SURVEY PROVIDED BY BATHLA (DATE 9th JANUARY 2018)

    2. CONTRACTOR TO ESTABLISH EXTENT OF ALL EXISTINGSERVICES WITHIN THE EXTENT OF WORKS.

    3. CONTRACTOR TO GAIN ALL NECESSARY APPROVALS &PERMITS TO DEMOLISH, CAP OR REMOVE EXISTING SERVICESAS REQUIRED.

    4. CONTRACTOR TO ALLOW FOR THE DEMOLITION OF ALLEXISTING STRUCTURES & FEATURES (ABOVE & BELOWGROUND) ON THE SITE REQUIRED, INCLUDING BUILDINGS,FENCES, EXISTING PAVEMENT, DRAINAGE, SIGNS ETC.

    5. ALL DEMOLITION WORKS SHALL COMPLY WITH THEPROVISIONS OF AS2601:2001 THE DEMOLITION OFSTRUCTURES.

    6. REMOVAL OF EXISTING ELECTRICAL INFRASTRUCTURE TO BECOMPLETED IN ACCORDANCE ELECTRICAL CONSULTANTSSPECIFICATIONS & DRAWINGS.

    7. EXISTING SERVICES TO BE LOCATED FROM DBYD PLANS ANDONSITE SERVICES LOCATION.

    8. TREE REMOVAL SHALL BE IN ACCORDANCE WITH BLACKTOWNCITY COUNCIL'S REQUIREMENTS AND SPECIFICATIONS.

    UTILITIES SHOWN ARE DIAGRAMMATIC ONLY AND MAY NOTINCLUDE ALL SERVICES WITHIN THE LIMIT OF WORKS.

    IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY,LOCATE AND AVOID DAMAGE TO THEM AS SPECIFIED BY EACH

    UTILITIES EXCAVATION GUIDE LINES/STANDARDS.

    EXISTING DAMN TO BE DE-SILTED,DE-SLUGGED & COMPACTED TO 95% STD

    EXISTING FENCE TO BE REMOVED

    PROVIDE LOCKABLESITE ACCESS GATE

    AutoCAD SHX Text145

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text148

    AutoCAD SHX Text149

    AutoCAD SHX Text154

    AutoCAD SHX Text155

    AutoCAD SHX Text156

    AutoCAD SHX Text157

    AutoCAD SHX Text158

    AutoCAD SHX Text159

    AutoCAD SHX Text160

    AutoCAD SHX Text161

    AutoCAD SHX Text162

    AutoCAD SHX Text163

    AutoCAD SHX Text183

    AutoCAD SHX Text164

    AutoCAD SHX Text180

    AutoCAD SHX Text181

    AutoCAD SHX Text182

    AutoCAD SHX Text184

    AutoCAD SHX Text130

    AutoCAD SHX Text129

    AutoCAD SHX Text128

    AutoCAD SHX Text127

    AutoCAD SHX Text136

    AutoCAD SHX Text135

    AutoCAD SHX Text134

    AutoCAD SHX Text133

    AutoCAD SHX Text141

    AutoCAD SHX Text142

    AutoCAD SHX Text143

    AutoCAD SHX Text144

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text58

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text4

    AutoCAD SHX Text3

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX Text15

    AutoCAD SHX Text11

    AutoCAD SHX Text13

    AutoCAD SHX Text14

    AutoCAD SHX Text16

    AutoCAD SHX Text17

    AutoCAD SHX Text18

    AutoCAD SHX Text19

    AutoCAD SHX Text10

    AutoCAD SHX Text9

    AutoCAD SHX Text8

    AutoCAD SHX Text12

    AutoCAD SHX Text7

    AutoCAD SHX Text25

    AutoCAD SHX Text67

    AutoCAD SHX Text26

    AutoCAD SHX Text24

    AutoCAD SHX Text68

    AutoCAD SHX Text22

    AutoCAD SHX Text21

    AutoCAD SHX Text20

    AutoCAD SHX Text23

    AutoCAD SHX Text66

    AutoCAD SHX Text31

    AutoCAD SHX Text61

    AutoCAD SHX Text30

    AutoCAD SHX Text62

    AutoCAD SHX Text29

    AutoCAD SHX Text63

    AutoCAD SHX Text28

    AutoCAD SHX Text64

    AutoCAD SHX Text27

    AutoCAD SHX Text65

    AutoCAD SHX Text36

    AutoCAD SHX Text56

    AutoCAD SHX Text35

    AutoCAD SHX Text57

    AutoCAD SHX Text34

    AutoCAD SHX Text33

    AutoCAD SHX Text59

    AutoCAD SHX Text32

    AutoCAD SHX Text60

    AutoCAD SHX Text52

    AutoCAD SHX Text39

    AutoCAD SHX Text53

    AutoCAD SHX Text38

    AutoCAD SHX Text54

    AutoCAD SHX Text37

    AutoCAD SHX Text55

    AutoCAD SHX Text43

    AutoCAD SHX Text42

    AutoCAD SHX Text41

    AutoCAD SHX Text40

    AutoCAD SHX Text49

    AutoCAD SHX Text50

    AutoCAD SHX Text51

    AutoCAD SHX Text45

    AutoCAD SHX Text44

    AutoCAD SHX Text46

    AutoCAD SHX Text47

    AutoCAD SHX Text48

    AutoCAD SHX Text16

  • 36.5

    36.5

    36.5

    37.5

    37.5

    37.538.0

    38.5

    38.5

    39.0

    39.5

    40.0

    34.0

    35.0

    35.5

    35.5

    36.0

    36.0

    36.5

    36.5

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0 38.0

    38.5

    38.5

    39.540.0

    40.5

    41.0

    41.5

    42.0

    42.5

    43.0

    35.0

    35.5

    35.5

    35.5

    35.536.0

    36.0 36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    36.5

    37.037.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0

    38.5

    39.0

    39.5

    40.0

    40.541.0

    41.5

    42.0

    42.5

    43.0

    43.5

    43.5

    44.0

    44.044.5

    44.5

    45.0

    45.0

    45.5

    45.5

    46.0

    46.5

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.75

    37.75

    37.50

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.75

    37.75

    37.50

    BAYSWATER AVENUE

    MARW

    AN A

    VENU

    E

    BALF

    OUR

    STR

    EET

    WAT

    ERLO

    O ST

    REET

    LOT 1DP 1208526

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    LOT 11DP 236422

    SP2DRAINAGE

    ZONE

    RE1LAND

    RE1LAND

    SP2DRAINAGE

    ZONE

    LOT 37DP 39341

    LOT 39DP 39341

    LOT 38DP 39341

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-25

    DA 15/01643

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    NORTH WESTERN SURVEYS REF: 17-25DA 16/14914

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD No.05

    ROAD No.04

    CH 0.

    0

    CH 37

    1.161

    CH 15

    .0

    CH 30

    .0

    CH 45

    .0

    CH 60

    .0

    CH 75

    .0

    CH 90

    .0

    CH 10

    5.0

    CH 12

    0.0

    CH 13

    5.0

    CH 15

    0.0

    CH 16

    5.0

    CH 18

    0.0

    CH 19

    5.0

    CH 21

    0.0

    CH 22

    5.0

    CH 24

    0.0

    CH 25

    5.0

    CH 27

    0.0

    CH 28

    5.0

    CH 30

    0.0

    CH 31

    5.0

    CH 33

    0.0

    CH 34

    5.0

    CH 36

    0.0

    CH 0.0

    CH 100.0

    CH 15.0

    CH 30.0

    CH 45.0

    CH 60.0

    CH 75.0

    CH 90.0

    CH 0.0

    CH 100.0

    CH 15.0

    CH 30.0

    CH 45.0

    CH 60.0

    CH 75.0

    CH 90.0

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    15:32

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A003

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA0

    03.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    NORTH

    SITE REGRADING PLAN

    003

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    VOLUMESCUT - 890m³FILL - 27,130m³

    IMPORT - 26,240m³

    NOTES:- THESE VOLUMES ARE IN SITU ONLY(EXISTING SURFACE TO FINISHED DESIGNSURFACE).- NO BULKING FACTOR HAS BEEN APPLIED.- NO ALLOWANCE HAS BEEN MADE FORTOPSOIL STRIPPING OR RESPREAD.- NO ALLOWANCE HAS BEEN MADE FORUNSUITABLE MATERIAL ASSOCIATED WITHEXISTING DAMS SUCH AS WATER, MUD,SLUDGE ETC.- NO BOXING HAS BEEN APPLIED.

    LEGEND

    APPROXIMATEEXTENT OF CUT

    APPROXIMATEEXTENT OF FILL

    0.0 - 0.5m

    0.5 - 1.0m

    1.0 - 1.5m

    1.5 - 2.0m

    2.0 - 2.5m

    > 2.5m

    0.0 - 0.5m

    0.5 - 1.0m

    1.0 - 1.5m

    1.5 - 2.0m

    2.0 - 2.5m

    > 2.5m

    TEMP

    ORAR

    Y RE

    TAIN

    ING

    WAL

    L 'RW

    01'

    A004

    B004

    C004

    AutoCAD SHX Text145

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text148

    AutoCAD SHX Text149

    AutoCAD SHX Text154

    AutoCAD SHX Text155

    AutoCAD SHX Text156

    AutoCAD SHX Text157

    AutoCAD SHX Text158

    AutoCAD SHX Text159

    AutoCAD SHX Text160

    AutoCAD SHX Text161

    AutoCAD SHX Text162

    AutoCAD SHX Text163

    AutoCAD SHX Text183

    AutoCAD SHX Text164

    AutoCAD SHX Text180

    AutoCAD SHX Text181

    AutoCAD SHX Text182

    AutoCAD SHX Text184

    AutoCAD SHX Text130

    AutoCAD SHX Text129

    AutoCAD SHX Text128

    AutoCAD SHX Text127

    AutoCAD SHX Text136

    AutoCAD SHX Text135

    AutoCAD SHX Text134

    AutoCAD SHX Text133

    AutoCAD SHX Text141

    AutoCAD SHX Text142

    AutoCAD SHX Text143

    AutoCAD SHX Text144

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text58

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text4

    AutoCAD SHX Text3

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX Text15

    AutoCAD SHX Text11

    AutoCAD SHX Text13

    AutoCAD SHX Text14

    AutoCAD SHX Text16

    AutoCAD SHX Text17

    AutoCAD SHX Text18

    AutoCAD SHX Text19

    AutoCAD SHX Text10

    AutoCAD SHX Text9

    AutoCAD SHX Text8

    AutoCAD SHX Text12

    AutoCAD SHX Text7

    AutoCAD SHX Text25

    AutoCAD SHX Text67

    AutoCAD SHX Text26

    AutoCAD SHX Text24

    AutoCAD SHX Text68

    AutoCAD SHX Text22

    AutoCAD SHX Text21

    AutoCAD SHX Text20

    AutoCAD SHX Text23

    AutoCAD SHX Text66

    AutoCAD SHX Text31

    AutoCAD SHX Text61

    AutoCAD SHX Text30

    AutoCAD SHX Text62

    AutoCAD SHX Text29

    AutoCAD SHX Text63

    AutoCAD SHX Text28

    AutoCAD SHX Text64

    AutoCAD SHX Text27

    AutoCAD SHX Text65

    AutoCAD SHX Text36

    AutoCAD SHX Text56

    AutoCAD SHX Text35

    AutoCAD SHX Text57

    AutoCAD SHX Text34

    AutoCAD SHX Text33

    AutoCAD SHX Text59

    AutoCAD SHX Text32

    AutoCAD SHX Text60

    AutoCAD SHX Text52

    AutoCAD SHX Text39

    AutoCAD SHX Text53

    AutoCAD SHX Text38

    AutoCAD SHX Text54

    AutoCAD SHX Text37

    AutoCAD SHX Text55

    AutoCAD SHX Text43

    AutoCAD SHX Text42

    AutoCAD SHX Text41

    AutoCAD SHX Text40

    AutoCAD SHX Text49

    AutoCAD SHX Text50

    AutoCAD SHX Text51

    AutoCAD SHX Text45

    AutoCAD SHX Text44

    AutoCAD SHX Text46

    AutoCAD SHX Text47

    AutoCAD SHX Text48

    AutoCAD SHX Text16

  • 044

    .15

    3.967

    44.37

    45.49

    1544

    .8745

    .41

    27.86

    745

    .3345

    .3130

    45.36

    45.23

    44.02

    45.53

    45.39

    4545

    .5445

    .4

    6045

    .2444

    .86

    7544

    .6144

    .27

    9043

    .7543

    .68

    101.2

    8543

    .1343

    .24

    105

    42.87

    42.99

    117.4

    4242

    .2243

    .2812

    042

    .143

    .2

    135

    41.59

    42.47

    150

    40.9

    41.79

    165

    40.26

    41.25

    180

    39.75

    40.71

    195

    39.29

    40.17

    210

    38.71

    39.63

    225

    38.31

    39.22

    240

    3839

    .05

    255

    37.45

    38.82

    270

    37.09

    38.59

    285

    36.61

    38.36

    300

    36.19

    38.13

    315

    35.86

    37.9

    330

    34.95

    35.5

    344.7

    1834

    .9737

    .2534

    534

    .9737

    .24

    360

    35.01

    37.05

    361.7

    1535

    .0137

    .01

    371.1

    6135

    .0335

    .28

    CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 32

    0 7.791

    45.34

    1544

    .7545

    .5115

    .868

    44.72

    45.55

    3044

    .6145

    .03

    4544

    .5744

    .46

    6044

    .4144

    .11

    7543

    .9943

    .8

    9043

    .6443

    .5692

    .783

    43.46

    43.52

    100CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 40

    0 7.887

    38.15

    1538

    .1238

    .4615

    .963

    38.12

    38.5

    3037

    .9538

    .72

    4537

    .7738

    .92

    6037

    .7538

    .81

    7537

    .4138

    .54

    84.70

    237

    .1838

    .35

    9037

    .0538

    .1692

    .775

    37.28

    38.25

    100CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 33

    TEMPORARY BATTER1V:4H (MAX)

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD

    No.0

    5

    ROAD

    No.0

    5

    ROAD

    No.0

    4

    DESIGN SURFACE

    EXISTING SURFACE

    DESIGN SURFACE

    EXISTING SURFACE

    EXISTING SURFACE

    DESIGN SURFACE

    PROPOSED DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    TEMPORARY BATTER1V:4H (MAX)

    ULTIMATE DESIGN SURFACE

    PROPOSED DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    SECTIONSCALE: 1:100SCALE: 1:500003

    A

    SECTIONSCALE: 1:100SCALE: 1:500003

    B SECTIONSCALE: 1:100SCALE: 1:500003

    C

    BASINBATTER1V:3H (MAX)

    TEMPORARY RETAININGWALL 'RW01'

    PROPOSED DEVELOPMENTEXISTING DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    PROPOSED DEVELOPMENT FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    REFER CRAIG & RHODES PLANSREF: 17-88

    DA: 15/02283

    PROPOSED DEVELOPMENTFUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    REFER ORION CONSULTINGENGINEERS PLANS

    REF: 17-25DA: 15/01643

    FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    REFER CRAIG & RHODES PLANSREF: 17-88

    DA: 15/02283

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    15:40

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A004

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA0

    04.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    SITE REGRADINGSECTIONS

    004

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    0 1 2 3 4 5 6 7 8 9 10

    SCALE 1:100 (A1) SCALE 1:200 (A3)

  • 36.5

    36.5

    36.5

    37.5

    37.5

    37.538.0

    38.5

    38.5

    39.0

    39.5

    40.0

    34.0

    35.0

    35.5

    35.5

    36.0

    36.0

    36.5

    36.5

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0 38.0

    38.5

    38.5

    39.540.0

    40.5

    41.0

    41.5

    42.0

    42.5

    43.0

    35.0

    35.5

    35.5

    35.5

    35.536.0

    36.0 36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    36.5

    37.037.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0

    38.5

    39.0

    39.5

    40.0

    40.541.0

    41.5

    42.0

    42.5

    43.0

    43.5

    43.5

    44.0

    44.044.5

    44.5

    45.0

    45.0

    45.5

    45.5

    46.0

    46.5

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.75

    37.75

    37.50

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.75

    37.75

    37.50

    BAYSWATER AVENUE

    MARW

    AN A

    VENU

    E

    BALF

    OUR

    STR

    EET

    WAT

    ERLO

    O ST

    REET

    LOT 1DP 1208526

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    LOT 11DP 236422

    SP2DRAINAGE

    ZONE

    RE1LAND

    RE1LAND

    SP2DRAINAGE

    ZONE

    LOT 37DP 39341

    LOT 39DP 39341

    LOT 38DP 39341

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-25

    DA 15/01643

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    NORTH WESTERN SURVEYS REF: 17-25DA 16/14914

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD No.05

    ROAD No.04

    POSSIBLESTOCKPILELOCATION

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    15:47

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A100

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA1

    00.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    NORTH

    SEDIMENT & EROSIONCONTROL PLAN

    100

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    PROVIDE LOCKABLESITE ACCESS GATE

    LEGEND20.0

    STABILISED SITE ACCESS

    SITE SECURITY FENCE

    POSSIBLE STOCKPILE LOCATION

    SEDIMENT FENCE

    CATCH DRAIN / DIVERSION BANK

    PIT INLET FILTER (GEOTEXTILEOR MESH & GRAVEL)

    CONTOURS

    STRAW / HAY BALE FILTER

    ENERGY DISSIPATER(LEVEL SPREADER)

    WASTE BINS x 4 - 1 x MIXED MATERIAL,1 x PAPER / CARDBOARD,1 x METAL & 1 x TREATED TIMBER

    GREEN WASTE BIN (1 x 2.5 x 2.5m)

    MASONRY WASTE BIN (1 x 2.5 x 2.5m)

    BASIN TO BE USED AS SEDIMENTBASIN DURING CONSTRUCTION

    AutoCAD SHX Text145

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text148

    AutoCAD SHX Text149

    AutoCAD SHX Text154

    AutoCAD SHX Text155

    AutoCAD SHX Text156

    AutoCAD SHX Text157

    AutoCAD SHX Text158

    AutoCAD SHX Text159

    AutoCAD SHX Text160

    AutoCAD SHX Text161

    AutoCAD SHX Text162

    AutoCAD SHX Text163

    AutoCAD SHX Text183

    AutoCAD SHX Text164

    AutoCAD SHX Text180

    AutoCAD SHX Text181

    AutoCAD SHX Text182

    AutoCAD SHX Text184

    AutoCAD SHX Text130

    AutoCAD SHX Text129

    AutoCAD SHX Text128

    AutoCAD SHX Text127

    AutoCAD SHX Text136

    AutoCAD SHX Text135

    AutoCAD SHX Text134

    AutoCAD SHX Text133

    AutoCAD SHX Text141

    AutoCAD SHX Text142

    AutoCAD SHX Text143

    AutoCAD SHX Text144

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text58

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text4

    AutoCAD SHX Text3

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX Text15

    AutoCAD SHX Text11

    AutoCAD SHX Text13

    AutoCAD SHX Text14

    AutoCAD SHX Text16

    AutoCAD SHX Text17

    AutoCAD SHX Text18

    AutoCAD SHX Text19

    AutoCAD SHX Text10

    AutoCAD SHX Text9

    AutoCAD SHX Text8

    AutoCAD SHX Text12

    AutoCAD SHX Text7

    AutoCAD SHX Text25

    AutoCAD SHX Text67

    AutoCAD SHX Text26

    AutoCAD SHX Text24

    AutoCAD SHX Text68

    AutoCAD SHX Text22

    AutoCAD SHX Text21

    AutoCAD SHX Text20

    AutoCAD SHX Text23

    AutoCAD SHX Text66

    AutoCAD SHX Text31

    AutoCAD SHX Text61

    AutoCAD SHX Text30

    AutoCAD SHX Text62

    AutoCAD SHX Text29

    AutoCAD SHX Text63

    AutoCAD SHX Text28

    AutoCAD SHX Text64

    AutoCAD SHX Text27

    AutoCAD SHX Text65

    AutoCAD SHX Text36

    AutoCAD SHX Text56

    AutoCAD SHX Text35

    AutoCAD SHX Text57

    AutoCAD SHX Text34

    AutoCAD SHX Text33

    AutoCAD SHX Text59

    AutoCAD SHX Text32

    AutoCAD SHX Text60

    AutoCAD SHX Text52

    AutoCAD SHX Text39

    AutoCAD SHX Text53

    AutoCAD SHX Text38

    AutoCAD SHX Text54

    AutoCAD SHX Text37

    AutoCAD SHX Text55

    AutoCAD SHX Text43

    AutoCAD SHX Text42

    AutoCAD SHX Text41

    AutoCAD SHX Text40

    AutoCAD SHX Text49

    AutoCAD SHX Text50

    AutoCAD SHX Text51

    AutoCAD SHX Text45

    AutoCAD SHX Text44

    AutoCAD SHX Text46

    AutoCAD SHX Text47

    AutoCAD SHX Text48

    AutoCAD SHX Text16

    AutoCAD SHX Text10.0

  • Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    15:55

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A101

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA1

    01.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    SEDIMENT & EROSIONCONTROL NOTES &DETAILS 101

    VEGETATION.

    IF STOCKPILES ARE TO BE IN PLACE FOR LONGER THAN 14 DAYS THEN THEY

    SPOIL AND TOPSOIL STOCKPILES SHALL BE LOCATED AWAY FROM DRAINAGE LINESAND AREAS WHERE WATER MAY CONCENTRATE.

    STOCKPILE NOTES:

    FOLLOWING CONSTRUCTION, TOPSOIL SHALL BE RESPREAD TO A MINIMUM DEPTH

    SHALL BE STABILIZED BY COVERING WITH A MULCH OR WITH TEMPORARY

    CONFIRMED ON SITE.

    MARK:-

    SEDIMENTATION CONTROL DEVICES:

    (PROPEX OR SIMILAR) BETWEEN POSTS AT 2m (3m MAX) CENTRES. FABRIC SHALLSILT FENCES SHALL BE CONSTRUCTED BY STRETCHING A FILTER FABRICDRIVEN 450mm INTO THE GROUND AND LOCATED ON THE BALE CENTRE LINE.100mm. EACH BALE SHALL BE SECURELY ANCHORED WITH TWO STEEL STAKESEND TO END IN A SINGLE ROW AND EMBEDDED INTO THE SOIL TO A DEPTH OFALL STRAW BALES SHALL BE BOUND WITH WIRE. STRAW BALES SHALL BE PLACED

    BE BURIED 150mm ALONG ITS LOWER EDGE.

    A POINT NOMINATED BY THE ENGINEER.

    NO TREES SHALL BE REMOVED WITHOUT COUNCIL'S CLEARANCE.

    b) ALL TREES TO BE LEFT UNDISTURBED AND TO BE CORDONED OFF.

    THE APPLICANT'S REPRESENTATIVE TO IDENTIFY AND APPROPRIATELYTHE SITE MUST BE INSPECTED BY COUNCIL'S REPRESENTATIVE ANDROAD CENTRELINES HAVE BEEN PEGGED AND/OR PERMANENTLY MARKED,PRIOR TO THE COMMENCEMENT OF ANY EARTHWORKS, AND AFTER THE

    WHERE CLEANING IS REQUIRED, THE SEDIMENT SHALL BE REMOVED TOMANAGEMENT DEVICES SHALL BE MAINTAINED ON A REGULAR BASIS.

    DAMAGE DURING THE COURSE OF THE CONTRACT.RESPONSIBILITY OF THE CONTRACTOR TO PROTECT AGAINST WATERCONFORMITY WITH THIS PLAN SHALL IN NO WAY REDUCE THE

    AND THE ACCOMPANYING ROAD AND DRAINAGE PLANS."MANAGING URBAN STORMWATER SOILS AND CONSTRUCTION " -4TH EDITIONTHIS PLAN IS TO BE READ IN CONJUNCTION WITH THE GUIDELINES SET OUT IN

    IS DIAGRAMMATIC ONLY AND THE ACTUAL REQUIREMENTS SHALL BELOCATION AND EXTENT OF SOIL AND WATER MANAGEMENT DEVICES

    a) THE TREES TO BE RETAINED.

    SPECIAL NOTES:

    OF 100mm ON THE BARE SOIL SURFACES AND REVEGETATE.

    ALL STOCKPILES TO BE (MAX) 2m HIGH AND PROTECTED WITH SILT FENCE.

    FROM THE CONCLUSION OF LAND SHAPING.ALL DISTURBED AREAS SHALL BE REVEGETATED WITHIN 14 WORKING DAYS

    AREAS WITHOUT CONSULTATION WITH COUNCIL'S ENGINEER.DRAINAGE LINES. NO LOT GRADING SHALL BE CARRIED OUT IN UNDISTURBEDDISTURBANCE OF VEGETATION SHALL BE LIMITED TO FILL AREAS, ROADWAYS AND

    AREAS TO BE LEFT UNDISTURBED SHALL BE MARKED OFF.ACCESS WHERE POSSIBLE TO PROPOSED OR EXISTING ROAD ALIGNMENTS.VEHICULAR TRAFFIC SHALL BE CONTROLLED DURING DEVELOPMENT CONFINING

    BALES SHALL BE PLACED AS A SEDIMENT CONTROL DEVICE WHERE REQUIRED.ALL TAIL-OUT DRAINS SHALL BE GRASSED AND TRAPEZOIDAL IN SECTION. STRAW

    ALL DRAINAGE WORKS SHALL BE CONSTRUCTED AND STABILIZED AS EARLY AS

    RESPREAD TO AID REVEGETATION IN THOSE AREAS.TOPSOIL FROM ALL AREAS TO BE DISTURBED SHALL BE STOCKPILED AND LATER

    STORAGE OF SOIL AND TOPSOIL, SHALL BE IMPLEMENTED TO THE REQUIREMENTSALL EROSION AND SEDIMENT CONTROL MEASURES, INCLUDING REVEGETATION AND

    POSSIBLE DURING DEVELOPMENT.

    OF THE "ENVIRONMENT PROTECTION AUTHORITY".AND "DEPT OF LAND AND WATER

    GENERAL NOTES:

    MINIMISE DUST BY WATERING WHEN REQUIRED.

    CONSERVATION". MEASURES OUTLINED IN THE SEDIMENT & EROSION CONTROL PLAN

    MANAGEMENT DEVICES TO REMAIN UNTIL THE END OF THE MAINTENANCE PERIOD.

    MUST BE IMPLEMENTED PRIOR TO AND MAINTAINED DURING AND AFTER THECONSTRUCTION WORKS.

    10.

    9.

    11.

    21.

    20.

    18.

    17.

    16.

    15.

    14.

    13.

    12.

    7.

    6.

    5.

    4.

    3.

    2.

    1.

    8.

    19.

    2:1 SLOPE (MAX.)

    FLOW2:1 S

    LOPE (MA

    X.)

    SD 4-1STOCKPILES

    CONSTRUCTION NOTES:1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION,

    CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.2. CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.4. ALL STOCKPILES ARE TO BE LOCATED AND PLACED IN ACCORDANCE WITH THE CONTRACTOR'S

    EROSION AND SEDIMENT CONTROL PLAN.5. WHERE STOCKPILES ARE TEMPORARY (

  • 36.5

    36.5

    36.5

    37.5

    37.5

    37.538.0

    38.5

    38.5

    39.0

    39.5

    40.0

    34.0

    35.0

    35.5

    35.5

    36.0

    36.0

    36.5

    36.5

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0 38.0

    38.5

    38.5

    39.540.0

    40.5

    41.0

    41.5

    42.0

    42.5

    43.0

    35.0

    35.5

    35.5

    35.5

    35.536.0

    36.0 36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    36.5

    37.037.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0

    38.5

    39.0

    39.5

    40.0

    40.541.0

    41.5

    42.0

    42.5

    43.0

    43.5

    43.5

    44.0

    44.044.5

    44.5

    45.0

    45.0

    45.5

    45.5

    46.0

    46.5

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    CH 115.023

    CH 90.0

    CH 105.0

    114.988

    CH 90.0

    CH 105.0

    CH 18

    0.0

    CH 19

    5.0

    CH 0.0

    CH 15.0

    CH 135.0

    CH 150.0

    CH 165.0

    SAG 135.937

    BAYSWATER AVENUE

    MARW

    AN A

    VENU

    E

    332°

    15'44

    "

    332°

    15'44

    "

    R-75

    8.0

    BALF

    OUR

    STR

    EET

    WAT

    ERLO

    O ST

    REET

    RK RK

    RK RK

    RK KG

    RK RK RK

    RKRK

    'RW

    01'

    'RW

    01'

    4.53.5

    4.53.5

    3.5 4.54.5

    4.53.53.5

    4.54.53.5

    4.53.5

    3.5 4.5 4.5 3.5 4.5 4.5 3

    .53.5

    LOT 1DP 1208526

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    LOT 11DP 236422

    SP2DRAINAGE

    ZONE

    RE1LAND

    RE1LAND

    SP2DRAINAGE

    ZONE

    LOT 37DP 39341

    LOT 39DP 39341

    LOT 38DP 39341

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-25

    DA 15/01643

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    NORTH WESTERN SURVEYS REF: 17-25DA 16/14914

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    330°

    37'56

    "

    R300

    .0

    330°

    32'10

    "

    R300

    .0

    68°31'35"

    R-300.0 68°29'33" R-300.0 68°10'27"

    148°

    56'35

    "

    R-50

    0.0

    144°

    42'7"

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD No.05

    ROAD No.04

    TP 22

    5.927

    CH 0.0

    TP 75.146

    TP 83.679

    CH 15.0

    CH 30.0

    CH 45.0

    CH 60.0

    CH 75.0

    CH 0.0

    TP 72.422

    TP 81.459

    CH 15.0

    CH 30.0

    CH 45.0

    CH 60.0

    CH 75.0

    CH 0.

    0

    CH 24

    1.855

    CH 15

    .0

    CH 30

    .0

    CH 45

    .0

    CH 60

    .0

    CH 75

    .0

    CH 90

    .0

    CH 10

    5.0

    CH 12

    0.0

    CH 13

    5.0

    CH 15

    0.0

    CH 16

    5.0

    CH 18

    0.0

    CH 19

    5.0

    CH 21

    0.0

    CH 22

    5.0

    CH 24

    0.0

    SAG

    227.4

    28

    TP 22

    7.759

    TP 54

    0.978

    TP 54

    2.644

    CH 55

    2.673

    CH 21

    0.0

    CH 22

    5.0

    CH 24

    0.0

    CH 25

    5.0

    CH 27

    0.0

    CH 28

    5.0

    CH 30

    0.0

    CH 31

    5.0

    CH 33

    0.0

    CH 34

    5.0

    CH 36

    0.0

    CH 37

    5.0

    CH 39

    0.0

    CH 40

    5.0

    CH 42

    0.0

    CH 43

    5.0

    CH 45

    0.0

    CH 46

    5.0

    CH 48

    0.0

    CH 49

    5.0

    CH 51

    0.0

    CH 52

    5.0

    CH 54

    0.0

    CRES

    T 21

    6.625

    SAG

    540.7

    37

    TP 54.166

    TP 91.177

    TP 106.212

    CH 30.0

    CH 45.0

    CH 60.0

    CH 75.0

    CH 90.0

    CH 105.0

    CH 120.0

    CH 19

    8.169

    IP 115.83

    CH 85.023 CH 84.988

    IP 23

    1.421

    IP 30

    4.911

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    16:02

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A200

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA2

    00.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    NORTH

    ENGINEERING PLAN

    200

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    LIMIT OF ROAD CONSTRUCTION CH 85.023PROVIDE SMOOTH CONNECTION TOPROPOSED ROAD

    LIMIT OF ROAD CONSTRUCTION CH 84.988PROVIDE SMOOTH CONNECTION TOPROPOSED ROAD

    LIMIT OF ROAD CONSTRUCTIONCH 115.83

    LIMIT OF ROADCONSTRUCTION

    CH 32.92

    LIMIT OF ROAD CONSTRUCTION CH 30.0PROVIDE SMOOTH CONNECTION TOPROPOSED ROAD

    MAX1V:3H

    MAX1V:4H

    MAX1V:4H

    PROVIDE 1.2m WIDECONCRETE FOOTPATH TOCOUNCIL STANDARD (TYP.)

    HALF ROAD CONSTRUCTIONMAKE SMOOTH JUNCTION

    WITH EXISTING LEVELS.

    TEMPORARY OSD/WATER QUALITY BASINREFER TO DRAWINGS 401 & 402 FOR FURTHER

    INFORMATION.

    EXISTING DAMN TO BEDE-SILTED, DE-SLUGGED &COMPACTED TO 95% STD

    FUTURE PITS AND PIPES

    PROVIDE STUB FORFUTURE DRAINAGE

    PROVIDE ALL WEATHERBASIN ACCESS RAMP

    MAX 1:10 MAX1V

    :3H

    PIPE TO BE TEMPORARILYBLOCKED TO DIVERTFLOWS INTO BASIN

    PIPE TO BE TEMPORARILY BLOCKEDTO DIVERT FLOWS INTO BASIN

    TEMPORARY RETAINING WALL

    TEMPORARY BATTER 1:4 MAX

    NOTE:TEMPORARY STORMWATER PIPES TO BE REMOVED/DECOMMISSIONED FOLLOWING THE CONSTRUCTION OF THEADJOINING DEVELOPMENT AND FUTURE REGIONAL BASIN

    CONSTRUCT TEMPORARY HEADWALLOUTLET WITH RIPRAP SCOUR PROTECTION

    TAILOUT @ MIN 0.5% TO EXISTING

    PIPE TO BE TEMPORARILY BLOCKEDTO DIVERT FLOWS INTO BASIN

    PIPE TO BE TEMPORARILY BLOCKEDTO DIVERT FLOWS INTO BASIN

    AutoCAD SHX TextE. T. D. W.

    AutoCAD SHX Text145

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text148

    AutoCAD SHX Text149

    AutoCAD SHX Text154

    AutoCAD SHX Text155

    AutoCAD SHX Text156

    AutoCAD SHX Text157

    AutoCAD SHX Text158

    AutoCAD SHX Text159

    AutoCAD SHX Text160

    AutoCAD SHX Text161

    AutoCAD SHX Text162

    AutoCAD SHX Text163

    AutoCAD SHX Text183

    AutoCAD SHX Text164

    AutoCAD SHX Text180

    AutoCAD SHX Text181

    AutoCAD SHX Text182

    AutoCAD SHX Text184

    AutoCAD SHX Text130

    AutoCAD SHX Text129

    AutoCAD SHX Text128

    AutoCAD SHX Text127

    AutoCAD SHX Text136

    AutoCAD SHX Text135

    AutoCAD SHX Text134

    AutoCAD SHX Text133

    AutoCAD SHX Text141

    AutoCAD SHX Text142

    AutoCAD SHX Text143

    AutoCAD SHX Text144

    AutoCAD SHX Text146

    AutoCAD SHX Text147

    AutoCAD SHX Text1.5m WIDE

    AutoCAD SHX TextE. T. D. W.

    AutoCAD SHX Text1.5m WIDE

    AutoCAD SHX TextE. T. D. W.

    AutoCAD SHX Text1.5m WIDE

    AutoCAD SHX TextE. T. D. W.

    AutoCAD SHX Text1.5m WIDE

    AutoCAD SHX Text58

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text4

    AutoCAD SHX Text3

    AutoCAD SHX Text2

    AutoCAD SHX Text1

    AutoCAD SHX Text15

    AutoCAD SHX Text11

    AutoCAD SHX Text13

    AutoCAD SHX Text14

    AutoCAD SHX Text16

    AutoCAD SHX Text17

    AutoCAD SHX Text18

    AutoCAD SHX Text19

    AutoCAD SHX Text10

    AutoCAD SHX Text9

    AutoCAD SHX Text8

    AutoCAD SHX Text12

    AutoCAD SHX Text7

    AutoCAD SHX Text25

    AutoCAD SHX Text67

    AutoCAD SHX Text26

    AutoCAD SHX Text24

    AutoCAD SHX Text68

    AutoCAD SHX Text22

    AutoCAD SHX Text21

    AutoCAD SHX Text20

    AutoCAD SHX Text23

    AutoCAD SHX Text66

    AutoCAD SHX Text31

    AutoCAD SHX Text61

    AutoCAD SHX Text30

    AutoCAD SHX Text62

    AutoCAD SHX Text29

    AutoCAD SHX Text63

    AutoCAD SHX Text28

    AutoCAD SHX Text64

    AutoCAD SHX Text27

    AutoCAD SHX Text65

    AutoCAD SHX Text36

    AutoCAD SHX Text56

    AutoCAD SHX Text35

    AutoCAD SHX Text57

    AutoCAD SHX Text34

    AutoCAD SHX Text33

    AutoCAD SHX Text59

    AutoCAD SHX Text32

    AutoCAD SHX Text60

    AutoCAD SHX Text52

    AutoCAD SHX Text39

    AutoCAD SHX Text53

    AutoCAD SHX Text38

    AutoCAD SHX Text54

    AutoCAD SHX Text37

    AutoCAD SHX Text55

    AutoCAD SHX Text43

    AutoCAD SHX Text42

    AutoCAD SHX Text41

    AutoCAD SHX Text40

    AutoCAD SHX Text49

    AutoCAD SHX Text50

    AutoCAD SHX Text51

    AutoCAD SHX Text45

    AutoCAD SHX Text44

    AutoCAD SHX Text46

    AutoCAD SHX Text47

    AutoCAD SHX Text48

    AutoCAD SHX Text2.0m WIDE

    AutoCAD SHX TextE. T. D. W.

  • 4% -3% -3% 4%

    -8.5

    0.143

    -80.1

    23

    -4.6

    -0.01

    1-4

    .5-0

    .141

    -4.05

    -0.12

    1

    00

    4.05

    -0.12

    14.5

    -0.14

    14.6

    -0.01

    1

    80.1

    238.5

    0.143

    OFFSET

    DESIGNLEVEL

    1V:4H

    -2% -3% -3% 4%

    VARI

    ESVA

    RIES

    -9.40

    1-0

    .105

    -8.74

    3-0

    .092

    -4.54

    -0.01

    1-4

    .5-0

    .161

    -4.05

    -0.12

    1

    00

    4.05

    -0.12

    14.5

    -0.14

    14.6

    -0.01

    1

    80.1

    238.5

    0.143

    OFFSET

    DESIGNLEVEL

    NOTE· FOR STANDARD KERB TYPES REFER TO

    BLACKTOWN CITY COUNCIL STANDARDDRAWING A(BS)101M.

    · FOR FOOTPATH AND CYCLEWAY DETAILSREFER TO BLACKTOWN CITY COUNCILSTANDARD DRAWINGS A(BS)102S.

    TYPICAL CROSS SECTION - ROAD No.01 & ROAD No.02SCALE 1:100 (NATURAL)

    TYPICAL CROSS SECTION - ROAD No.03SCALE 1:100 (NATURAL)

    CENT

    RELIN

    E CEN

    TREL

    INE

    -3% 4%

    00

    4.05

    -0.12

    24.5

    -0.14

    24.6

    -0.01

    2

    80.1

    228.5

    0.142

    TYPICAL CROSS SECTION - ROAD No.05SCALE 1:100 (NATURAL)

    CENT

    RELIN

    E

    -3%4%

    4.05

    -0.12

    24.5

    -0.14

    24.6

    -0.01

    2

    80.1

    228.5

    0.142

    OFFSET

    DESIGNLEVEL

    -3% 4%

    00

    4.05

    -0.12

    24.5

    -0.14

    24.6

    -0.01

    2

    80.1

    228.5

    0.142

    TYPICAL CROSS SECTION - ROAD No.04SCALE 1:100 (NATURAL)

    CENT

    RELIN

    E

    -3%4%

    4.05

    -0.12

    24.5

    -0.14

    24.6

    -0.01

    2

    80.1

    228.5

    0.142

    OFFSET

    DESIGNLEVEL

    BOUN

    DARY

    0.5m

    BERM

    0.9m

    1.2m

    FOOT

    PATH

    PAT

    HAT

    2.5%

    CRO

    SSFA

    LL

    BOUN

    DARY

    0.5m

    BERM

    KERB

    LINE

    (RK)

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    LOCAL STREET16.0m WIDE

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    KERB

    LINE

    (RK)

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    LOCAL STREET16.0m WIDE

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    LOCAL STREET16.0m WIDE

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    VERGE4.5m WIDE & VARIES

    CARRIAGEWAY4.5m WIDE

    VERGE3.5m WIDE

    CARRIAGEWAY4.5m WIDE

    LOCAL STREET17.0m WIDE

    BOUN

    DARY

    0.5m

    BERM

    0.9m

    1.2m

    FOOT

    PATH

    PAT

    HAT

    2.5%

    CRO

    SSFA

    LL

    BOUN

    DARY

    0.5m

    BERM

    KERB

    LINE

    (RK)

    FUTURE PAVEMENT

    KERB

    LINE

    (RK)

    0.9m

    1.2m

    FOOT

    PATH

    PAT

    HAT

    2.5%

    CRO

    SSFA

    LL

    BOUN

    DARY

    0.5m

    BERM

    KERB

    LINE

    (RK)

    BOUN

    DARY

    0.5m

    BERM

    KERB

    LINE

    (RK)

    FUTURE PAVEMENT

    BOUN

    DARY

    0.5m

    BERM

    KERB

    LINE

    (RK)

    0.9m

    1.2m

    FOOT

    PATH

    PAT

    HAT

    2.5%

    CRO

    SSFA

    LL

    KERB

    LINE

    (KG)

    300mm

    300mm

    300mm 300mm

    300mm 300mm

    300mm

    300mm

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    16:11

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A300

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA3

    00.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    ROAD TYPICAL CROSSSECTIONS

    300

    0 1 2 3 4 5 6 7 8 9 10

    SCALE 1:100 (A1) SCALE 1:200 (A3)

  • CH 0

    RL 46

    .645

    INTE

    RSEC

    TION

    ROA

    D No

    .05

    I.P. R

    .L. 45

    .428

    -2.79% -5%GRADE

    V.C.

    R300HORIZ. GEOMETRY

    046

    .597

    46.64

    6

    13.66

    146

    .2346

    .265

    1546

    .209

    46.22

    7

    3045

    .824

    45.76

    43.66

    145

    .473

    45.26

    245

    45.42

    945

    .21

    6044

    .862

    44.57

    7

    73.66

    144

    .165

    43.92

    875

    44.10

    643

    .861

    75.14

    644

    .143

    .854

    83.67

    943

    .906

    43.42

    785

    .023

    43.92

    443

    .36

    9043

    .746

    43.11

    1

    105

    42.46

    42.36

    1

    115.0

    2342

    .047

    41.86

    CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 38

    LONG SECTION - ROAD No.01SCALE 1:500 (H)SCALE 1:100 (V)

    CH 0

    RL 43

    .889

    INTE

    RSEC

    TION

    ROA

    D No

    .05

    I.P. R

    .L. 43

    .543

    I.P. R

    .L. 43

    .235

    -2.365% -3%GRADE

    V.C.

    R300HORIZ. GEOMETRY

    043

    .873

    43.88

    8

    9.607

    42.88

    143

    .661

    14.60

    742

    .738

    43.56

    1542

    .732

    43.55

    319

    .607

    42.67

    643

    .493

    22.82

    342

    .642

    43.46

    3042

    .592

    43.37

    7

    4542

    .686

    43.12

    945

    .323

    42.75

    343

    .123

    6042

    .592

    42.78

    1

    67.82

    342

    .415

    42.56

    72.42

    242

    .315

    42.42

    275

    42.30

    142

    .345

    81.45

    942

    .084

    42.15

    1

    84.98

    842

    .051

    42.04

    6

    9041

    .711

    41.89

    5

    105

    41.80

    341

    .445

    114.9

    8841

    .647

    41.14

    5

    CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 36

    LONG SECTION - ROAD No.02SCALE 1:500 (H)SCALE 1:100 (V)

    I.P. R

    .L. 37

    .325

    I.P. R

    .L. 36

    .624

    -1%GRADE

    V.C.

    R-500HORIZ. GEOMETRY

    034

    .8537

    .75

    1534

    .758

    37.6

    3036

    .542

    37.45

    42.5

    35.19

    237

    .333

    4535

    .164

    37.31

    1

    54.16

    635

    .075

    37.23

    855

    35.07

    37.23

    1

    6035

    .039

    37.19

    4

    7535

    .014

    37.08

    1

    9035

    .136

    .969

    91.17

    735

    .107

    36.96

    105

    36.87

    936

    .856

    106.2

    1237

    .346

    36.84

    7

    115.8

    335

    .386

    36.77

    5

    120

    37.17

    236

    .744

    120.9

    3737

    .633

    36.73

    7

    135

    38.47

    736

    .681

    135.9

    3738

    .505

    36.68

    150

    38.02

    536

    .7315

    0.937

    37.91

    836

    .737

    165

    35.92

    36.84

    2

    180

    35.95

    236

    .955

    195

    36.37

    237

    .067

    197.2

    436

    .364

    37.08

    4

    CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 29

    LONG SECTION - ROAD No.03SCALE 1:500 (H)SCALE 1:100 (V)

    FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    60VC 10VC

    -1%

    45VC

    25VC

    -0.75%

    30VC

    R-758

    0.75%

    INTE

    RSEC

    TION

    ROA

    D No

    .04RL

    37.45

    CH 30

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    R.L.

    36.68

    CH 13

    5.937

    SAG

    INTE

    RSEC

    TION

    ROA

    D No

    .05RL

    36.77

    5CH

    115.8

    3

    INTE

    RSEC

    TION

    ROA

    D No

    .04RL

    42.04

    6CH

    84.98

    8

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    16:15

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A301

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA3

    01.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    ROAD LONG SECTIONS- SHEET 01 OF 02

    301

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    0 1 2 3 4 5 6 7 8 9 10

    SCALE 1:100 (A1) SCALE 1:200 (A3)

  • CH 0

    RL 42

    .046

    INTE

    RSEC

    TION

    ROA

    D No

    .02

    CH 24

    1.855

    RL 37

    .45IN

    TERS

    ECTI

    ON R

    OAD

    No.03

    CH 22

    7.428

    R.L.

    37.14

    6SA

    G

    I.P. R

    .L. 38

    .393

    I.P. R

    .L. 37

    .094

    -1.2%GRADE

    V.C.

    HORIZ. GEOMETRY

    042

    .051

    42.04

    6

    1541

    .544

    41.59

    6

    3040

    .952

    41.14

    6

    4540

    .527

    40.69

    6

    6039

    .841

    40.24

    6

    7539

    .087

    39.79

    6

    9038

    .579

    39.34

    691

    .758

    38.50

    939

    .293

    105

    38.11

    338

    .922

    120

    37.55

    438

    .565

    121.7

    5837

    .508

    38.52

    8

    135

    37.33

    438

    .276

    150

    36.92

    238

    .055

    151.7

    5836

    .873

    38.03

    3

    165

    36.45

    637

    .874

    180

    36.08

    537

    .694

    195

    35.94

    37.51

    4

    210

    35.75

    337

    .334

    224

    35.89

    337

    .166

    225

    35.93

    137

    .156

    227.4

    2836

    .024

    37.14

    623

    036

    .142

    37.15

    7

    236

    36.41

    637

    .274

    240

    36.50

    337

    .394

    241.8

    5536

    .542

    37.45

    CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 29

    LONG SECTION - ROAD No.04SCALE 1:500 (H)SCALE 1:100 (V)

    CH 23

    1.421

    RL 46

    .646

    INTE

    RSEC

    TION

    ROA

    D No

    .01

    CH 30

    4.911

    RL 43

    .889

    INTE

    RSEC

    TION

    ROA

    D No

    .02

    CH 55

    2.673

    RL 36

    .775

    INTE

    RSEC

    TION

    ROA

    D No

    .03

    CH 21

    6.625

    R.L.

    46.75

    5CR

    EST

    CH 54

    0.738

    R.L.

    36.60

    3SA

    G

    I.P. R

    .L. 47

    .341

    I.P. R

    .L. 38

    .453

    -1.5% -3.185%GRADE

    V.C.

    HORIZ. GEOMETRY

    195

    46.49

    446

    .52

    198.1

    6946

    .568

    46.58

    4

    210

    46.72

    946

    .733

    216.6

    2546

    .7846

    .755

    224.2

    4146

    .731

    46.72

    622

    546

    .722

    46.72

    225.9

    2746

    .712

    46.71

    222

    7.759

    46.67

    346

    .693

    231.4

    2146

    .597

    46.64

    5

    240

    46.41

    846

    .481

    255

    45.93

    646

    .016

    259.2

    4145

    .785

    45.84

    3

    270

    45.34

    745

    .383

    285

    44.70

    144

    .741

    300

    44.07

    244

    .099

    304.9

    1143

    .873

    43.88

    9

    315

    43.46

    543

    .457

    330

    42.85

    842

    .815

    345

    41.64

    342

    .173

    360

    40.90

    241

    .531

    375

    40.43

    340

    .889

    390

    39.75

    940

    .247

    405

    39.13

    439

    .605

    410.9

    0639

    .026

    39.35

    2

    420

    38.86

    38.99

    431.9

    0638

    .479

    38.59

    9

    435

    38.37

    638

    .513

    450

    37.87

    438

    .185

    452.9

    0637

    .777

    38.13

    8

    465

    37.40

    537

    .957

    480

    36.92

    537

    .732

    495

    36.35

    337

    .507

    508

    35.98

    737

    .312

    510

    35.92

    237

    .28

    520.5

    35.57

    37.07

    2

    525

    35.43

    236

    .959

    533

    35.31

    536

    .726

    539

    35.31

    336

    .609

    540

    35.31

    736

    .604

    540.7

    3835

    .3236

    .603

    540.9

    7835

    .317

    36.60

    354

    2.644

    35.32

    436

    .6154

    535

    .341

    36.64

    552.6

    7335

    .386

    36.77

    5

    CHAINAGE

    EXISTINGLEVEL

    DESIGNLEVEL

    DATUM R.L. 29

    LONG SECTION - ROAD No.05SCALE 1:500 (H)SCALE 1:100 (V)

    FUTURE DEVELOPMENT

    LIMIT

    OF

    WOR

    KS

    -3%

    60VC 12VC

    3%

    70VC

    2.75%

    R-300

    -4.28%

    42VC 25VC 12VC

    1.755%

    R-300

    I.P. R

    .L. 36

    .535

    I.P. R

    .L. 37

    .124

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    16:21

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A302

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA3

    02.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    ROAD LONG SECTIONS- SHEET 02 OF 02

    302

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    0 1 2 3 4 5 6 7 8 9 10

    SCALE 1:100 (A1) SCALE 1:200 (A3)

  • 36.5

    36.5

    36.5

    37.5

    37.5

    37.538.0

    38.5

    38.5

    39.0

    39.5

    40.0

    34.0

    34.034.5

    35.0

    35.0

    35.035.0

    35.5

    35.5

    35.5

    35.5

    36.0

    36.036.0

    36.0

    36.5

    36.536.5

    36.5

    37.0

    37.0

    37.037.0

    37.5

    37.5

    37.537.5

    38.0 38.038.0

    38.5

    38.5

    38.5

    39.0

    39.540.0

    40.0

    40.5

    40.5

    41.0

    41.0

    41.5

    42.0

    42.5

    43.0

    35.0

    35.5

    35.5

    35.5

    35.536.0

    36.0 36.0

    36.0

    36.0

    36.5

    36.5

    36.5

    36.5

    36.5

    37.0

    37.0

    37.0

    37.0

    37.0

    37.5

    37.5

    37.5

    38.0

    38.5

    39.0

    39.5

    40.0

    40.541.0

    41.5

    42.0

    42.5

    43.0

    43.5

    43.5

    44.0

    44.044.5

    44.5

    45.0

    45.0

    45.5

    45.5

    46.0

    46.5

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.75

    37.75

    37.50

    37.0

    37.5

    37.5

    38.0

    38.0

    38.5

    38.5

    39.0

    39.0

    39.5

    39.5

    40.0

    40.0

    40.5

    40.5

    41.0

    41.041.5

    41.5

    42.0

    42.0

    42.5

    42.5

    42.5

    43.0

    43.0

    43.5

    43.5

    43.5

    44.044.0

    44.0

    44.5

    44.5

    44.5

    45.0

    45.0

    45.0

    45.5

    45.5

    46.0

    46.0

    46.5

    37.75

    37.75

    37.50

    BAYSWATER AVENUE

    MARW

    AN A

    VENU

    E

    BALF

    OUR

    STR

    EET

    WAT

    ERLO

    O ST

    REET

    LOT 1DP 1208526

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    CRAIG & RHODES REF: 1788DA 15/02283

    LOT 11DP 236422

    SP2DRAINAGE

    ZONE

    RE1LAND

    RE1LAND

    SP2DRAINAGE

    ZONE

    LOT 37DP 39341

    LOT 39DP 39341

    LOT 38DP 39341

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-25

    DA 15/01643

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BY

    NORTH WESTERN SURVEYS REF: 17-25DA 16/14914

    PROPOSED SUBDIVISIONREFER TO PLANS PREPARED BYORION CONSULTING REF: 17-103

    ROAD

    No.0

    1

    ROAD

    No.0

    2

    ROAD

    No.0

    3

    ROAD No.05

    ROAD No.04

    Project No.

    Design Date Revision DescriptionFirstIssue Drawn Appd.

    ALL DIMENSIONS TO BE CHECKED ON SITE BYCONTRACTOR PRIOR TO CONSTRUCTION.USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE.

    Disclaimer and Copyright:

    THESE DRAWINGS, PLANS, AND SPECIFICATIONS AND THECOPYRIGHT ARE THE PROPERTY OF ORION CONSULTINGENGINEERS PTY LTD AND MUST NOT BE REPRODUCEDOR COPIED WHOLLY OR IN PART WITHOUT THEPERMISSION OF ORION CONSULTING ENGINEERS PTY LTD ABN: 25 604 069 981 PO Box 7936, BAULKHAM HILLS NSW 2153 T:(02) 8660 0035 E: [email protected]

    Title:Project:Scale:

    Orion

    Consulting

    Engineers

    Revis

    ion

    By:For:

    Milestone

    Plan

    Revision

    Plott

    ed: 2

    1 Feb

    ruar

    y , 20

    18 1:

    16:27

    PM

    File

    Nam

    e: O:

    \Pro

    jects\

    _201

    8\18-

    03 78

    Bou

    ndar

    y Rd,

    Scho

    fields

    Eas

    t\Drg

    s\Civi

    l\des

    ign D

    a\18-

    03 D

    A400

    .dwg

    DEVELOPMENT APPLICATIONISSUEDFORNOT FOR CONSTRUCTION

    DA

    18-03

    01

    78 BOUNDARY ROAD,SCHOFIELDS -

    ROAD & DRAINAGE DESIGNDW MP 20/02/2018BMISSUED FOR DEVELOPMENT APPLICATION01 DW MP BM 20/02/2018

    FILE

    : O:\P

    ROJE

    CTS\

    _201

    8\18-

    03 78

    BOU

    NDAR

    Y RD

    , SCH

    OFIE

    LDS

    EAST

    \DRG

    S\CI

    VIL\D

    ESIG

    N DA

    \18-0

    3 DA4

    00.D

    WG

    PRIN

    TED:

    2/21

    /18 U

    SER:

    DUS

    TIN

    WAL

    TERS

    NORTH

    CATCHMENT PLAN

    400

    0 5 10 15 20 25 30 35 40 45 50

    SCALE 1:1000 (A3)SCALE 1:500 (A1)

    LEGENDCATCHMENT NAME, DIRECTION OFFALL & AREA

    PROPOSED / DESIGN CATCHMENT ANDBOUNDARY

    20.010.0CONTOURS (EXISTING & DESIGN)

    APPROXIMATE EXISTING CATCHMENTAND B