BILL OF QUANTITY
BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- SHERINGAL THALL ROAD PF-92 DIR UPPER.
SUB WORK:-
SWAT KONAL BARIKOT ROAD.
S#Description Qty:Unit Rate Amount
01
Excavation as in foundation hard soil 848.52M3117/69Rs.99862/-
02
P:C:C: (1:3:6) with 40 % boulders 2759.43M32440/84Rs.6735338/-
03
R:R stone masonry laid dry 3444.56M31596/12Rs.5497931/-
04
R:R Stone masonry in (1:6) CSM 674.72M33185/-Rs.2148983/-
05
P:C:C: (1:3:6) in band, copping etc 417.97M33477/21Rs.1453369/-
06
Stone/builders filling behind Retuning wall 1457M3747/48Rs.1089078/-
Total:- Rs.17024561/-
Say:-Rs.17024000/-
Add: Cost Factor 1.10 Rs.18726400/-RS.18.726 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR
BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- USHERI DARA ROAD PF-92 UPPER DIR
SUB WORK:-
GORKOHI ROAD.
S#Description Qty:Unit Rate Amount
01Excavation as in foundation 273.49
M3105/10Rs.28743/-
02P:C:C: (1:3:6) with 50 % Boulders 446.91
M32211/- Rs.988118/-
03
R:R masonry laid dry 436M31596/12Rs.695856/-
04
R:R masonry in (1:6) CSM 102.21M33185/11RS.352353/-
05
P:C:C: (1:3:6) as in coping 68.51M33477/21Rs.238209/-
06
Stone/boulders filling 194.64M3747/48RS.145489/-
07
P:C:C: (1:2:4) as in topping as spd:. 20.38M3 4156/42Rs.145489/-
Total:- Rs.2503467/-
Add: Cost Factor 1.10 Rs.2753813/-RS.2.753 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- USHERI DARA ROAD PF-92 UPPER DIR
SUB WORK:-
RANZRA GAL LAMCHAR ROAD KM 27-28
S#Description Qty:Unit Rate Amount
01Excavation/Cutting in hard rock S/gravel disposal of excavation material upto any lead
i- required blasting 28146.65
M3 341/57 Rs.9616865/-
ii- Ordinary soil 3127.40
M344/34 Rs.138669/-
02Excavation as in foundation 73.89
M3105/10Rs.7765/-
03P:C:C: (1:3:6) with 50 % Boulders 839.09
M32211/- Rs1855227/-.
04R:R Stone masonry in (1:6) CSM 81.28
M33185/11Rs.2588227/-
05P:C:C: (1:3:6) as in coping 4.92
M33477/21Rs.17107/-
06Stone/boulder filling behind R/Wall 86.21
M3747/48 Rs.64440/-
07P:C:C: (1:2:4) topping 356.73
M34150/- Rs.1482569/-
Total:- Rs.13441500/-
Add: Cost Factor 1.10 Rs.14785650/-
RS.14.785 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- USHERI DARA ROAD PF-92 UPPER DIR
SUB WORK:-
BATAL KHASS ROAD KM 22.
S#Description Qty:Unit Rate Amount
01Excavation as in foundation
557.18 M3 105/10 Rs.58560/-
02P:C:C: (1:4:8) as in foundation
16.64 M3 2578/32 Rs.4903/-
03P:C:C: (1:3:6) with 50 % boulders
2521.80 M32211/- Rs.5575700/-
04R:R masonry (1:6) as specified.
806.09M33185/11Rs.2567485/-
05P:C:C: (1:3:6) in copping ,bands ,etc
21.47M33477/21Rs.74656/-
06Stone/boulders filling behind R/Wall
1194.39M3747/48Rs.892782/-
07R:C:C: (1:2:4) as in slab 12.68M3 5261/51 Rs.66716/-
08Feb: of Mild steel comp: as specified. 1.47Ton 82234/55 Rs.120885/-
09P:C:C: (1:2:4) as in bed, topping etc
239.92M34156/42 Rs.997208/-
Total:- Rs.10396895/-
Say:-
Rs.10396800/-
Add: Cost Factor 1.10 Rs.11436480/-
RS.11.436 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- USHERI DARA ROAD PF-92 UPPER DIR
SUB WORK:-
SAMKOT BALA ROAD KM 21.
S#Description Qty:Unit Rate Amount
01Excavation as in foundation
589.60M3 105/10 Rs.61967/-
02P:C:C: (1:3:6) with 50 % boulders
1137.31M32211/- Rs2514592/-.
03R:R masonry laid dry
1189.16M31596/12Rs.1897978/-
04R:R masonry (1:6) CSM
367.16M33185/11Rs.1169445/-
05P:C:C: (1:3:6) in copping ,bands ,etc
255.08M33477/21Rs.7782650/-
06Stone/boulders filling behind R/Wall
9428.08M3747/48Rs.7047301/-
07P:C:C: (1:2:4)
112.12M34156/-Rs.465970/-
08Dozer Charges
300M34100/-Rs.1230000/-
Total:- Rs.15169903/
Say:-
Rs.15169000/-
Add: Cost Factor 1.10 except item No-08 Rs.16562900/-
RS.16.562 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- SHERINGAL THALL ROAD PF-92 DIR UPPER
SUB WORK:-
R:C:C: BRIDGE THALL.
S#Description Qty:Unit Rate Amount
01Excavation as in foundation in S/gravel soil 113.25 M3187/20Rs.21178/-
02Excavation as in foundation
264.72M3133/56Rs.35356/-
03P:C:C: (1:3:6) with 50 % Boulders
710.64M32211/-Rs.1571237/-
04P:C:C: (1:3:6) with 30 % Boulders
432.10M32674/95Rs.1155845/-
05P:C:C: (1:4:4 in road foundation
117.72M34156/42Rs.489294/-
06P:C:C: (1:3:6) in P/pet etc.
9.06M33477/21Rs.31504/-
Total:- Rs.3304414/-
Say:-
Rs.3634855/-
Add: Cost Factor 1.10 Rs.3635000/-
RS.3.635 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR
BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- RETUNING WALL AT SALOOL
S#Description Qty:Unit Rate Amount
01Excavation as in foundation. 165.62M3 117/69Rs.19491/-
02R:C:C: (1:2:4) as in foundation 55.21M3 4699/95Rs.259484/-
03S/Fabrication of M/S Compt: 4.26Ton 82294/55Rs.350319/-
04P:C:C: (1:3:6) with 40 % Boulders 716.30M3 2440/84Rs.1748373/-
05R:R masonry dry 846.40M31596/12Rs.1350955/-
06PCC (1:3:6) in band coping etc 255.37M33477/21Rs.887975/-
07P/L boulder hand pack behind R/Wall 1817.66M31246/36Rs.2265458/-
08S/Sperding of stone matel 9" loose 6" compacted 16.98M3984/52Rs.16717/-
09Bituminous prime coat 111.48M2 79/49Rs.8861/-
10P/C 1.5" thick premix carpeting 111.49M2 285/17Rs.31790/-
11RR Masonry (1:6) in P/pit wall 11.21M3 3313/74Rs.37147/-
12Cement pointing in (1:3) CSM 79.71M2 128/83Rs.10269/-
Total:- Rs.6986839/-
Say:-
Rs.6986900/-
Add: Cost Factor 1.10 Rs.7685523/-
RS.7.685 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
SUBHEAD:- APPROACHES OF RCC BRIDGE PATRAK.
S#Description
Qty:Unit Rate Amount
01Excavation as in foundation in hard soil 530.86M3 117.69Rs.62476/-
02P:C:C: (1:4:8) as in foundation 106.17M32578/32Rs.273740/-
03RR Stone masonry in (1:6) CSM in F/plinth 1121.17M33185/11Rs.3571049/-
04Stone/Boulders filling 1698.75M3747/48Rs.1269781/-
05P:C:C: (1:3:6) with 40 % boulders 169.87 M32440/84Rs.414540/-
06P:C:C: (1:2:4) as in topping 56.05 M3 4156/-Rs.232943/-
07P:C:C: (1:3:6) as in coping 16.98 M3 3477/21Rs.59043/-
Total:- Rs.5883572/-
Add: Cost Factor 1.10 Rs.6471300/-
RS.6.741 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.
SUBHEAD:- BARIKOT BAZAR THALL ROAD PF-92.
S#Description
Qty:Unit Rate Amount
01Excavation as in foundation. 1992.95 M3117/69 234550/-
02P:C:C: (1:4:8) as in foundation 18.22M32578/- 46971/-
03P:C:C: (1:3:6) with 40 % Boulders 2768.96 M32440/84 6758588/-
04RR Stone masonry (1:6) CSM 200.09 M33185/11637309/-
05Stone/Boulders filling 10968.78M3747/48 8198944/-
06RCC (1:2:4) in slab etc 12.68 M35261/5166716/-
07Fabrication of mild steel 1.47 Ton 82234/55120884/-
08RCC (1:2:4) in bed2.08 M3 4156/-8645/-
09" thick plaster (1:4)83.24 M2168/6814040/-
10P/C Stone matel 9" loose 6" compacted443.51 M3984/52 436644/-
11P/L bitumeus prim coat 2686.73 M279/49 213568/-
12P/C 1.5" thick premix carpeting 2686.73M2285/17766174/-
13P:C:C: (1:3:6) in drin etc 317.19 M33477/211102936/-
14Dozer Charges 300 Hours 4100/- 1230000/-
Total:- Rs.19835964/-
Add: Cost Factor 1.10 except item No-14 Rs.21696560/-
Rs.21695500/-
Rs.21.695 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.
SUBHEAD:- KALKOT NANGIRA ROAD SHERINGAL THALL PF-92.
S#Description
Qty:Unit Rate Amount
01Excavation as in foundation in hard soil 1108/43 M3 117.69Rs.130451/-
02P:C:C: (1:3:6) with 40 % Boulders 2471/97M32440/84Rs.6033683/-
03R:R Stone Masonry dry 3027/18M31596/12Rs.4831742/-
04R:R Stone masonry in (1:6) CSM 653/60M33185/11Rs.2081787/-
05P:C:C: (1:3:6) as in cooping/band etc 456/73M33477/21Rs.1588146/-
06Stone/boulders filling behind R/Wall 3209/70 M3747/48Rs.2399187/-
Total:- Rs.17064996/-
Say:Rs.17065000/-
Add: Cost Factor 1.10 Rs.18771500/-
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTORBILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.
SUBHEAD:- SHERINGAL ROAD VILLAGE GALOON PF-92.
S#Description
Qty:Unit Rate Amount
01Excavation as in foundation in hard soil 1314/26M3 117.69Rs.154675/-
02P:C:C: (1:3:6) with 40 % Boulders 2788/98M32440/84Rs.6807454/-
03R:R Stone Masonry laid dry 3604/86M31596/12Rs.5753789/-
04R:R Stone masonry in (1:6) CSM 847/97M33185/11Rs.2700878/-
05P:C:C: (1:3:6) as in cooping/band etc 549/63 M33477/21Rs.1911179/-
06Stone/boulders filling behind R/Wall 1705/83 M3747/48Rs.1275074/-
Total:- Rs.18603049/-
Say:Rs.18603000/-
Add: Cost Factor 1.10 Rs.20463300/-
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.
SUBHEAD:- SHERINGAL BADA BARIKOT ROAD PF-92.
S#Description
Qty:Unit Rate Amount
01Excavation as in foundation in hard soil 699/32 M3 117.69Rs.82302/-
02P:C:C: (1:3:6) with 40 % Boulders 1494/94 M32440/84Rs.3648909/-
03R:R Stone Masonry laid dry 1610/27 M31596/12Rs.2570184/-
04P:C:C: (1:3:6) as in cooping/band etc 241/54 M33477/21Rs.839885/-
05Stone/boulders filling behind R/Wall 2208/38 M3747/48Rs.1650720/-
Total:- Rs.8792000/-
Add: Cost Factor 1.10 Rs.9671200/-
RS.9.671 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.
SUBHEAD:- SHERINGAL THALL BEYAR ROAD PF-92.
S#Description
Qty:Unit Rate Amount
01Excavation/cutting in shingle/gravel etc 6293/45 M3 187/20
Rs.1176875/-
02Excavation as in foundation. 49/26M3105/10 Rs.5177/-
03P:C:C: (1:4:8) as in foundation 12/31 M32578/32 Rs.31739/-
04R:R Stone masonry in (1:6) CSM172/48 M33185/-
Rs.549158/-
05P:C:C: (1:3:6) as in coping 8/12 M33477/- Rs.28233/-
06Construction of toe wall 435/- M34403/- Rs.1915305/-
Total:- Rs.3706487/-
Add: Cost Factor 1.10 Rs.4077135/-
Dozer Charges 122Hours4100/- Rs.500000/-
TOTAL:-RS.4577135/-
SAY:-RS.4577000/-
RS.4.577 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR
BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED
ROADS/BRIDGES DURING THE RECENT
TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.
SUBHEAD:- GOWALDI DARA ROAD PF-92 DISTRICT UPPER DIR
E/COST:- RS.46.480 (M) S#Description
Qty:Unit Rate Amount
ROAD WORK
013.65 high Retuning Wall both sides the road formation 1600Meter13200/-Rs.21120000/-
02Formation of embankment from borrow excavation in common material i/c completion by power roller 4368M3404/16Rs.1765371/-
03Sub Grade preparation of existing road16440M2 32/39 Rs.532492/-
04P:C:C: (1:3:6) as in mass concrete using 50 % boulders 5429M3 2211/-Rs.12003519/-
05P:C:C: (1:2:4) as in road formation
1644 M3 4156/42Rs.6833154/-
Total:- Rs.42254536/-
Add: Cost Factor Rs.464801/-
SAY:-
RS.46.480 (M)
SUB DIVISIONAL OFFICER PF-92
C&W SUB DIVISION UPPER DIR
Add:__________% Above/Below/AT PAR
On CSR 2009.
CONTRACTOR BILL OF QUANTITYNAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED
ROADS/BRIDGES DURING THE RECENT
TORRENTIAL/ DISASTER RAIN IN JULY
2010 IN DISTRICT UPPER DIR.
SUB HEAD:- GOWALDI DARA ROAD PF-92 DISTRICT
UPPER DIR.
ESTIMATED COST: RS.46.480 (M)
COMMUNICATION & WORKS DEPARTMENT UPPER DIR
Ph: NO-0944-880836 BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR..
S# Description Quantity Unit Rate Amount
ABARIKOT BAZAR
01Excavation as in foundation 1909.14M3 117.69Rs.224687/-
02P/L P:C:C: plub cm 40 % Boulder2768.96M32440.34Rs.6757203/-
03Stone filling behind retuning wall 10973.95M3747/48Rs.8202808/-
04S/spreading stone metal 9" long 6" compacted 443.51M3984.52Rs.436644/-
05P/L bitumen prim coat 2686.73M2 79.49 Rs.213568/-
06P/L 1 " thick premix carpeting 2686.73M2 285/17Rs.766174/-
07PCC (1:4:8) as in foundation 9.11 M3 2578/-Rs.23485/-
08R:R masonry in (1:6) CM in F/Plinth 207.525M3 3185/11Rs.660990/-
09R:C:C: (1:2:4) as in slab6.34M3 5261/51Rs.33358/-
10Fabrication of mild steel 0.735M3 82234/55Rs.60442/-
11P:C:C: (1:2:4) as specified 1.04 M3 4156/-Rs.4322/-
12" thick cement plaster (1:4) CM 41.62M2 168/68Rs.7020/-
13P:C:C: (1:3:6) as specified 317.19M3 3477/21Rs.1102936/-
Total:- Rs.1,84,93,637/-
Add: Cost Factor 1.10 Rs.2,03,43,000/-
BRETUNING WALL AT SALOOL
01Excavation as in foundation. 165.62M3 117/69Rs.19491/-
02R:C:C: (1:2:4) as in foundation 55.21M3 4699/95Rs.259484/-
03S/Fabrication of M/S Compt: 4.26Ton 82294/55Rs.350319/-
04P:C:C: (1:3:6) with 40 % Boulders 716.30M3 2440/84Rs.1748373/-
05R:R masonry dry 846.40M31596/12Rs.1350955/-
06PCC (1:3:6) in band coping etc 255.37M33477/21Rs.887975/-
07P/L boulder hand pack behind R/Wall 1817.66M31246/36Rs.2265458/-
08S/Sperding of stone matel 9" loose 6" compacted 16.98M3984/52Rs.16717/-
09Bituminous prime coat 111.48M2 79/49Rs.8861/-
10P/C 1.5" thick premix carpeting 111.49M2 285/17Rs.31790/-
11RR Masonry (1:6) in P/pit wall 11.21M3 3313/74Rs.37147/-
12Cement pointing in (1:3) CSM 79.71M2 128/83Rs.10269/-
Total:- Rs.6986839/-
Say:-Rs.6986900/-
Add: Cost Factor 1.10 Rs.7685523/-
Say:-Rs.7686000/-
CRANZARO GAT LAMCHAR
01Earth Work Excavation as in hill side cutting
i- Requiring Blasting 24103.947M3 341/67Rs.8235560/-
ii- Ordinary Soil 2678.212M344/34Rs.118752/-
02Excavation as in foundation 6.24 M3 105/10 Rs.656/-
03P:C:C: (1:3:6)plumb concrete with 50 % boulders 167.818M3 2211/-Rs.371045/-
04R:R Masonry (1:6) CM in F/P.16.256M33185/11Rs.51777/-
05P:C:C: (1:3:6) as specified 1.069M33477/21Rs.3717/-
06Stone/boulders filling behind Retuning Wall 17.242 M3 747/48Rs.12888/-
07P:C:C: (1:2:4) as specified 71.346 M34156/-Rs.296514/-
Total:-Rs.9090909/-
Add: Cost Factor 1.10 Rs.1,00,00,000/-
DR:C:C: BRIDGE THALL
01Excavation as in foundation in S/gravel soil 113.25 M3187/20Rs.21178/-
02Excavation as in foundation 264.72M3133/56Rs.35356/-
03P:C:C: (1:3:6) with 50 % Boulders 710.64M32211/-Rs.1571237/-
04P:C:C: (1:3:6) with 30 % Boulders 432.10M32674/95Rs.1155845/-
05P:C:C: (1:4:4 in road foundation 117.72M34156/42Rs.489294/-
06P:C:C: (1:3:6) in P/pet etc. 9.06M33477/21Rs.31504/-
Total:- Rs.3304414/-
Add: Cost Factor 1.10 Rs.3634554/-
Rs.3635000/-
RS.3.635 (M)
G: Total A+B+C+DRs.4,16,64,000/-
Say:-Rs.41.6464
SUB DIVISIONAL OFFICER PF-92
C&W SUB DIVISION UPPER DIR
Add:__________% Above/Below/AT PAR
On CSR 2009.
CONTRACTOR BILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.. S#Description Qty:Unit Rate Amount
ABATAL KHASS ROAD KM 22
01Excavation as in foundation 557.18 M3 105/10 Rs.58560/-
02P:C:C: (1:4:8) as in foundation 16.64 M3 2578/32 Rs.4903/-
03P:C:C: (1:3:6) with 50 % boulders 2521.80 M32211/- Rs.5575700/-
04R:R masonry (1:6) as specified. 806.09M33185/11Rs.2567485/-
05P:C:C: (1:3:6) in copping ,bands ,etc 21.47M33477/21Rs.74656/-
06Stone/boulders filling behind R/Wall 1194.39M3747/48Rs.892782/-
07R:C:C: (1:2:4) as in slab 12.68M3 5261/51 Rs.66716/-
08Feb: of Mild steel comp: as specified. 1.47Ton 82234/55 Rs.120885/-
09P:C:C: (1:2:4) as in bed, topping etc 239.92M34156/42 Rs.997208/-
Total:- Rs.10396895/-
Say:-Rs.10396800/-
Add: Cost Factor 1.10 Rs.11436480/-
BRANZRA GAT LAMCHAR
01Earth Work Excavation as in hill side cutting
i- Requiring Blasting 4042.703M3 341/67Rs.1381270/-
ii- Ordinary Soil 449.188M344/34Rs.19917/-
02Excavation as in foundation 59.12 M3 105/10 Rs.6213/-
03P:C:C: (1:3:6)plumb concrete with 50 % boulders 671.272M3 2211/-Rs.1484182/-
04R:R Masonry (1:6) CM in F/P.65.024M33185/11Rs.207109/-
05P:C:C: (1:3:6) as specified 3.936M33477/21Rs.13686/-
06Stone/boulders filling behind Retuning Wall 68.968 M3 747/48Rs.51552/-
07P:C:C: (1:2:4) as specified 285.384 M34156/-Rs.1186056/-
Total:-Rs.4349985/-
Add: Cost Factor 1.10 Rs.4784983/-
G: Total A+BRs.16221463/-
Say:-
Rs.16221000/-Rs.16.221 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTORBILL OF QUANTITY.NAME OF WORK:- REPAIR/REHABILITATION OF DAMAGED ROADS/BRIDGES DURING
THE RECENT TORRENTIAL/DISASTER RAIN IN JULY 2010 IN
DISTRICT UPPER DIR.. S#Description Qty:Unit Rate Amount
ADOBANDO ROAD.
01Excavation as in foundation 385.88 M3 105/10 Rs.40556/-
02P:C:C: (1:4:8) as in foundation 8.50 M3 2890/30 Rs.24568/-
03P:C:C: (1:3:6) with 50 % boulders 344.682 M32211/61Rs.762302/-
04Erecting/Removing from work 725.26M306/59Rs.222357/-
05Feb: of Mild steel comp: as specified. 1.592Ton 82234/55 Rs.130917/-
06R:C:C: (1:2:4) as in specified. 9.552M3 5261/51 Rs.50258/-
07P:C:C: (1:2:4) as specified. 3M34156/42 Rs.12469/-
08Stone/boulders filling . 271.79M31246/36Rs.338748/-
09R:R masonry (1:6) as specified. 167.32M33785/-Rs.532914/-
10P:C:C: (1:3:6) in specified 2.51M33477/-Rs.8727/-
11Formation of embankment from barrow pit excavation in common material 13.283M3 404/-Rs.5366/-
12Re-handling of gravel work 6137.46M3 98/53Rs.604724/-
13Transportation of earth all type upto 1-Km 1698.75M3 163/55Rs.277831/-
Total:- Rs.3011737/-
Add: Cost Factor 1.10Rs.3312911/-.
Say:-Rs.33,13,000/-Rs.3.313 (M)
SUB DIVISIONAL OFFICER
C&W SUB DIVISION UPPER DIR
Add: _________% Above/Below/AT PAR
On CSR 2009
CONTRACTOR