Top Banner

of 17

BOP requirement post BOP

Jul 06, 2018

Download

Documents

smithyry2014
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/17/2019 BOP requirement post BOP

    1/17

    Lloyd’

    s Register energy services

    BOP and control systems –What’s new post Macondo?

    Jeffry P. Sattler, P.E.Sr Vice President, EngineeringWEST Engineering ServicesSeptember 2012

  • 8/17/2019 BOP requirement post BOP

    2/17

    Lloyd’

    s Register energy services

    Jeff Sattler• Sr. Vice President Engineering

    • 33-year oil and gas career

    • Began with West in 1993

    • 15 years at Shell in various positions inthe Americas

    • Degrees in Chemical and PetroleumRefining Engineering

  • 8/17/2019 BOP requirement post BOP

    3/17

    Lloyd’

    s Register energy services

    Manufacturing, Testing, Maintenance,and Certification Requirements

    • Current Status

    • Issues

  • 8/17/2019 BOP requirement post BOP

    4/17

    Lloyd’

    s Register energy services

    Current Status• Subsea failure rate comparison

    SINTEF V

    SINTEF II DW

    Current JIP2000

    0

    1000

    3000

    4000

    5000

    6000

    7000

    7000

    9000

    10000

    R a t e

    , M T T F

    , D a y s

    106,526

  • 8/17/2019 BOP requirement post BOP

    5/17

    Lloyd’

    s Register energy services

    Current Status• MTTF by Rig (Subsea)

    13 (35%) of rigs had no associated failures

  • 8/17/2019 BOP requirement post BOP

    6/17

    Lloyd’

    s Register energy services

    Current Status• Existing standards

    • Class

    • API• Specifications (design and manufacture)

    • Recommended Practices (operations and maintenance)• Private

    • Regulatory

    • Generally considered minimums

  • 8/17/2019 BOP requirement post BOP

    7/17

    Lloyd’

    s Register energy services

    Compliance to Standards

    • Who verifies compliance?• What are competence requirements?

    • How often?

  • 8/17/2019 BOP requirement post BOP

    8/17

    Lloyd’

    s Register energy services

    WEST Verification Process

    • Procedure developed over 26 years• Job specific

    • Regulations, standards, best industry practices

    • Decide what is mandatory• Includes controls (hydraulic and electronic)

    • This standard is one among several in the oil

    industry

  • 8/17/2019 BOP requirement post BOP

    9/17

    Lloyd’

    s Register energy services

    Unintended Consequences?

    • Consideration of reduced redundancy• Increased wellbore pressure testing

    • Increased focus on repair work (non-

    floaters)

  • 8/17/2019 BOP requirement post BOP

    10/17

    Lloyd’

    s Register energy services

    Issues

    • Focus on asking questions• Considerations

    • And the answer is . . . . . ?

  • 8/17/2019 BOP requirement post BOP

    11/17

    Lloyd’

    s Register energy services

    Manufacturing Standards

    • Base (minimum) requirements• Compromises inevitable

    • Consistent between manufacturers

    • Gaps• Technology advances

  • 8/17/2019 BOP requirement post BOP

    12/17

    Lloyd’

    s Register energy services

    Maintenance Systems

    • Centralized or decentralized?• Control vs optimization

    • _____ BEST ways to maintain?

    • Is more better?

  • 8/17/2019 BOP requirement post BOP

    13/17

  • 8/17/2019 BOP requirement post BOP

    14/17

    Lloyd’

    s Register energy services

    Repair

    • Parts• RP 53 – “equal or better”

    • Mix and match

    • Buy out equipment• Upgrade (may not be available from OEM)

    • Discontinued

  • 8/17/2019 BOP requirement post BOP

    15/17

  • 8/17/2019 BOP requirement post BOP

    16/17

    Lloyd’

    s Register energy services

    Wrap-up

    Compliance related answers will vary byproviders

    • What is minimum standard?

    • and are we happy with minimum?

  • 8/17/2019 BOP requirement post BOP

    17/17

    For more information, please contact:

    Jeffry P. Sattler, P.E.Sr Vice President, Engineering

    WEST Engineering Services907 Bains StreetBrookshire, TX 77423

    T +1 (281) 375 5515

    E [email protected] w www.westengineer.com

    The materials contained herein are summary in nature, subject to change and intended for general information only.Lloyd’s Register is the trading name of the Lloyd’s Register Group of entities. Services are provided by members of the Lloyd’s RegisterGroup. For further details, pleas e see our website: http://www.lr.org/about_us/our_Group/index.aspx.

    mailto:[email protected]:[email protected]