 SATUAN KERJA : POKJA UPL UIN ALAUDDIN PROYEK : PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS ISLAM  UIN ALAUDDIN MAK ASSAR TAHUN : 2015 A PRELIMINARIES - Rp B PEKERJAAN STRUKTUR - Rp  JUMLAH - Rp PPN 10% - Rp TOTAL - Rp DIBULATKAN - Rp TERBILANG Makassar, ………………………... 2015 PT/CV………………………………. ………………………………………. Direktur REKAPITULASI URAIAN PEKERJAAN JUMLAH NO BILL OF QUANTITY
19

Boq Febi Uin Tahap i

Nov 05, 2015

Download

Documents

DaengNojengs

dok. lelang
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • SATUAN KERJA : POKJA UPL UIN ALAUDDIN

    PROYEK : PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS ISLAM

    UIN ALAUDDIN MAKASSAR

    TAHUN : 2015

    A PRELIMINARIES -Rp

    B PEKERJAAN STRUKTUR -Rp

    JUMLAH -Rp

    PPN 10% -Rp

    TOTAL -Rp

    DIBULATKAN -Rp

    TERBILANG

    Makassar, ... 2015

    PT/CV.

    .

    Direktur

    REKAPITULASI

    URAIAN PEKERJAAN JUMLAHNO

    BILL OF QUANTITY

  • SATUAN KERJA : POKJA UPL UIN ALAUDDIN

    PROYEK : PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS ISLAM

    UIN ALAUDDIN MAKASSAR

    PEKERJAAN : PREELIMINARIES

    TAHUN : 2015

    A. PRELIMINARIES -Rp

    1 Pembersihan Lokasi 1.00 Ls -Rp -Rp

    2 Pemasangan pagar keliling 332.00 m -Rp -Rp

    3 Papan nama proyek 1.00 Ls -Rp -Rp

    4 Direksi Keet 45.00 m -Rp -Rp

    5 Air proyek + instalasi dan Penampungan 5.00 bln -Rp -Rp

    6 P3k 1.00 Ls -Rp -Rp

    7 Testing material 1.00 Ls -Rp -Rp

    8 Shop drawing & as built drawing 1.00 Ls -Rp -Rp

    9 Laporan dan fotograph 5.00 bln -Rp -Rp

    10 Mobilisasi dan demobilisasi 1.00 Ls -Rp -Rp

    11 Listrik kerja 5.00 bln -Rp -Rp

    HARGA SATUAN

    BILL OF QUANTITY

    NO. URAIAN PEKERJAAN TOTAL HARGAVOLUME

  • SATUAN KERJA : POKJA UPL UIN ALAUDDINPROYEK : PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS ISLAM

    UIN ALAUDDIN MAKASSARPEKERJAAN : STRUKTURTAHUN : 2015

    B. PEKERJAAN STRUKTUR -Rp

    a. ELEVASI BOC - PONDASI -Rp

    1. Pondasi Tiang Pancang -Rp

    1.1 Pekerjaan tiang pancang dia. 40 cm 880.00 m -Rp -Rp 1.2 Mobilisasi tiang pancang 1.00 ls -Rp -Rp 1.3 Test PDA 4.00 ttk -Rp -Rp

    2. Pile Cap -Rp

    2.1 Type P1 uk. 60x60 cm -Rp 2.1.1 Galian tanah Pondasi Poer 0.86 m -Rp -Rp 2.1.2 Urugan pasir bawah pile cap 0.14 m -Rp -Rp 2.1.3 Lantai kerja 0.14 m -Rp -Rp 2.1.4 Urugan kembali bekas galian 0.29 m -Rp -Rp 2.1.5 Bekisting 6.67 m2/m3 5.76 m -Rp -Rp 2.1.6 Pembesian 169.51 kg/m3 146.46 kg -Rp -Rp 2.1.7 Cor Beton K-275 0.86 m -Rp -Rp

    2.2 Type P2 uk. 180x60 cm -Rp 2.2.1 Galian tanah Pondasi Poer 15.12 m -Rp -Rp 2.2.2 Urugan pasir bawah pile cap 2.16 m -Rp -Rp 2.2.3 Lantai kerja 2.16 m -Rp -Rp 2.2.4 Urugan kembali bekas galian 5.04 m -Rp -Rp 2.2.5 Bekisting 5.71 m2/m3 86.40 m -Rp -Rp 2.2.6 Pembesian 141.96 kg/m3 2,146.41 kg -Rp -Rp 2.2.7 Cor Beton K-275 15.12 m -Rp -Rp

    2.3 Type P3 -Rp 2.3.1 Galian tanah Pondasi Poer 36.51 m -Rp -Rp 2.3.2 Urugan pasir bawah pile cap 5.22 m -Rp -Rp 2.3.3 Lantai kerja 5.22 m -Rp -Rp 2.3.4 Urugan kembali bekas galian 12.17 m -Rp -Rp 2.3.5 Bekisting 6.63 m2/m3 241.92 m -Rp -Rp 2.3.6 Pembesian 96.27 kg/m3 3,515.06 kg -Rp -Rp 2.3.7 Cor Beton K-275 36.51 m -Rp -Rp

    3 Pedestel Kolom -Rp

    4.1 Kolom K1 uk. 50/50 -Rp 4.1.1 Bekisting 2x pakai 8.00 m2/m3 28.80 m -Rp -Rp 4.1.2 Pembesian 190.22 kg/m3 684.80 kg -Rp -Rp 4.1.3 Cor Beton K-275 3.60 m -Rp -Rp

    4.2 Kolom K1 - 1uk. 50/60 bh -Rp 4.2.1 Bekisting 2x pakai 7.33 m2/m3 8.45 m -Rp -Rp 4.2.2 Pembesian 177.84 kg/m3 204.88 kg -Rp -Rp 4.2.3 Cor Beton K-275 1.15 m -Rp -Rp

    4.3 Kolom K3uk. 60cm bh -Rp 4.3.1 Bekisting 2x pakai 6.67 m2/m3 4.52 m -Rp -Rp 4.3.2 Pembesian 105.49 kg/m3 71.55 kg -Rp -Rp 4.3.3 Cor Beton K-275 0.68 m -Rp -Rp

    4 Tie Beam dan Sloef -Rp

    5.1 Type TB1 uk. 30/50 378.00 m' -Rp 5.1.1 Bekisting 2x pakai 5.07 m2/m3 219.34 m -Rp -Rp 5.1.2 Pembesian 192.62 kg/m3 8,338.58 kg -Rp -Rp 5.1.3 Cor Beton K-275 43.29 m -Rp -Rp

    5.2 Type TB2 uk. 40/60 448.29 m' -Rp 5.2.1 Bekisting 2x pakai 4.00 m2/m3 65.28 m -Rp -Rp 5.2.2 Pembesian 176.01 kg/m3 2,872.44 kg -Rp -Rp 5.2.3 Cor Beton K-275 16.32 m -Rp -Rp

    5.3 Type TB4 uk. 25/40 m' -Rp 5.4.1 Bekisting 2x pakai 5.60 m2/m3 32.93 m -Rp -Rp 5.4.2 Pembesian 156.53 kg/m3 920.40 kg -Rp -Rp 5.4.3 Cor Beton K-275 5.88 m -Rp -Rp

    BILL OF QUANTITY

    NO URAIAN PEKERJAAN VOLUMEUKURAN HARGA SATUAN TOTAL

  • NO URAIAN PEKERJAAN VOLUMEUKURAN HARGA SATUAN TOTAL

    5 Ground Water Tank -Rp

    6.1 Galian tanah 204.88 m -Rp -Rp 6.2 Urugan pasir bawah lantai 4.39 m -Rp -Rp 6.3 Sloef 25x40

    6.3.1 Bekisting 2x pakai 5.60 m/m 20.58 m -Rp -Rp 6.3.2 Pembesian 156.53 kg/m 575.25 kg -Rp -Rp 6.3.3 Cor Beton K-275 3.68 m -Rp -Rp

    6.4 balok 25x406.3.1 Bekisting 2x pakai 8.10 m/m 33.01 m -Rp -Rp 6.3.2 Pembesian 152.74 kg/m 622.40 kg -Rp -Rp 6.3.3 Cor Beton K-25 4.08 m -Rp -Rp

    6.5 Lantai GWT6.3.1 LantaiKerja 4.39 m -Rp -Rp 6.3.2 Pembesian 83.84 kg/m 874.56 kg -Rp -Rp 6.3.3 Cor Beton K-275 10.43 m -Rp -Rp

    6.6 Dinding GWT6.4.1 Bekisting 2x pakai 10.00 m/m 135.76 m -Rp -Rp 6.4.2 Pembesian 127.28 kg/m 1,727.95 kg -Rp -Rp 6.4.3 Cor Beton K-275 13.58 m -Rp -Rp

    6.7 Plat penutup GWT6.5.1 Bekisting 2x pakai 5.83 m/m 36.00 m -Rp -Rp 6.5.2 Pembesian 141.65 kg/m 874.56 kg -Rp -Rp 6.5.3 Cor Beton K-275 6.17 m -Rp -Rp

    b. ELEVASI TOC 0,00 (Lantai 1) -Rp

    1 Plat Lantai 1 -Rp

    1.1 Plat Lantai -Rp 1.1.1 Lantai Kerja 98.52 m -Rp -Rp 1.1.2 Pembesian 151.02 kg/m 22,317.39 kg -Rp -Rp 1.1.3 Cor Beton K-275 147.78 m -Rp -Rp

    2 Kolom -Rp

    2.1 Kolom K1 uk. 50x50 2.78 bh -Rp 1.1.1 Bekisting 2x pakai 8.00 m2/m3 192.00 m -Rp -Rp 1.1.2 Pembesian 190.22 kg/m3 4,565.36 kg -Rp -Rp 1.1.3 Cor Beton K - 275 24.00 m -Rp -Rp

    2.2 Kolom K1-1 uk. 50x60 4.94 bh -Rp 1.2.1 Bekisting 2x pakai 7.33 m2/m3 105.60 m -Rp -Rp 1.2.2 Pembesian 177.84 kg/m3 2,560.97 kg -Rp -Rp 1.2.3 Cor Beton K - 275 14.40 m -Rp -Rp

    2.3 Kolom K3 uk. 60 cm bh -Rp 1.3.1 Bekisting 2x pakai 6.67 m2/m3 36.93 m -Rp -Rp 1.3.2 Pembesian 105.49 kg/m3 584.30 kg -Rp -Rp 1.3.3 Cor Beton K - 275 5.54 m -Rp -Rp

    2. Tangga -Rp

    2.1 Tangga type 1 termasuk balok tangga 2 -Rp 2.1.1 Bekisting 10.00 m2/m3 48.90 m -Rp -Rp 2.1.2 Pembesian 150.00 kg/m3 733.50 kg -Rp -Rp 2.1.3 Cor Beton K - 275 4.89 m -Rp -Rp

    2.2 Tangga type 2 termasuk balok tangga -Rp 2.1.1 Bekisting 10.00 m2/m3 25.60 m -Rp -Rp 2.1.2 Pembesian 150.00 kg/m3 384.00 kg -Rp -Rp 2.1.3 Cor Beton K - 275 2.56 m -Rp -Rp

    c. ELEVASI TOC +4.00 (Lantai 2) -Rp

    1. Balok -Rp

    1.1 Balok BI1 uk. 30x50 m' -Rp 1.1.1 Bekisting 2x pakai 6.27 m2/m3 79.68 m -Rp -Rp 1.1.2 Pembesian 216.08 kg/m3 2,745.31 kg -Rp -Rp 1.1.3 Cor Beton K - 275 12.71 m -Rp -Rp

    1.2 Balok BI2 uk. 30x60 m' -Rp 1.2.1 Bekisting 2x pakai 7.00 m2/m3 27.72 m -Rp -Rp 1.2.2 Pembesian 247.38 kg/m3 979.62 kg -Rp -Rp 1.2.3 Cor Beton K - 275 3.96 m -Rp -Rp

    1.3 Balok BI3 uk. 30x60 m' -Rp 1.3.1 Bekisting 2x pakai 7.00 m2/m3 211.68 m -Rp -Rp 1.3.2 Pembesian 229.15 kg/m3 6,929.60 kg -Rp -Rp 1.3.3 Cor Beton K - 275 30.24 m -Rp -Rp

    1.4 Balok BI4 uk. 40x60 m' -Rp 1.4.1 Bekisting 2x pakai 5.67 m2/m3 88.94 m -Rp -Rp 1.4.2 Pembesian 203.35 kg/m3 3,191.72 kg -Rp -Rp 1.4.3 Cor Beton K - 275 15.70 m -Rp -Rp

  • NO URAIAN PEKERJAAN VOLUMEUKURAN HARGA SATUAN TOTAL

    1.5 Balok BI5 uk. 25x40 m' -Rp 1.5.1 Bekisting 2x pakai 8.10 m2/m3 17.50 m -Rp -Rp 1.5.2 Pembesian 212.71 kg/m3 459.45 kg -Rp -Rp 1.5.3 Cor Beton K - 275 2.16 m -Rp -Rp

    1.6 Balok Ba1 uk. 25x40 m' -Rp 1.6.1 Bekisting 2x pakai 8.10 m2/m3 64.72 m -Rp -Rp 1.6.2 Pembesian 192.71 kg/m3 1,539.73 kg -Rp -Rp 1.6.3 Cor Beton K - 275 7.99 m -Rp -Rp

    1.7 Balok Ba2 uk. 25x50 m' -Rp 1.6.1 Bekisting 2x pakai 8.08 m2/m3 123.22 m -Rp -Rp 1.6.2 Pembesian 201.81 kg/m3 3,077.60 kg -Rp -Rp 1.6.3 Cor Beton K - 275 15.25 m -Rp -Rp

    2. Plat -Rp

    2.1 Plat Lantai -Rp 2.1.1 Steel floor decking 1.00 m2 913.63 m -Rp -Rp 2.1.2 Pembesian warmesh M-8 1.00 m2 913.63 m -Rp -Rp 2.1.3 Cor Beton K - 275 t=12 cm 109.64 m -Rp -Rp

    3. Kolom -Rp

    3.1 Kolom K1 uk. 50 x 50 2.78 4.94 bh -Rp 3.2.1 Bekisting 2x pakai 8.00 m2/m3 153.60 m -Rp -Rp 3.2.2 Pembesian 190.22 kg/m3 3,298.65 kg -Rp -Rp 3.2.3 Cor Beton K - 275 24.00 m -Rp -Rp

    3.2 Kolom K1 - 1 uk. 50 x 60 2.78 bh -Rp 3.3.1 Bekisting 2x pakai 7.33 m2/m3 96.00 m -Rp -Rp 3.3.2 Pembesian 177.85 kg/m3 1,902.67 kg -Rp -Rp 3.3.3 Cor Beton K - 275 14.40 m -Rp -Rp

    d. STRUKTUR AREA AULA -Rp

    1. Pekerjaan tiang pancang dia. 40 cm 120.00 m -Rp -Rp

    2. Pile Cap Type P1 uk. 60x60 cm

    2.1 Galian tanah Pondasi Poer 2.59 m -Rp -Rp

    2.2 Urugan pasir bawah pile cap 0.43 m -Rp -Rp

    2.3 Lantai kerja 0.43 m -Rp -Rp

    2.4 Urugan kembali bekas galian 0.86 m -Rp -Rp

    2.5 Bekisting 6.67 m2/m3 17.28 m -Rp -Rp

    2.6 Pembesian 169.51 kg/m3 439.38 kg -Rp -Rp

    2.7 Cor Beton K - 275 2.59 m -Rp -Rp

    3. Pedestal Kolom K2 uk. 50/50 4.17

    3.1 Bekisting 2x pakai 8.00 m2/m3 14.40 m -Rp -Rp

    3.2 Pembesian 144.67 kg/m3 260.41 kg -Rp -Rp

    3.3 Cor Beton K - 275 1.80 m -Rp -Rp

    4 Type TB3 uk. 30/50 (AULA)

    4.1 Bekisting 2x pakai 5.07 m2/m3 78.58 m -Rp -Rp

    4.2 Pembesian 163.67 kg/m3 2,538.54 kg -Rp -Rp

    4.3 Cor Beton K - 275 15.51 m -Rp -Rp

  • SATUAN KERJA : POKJA UPL UIN ALAUDDINPEKERJAAN : STRUKTUR DAN ARSITEKTURPROYEK : PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS ISLAM

    UIN ALAUDDIN MAKASSARTAHUN : 2015

    1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.4000 - - Tukang L.04 OH 0.2000 - - Kepala Tukang OH 0.0200 - - Mandor OH 0.0200 - -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu Dolken 8-10/400 cm Btg 1.2500 - - Semen Portland kg 2.5000 - - Seng Gelombang Bjls 20 Lbr 1.2000 - - Pasir Beton M 0.0050 - - Koral Beton M 0.0090 - - Kayu 5/7 Kls. III M 0.0720 - - Paku biasa 2"-5" Kg 0.0600 - - Cat Meni kg 0.4500 - -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    1 M2 PEMBERSIHAN LAPANGAN DAN PEMERATAAN

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.10 - - Mandor L.04 OH 0.05 - -

    JUMLAH TENAGA KERJA - B BAHAN

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    No Uraian Kode Satuan Koefisien

    Satuan Koefisien

    ANALISA HARGA SATUAN PEKERJAAN

    No Uraian Kode

  • 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGA Pekerja L.01 OH 0.1000 - - Tukang L.04 OH 0.1000 - - Kepala Tukang OH 0.0100 - - Mandor OH 0.0050 - -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu 5/7 Kls III M 0.0120 - - Paku biasa 2"-5" Kg 0.0200 - - Kayu papan 3/20 Kls III M 0.0070 - -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Pekerjaan Pondasi Pancang per 1m'

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.2775 0.00 - Tukang L.02 OH 0.1108 0.00 - Mandor L.04 OH 0.0275 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Tiang pancang dia 40 m' 1.0000 0.00 - Kawat Las Kg 0.0185 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    Mesin Las jam 0.0185 0.00 - Hummer+crane jam 0.445 0.00 -

    JUMLAH HARGA ALAT - 10 % x D -

    D Jumlah (A+B+C) - E Overhead & Profit (Contoh 10 %) 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Penggalian 1 m tanah biasa sedalam 1 m'

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.75 - - Mandor L.04 OH 0.03 - -

    JUMLAH TENAGA KERJA - B BAHAN

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    Koefisien

    No Uraian Kode Satuan

    No Uraian Kode Satuan Koefisien

    No Uraian Kode Satuan

  • Pengurugan kembali 1 m galian tanahPengurugan kembali 1 m3 galian dihitung 1/3 kali dari koefisien pekerjaan galian

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.50 - - Mandor L.04 OH 0.05 - -

    JUMLAH TENAGA KERJA - B BAHAN

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Pengurugan 1 m dengan pasir urug

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.30 - - Mandor L.04 OH 0.01 - -

    JUMLAH TENAGA KERJA - B BAHAN

    Pasir urug m3 1.20 - - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit ( 10 %) 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Pemadatan tanah 1 m tanah (per 20 cm )

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.50 - - Mandor L.04 OH 0.05 - -

    JUMLAH TENAGA KERJA - B BAHAN

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    Kode Satuan Koefisien

    No Uraian Kode

    KoefisienNo Uraian Kode Satuan

    Satuan

    No Uraian

  • Pengurugan 1 m sirtu padat

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.25 - - Mandor L.04 OH 0.03 - -

    JUMLAH TENAGA KERJA - B BAHAN

    Sirtu m3 1.20 - - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Penggalian 1 m tanah biasa sedalam 2 m'

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.90 - - Mandor L.04 OH 0.05 - -

    JUMLAH TENAGA KERJA - B BAHAN

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Membuat 1 m lantai kerja beton mutu f' = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.2000 0.00 - Tukang batu L.02 OH 0.2000 0.00 - Kepala Tukang L.03 OH 0.0200 0.00 - Mandor L.04 OH 0.0600 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Semen portland Kg 230.0000 0.00 - Pasir beton Kg 893.0000 0.00 - Kerikil (Maks. 30 mm) Kg 1027.0000 0.00 - Air Ltr 200.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    CATATANBobot isi pasir + 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bucking factor pasir = 20 %

    No Uraian Kode Satuan Koefisien

    Koefisien

    Kode Satuan KoefisienNo Uraian

    No Uraian Kode Satuan

  • Membuat 1 m beton mutu f' = 14,5 Mpa (K 175), slump (12 2) cm, w/c = 0,65

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.6500 0.00 - Tukang batu L.02 OH 0.2750 0.00 - Kepala Tukang L.03 OH 0.0280 0.00 - Mandor L.04 OH 0.0830 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Semen portland Kg 326.0000 0.00 - Pasir beton Kg 760.0000 0.00 - Kerikil (Maks. 30 mm) Kg 1029.0000 0.00 - Air Ltr 215.0000 - -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Membuat 1 m beton mutu f' = 16,9 Mpa (K 200), slump (12 2) cm, w/c = 0,61

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.6500 0.00 - Tukang batu L.02 OH 0.2750 0.00 - Kepala Tukang L.03 OH 0.0280 0.00 - Mandor L.04 OH 0.0830 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Semen portland Kg 352.0000 0.00 - Pasir beton Kg 731.0000 0.00 - Kerikil (Maks. 30 mm) Kg 1031.0000 0.00 - Air Ltr 215.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Membuat 1 m beton mutu f' = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.6500 0.00 - Tukang batu L.02 OH 0.2750 0.00 - Kepala Tukang L.03 OH 0.0280 0.00 - Mandor L.04 OH 0.0830 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Ready mix K-225 m3 1.0100 0.00 - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    No Uraian Kode KoefisienSatuan

    No Uraian Kode Satuan Koefisien

    No Uraian Kode Satuan

  • Membuat 1 m beton mutu f' = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.6500 0.00 - Tukang batu L.02 OH 0.2750 0.00 - Kepala Tukang L.03 OH 0.0280 0.00 - Mandor L.04 OH 0.0830 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Ready mix K-250 m3 1.0100 0.00 - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Membuat 1 m beton mutu f' = 24,0 Mpa (K 275), slump (12 2) cm, w/c = 0,53

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.6500 0.00 - Tukang batu L.02 OH 0.2750 0.00 - Kepala Tukang L.03 OH 0.0280 0.00 - Mandor L.04 OH 0.0830 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Ready mix K-275 m3 1.0100 0.00 - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Membuat 1 m beton mutu f' = 26,4 Mpa (K 300), slump (12 2) cm, w/c = 0,52

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 1.6500 0.00 - Tukang batu L.02 OH 0.2750 0.00 - Kepala Tukang L.03 OH 0.0280 0.00 - Mandor L.04 OH 0.0830 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Ready mix K-300 m3 1.0100 0.00 - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    No Uraian Kode Satuan Koefisien

    No Uraian Kode Satuan

    No Uraian Kode Satuan Koefisien

  • Membuat 1 m beton mutu f' = 28,8 Mpa (K 325), slump (12 2) cm, w/c = 0,49

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 2.1000 0.00 - Tukang batu L.02 OH 0.3500 0.00 - Kepala Tukang L.03 OH 0.0350 0.00 - Mandor L.04 OH 0.1050 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Ready mix K-325 m3 1.0100 0.00 - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Membuat 1 m beton mutu f' = 31,2 Mpa (K 350), slump (12 2) cm, w/c = 0,48

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 2.1000 0.00 - Tukang batu L.02 OH 0.3500 0.00 - Kepala Tukang L.03 OH 0.0350 0.00 - Mandor L.04 OH 0.1050 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Ready mix K-350 m3 1.0100 0.00 - JUMLAH HARGA BAHAN -

    C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Pembesian 10 kg dengan besi polos atau besi ulir

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.0700 0.00 - Tukang besi L.02 OH 0.0700 0.00 - Kepala Tukang L.03 OH 0.0070 0.00 - Mandor L.04 OH 0.0040 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Besi beton (polos/ulir) Kg 10.5000 0.00 - Kawat beton Kg 0.1500 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    Alat bantu kg 1.00 0 - JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit ( 10 %) 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Harga Satuan untuk 1 kg -

    Koefisien

    Koefisien

    No Uraian Kode Satuan

    No Uraian Kode Satuan Koefisien

    No Uraian Kode Satuan

  • Pemasangan M2 kg jaring kawat baja (wiremesh) M8

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.0250 0.00 - Tukang besi L.02 OH 0.0250 0.00 - Kepala Tukang L.03 OH 0.0025 0.00 - Mandor L.04 OH 0.0015 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Wire mesh M-8 M2 1.0000 0.00 - Kawat beton Kg 0.8050 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Pemasangan M2 kg jaring kawat baja (wiremesh) M10

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.0250 0.00 - Tukang besi L.02 OH 0.0250 0.00 - Kepala Tukang L.03 OH 0.0025 0.00 - Mandor L.04 OH 0.0015 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Wire mesh M-10 M2 1.0000 0.00 - Kawat beton Kg 0.8050 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Pemasangan 1 m bekisting untuk pondasi

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.5200 0.00 - Tukang Kayu L.02 OH 0.2600 0.00 - Kepala Tukang L.03 OH 0.0260 0.00 - Mandor L.04 OH 0.0260 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0400 0.00 - Paku 5 - 10 cm Kg 0.3000 0.00 - Minyak bekisting Ltr 0.1000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Untuk 2x pakai (A+1/2B+C) - H Overhead & Profit 10% x D - I Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    No Uraian Kode Satuan Koefisien

    No Uraian Kode

    Koefisien

    Satuan

    No Uraian Kode Satuan

  • Pemasangan 1 m bekisting untuk Tie Beam

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.5200 0.00 - Tukang Kayu L.02 OH 0.2600 0.00 - Kepala Tukang L.03 OH 0.0260 0.00 - Mandor L.04 OH 0.0260 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0450 0.00 - Paku 5 - 10 cm Kg 0.3000 0.00 - Minyak bekisting Ltr 0.1000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Untuk 2x pakai (A+1/2B+C) - H Overhead & Profit 10% x D - I Harga Satuan Pekerjaaan (D+E) -

    Pemasangan 1 m bekisting untuk kolom

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.6600 0.00 - Tukang Kayu L.02 OH 0.3300 0.00 - Kepala Tukang L.03 OH 0.0330 0.00 - Mandor L.04 OH 0.0330 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0400 0.00 - Paku 5 - 10 cm Kg 0.4000 0.00 - Minyak bekisting Ltr 0.2000 0.00 - Balok kayu kelas II m3 0.0150 0.00 - Plywood tebal 9 mm Lbr 0.3500 0.00 - Bambu Besar Batang 2.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Untuk 2x pakai (A+1/2B+C) - H Overhead & Profit 10% x D - I Harga Satuan Pekerjaaan (D+E) -

    G Harga Satuan untuk 2 kali pakai -

    Koefisien

    No Uraian Kode Satuan Koefisien

    No Uraian Kode Satuan

  • Pemasangan 1 m bekisting untuk balok

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.6600 0.00 - Tukang Kayu L.02 OH 0.3300 0.00 - Kepala Tukang L.03 OH 0.0330 0.00 - Mandor L.04 OH 0.0330 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0400 0.00 - Paku 5 - 10 cm Kg 0.4000 0.00 - Minyak bekisting Ltr 0.2000 0.00 - Balok kayu kelas II m3 0.0180 0.00 - Plywood tebal 9 mm Lbr 0.3500 0.00 - Bambu Besar Batang 2.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Untuk 2x pakai (A+1/2B+C) - H Overhead & Profit 10% x D - I Harga Satuan Pekerjaaan (D+E) -

    Pemasangan 1 m bekisting untuk lantai

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.6600 0.00 - Tukang Kayu L.02 OH 0.3300 0.00 - Kepala Tukang L.03 OH 0.0330 0.00 - Mandor L.04 OH 0.0330 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0400 0.00 - Paku 5 - 10 cm Kg 0.4000 0.00 - Minyak bekisting Ltr 0.2000 0.00 - Balok kayu kelas II m3 0.0150 0.00 - Plywood tebal 9 mm Lbr 0.3500 0.00 - Bambu Besar Batang 6.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Bambu Besar 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Untuk 2x pakai (A+1/2B+C) - H Bambu Besar 10% x D - I Harga Satuan Pekerjaaan (D+E) -

    No Uraian Kode Satuan Koefisien

    No Uraian Kode KoefisienSatuan

  • Pemasangan 1 m bekisting untuk dinding

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.6600 0.00 - Tukang Kayu L.02 OH 0.3300 0.00 - Kepala Tukang L.03 OH 0.0330 0.00 - Mandor L.04 OH 0.0330 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0300 0.00 - Paku 5 - 10 cm Kg 0.4000 0.00 - Minyak bekisting Ltr 0.2000 0.00 - Balok kayu kelas II m3 0.0200 0.00 - Plywood tebal 9 mm Lbr 0.3500 0.00 - Bambu Besar Batang 3.0000 0.00 - Penjaga jarak bekisting/spacer Bh 4.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Bambu Besar 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    G Untuk 2x pakai (A+1/2B+C) - H Bambu Besar 10% x D - I Harga Satuan Pekerjaaan (D+E) -

    Pemasangan 1 m bekisting untuk tangga

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.6600 0.00 - Tukang Kayu L.02 OH 0.3300 0.00 - Kepala Tukang L.03 OH 0.0330 0.00 - Mandor L.04 OH 0.0330 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Kayu kelas III m3 0.0300 0.00 - Paku 5 - 10 cm Kg 0.4000 0.00 - Minyak bekisting Ltr 0.1500 0.00 - Balok kayu kelas II m3 0.0150 0.00 - Plywood tebal 9 mm Lbr 0.3500 0.00 - Bambu Besar Batang 2.0000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Bambu Besar 10 % x D - F Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    Uraian Kode

    Uraian Kode Satuan

    No Satuan Koefisien

    No

  • Membuat 1 m2 Rabat beton mutu f' = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58 t = 5cm

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.2857 0.00 - Tukang batu L.02 OH 0.0714 0.00 - Kepala Tukang L.03 OH 0.0071 0.00 - Mandor L.04 OH 0.0143 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Semen portland Kg 9.2821 0.00 - Pasir beton Kg 54.0000 0.00 - Kerikil (Maks. 30 mm) Kg 87.7500 0.00 - Air Ltr 16.1250 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Untuk tebal 10 cmG Jumlah (A+B*2+C) - H Overhead & Profit 10% xG - I Harga Satuan Pekerjaaan (G+H) -

    Pemasangan 1m2 Steel Floor decking

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAPekerja L.01 OH 0.1000 0.00 - Tukang L.02 OH 0.2600 0.00 - Kepala Tukang L.03 OH 0.0300 0.00 - Mandor L.04 OH 0.0050 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Steel Floor Decking Lbr 0.3472 - Baut kg 0.4000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    Alat dan material Bantu Ls 1.000 - JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    1 m' kolom praktis dan balok latai

    Harga Satuan Jumlah Harga(Rp) (Rp)

    A TENAGAUpah beton K 175 m3 0.0100 0.00 - Upah Pembesian kg 2.8300 0.00 - Upah Bekisting m2 0.2000 0.00 -

    JUMLAH TENAGA KERJA - B BAHAN

    Beton K 175 m3 0.0100 0.00 - Pembesian kg 2.8300 0.00 - Bekisting 2x pakai m2 0.2000 0.00 -

    JUMLAH HARGA BAHAN - C PERALATAN

    Alat dan material Bantu Ls 0.000 - - JUMLAH HARGA ALAT -

    D Jumlah (A+B+C) - E Overhead & Profit 10% x D - F Harga Satuan Pekerjaaan (D+E) -

    Koefisien

    No Uraian Kode Satuan Koefisien

    Uraian KodeNo Satuan

    KoefisienNo Uraian Kode Satuan

  • NO. DAFTAR UPAH SAT.

    1 Pekerja Org/Hr Rp.

    2 Tukang Batu Org/Hr Rp.

    3 Kepala Tukang Org/Hr Rp.

    4 Mandor Org/Hr Rp.

    5 Tukang Org/Hr Rp.

    6 Operator crane Org/Hr Rp.

    7 Operator Org/Hr Rp.

    8 Operator Alat Berat Org/Hr Rp.

    9 Tukang Cat Org/Hr Rp.

    10 Tukang Kayu Org/Hr Rp.

    11 Tukang Las Konstruksi Org/Hr Rp.

    12 Tukang Las Biasa Org/Hr Rp.

    13 Tukang Vibrator Org/Hr Rp.

    14 Tukang erection Org/Hr Rp.

    15 Tukang Besi Org/Hr Rp.

    16 Pembantu operator crane Org/Hr Rp.

    NO. JENIS MATERIAL SAT.

    AGREGAT HALUS :

    1 Pasir urug / Pasir Timbun m Rp.2 Pasir pasang/kali m Rp.3 Pasir Beton m Rp.4 Sirtu m Rp.5 Tanah Timbunan m Rp.6 Tanah Liat m Rp.7 Kerirkil m Rp.

    AGREGAT KASAR :

    1 Batu kali utuh m Rp.2 Batu Karang Putih/B. Gunung m Rp.3 Batu pecah 1 - 2 m Rp.4 Batu koral/Batu pecah 2-3 (kerikil) m Rp.5 Batu belah m Rp.6 Kapur m Rp.

    S E M E N :

    1 Semen Tonasa @ 50 Kg Zak Rp.

    2 Semen Tonasa @ 40 Kg Zak Rp.

    3 Semen Bosowa @ 50 Kg Zak Rp.

    4 Semen Putih Zak Rp.

    5 Semen Portland kg Rp.

    BETON READY MIX

    1 K - 225 m Rp.2 K - 250 m Rp.3 K - 275 m Rp.4 K - 300 m Rp.5 K - 325 m Rp.6 K - 350 m Rp.

    K A Y U :

    Kayu Dolken :

    1 Dolken uk. 4-6 / 400cm btg

    2 Dolken uk. 5-7 / 400cm btg

    3 Dolken uk. 8-10 / 400cm btg

    4 Dolken uk. 10-12 / 400cm btg

    DAFTAR UPAH DAN HARGA MATERIAL

    HARGA

    HARGA

    PROYEK PEMBANGUNAN GEDUNG FAKULTAS EKONOMI DAN BISNIS ISLAM UIN ALAUDDIN MAKASSAR

    TAHUN 2015

  • NO. JENIS MATERIAL SAT. HARGA

    Kayu Balok:

    1 Balok 4/6 - 6/12 Klas I m Rp.2 Balok Reng 2/3 klas I m Rp.3 Balok 4/6 - 6/12 Klas I m Rp.4 Balok 5/7 kls III m Rp.5 Kayu kelas II (Balok) m Rp.

    Kayu Papan :

    1 Papan (Meranti) m Rp.2 Papan (Natou) m Rp.3 Papan (Kapur) m Rp.4 Papan bayam SM m Rp.5 Papan jati raha SM m Rp.6 Kayu Papan 3/20 kls III m Rp.7 Minyak Bekisting Ltr Rp.

    8 Penjaga jarak bekisting(Spacer) bh Rp.

    BAMBU :

    1 Bambu Petung btg Rp.

    2 Bambu Besar btg Rp.

    3 Bambu Sedang btg Rp.

    4 Bambu Kecil btg Rp.

    KAYU LAPIS :

    1 Multipleks 18mm lbr Rp.

    2 Multipleks 15mm lbr Rp.

    3 Multipleks 12mm lbr Rp.

    4 Multipleks 9 mm lbr Rp.

    5 Multipleks 6 mm lbr Rp.

    6 Plywood 4 mm (Tripleks) lbr Rp.

    7 Plywood 9 mm (Tripleks) lbr Rp.

    BAHAN TIANG PANCANG

    1 Tiang Pancang dia. 40cm K-600 m Rp.

    P A K U :

    1 2, 3, 4 cm Kg Rp.

    2 5, 7, 10, 12 cm Kg Rp.

    3 Paku Beton 2, 3, 4 cm Dos Rp.

    4 Paku Beton 5, 7, 10 cm Dos Rp.

    5 Paku Biasa kg Rp.

    B E S I :

    1 Besi tulangan (besi beton) Kg Rp.

    2 Kawat Beton Kg Rp.

    3 Wire mesh M- 8 m Rp.4 Besi Profil kg Rp.

    5 Besi Strip kg Rp.

    6 Kawat Las kg Rp.

    7 Asesoris ( Perkuatan, Las ) Ls Rp.

    8 Steel Floor Decking lbr Rp.

    9 Baut kg Rp.

    Lain- lain

    1 Air ltr Rp.

    2 Solar ltr Rp.

    3 Minyak Pelumas ltr Rp.

    4 Lem Fox kg Rp.

    5 Lem Kayu kg Rp.

    6 Cat meni Besi kg Rp.

    7 Seng Gelombang 0.20 BJLS (7 kaki) lbr Rp.

    8 Perancah Kayu m3 Rp.

    Lain- lain

    1 Hummer + Crane jam Rp.

    2 Mesin Las jam Rp.

    3 Trowel jam Rp.