PARKS PLAYGROUNDS CAMPS ZOOS ENTRIES RESORTS PUBLIC ART jungle rock ACM Playgrounds, Inc. Tel.914-739-6858 Fax.914-736-0554 [email protected]
SPORT ROCK INTL., INC
PARKS PLAYGROUNDS CAMPS ZOOS ENTRIES RESORTS PUBLIC ART
jungle rock
ACM Playgrounds, Inc. Tel.914-739-6858 Fax.914-736-0554 [email protected]
jungle rock
Features:Unsurpassed Aesthetic Appearance Functional ArtLight weight/ easy installation Shipped in one pieceDurable 5 year structural warrantyPrefabricated using recycled green & Optional matching handholdsnatural materials
BenchesBoulders
SPORT ROCK INTL., INC Phone 805-481-5686www.sportrockintl.com - [email protected]
PO Box 32 Pismo Beach California 93448
Lion -9ft H X 8ft L X 8ft WFRONT BACK
FRONT Elephant -9ft H X 9ft L X 8ft W BACK
Fox -3ft 7in H X 8ft L X 3ft 7in W
Rabbit -3ft 3in H X 8ft L X 3ft 7in W
Bear - 9.5ft H X 14.5ft L X 8ft WFRONT BACK
Bould
ers
Owl -3ft 7in H X 8ft L X 3ft 7in W
ACM Playgrounds, Inc. Tel.914-739-6858 Fax.914-736-0554 [email protected] Playgrounds, Inc. Tel.914-739-6858 [email protected]
JUNGLE ROCKFOX BENCH
TOP VIEW
FRONT VIEW
SPORT ROCK INTL., INC.SPORT ROCK INTL., INC.SPORT ROCK INTL., INC.SPORT ROCK INTL., INC.SPORT ROCK INTL., INC. PO BOX 32 PISMO BEACH CA 93448 PH805-481-5686 FX 805-489-6451
www.sportrockintl.com [email protected]
3/4INCH = 1FOOT WEIGHT: 275 lbs
ACM Playgrounds, Inc. Tel. 914-739-6858 [email protected]
JUNGLE ROCK
JUNGLE ROCKRABBIT BENCH
SPORT ROCK INTL., INC.SPORT ROCK INTL., INC.SPORT ROCK INTL., INC.SPORT ROCK INTL., INC.SPORT ROCK INTL., INC. PO BOX 32 PISMO BEACH CA 93448 PH805-481-5686 FX 805-489-6451
www.sportrockintl.com [email protected]
FRONT VIEW
TOP VIEW3/4 INCH = 1 FOOT WEIGHT: 275lbs
ACM Playgrounds, Inc. Tel. 914-739-6858 [email protected]
JUNGLE ROCK
GROUND PREPARATION
Choose the best location and excavate the area to accept the Jungle Rock boulder, drain-age, and fall protection material. Refer to industry approved fall protection surface require-ments to determine thickness and depth.
For the most efficient installation, it is wise to have this portion of the project complete priorto the rock arriving to the site. It will eliminate having to move the rock a second time.There are several pieces of equipment that can be used to unload and set the rock intoposition i.e.. forklift with extension forks or a local sign crane with a spreader bar.The rock comes with two eyebolts threaded into lifting anchors at the top of the rock. Usethese two eyebolts to unload and set the rock.Determine the position of the rock in the prepared ground area and rake the sand with agarden rake.Set the rock in place, move accordingly to desired final orientation.Trace the outline of the rock into the sand with the handle of the rake.Raise the rock and set it to the side. Tie the rebar inside the traced area.
PLACING THE CONCRETE
Pour the concrete 4in. to 6in. outside the traced line in the sand. Concrete should be aminimum of 6in. thick.Reset the rock back into its position in the fresh wet concrete. The preset anchor bolts inthe rock will be embedded in the wet concrete. Remove eye bolts while unhooking strapsfrom crane. Seal eye bolt holes with silicone.When the concrete has tightened up (but not hard), use a flat square nose shovel and cutthe excess concrete off the outside of the rock and discard.Allow the concrete to harden at least 72 hours prior to use.
HANDHOLD INSTALLATION
The placement of the handhold has several functions.The degree of difficulty in the climbing experience directly related to how close the handholdare placed. The closer the hold are together, the easier it will be for younger climbers.Keep handholds snug at all times.
JUNGLE ROCKJUNGLE ROCKJUNGLE ROCKJUNGLE ROCKJUNGLE ROCKBOULDER INSTALLATION
SPORT ROCK INTL., INC. PO BOX 32 PISMO BEACH CA 93448 PHONE 805-481-5686ACM Playgrounds, Inc. Tel. 914-739-6858 [email protected]
JUNGLE ROCK
Hold down AnchorBolts 4ft. OC(See Detail A )
6in. minimum thickconcrete with #4rebar 12in. O.C.both ways
BOULDER SHELL
Industry approved fall protectionmaterial (thickness varies)
Filter fabric top and bottom of3in. to 4in. layer of 3/4in.crushed rock
Perforated drainto daylight
9ft. max
PO BOX 32 PISMO BEACH CALIF. 93448 PH 805-481-5686 / [email protected]
BOULDER INSTALLATION DIAGRAMJUNGLE ROCK
6 in. minimunconcrete
boulder shellIncluded 1/2in. holddown anchor bolts4ft. O.C.
fall protection
DETAIL A
DETAIL A - HOLD DOWN ANCHOR BOLT DETAILALL JUNGLE ROCK BOULDERS MUSTBE INSTALLED WITH INDUSTRY AP-PROVED RESILIENT “SAFETY” SUR-FACING APPROPRIATE TO THESAFETY GUIDELINES OF YOUR CITY,COUNTY, STATE, OR COUNTRY.