  • 8/19/2019 BOQ for villa units

    1/26

    Package #3: Completion of Construction 16 buildings. (36 residential units) in Rafah.

    ITB 2011-010

    Contractor Signature

    !" $11% $1$

    P&' 1$%*$ +Construction of 3$$ Residential ,nits in Rafah

    Package #3: Completion of Construction 16 buildings (36 residential units) in Rafah.

     

    -C!/0 : PRC -C2,' ("ill of uantities)

    lectronic cop4 of the "/ shall be submitted along 5ith the signed hard cop4 thereof. ncase of an4 discrepanc4 bet5een the soft and the hard copies the hard cop4 shall pre7ail.

  • 8/19/2019 BOQ for villa units

    2/26

  • 8/19/2019 BOQ for villa units

    3/26

    Package #3: Completion of Construction 16 buildings. (36 residential units) in Rafah.

    ITB 2011-010

    Contractor Signature

    Bill No (0)

    1. Mobilization & Demobilization

    2escription ,nit uantit4

    0/1 LS 1

    0/2 LS 1

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

     wor s accor n( o par cu arspecifications' and supervisor en(ineer

    The contractor must submit reports for thee&isitin( activities and materials on the proectsite supported with photo(raphs before workstart and take approval to start the work.+shifted from e&cavation item-

    Preparation the e&istin( site include/10 Suppl) Site office' shed' e!uipments' andfurniture for both supervision and contractor.20 $ccess road to and throu(h the site.#0 Transportation ommunication for thecontractor team and for the supervisionen(ineers as well*0 leanin( the e&istin( site either inside or

    outside the buildin(s' the work includesremovin( all debris from floors' stairs' roofs'around buildin(s.

    Dismantle and remove all facilities' services'furniture' shed and an) e!uipment related tothe proect supervisor and contractor office.$s per the en(ineer instructon.

  • 8/19/2019 BOQ for villa units

    4/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (1)

    1. 9ca7ation &nd arth 5orks

    2escription ,nit uantit4

    1/1 LS 1

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Preamble for the existing in completebuilings

    ontractor s a ta e nto cons erat on t at a 3 direct and indirect works and e&pensesre!uired for the completion of the comin(

    items are included in the uint rice.  wor s s a e carr e ou accor n( ospecification' Bo4' drawin( and as directed b)

    The contractor must complete all the workwhich partiall) performed previousl).

    ean n( an eve n( aroun t e u n(saccordin( to the accompanied drawin(s as faras the work completed and handed over for theen ineer  

    $ll works must be accordin( to drawin(s'specification and en(ineer instructions. atesshall include /

    . ore up e s es o e&cava on an a eall precautions to keep the adacent buildin(ssafe.2. leanin( the site and removin( all debrisand rubbles to approved dump site.

    #.$pproval of Bench mark and levelin(network before e&cavation works.. a) n( ou e u n(s coor na es o e

    carried out b) professional office surve)orusin total station device.. ac n( n a)ers no more an cmthick for each la)er and compaction to 789 of

    :. Safet) precautions to protect nei(hborutili;es and persons.

    8. $ll re!uired Tests should be accommodated b) an approved lab.

    . e a ove men one an o ow n(specifications is part of the contractor

    5evelin(' importin( (ranular sand and backfillin( to make up levels around the buildin(s up to the top of e&ternal (round beams levels in la)ers 26cm thick +,.D.D789-. The work includes cleanin( thesurroundin( area and re!uired tests accordin(to en(ineer instruction and specifications.

  • 8/19/2019 BOQ for villa units

    5/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    . 'oncrete or%s.

    2escription ,nit uantit4

    *. $pproved additives and admi&tures.

    2/1 52

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    ates of oncrete =orks shall include/01. $ll form works and shutterin( +new lumberfor shutterin( painted b) special oil - in an)form' shape and si;e . ,akin( chamfered and

    curved ed(es' allowin( for and makin((rooves and sleeves and usin( Tie ods+Batant- for concrete walls > removal of formsand cleanin( of all e&posed tie wires and rods.Steel forms must be used in shutterin( thee&ternal decorations.

    2. ?uel or burned oil is not accepted to be usedfor paintin( the lumber before use the form.

    #. Suppl)in(' astin(' vibratin( and curin( as

     per specifications.

    6. "ncurred costs on New oncrete @ob ,i&Desi(ns' Samplin( ' testin( and providin( testresults certificates' storin( and savin( ofsamples.

    :. Paintin( of e&posed surfaces ofunder(round reinforced concrete elementswith two coats of hot bituminous paint +86%26-after primer la)er ' the strokes of each la)er to be opposite to each other.

    8. Preliminar) installations for Alectrical' plumbin( and floor draina(e in floor slabs.

  • 8/19/2019 BOQ for villa units

    6/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    2/2 41

    Suppl) and cast read) mi& concrete B+26-k(%cm2 for boundar) beams around unitsincluding  pol)thene sheets under the beams'e&cavation' compaction under beams and backfillin( .

    ,#

  • 8/19/2019 BOQ for villa units

    7/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    . 'oncrete or%s.

    2escription ,nit uantit4

    2/3 ,2 200

    2/4 1820

    2/5 272

    2/6 100

    2/7 18

    2/8 72

    2/9 Ditto but for e&ternal decorations. 36

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Suppl) and cast read) mi& concrete B+26-k(%cm2 for the (round slab all drop beams in the slab > slopes.69 for the final slab where the minimumdepth not less than 26cm at the locations atrain water traps and > an inverted beam at the boundar) of the final roof > the final roofshould be finished be steel trowel machine.

    ,2

    Suppl) and cast read) mi& concrete B +26-k(%cm2 for solid slab 2 cm thick forstaircase . The price include the slopes .69for the final slab where the minimum depthnot less than 2cm at the locations at rainwater traps ever)where in the slab and allother materials as per specifications ' drawin(sand supervisor en(ineerCs instructions.

    ,2

    Suppl) and cast read) mi& concrete B +26-k(%cm2 for lintels' sills' beams' parapet beams' inverted beams for terrace and e&istin(slab 'and concrete infill +B26- between

    columns the e&istin( block walls.

    ,#

     Suppl) and cast read) mi& concrete B +2-k(%cm2 for stub columns.

    ,#

    Suppl) and cast read) mi& concrete B +26-k(%cm2 for stairs includin( fli(hts' landin(s'steps' drop' inverted beams and hand rail wallincludin( entrance stairs.

    ,#

    ,#

  • 8/19/2019 BOQ for villa units

    8/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    . Builing or%s

    2escription ,nit uantit4

    3/1 3400

    3/2 320

    3/3 1600

    3/4 5.m 100

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    The price include/10 suppl)in( hollow or solid cement blockfrom (ood and approved factor) in perfectdimension and build it in (ood manner with acompressive stren(th #6 k(%cm2  for hollow

     block and : k(%cm2

     for solid block. This itemwill include cement mortars' reinforcedconcrete infill +B26- between columns  block walls +102 cm wide- with2Ø

  • 8/19/2019 BOQ for villa units

    9/26

    Package #3: Completion of Construction 16 buildings.  36 residential units in Rafah.

    ITB 2011-010

    ontractor Signature

    Bill No (*)

    *. Plastering or%s

    2escription ,nit uantit4

     Internal Plastering

    4/1 4950

    4/2 12890

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    $ll works must be accordin( to drawin(s'specification and en(ineer instructions. atesshall include /

    Suppl) of all needed materials' includin((alvani;ed an(les for the corners'windows ande&ternal decorations as well as the use of(alvani;ed wire mesh between concrete and block work.

    Preparation works b) coverin( all conduits ofelectricit)' water supplies ' etc' with a(alvani;ed wire mesh at least 2cm widthcoated b) mortar +1/1- cement / sand and thework includes removal of wires and nailsand cleanin( of surfaces to be read) for plasterin(.

     ontractor shall take into consideration thatall 3 direct and indirect works and e&pensesre!uired for the completion of the comin(items are included in the uint price.

    The work includes closin( all openin( ine&istin( walls' as openin( around e&istin(+plumbin(' electrical- and between e&istin(walls and slabs b) usin( Ealvani;ed mesh andmortar cement.

    Trimmin( of concrete chippin(s' removin( thewires and etc. from e&istin( concrete' andcleanin( of e&istin( surfaces to be read) for plasterin(.

    The work shall include checkin( out all of the preliminar) installation in ceilin(s and wallssuch as electrical' water suppl) and wastewater pipes and repairin( the dama(es if an).

    This should be done prior to commencementof plasterin( and after obtainin( a writtenapproval from the supervision en(ineer.

    urin( with water for at least three da)s foreach coat.

    Suppl) and make internal plasterin( 1# mmthick for ceilin( and soffits. The workincludes rou(h primer nail renderin( to form ake) with +mi& 1/1- cement sand' second la)er1#mm/ Base0oat Fenderin(F with +1/#/.26-cement/ sand mortar/ lime and third la)er/?inishin( oat with +1/1/1- cement/ sandmortar/ lime . =orks include all materialsneeded to finish the works accordin( tospecifications ' drawin(s and supervisoren(ineerCs instructions

    ,2

    Ditto' but internal plasterin( 16 mm thick for

    internal walls and =indows ed(es. ,2

  • 8/19/2019 BOQ for villa units

    10/26

    Package #3: Completion of Construction 16 buildings.  36 residential units in Rafah.

    ITB 2011-010

    ontractor Signature

    Bill No ()

    *. Plastering or%s

    2escription ,nit uantit4

     External Plastering

    4/3 7890

    4/4 1500

    !otal

    tem0o.

    ,nit Rate,- 8

    ,nit Rate,- 8

    !otal &mount,- 8

    Suppl) and make e&ternal plasterin( 2mmthick to walls with four faces / the first is the

    rou(h nail renderin( +mi& 1/1- cement sand>the second is 6mm thick mortar +mi& 1/ 2-cement/sand' the third is the undercoat 1#mm+mi& 1/ # /.26- cement/sand/lime' the forth istwo coats of T)rolean finish + mi& 1/ #- whitecement to fine a((re(ate +4uarti;- and all isaccordin( to specifications ' drawin(s andsupervisor en(ineerCs instructions

    ,2

    Suppl) and make e&ternal plasterin( 2mmthick for decorates at four faces / the first isthe rou(h nail renderin( +mi& 1/1-

    cement/sand' the second is 6mm thick mortar+mi& 1/ 2- cement/sand' the third is theundercoat 1#mm +mi& 1/ # /.26-cement/sand/lime> the forth is make ?inishin(oat' smooth surface with +1/1/1- cement/sandmortar/lime. and all this is accordin( tospecifications ' drawin(s and supervisoren(ineerCs instructions

    ,2

  • 8/19/2019 BOQ for villa units

    11/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (+)

    +. ,iling an Marble or%s

    2escription ,nit uantit4

    5/1 3300

    5/2 720

    5/3 1330

    5/4 o. 816

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    $ll works must be accordin( to drawin(s'specification and en(ineer instructions. atesshall include /

    1. Samples for approval and all the re!uiredtests.

    2. leanin(' mechanical polishin( and pointin( usin( (rout.

    #."nsulation works under ceramic floor tilesfor upstairs bath rooms and kitchens usin( primer coat' two hot bitumen coats +86%26-

     *. Plastic an(le beads for ceramic wall tilesand $luminum an(le for ceramic of walls atthe corners and top and free sides of ceramic.

    6. 5ocal marble must be Erade +$- free cracksand cla) flaws.

    :. ,easurin( the stockpiled !uantities of tilesand obtainin( the en(ineer approval prior toshipment to the site.

    8.Transportin( and carefull) handlin( thestored !uantities to the site.

    Suppl) and install mo;aico floor tiles +Baladi-'(rade $' si;e 26cm&26cm&2.6cm laid on 2cmmortar bed and 6 cm thick sand bed andterra;;o skirtin( 26cm& 8cm&1cm includin(all needed materials as per specifications 'drawin(s and supervisor en(ineer instructions

    ,2

    Suppl) and fi& non0slip color ceramic floortiles Erade $ Spain made or e!uivalent' si;e###&.:cm for bath rooms' toilets and

    kitchens' bedded on cement and sand mortar1/# laid on a dr) mi&ed sand and cement backfill' the price includin( skirtin( 8cmhei(ht wherever no wall tiles re!uired' pointin( usin( special pre0mi& (rout andfinal polishin( as per specifications ' drawin(sand supervisor en(ineer instructions

    ,2

    Suppl) and fi& color (la;ed ceramic wall tiles'Erade $ Spain made or e!uivalent' si;e26&*&.:cm for bath rooms' toilets andkitchens' bedded in cement and sand mortar1/# to walls. Price to include lime free ke) nail

    then plain plaster la)ers and pointin( usin(special pre0 mi&ed (rout as specifications'drawin(s and supervisor en(ineer instructions

    ,2

    Suppl) and la) precast reiforced mo;aico stairtreads si;e #6 cm wide & 6cm thick chamferedonce ' rebated once and laid on 2cm thickmortar bed same color and kind of the floortiles and the price includin( mo;aico stairrisers si;e 12.*cm hi(h &2cm thick andskirtin( 2cm hi(h &2cm thick on the bothsides' (routin( and polishin( as specificationand drawin(.

  • 8/19/2019 BOQ for villa units

    12/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (+)

    +. ,iling an Marble or%s

    2escription ,nit uantit4

    5/5 L.! 442

    5/6Ditto but #: cm wide for wider windows sills

    L.! 48

    5/7 L.! 304

    5/8 L.! 125

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Suppl) and install mo;aico window sill si;e2: cm wide & 6cm thick for units and roofentrances' flatCs entrances' and (uest roomentrance laid on 2 cm thick mortar bedincludin( polishin( and (roovin( as approved

     b) the representative en(ineer and asspecification and drawin(s.

    Suppl) and cast mo;aico copin( for handrail16cm wide & 6cm thick of the same kind andcolor of the floor tiles includin( smoothin( thesurfaces and ed(es as per specifications anddrawin(s.

    Suppl) and erect osa bitta counter top :cmwide for kitchen cupboard' includin( localmarble shelves and vertical dividers' back ofcupboard' floors and skirtin( .Gertical dividers

    and floor should be #cm thick' but back andshelves 2cm' makin( openin( for kitchen sinkwith si;e +:cm &*cm-' and another siutableopenin( for (as pipe. as per specification'drawin(s and en(ineer instructions

  • 8/19/2019 BOQ for villa units

    13/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (-)

    -. Painting or%s

    2escription ,nit uantit4

    ates include/

    6/1 17320

    6/2 690

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    10$ll the paintin( materials used should beapproved and tested b) approved locallaborator) and have the final approved fromthe supervisor en(ineer.

    20 The surface must be dr) and clean before paintin(.

    #0 $ll paintin( works should provide there!uired covera(e.

    *0 $ll paint works must be accordin( tospecifications ' drawin(s and supervisoren(ineer instructions.

    60 ontractor shall take into consideration thatall 3 direct and indirect works and e&pensesre!uired for the completion of the comin(items are included in the uint price.

    :0Smoothen surfaces of e&isitin( plasterin(

     before the ommencement paint80Providin( scafoldin( to carr) out thee&ternal paintin(

    Suppl) and Paint the internal walls and ceilin(with one coat primer and at least two coats ofcolored +Poliside- approved as specifications 'drawin(s and supervisor en(ineer instructions

    ,2

    Suppl) and Paint' e&ternal decorations withone coat of Pendrole primer and at least twocoats of A&ternal !ualit) of colored emulsion+=eather Shield- or e!ual approved asspecification and drawin(s

    ,2

  • 8/19/2019 BOQ for villa units

    14/26

    "ac#age $3% Co!&'etion o( Con)truction 16 *ui'+ing). 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    . 'arpentr/ $or%s

    2escription ,nit uantit4

    7/1 o. 36

    7/2 Ditto but D2' overall si;e 7&226cm . o. 45

    7/3 o. 171

    7/4 o. 72

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    $ll works must be accordin( to drawin(s'specification and en(ineer instructions. atesshall include /

    1. suppl)in( carpentr) works from (oodSwedish wood (rade H$I includin( frame'

    cover mould' architrave.

    2. Paintin( of ?rame sides 'e&posed to walls'with cold Bitumen in addition to complete paintin( of the bottom 1cm

    #. ?i&in( =ooden frame with # (alvani;edsteel an(led plates #mm thick per side.

    *. Jard ware locked t)pe =all) switch ore!uivalent for all doors and bath t)pe forToilets doors' and brass hin(es 1cm hei(ht'door stopper 'and all other fittin(.

    6. ?lushed doors and frames shall be primedwith sandin( siller' two coats of putt)' one coatof under coat and two coats oil paint.

    :. Paneled solid doors and frames shall be primed with sandin( siller' two coats ofGarnish Paint' one coat of 5ucker paint.

    8.The items include 16cm $luminum kick plate 1mm thick from both sides +@ust for baths kitchen' and washin( room-'

  • 8/19/2019 BOQ for villa units

    15/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    . Metal $or%s

    2escription ,nit uantit4

    8/1

    o 16

    8/2

    o 16

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    $ll works must be accordin( to drawin(s'specification and en(ineer instructions. atesshall include /

    1. Submittin( samples for approval ofmaterial' accerrories' color and fi&ation

    method.

    2.$ll metal works include the fi&ation forframes and leaves and all re!uired accessoriesaccordin( to the en(ineerCs instructions.

    #. Paintin( after smoothin( and fillin( all thevoids with putt)' primer coat' undercoat andtwo oil coats and in case of (alvani;ed steelthe primer should be pol) ;inc.*.$diustment the structural openin(dimensions accordin( to drawin(s.

    Suppl) and fi& steel sin(le door SD1 +1

    &2#cm- for entrance' complete with frame#mm thick' reinforced (lass : mm'ironmon(er)' hardware and oil paintin(' andall re!uirement as latches'Ketc as perspecifications ' drawin(s and supervisoren(ineer instructions

    Suppl) and fi& steel plate door SD2 +7&2#cm- for roof' complete with frame #mmthick' ironmon(er)' hardware and oil paintin('=all) switch and all re!uirement as latches'Ketc' all works as per specifications ' drawin(sand supervisor en(ineer instructions

  • 8/19/2019 BOQ for villa units

    16/26

    "ac#age $3% Co!&'etion o( Con)truction 16 *ui'+ing). 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    . #luminum $or%s

    2escription ,nit uantit4

    9/1 o. 171

    9/2 o. 36

    9/3 o. 36

    9/4 o. 72

    9/5 Ditto but' $=* : & :cm for =.. o. 72

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    $ll works must be accordin( to drawin(s'specifications and en(ineerCs instructions.ates shall include /

    1. Submittin( samples for approval ofmaterial' accessories' color and fi&ation

    method.

    2.Suppl) and install the re!uired profile 8and *6 with minimum thickness 1.6 mmfrom approved source b) the Palestinianstandard institution with all re!uiredaccessories accordin( to the en(ineerCsinstructions.

    #.Jardware' ironmon(er) and accessoriesshould be made of aluminum

    *. $ll tests for thickness and paintin( .6.$diustment of the structural openin(dimensions accordin( to drawin(s.

    Suppl) and fi& colored aluminum windowsection 8 t)pe $=1' overall si;e 1&1*cm'slidin( with three rails includin( fl)screen leaf for bedrooms and livin(' completewith frame' (lass *mm thick' ironmon(er)and hardware as per specifications anddrawin(s and en(ineerCs instructions.

    Ditto but' T)pe $=2 overall si;e

  • 8/19/2019 BOQ for villa units

    17/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (10)

    1$. Plumbing 5orks

    2escription ,nit uantit4

    60 leanin( and desinfictin( all water pipes.

    10/1 o 72

    10/2 o 36

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    $ll Plumbin( works include the re!uired unitsand its accessories as described in the itemsand the rates include/

    10 $ll the plumbin( units should be from the best !ualit) and has trade mark.

    20 Submittin( shopdrawin( for water suppl)and waste water networks for approval prior to

    #0Submittin( samples for all re!uired materialwith catalo(ue indicatin( its specifications.

    *0$ll re!uired tests ' pressure for water network ' h)draulic test for sewa(e lines

    :0 "nsulation of all (alvani;ed water pipes andwrapin( it with bitumenCs sheets and protect pipes located under tiles with cement morter."n addition to the insulation materials a(ainstheat loss for hot water pipes.

    80 $ll hot and cold water pipes for the pointsof fi&tures to the nearest distribution board.

  • 8/19/2019 BOQ for villa units

    18/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No ()

    1$. Plumbing 5orks

    2escription ,nit uantit4

    10/3 o 36

    10/4 o 36

    10/5 o 36

    10/6 o 173

    10/7 L.! 410

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Suppl) and fi& bath shower mi&er +Tebisa ack t)pe- includin( spra)er' hose' stand'(la;ed fire cla) soap holder' includin( allneeded fittin(s' pipes' and connections towater network to reach the distribution bo&.

    The price include makin( suitable hunch infloor ceramic with si;e 8 & 8 cm includin(its floor trap' and all the dischar(ere!uirements to the nearest trap' all re!uiredfittin(s for work completion .

    Suppl) and fi& white (la;ed firecla) Auropean=.. suite +Gitra t)pe 0 (rade $ -' ore!uivalent complete with heav) dut) cover' 7liter plastic double action flushin( cistern' andfi&ed chromium plated tap 1%2I Tibesa t)pe ore!uivelent' includin( all water suppl) pipes1:mm+Eolan)- to the nearest dist. bo& +DB-'flushin( hose spra)er' an(le valves' UPG

    draina(e pipe connectin( to the nearestmanhole or sewa(e header as perspecifications ' drawin(s and supervisoren(ineer instructions.

     =.. suite +Gitra t)pe 0 (rade $ -' ore!uivalent complete with 7 liter plastic doubleaction flushin( cistern' and fi&ed chromium plated tap 1%2I Tibesa t)pe or e!uivelent'includin( all water suppl) pipes1:mm+Eolan)- to the nearest dist. bo& +DB-'flushin( hose spra)er' an(le valves' UPGdraina(e pipe connectin( to the nearestmanhole or sewa(e header as perspecifications ' drawin(s and supervisor

    Suppl) and fi& floor trap *F diameter' 2.6mmthick for baths' kitchens' and balconies'complete with concrete protection' heav) dut) brass (ratin( and *I 2I PG draina(e pipeto the nearest manhole or ne&t vertical pipesincludin( heav) dut) S trap where needed as per specifications ' drawin(s and supervisoren(ineer instructions

    Suppl) and install PG *F internal draina(e pipes for vertical embedded pipes in the wallsincludin( all connections' Tees' bends' fittin(s'and *F PG vent for upper end of pipes as per

    specifications' drawin(s and supervisoren(ineer instructions

  • 8/19/2019 BOQ for villa units

    19/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (10)

    1$. Plumbing 5orks

    2escription ,nit

    10/8 L.! 280

    10/9 L.! 320

    10/10 o 48

    10/11 o 36

    10/12 o 72

    10/13 o 36

    tem0o.

    uantit4

    ,nit Rate,- 8 (letters)

     ,- 8

    !otal &mount,- 8

    Suppl) and install PG pipes #F' for rainwater drain' with #F PG vent with ballon and(alvani;ed steel mesh for upper end of vertical pipes. The work include all Tees' bends' andall related work accessories and fittin(saccordin( to the specifications ' drawin(s and

    supervisor en(ineerCs instructions.

    Suppl) and install UPG :F pipes ' SN* fore&ternal draina(e' with sockets. The workincludes e&cavatin( of trenches +depth up to2.m-' beddin(' compacted backfillin( withclean sand' connectin( to the manholes andh)draulic test accordin( to the specificationsand drawin(s

    Suppl) and install pre0cast reinforcedconcrete manhole B26 of internal diameter: cm depth up to 1.6m'walls 'founadtion

    and slab thickness 1cm accordin( to there!uired level' with concrete cover with ironframe 6cm openin(' < ton bearin( capacit)'includin( e&cavation' backfillin(' hunchin(and makin( (ood accordin( to specification'drawin(' and the en(ineer instructions.

    2ot an col $ater s/stem /Suppl)' install' test ' operate' and

    sterili;e the water s)stem in each buildin( .ates include the connections and valves andall that is necessar) for the operation of thes)stem as per specifications ' drawin(s and

    instructions supervisin( en(ineer 

    Suppl) and install water distribution bo& withlocal marble frame 2.cm thick includin( allneeded accessories and fittin(s. The priceincludes all distribution headers> +Sa(iv-valves on cold and hot water in addition tovalves on all feedin( point 1:mm pipes in theD.B' air valves' aluminum leaves with frameand all re!uired accessories as per drawin(s'specifications and en(ineer instructions. Thesi;e of DB is to fit the No. of outlets M 29spare space .

    Suppl) and fi& short water tap +hammat t)pe-for laundar) includin( all needed fittin(s' and+Eolan)- pipes to the nearest dist. bo&. The price includes 2F PG draina(e pipe to nearest(round trap as per specifications' drawin(s'and en(ineer instructions

    Lnl) preparation for water filter point insidekitchen cup board includin( all needed'fittin(s' +Eolan)- pipes connection to thenearest dist. bo&' and all needed works as perspecifications' drawin(s' and en(ineer

    instructions.

  • 8/19/2019 BOQ for villa units

    20/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    10/14 o. 16

    Lnl) preparation for (as point for the kitchenincludin( sleaves 2F PG pipes' (as valve and#%

  • 8/19/2019 BOQ for villa units

    21/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (10)

    1$. Plumbing 5orks

    2escription ,nit uantit4

    10/15 Ditto' but without sleaves 2F PG pipes o. 20

    10/16 L.! 320

    10/17 L.! 480

    10/18 L.! 1100

    10/19 o 36

    10/20 o 36

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Suppl) and install Ealvani;ed steel pipe +1F-Erade $' includin( insulation with asphalt paper. The +1F- Ealvani;ed steel pipe connectsthe suppl) line with water meter. The rateincludes suppl) and install all necessar)fittin(s' non return valves'unions' clamps'supports' *F PG sleaves to protect the pipesinside the walls' and e&cavation and backfillin( as per specifications' drawin(s anden(ineer instructions

    Ditto but +#%*F- for cold and hot water laid onthe roof of the buildin(.

    Ditto but 2mm ,DPA pipes for cold and hotwater lines connected from water meter to roofwater tanks and from roof water tanks to waterdist. Bo&. The price include *F PG pipes

    embedded in the walls.

    Suppl) install' water meter device' t)pe+$BB- or e!uivalent #%*I' ointin(' valves'non0returnvalves and connection to bothfeeder 1F (alvani;ed steel pipes and 2mm,DPA pipes includin( (alvani;ed steel bo&for peotection and all re!uired fittin(s andaccessories as per specifications ' drawin(sand supervisor en(ineer instructions

    Suppl)' paint' fi& and disinfect cold waterstora(e plastic tank 16 liter capacit) 'approved t)pe' float valve'washin( valve withall connections to the risin( main anddistribution pipe work and stop valves #%*I'and painted steel foundation dimensions11&11&6cm from welded an(les*6&*6&*.6mm ' 2.6cm new hard wood on thecomplete area under the tanks' with allaccessories as specification and drawin(s. therate includes paintin( of the water tank.

  • 8/19/2019 BOQ for villa units

    22/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (11)

    11. !lectrical $or%s

    2escription ,nit uantit4

    1) 3$itches

    a o 61

    * Ditto but without pipes and bo&. o 52

    c Ditto but double pole and with pipes and bo&. o 96

    + Ditto but double pole without pipes and bo&. o 120

    e Ditto but three pole and with pipes and bo&. o 40

    (  Ditto but three pole without pipes and bo&. o 59

    g o 24

    Ditto but three pole without pipes and bo&. o 44

    i o 16

      Ditto but without pipes and bo&. o 20

    ) 3oc%ets

    a o 414

    * Ditto but waterproof t)pe with pipes and bo&. o 189

    c o 72

    + o 108

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    The followin( items shall include suppl)'install' connect and commission li(htin( and power socket outlets' includin( PG conduits'conduit fittin(s' pull bo&es' wires' cables'accessories and circuit wirin( between fittin(s'

    switches or socket outlet up to its sub0panel board. $s shown on drawin(s specifications.

    4n case the conuits an 5or $ires arealrea/ exist6 the contractor must chec%out7 repair the efects if an/7 replace an/amages an obtain the engineer8s appro"alprior to resuming the $or%.

    Suppl) and install sin(le pole 1$ LN%L??

    switch t)pe EA="SS or e!uivalent whitecomplete with the internal bo&' pipes' supportframe and cover plate wires 1.6mm2. Thework includes all accessories needed forconnection and commissionin(.

    Ditto but push0button switch with lampindecator for staircases. t)pe EA="SS with pipes and bo&.

    Ditto but push0button bell switch with si(nallamp includin( pipes and bo&.

    Suppl) and install 1:$' # Pin power socketoutlet EA="SS or e!uivalent' includin( PGconduits' wires 2.6mm2 and all accessories for

    connection and commissionin(.

    Ditto but satellite socket + Eewiss- completewith coa&ial cable 86 ohm' conduites bo& andall materials to reach the sub0distribution bo&in the staircase.

    Suppl) and install telephone socket +Eewiss-complete with *&.:mm cable with pipes and bo& and all materials to reach the sub0distribution bo& in the staircase.

  • 8/19/2019 BOQ for villa units

    23/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (11)

    11. !lectrical $or%s

    2escription ,nit uantit4

    3 o 36

    o 108

    ) lighting

    a o 120

    * Ditto but without pipes and bo&. o 159

    c o 40

    + Ditto but without pipes and bo&. o 59

    e o 146

    (  Ditto but without pipes and bo&. o 110

    g Ditto but waterproof with pipes and bo& o 29

    Ditto but without pipes and bo&. o 12

    i o 88

    g Ditto but without pipes and bo&. o 119

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Suppl) and install electrical bell approved!ualit) with wires 1.6mm2 and all necessar)works needed accordin( to drawin(s'specifications and An(ineerCs instructions.

    Lnl) preliminar) installation work for A&tractfan :F includin( pvc sleeve :F pipe 26cmlen(th' includin( conduits' wires 1.6 mm2' andall necessar) civil works needed accordin( todrawin(s' specifications and An(ineerCsinstructions.

    Suppl) and install ceilin( pendant mountin(li(htin( luminar) with lamp :w includin( pvc conduits' bo&' wires' and all accessoriesre!uired.

    Ditto but wall mounted with lamp 1w'includin( pipes and bo&.

    Suppl) and install Elobe li(htin( fi&ture with:w lamp +E$$SJ- or e!uivalent includin(all conduits' wires 1.6mm2'bo&es'etc...

    Lnl) preliminar) installation work forfluorescent luminaries on walls for rooms andkitchens ' and all necessar) works includin( bo&es conduits' wires' needed accordin( todrawin(s' specifications and An(ineerCsinstructions.

  • 8/19/2019 BOQ for villa units

    24/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    6) Cables

    a L.! 705

    * Ditto but without conduits. L.! 96

    c L.! 26

    + Ditto but without conduits. L.! 70

    e L.! 720

    *) ;ain 2istribution "oard (;2")

    o 16

  • 8/19/2019 BOQ for villa units

    25/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    Contractor Signature

    Bill No (11)

    11. !lectrical $or%s

    2escription ,nit uantit4

    e o 16

    ) o 16

    1$) L.S 16

    $ll civil works re!uired.

    11) L.S 4

    1) L.S 12

    13) o 32

    !otal

    tem0o.

    ,nit Rate,- 8 (letters)

    ,nit Rate,- 8 (0umbers)

    !otal &mount,- 8

    Suppl)' install' and commission mainommunication Board comprised of two partsfor Telephone and "ntercom.The bod) is madeof (alvani;ed steel with 2mm thickness and

    hot dipped paint with (re) color . The boardcontains the terminal block' locks andaccessories .The price includes the pvcconduits from the (round floor ever)apartment and all re!uired works.

    Suppl) and install two pvc bo&es for sattelliteand telephone services one in the staircase andthe other on the roof for ever) apartment. Thesi;es of bo&es should fit the stallite and tel.cables and onnection M #9 spare space. Theitem should include the conduit between the

    two bo&es

    !arthing 3/stem /Suppl)' install' andcommission complete earthin( s)stem includesthe followin(/

    upper electrodes with diameter 17mm inside:cm manhole with its standard cover.

    The wire of #6mm2 NQ$ from manhole to,DB and 1mm2 NQ$ from main water pipeto ,DB.

    The resistance of the s)stem must not e&ceed 2

    ohm.

    "ntercom S)stem /0Suppl) and installcommission complete intercom s)stemincludin( the followin( / The main doorstation with # push0buttons and the amplifier+2$022 volts- The internal hand sets # no 'the main electrical door lock and all cables'conduits re!uired ?$?"S$ made ore!uivalent.

    "ntercom S)stem /0Suppl) and installcommission complete intercom s)stemincludin( the followin( / The main doorstation with 2 push0buttons and the amplifier

    +2$022 volts- The internal hand sets 2 no 'the main electrical door lock and all cables'conduits re!uired ?$?"S$ made ore!uivalent.

    Suppl)' install' connect commission Alect.manhole' :cm dia.for the main cable of the buildin( complete with heav) dut) cover < toncapacit) written electricit) b) $rabic andAn(lish ' includin( e&cavation' backfillin( anda((re(ate beddin(s shown on drawin(s.

  • 8/19/2019 BOQ for villa units

    26/26

    Package #3: Completion of Construction 16 buildings. 

    ITB 2011-010

    -ummar4

    "ill 0o tem 2escription !otal (,s 8)

    "ill 0o ($) ;obili=ation > 2emobili=ation

    "ill 0o (1) 1 9ca7ation 5orks

    "ill 0o () 2 Concrete ?orks

    "ill 0o (3) 3 "uilding 5orks

    "ill 0o () 4 Plastering 5orks

    "ill 0o () 5 !illing > ;arble 5orks

    "ill 0o (6) 6 Painting 5orks

    "ill 0o (*) 7 Carpentr4 5orks

    "ill 0o (