7/24/2019 Boom Is On http://slidepdf.com/reader/full/boom-is-on 1/25 ANGOLA Sonangol— Lobito Refinery 200,000 Planning 2007 Kellogg Brown & Root New. Technip-60%, Sonangol-4 $2 billion. ARGENTINA Repsol YPF SA— La Plata FCC …. Planning 2006 Kellogg Brown & Root: lic. Revamp. Hydrodesulfurization …. Planning 2006 Axens: lic. New. Prime G FCC naphtha prefractionation and desulfurization. $19.5 million. Lujan de Cuyo FCC …. Planning 2006 Kellogg Brown & Root: lic. Upgrade. ARUBA Valero Energy Corp.— San Nicolas Delayed coker 12,000 Engineering June 2005 Expansion. $8 million. Visbreaker 30,000 Engineering June 2005 Expansion. $15 million. AUSTRALIA BP PLC— Kwinana Hydrotreater .... Under constr. July 2005 Aker Kvaerner: engr./PD New. For LSD. Caltex Refineries (NSW) Ltd.— Kurnell Hydrodesulfurization …. Engineering 2005 Uhde Group: engr. Expansion. Worley Parsons Lytton Hydrodesulfurization 3,000 Engineering 2005 Uhde Group: engr. Expansion. Worley Parsons AZERBAIJAN Baku Heydar Aliyev Refinery— Baku *Alkylation 300,000 Planning 2008 UOP: PD New. MMcfd BAHRAIN Bahrain Petroleum Co.— Sitra Hydrocracker 60,000 Under constr. June 2007 JGC: engr. Expansion. Hydrogen 100 MMcfd Under constr. June 2007 JGC: engr. Expansion. BANGLADESH Eastern Refinery Ltd.— Chittagong Hydrogen …. Planning Dec. 2007 New. Hydrotreater 10,000 Planning Dec. 2007 New. BELARUS PO Naftan— Novopolotsk *Vacuum distillation 30,200 Engineering 2006 Foster Wheeler: contr./PD New. Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes Jeannie Stell Survey Editor Construction project abbreviations: Listed are major construction projects engr. Engineer PE Procurement engineering by processing and pipeline categories. contr. Contractor CS Construction supervision Contractors, estimated completion date, tech. Technology PD Process design and added capacity are provided when design Design DD Detailed design available. constr. Constr uction JV Joint venture *Projects listed for the first time. PM Project management lic. License Refineries Added capacity listed in barrels per day (b/d) unless otherwise specified. W ORLDWIDE C ONSTRUCTION U PDATE Oil & Gas Journal / Apr. 25, 2005 1
25

Boom Is On

Feb 23, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 1/25

ANGOLASonangol—Lobito Refinery 200,000 Planning 2007 Kellogg Brown & Root New. Technip-60%, Sonangol-4

$2 billion.

ARGENTINARepsol YPF SA—

La Plata FCC …. Planning 2006 Kellogg Brown & Root: lic. Revamp. Hydrodesulfurization …. Planning 2006 Axens: lic. New. Prime G FCC naphtha

prefractionation anddesulfurization. $19.5 million.

Lujan de Cuyo FCC …. Planning 2006 Kellogg Brown & Root: lic. Upgrade.

ARUBAValero Energy Corp.—

San Nicolas Delayed coker 12,000 Engineering June 2005 Expansion. $8 million. Visbreaker 30,000 Engineering June 2005 Expansion. $15 million.

AUSTRALIABP PLC—

Kwinana Hydrotreater .... Under constr. July 2005 Aker Kvaerner: engr./PD New. For LSD.Caltex Refineries

(NSW) Ltd.—Kurnell Hydrodesulfurization …. Engineering 2005 Uhde Group: engr. Expansion.

Worley Parsons Lytton Hydrodesulfurization 3,000 Engineering 2005 Uhde Group: engr. Expansion.

Worley Parsons

AZERBAIJANBaku Heydar

Aliyev Refinery—Baku *Alkylation 300,000 Planning 2008 UOP: PD New.

MMcfd

BAHRAINBahrain Petroleum Co.—

Sitra Hydrocracker 60,000 Under constr. June 2007 JGC: engr. Expansion. Hydrogen 100 MMcfd Under constr. June 2007 JGC: engr. Expansion.

BANGLADESHEastern Refinery Ltd.—

Chittagong Hydrogen …. Planning Dec. 2007 New. Hydrotreater 10,000 Planning Dec. 2007 New.

BELARUSPO Naftan—

Novopolotsk *Vacuum distillation 30,200 Engineering 2006 Foster Wheeler: contr./PD New.

Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Jeannie Stell Survey Editor Construction project abbreviations:

Listed are major construction projects engr. Engineer PE Procurement engineeringby processing and pipeline categories. contr. Contractor CS Construction supervisionContractors, estimated completion date, tech. Technology PD Process design

and added capacity are provided when design Design DD Detailed designavailable. constr. Construction JV Joint venture *Projects listed for the first time. PM Project management lic. License

Refineries Added capacity listed in barrels per day (b/d) unless otherwise specified.

W ORLDWIDE C ONSTRUCTION U PDATE

Oil & Gas Journal / Apr. 25, 2005 1

Page 2: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 2/25

BRAZILAlberto Pasqualini Refinery—

Canoas, RGS Delayed coker 11,699 Under constr. 2005

*Hydrodesulfurization 30,157 Planning 2009Hydrogen 550,000 Under constr. 2005

cu m/d *Hydrogen 135000 Planning 2009

cu m/d Hydrotreater 23,399 Under constr. 2005 Segen: contr. New. $92 million.

IFP/Petrobras: lic.RFCC 40,948 Under constr. 2005 Segen: contr. New. $360 million.

Duque de Caxias Refinery—Rio de Janeiro Delayed coker 30,157 Under constr. 2006 Toyo Engineering: DD/PE/CS New. $50 million.

Hydrodesulfurization 12,063 Under constr. 2006 New. Hydrodesulfurization 30,157 Planning 2009 New.Gabriel Passos Refinery—

Betim, MG *Hydrodesulfurization 19,084 Planning 2009*Hydrodesulfurization 24,126 Planning 2009*Hydrogen 300, 000 Planning 2009

cu m/dHenrique Lage Refinery—

Sao Jose dos Campos, SP *Delayed coker 30,157 Planning 2008*Hydrodesulfurization 18,094 Planning 2008*Hydrodesulfurization 30,157 Planning 2009*Hydrogen 1,200,000 Planning 2008

cu m/d *Hydrotreater 36,189 Planning 2008

*Reformer 9,047 Planning 2009Ladulpho Alves Refinery—

Sao Francisco do Conde, BA *Hydrogen 250,000 Planning 2009cu m/d

*Hydrodesulfurization 18,094 Planning 2009*Hydrodesulfurization 30,157 Planning 2009

Paulinia Refinery—Paulinia, SP *Crude distillation 34,983 Planning 2007Hydrodesulfurization 24,126 Planning 2009*Hydrodesulfurization 24,126 Planning 2009*Hydrodesulfurization 36,189 Planning 2009*Reformer 15,079 Planning 2009

Petrobras/PDVSA—Pernambuco State *Refinery 200,000 Planning 2010 New. $2.5 billion. JV of Petrobra

and PDVSA for grassroots refineryPresidente Bernardes

Refinery—Cubatao, SP *Hydrodesulfurization 13,206 Under constr. 2009*Hydrodesulfurization 30,157 Planning 2009

Presidente Getulio VargasRefinery—Araucaria, Parana *Crude distillation 18,094 Planning 2008

*Delayed coker 30,157 Planning 2009*Hydrodesulfurization 18,094 Planning 2009 Segen: contr. New. Diesel. $77 million.

*Hydrodesulfurization 30,157 Planning 2009*Hydrotreater 36,189 Planning 2009*Reformer 6,031 Planning 2009

CANADABA Energy Inc.—

Ft. Saskatchewan, Alta. *Upgrader 226,000 Planning 2007 Jacobs Engineering: engr. New. Heartland Upgrader projecCanadian Natural Resources—

Horizon Upgrader, Alta. *Upgrader 270,000 Planning 2010 New. Ft. McMurray, Alta. Delayed coker 124,300 Engineering 2007 ABB Lummus Global: PD/lic. New.Husky Energy Inc.—

Lloydminster, Sask. *Upgrader 5,000 Planning 2007 Expansion. Prince George, BC Crude distillation 2,000 Under constr. Feb. 2006 SNC-Lavalin Inc.: constr. Expansion. Low-sulfur fuel.Imperial Oil—Edmonton, Alta. *Hydrotreater …. Engineering 2006 Fluor: engr. New.Irving Oil—St. John, NB Hydrodesulfurization …. Under constr. 2005 Expansion. Part of ULSD projec

$100 million.Northwest Capital *Upgrader 80,000 Planning 2009 New.Northwest Inc. *Upgrader 50,000 Planning 2010 New.OPTI Canada Inc.—

Ft. McMurray, Alta. Crude distillation 70,000 Engineering 2007 Fluor Corp.: engr. New. Hydrocracker …. Engineering 2007 Fluor Corp.: engr. New. Hydrogen …. Engineering 2007 Fluor Corp.: engr. New. Thermal cracker …. Engineering 2007 Fluor Corp.: engr. New. Vacuum distillation …. Engineering 2007 Fluor Corp.: engr. New.Petro-Canada Upgrader—

Strathcona, Alta. *Upgrader 70,000 Planning 2008 Expansion.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 2

Page 3: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 3/25

Petro-Canada Products Ltd.—Montreal, Que. Hydrotreater 30,000 Engineering 2005 ExxonMobil Corp.: lic. New.

Shell Canada Ltd.—Montreal, Que. Hydrotreater …. Under constr. Mar. 2006 Fluor Corp.: engr. New.

Scotford Hydrotreater …. Under constr. Mar. 2006 Fluor Corp.: engr. New. *Upgrader 140,000 Planning 2010 Expansion.Suncor Energy Services Inc.—

Ft. McMurray, Alta. *Hydrodesulfurization …. Engineering Nov. 2005 Jacobs Engineering Expansion. Upgrader, Alta. *Upgrader 300,000 Planning 2012 Expansion.Syncrude—Upgrader, Alta. *Upgrader 110,000 Under constr. 2006 Expansion.Synenco Energy—Northern

Lights Upgrader, Alta. *Upgrader 100,000 Planning 2007 New.UTS Energy/TrueNorth Energy *Upgrader 50,000 Planning 2009 New.Valero Energy—

St. Romuald, Que. Hydrotreater .... Under constr. 2005 Fluor Corp.: engr./DD/PE New. $500 million for cleanfuels program.

CHADSociete d’Etude et

d’Exploitation de laRaffinerie du Tchad—N’Djamena Isomerization …. Planning 2006 Axens: lic. New.

Refinery 3,000 Planning 2006 Kellogg Brown & Root: engr. New. Reformer …. Planning 2006 Axens: lic. New.

CHILEEmpresa Nactional

de Petroleo—Concon Delayed coker 20,000 Engineering 2006 Foster Wheeler New. $300 million. Hydrogen 1.7 MMcfd Planning June 2006 Linde AG New.

Hydrotreater 44,000 Planning 2006 Foster Wheeler New. Talcahuano Hydrotreater …. Planning 2006 Axens: lic.

CHINAChina Petroleum

Chemical Co.—Nanjing Delayed coker 16,000 Planning 2005 New. Hydrocracker 30,000 Planning 2005 New.CNOOC Group—

Huizhou Refinery 246,600 Planning 2008 New. $2.1 billion.Dalian Petrochemical Co.—

Dalian Hydrocracker 71,000 Planning Sept. 2006 UOP: lic. New. Hydrogen 100 cu m/hr Engineering 2006 Haldor Topsoe SA: lic. New. Hydrogen …. Planning Sept. 2006 Haldor Topsoe SA: lic. New. Reformer 1,200 Planning 2005 New.Danqing Petrochemical

Corp.—Danqing Reformer 6,000 Planning 2005 New.Fujian Petrochemical

Co. Ltd.—Quangang,Quanzhou City,Meizhou Bay Refinery 160,000 Planning 2008 Expansion. $3.5 billion.

Fujian Petrochemical, ExxonMobilAramco JV.

Fushun Petrochemical Corp.—Fushun Diesel hydrotreater 24,000 Planning 2005 New.

Huabei Petrochemical Corp.—Huabei Diesel hydrotreater 10,000 Planning 2005 New.

Jinxi Petrochemical Corp.—Jinxi Diesel hydrotreater 20,000 Planning 2005 New.

Reformer 12,000 Planning 2005 New.Karamay Petrochemical Corp.—

Karamay Diesel hydrotreater 9,000 Planning 2005 New.Liaohe Petrochemical Corp.—Liaohe Diesel hydrotreater 8,000 Planning 2005 New.

Maoming Petrochemical—Guangdong Crude distillation 131,805 Planning 2005 New.

PetroChina Co. Ltd.—Dagang *Hydrocracker 20,000 Engineering 2007 UOP: lic./tech. New.

Dalian *Hydrogen 100 cu m/hr Engineering 2006 Haldor Topsoe: engr./lic. New. Dushanzi *Hydrocracker 41,000 Planning 2007 UOP: lic./tech. New.Sinopec—Jinling Crude distillation 150,000 Planning 2005 Expansion. Delayed coker 20,000 Planning 2005 New. Hydrocracker 20,000 Planning 2005 New. Qingdao Refinery 205,500 Planning 2007 New. $1.2 billion.Yanchang Oil Administration—

Yongping Reformer 20,000 Engineering 2005 UOP: lic. New.Yumen Petrochemical Corp.—

Yumen Diesel hydrotreater 10,000 Planning 2005 New.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 3

Page 4: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 4/25

COLOMBIAEmpresa Colombiana

de Petroleos—Barrancabermeja-Santander Hydrotreater 55,000 Engineering 2007 Technip KTI Expansion.

Axens: lic. Hydrotreater 19,000 Engineering 2007 Axens: lic. New. Cartagena CCR reformer 27,200 Engineering 2005 Axens New. Desulfurization 6,500 Engineering 2005 Axens New. Hydrotreater 50,000 Engineering 2005 Axens New. Refinery 65,000 Engineering 2005 Technip: engr./PD/PM Expansion. $630 million. Thermal cracker 13,600 Engineering 2005 Axens New.

CROATIAINA Industrija Nafte —Rijeka Hydrocracker 26,000 Engineering 2005 New. *Hydrodesulfurization 4,300 Under constr. 2005 Haldor Topsoe: lic. New. Hydrogen 50 MMcfd Engineering 2005 New. Sisak Hydrocracker 16,000 Engineering 2005 New. Hydrotreater 3,300 Engineering 2005 Haldor Topsoe: lic. New. Hydrogen 35 MMcfd Engineering 2005 New. Isomerization …. Planning Apr. 2006 International Alliance Group:

engr./contr./PD/PEUOP: lic. Expansion.

CUBAPetrobras/PDVSA/ Cupet—

Havana *Lube oils …. Planning 2007 New. $20 million. JV of PetrobrasPDVSA, Cupet.

CZECH REPUBLICCeska Rafinerska AS—

Litinov Hydrodesulfurization 7,760 Engineering Jan. 2007 Axens-IFP Group New. $12.3 million.Technologies: PD/lic.

FINLANDFortum Oil Oy—Porvoo Hydrocracker 47,000 Under constr. July 2006 Neste-Jacobs Engineering New. $500 million. Hydrogen 153,500 cu m/hr Under constr. 2006 Uhde Group: engr./PE/CS/tech. New.

FRANCEBP PLC—Lavera FCC 2,000 Under constr. Mar. 2005 Foster Wheeler France SA: engr. Expansion. $10 million.

International Alliance Group/UOP-lic.*Hydrotreater 34,000 Engineering 2005 Haldor Topsoe: lic. New. *Hydrotreater 29,000 Engineering 2005 Haldor Topsoe: lic. New.

ExxonMobil RefiningSupply Co.—Fos sur Mer Hydrotreater …. Engineering 2005 New.

Total SA—Donges Hydrotreater 16,000 Engineering 2005 Axens: lic. New. Gonfreyville Hydrocracker 48,000 Engineering 2005 Technip Expansion. Reformer …. Planning 2005 Expansion. Low-sulfur fuels.

GREECEHellenic Petroleum SA—

Aspropyrgos Hydrodesulfurization 27,000 Engineering 2007 CD Tech: DD New. $25 million.Motor Oil Hellas SA—Corinth Hydrocracker 37,000 Engineering 2005 Axens New.

Technip Hydrogen 65,000 Engineering 2005 Technip New.

Hydrotreater 19,751 Engineering 2005 Axens New.Hydrotreater .... Engineering 2005 Axens New.Vacuum distillation 50,000 Engineering 2005 New.

HUNGARYMOL Rt. Hungarian Oil and

Gas Co.—Szazhalombatta FCC …. Planning 2005 International Alliance Group: PDUOP: lic.

INDIABharat Oman Refineries Ltd.—

Bina, Madhya Pradesh Refinery 125,000 Engineering 2007 Parsons E&C Engineers New. JV of Bharat PetroleumIndia Ltd.: PM and Oman Oil Co.

ChevronTexacoBharat Petroleum Co. Ltd.—

Numaligarh, Assam Isomerization 1,000 Engineering June 2005 Axens: lic. New. Reformer 3,000 Engineering June 2005 Axens: lic. New.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 4

Page 5: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 5/25

Hindustan PetroleumCorp. Ltd.—Mumbai *CCR 13,700 Engineering 2006 UOP: lic./tech. New.

FCC 31,000 Engineering 2005 UOP: lic. Revamp. Hydrotreater 6,900 Engineering 2005 Axens: lic. New. Hydrotreater 12,000 Engineering Dec. 2005 Axens: lic. New. Isomerization …. Engineering Dec. 2005 Axens: lic. New. Vishakapatnam *CCR 19,500 Engineering 2006 UOP: lic. New. FCC 21,000 Engineering 2005 UOP: lic. Revamp. Hydrotreater 23,000 Engineering 2005 Axens: lic. New. Isomerization 6,400 Engineering 2005 Axens: lic. New.Indian Oil Corp. Ltd.—

Haldia Hydrodesulfurization 7,600 Planning 2005 Axens: lic. New. Semi-regen reformer 2,500 Planning 2005 Axens: lic. New. Panipat *Hydrogen 70,000 tpy Under constr. 2005 Haldor Topsoe: lic. New. Paradip Delayed coker 41,000 Engineering 2005 ABB Lummus Global: PD/lic./PM New.Mangalore Refinery

Petrochemicals Ltd.—Mangalore Isomerization 13,200 Engineering Oct. 2005 UOP: engr./lic. New.

Numaligarh Refinery Ltd.—Assam Reformer 166,000 Engineering June 2005 Axen: lic. New.

Isomerization 55,000 Engineering June 2005 Axen: lic. New.

INDONESIAJambi Refining Co.—

Jambi Refinery 100,000 Planning 2005 New.Pertamina Balongan

Refinery—Indramayu Hydrotreater 52,000 Engineering 2005 UOP: engr. New. $150 million. Blue Sky PrToyo Engineering-EPC

Isomerization 23,000 Engineering 2005 UOP: engr.Toyo Engineering-EPC

Reformer 29,000 Engineering 2005 UOP: engr.Toyo Engineering-EPC

Pertamina Cilacap Refinery—Cilacap Hydrotreater 21,500 Planning 2005 Axens: lic. New.

Isomerization 21,500 Planning 2005 Axens: lic. New.

IRANNational Iranian Oil Co.—

Arak *CCR 20,000 Engineering 2005 Axens: lic. New. *Hydrotreater 50,500 Engineering 2005 Axens: lic. New. *Hydrotreater 53,000 Engineering 2005 Axens: lic. New. *Hydrotreater 33,000 Engineering 2005 Axens: lic. New. *Hydrotreater 31,500 Engineering 2005 Axens: lic. New.

IRAQUS Army Corps of Engineers—

Northern Iraq Refinery 250,000 Engineering 2009 Parsons Energy & Chemicals: New. JV of Iraq Oil Co. andengr./PE/constr. Parsons E&C. $800 million.

ITALYAPI Raffineria Ancona SPA—

Falconara *Hydrogen 36.4 MMtpd Under constr. 2005 Haldor Topsoe: lic. New.ENI Sannazzaro Refinery—

Sannazzaro, Pavia *ROSE 15,000 Planning 2006 Kellogg Brown & Root: lic. New.ENI Taranto Refinery—

Taranto Hydrocracker 24,500 Under constr. Dec. 2005 Snamprogetti SPA: Expansion.engr./contr./DD/PE/CS

ENI Venezia Refinery—Venice Hydrogen 8 MMcfd Planning 2005 APS Engineering Co.: PD/DD New. $4 million.

ERG Reffinerie MedditerraneeNorth—Priolo, Sicily Desulfurization 33,000 Under constr. Jan. 2006 Foster Wheeler: New.engr./contr./PD/DD/CS

ExxonMobil Corp.: lic.Saras SPA—Sarroch Hydrotreater …. Engineering 2005 Axens: lic.Tamoil Raffinazione SPA —

Cremona Hydrotreater 2,500 Engineering 2005 Axens: lic. New.

JAPANIndemitsu Kosan Co. Ltd.—

Chiba FCC …. Planning 2005 Expansion.Kyokuto Petroleum

Industries Ltd.—Ichihara, Chiba Hydrotreater 14,000 Planning Feb. 2007 ExxonMobil Corp.: lic. New.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 5

Page 6: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 6/25

JORDANJordan Petroleum Refinery—

Zarka Hydrocracker 1,300 Under constr. May 2005 Expansion.

KAZAKHSTANAgipKCO—Kashagan Refinery 300,000 Engineering 2008 Parsons Energy & Chemicals: PD/lic. New.

Parsons E&C/Fluor Corp: engr.

KUWAITKuwait National

Petroleum Co.—Mina Abdulla Desulfurization 18,000 Under constr. 2006 LG Eng. & Constr. Corp.: DD/PE/CS Expansion. $165 million.

ChevronTexaco: lic. Vacuum distillation 16,800 Under constr. 2006 Technip Expansion. $37 million. Shuaiba Industrial Area Refinery 432,000 Engineering 2009 Fluor New. $3.3 billion.

LITHUANIAJSC Mazeikiu Nafta—

Mazeikiai *Hydrotreater 32,000 Engineering 2006 Foster Wheeler: New. $43 million.engr./contr./PD/DD/PE/CS

Axens: lic.*Hydrodesulfurization 22,000 Engineering 2006 Foster Wheeler: New.

engr./contr./PD/DD/PE/CSAxens: lic.

MALAYSIAPetronas—Melaka Lube oils 16,000 Engineering 2007 Foster Wheeler New.

ExxonMobil Corp.: tech.

MEXICOPetroleos Mexicanos—

Minatitlan *Crude …. Engineering 2008 Foster Wheeler: DD New. Thermal cracking …. Planning Apr. 2008 Fluor Corp. Revamp. $2.4 million. *Vacuum distillation …. Engineering 2008 Foster Wheeler: DD New.

MOROCCOSociete Anonyme Marocaine

de L’Industrie de Raffinage—Mohammedia Crude distillation …. Engineering 2008 Foster Wheeler Expansion. $500 million

refinery project upgrade. Hydrocracker …. Engineering 2008 Foster Wheeler Expansion. Hydrogen …. Engineering 2008 Foster Wheeler Expansion. Hydrotreater …. Engineering 2008 Foster Wheeler Expansion. Vacuum distillation 35,000 Engineering 2008 Foster Wheeler Expansion. Visbreaker …. Engineering 2008 Foster Wheeler Expansion.

NETHERLANDSNetherlands Refining Co.—

Europoort FCC …. Engineering Dec. 2005 International Alliance Group:contr./PD/PE/CS

UOP: lic./tech.

NEW ZEALANDNew Zealand Refining—Marsden Point, Northland Benzene removal 21,000 Under constr. 2005 Foster Wheeler Expansion. Hydrodesulfurization 26,000 Under constr. 2005 Foster Wheeler Expansion. $90 million.

NIGERIAAmakpe International

Refineries Ltd.—Eket, Akwa Ibom Crude distillation 6,000 Engineering 2006 Ventech Engineers International: New.

engr./PD/DD/constr. Hydrotreater 4,000 Planning 2006 New.

Refinery 12,000 Under constr. 2006 Ventech Engineers International: New. $65 million.engr./PD/DD/constr.

Reformer 4,000 Planning 2006 New.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 6

Page 7: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 7/25

OMANOman Refining Co.—

Mina Al Fahal, Muscat Crude distillation 15,000 Engineering Dec. 2005 Granherne: engr. Expansion.UOP: PD

Hydrotreater 8,000 Engineering Dec. 2005 Granherne/Haldor Topsoe: engr. Expansion.UOP: PD

Isomerization 10,200 Engineering Oct. 2006 UOP: lic. New.Sohar Alkylation 7,222 Under constr. 2006 UOP: lic. New. $879 million for new

JGC/Chiyoda refinery for 2006. Crude distillation 116,400 Under constr. 2006 JGC Corp.: lic. New. Grassroots refinery.

Chiyoda Hydrogen .... Under constr. 2006 JGC/Chiyoda New. Hydrotreater .... Under constr. 2006 JGC/Chiyoda New. Hydrotreater 1,309 Under constr. 2006 UOP: lic. New.

JGC/Chiyoda Hydrotreater 26,858 Under constr. 2006 UOP: lic. New.

JGC/Chiyoda Hydrotreater 40,540 Under constr. 2006 UOP: lic. New.

JGC/Chiyoda RFCC 75,260 Under constr. 2006 JGC Corp.: lic. New.

Chiyoda

PAKISTANAttock Refinery Ltd.—

Rawalpindi, Punjab CCR 10,700 Planning 2006 New. Isomerization 3,600 Planning 2006 New. Hydrocracker 8,500 Planning 2006 New. Hydrotreater 9,400 Planning 2006 New. Hydrotreater 9,000 Planning 2006 New. Delayed coker 5,600 Planning 2006 New.National Refinery Ltd.—

Korangi, Karachi Hydrotreater 2,400 Planning June 2006 UOP Expansion. Lube oils 300 Engineering 2005 Enar Petrotech Services: Expansion. $14 million.

engr./PE/constr.ExxonMobil Corp.: lic.

Reformer …. Planning June 2006 UOP Revamp.

PERURepsol YPF—Lima Vacuum distillation 36,000 Under constr. 2005 Intecsa-Uhde/Technip/Dragados Expansion.

Industrial: engr./constr.ABB Lummus Global: lic.

Visbreaker 27,000 Under constr. 2005 Intecsa-Uhde/Technip/Dragados New.Industrial: engr./constr.

ABB Lummus Global: lic.

POLANDGrupa Lotos SA—Gdansk Crude distillation 3,000 Under constr. May 2005 Lurgi Polska SA: engr./PD/DD/PECS Expansion. $18 million. Hydrotreater 2,500 Under constr. May 2005 Lurgi Polska SA: engr./PD/DD/PE/CS Expansion. $ 3 million. Vacuum distillation 20,000 Under constr. May 2005 Lurgi Polska SA: engr./PD/DD/PE/CS Expansion. $10 million.Polski Koncern Naftowy

Orlen SA—Plock Hydrodesulfurization .... Engineering 2005 Uhde Group: engr./DD/PE New.

ROMANIAArpichem SA—Pitesti FCC …. Engineering 2005 Stone & Webster Inc.: PD/lic. Expansion. Hydrocracker 25,000 Engineering 2005 Stone & Webster Inc.: PD/lic. Expansion.

Axens: lic.Rompetrol SA—Pitesti Hydrogen 25,000 cu m/hr Engineering Apr. 2005 Foster Wheeler: engr./PE New.

RUSSIAAlliance Oil Co.—Khabarovsk Hydrocracker …. Engineering 2006 Shell Global Solutions: lic. New.

Hydrotreater …. Engineering 2006 Shell Global Solutions: lic. New.Lukoil—Volgograd Hydrotreater .... Planning 2010 Second stage for diesel fuel. Isomerization .... Planning 2010 New.Salavatnefteorgsintez—Salavat FCC …. Engineering 2005 Foster Wheeler: DD/PE New.

Shell Global Solutions: lic. Hydrotreater 16,500 Engineering 2005 Foster Wheeler: engr./DD/PE New.

Axens: lic.Slavneft—Yaroslav Hydrocracker 40,000 Under constr. 2005 Technip/Toyo Engineering: engr. New. Visbreaker 6,000 Under constr. 2005 Toyo Engineering Corp. Expansion.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 7

Page 8: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 8/25

SAUDI ARABIASaudi Aramco—Rabigh *Hydrocracker 120,000 Engineering 2006 Axens: lic. New. Riyadh Hydrotreater 45,000 Engineering 2006 Foster Wheeler Ltd./Technip: engr. New.

Axens: lic.Yanbu CCR reformer 40,000 Under constr. Dec. 2005 Snaprogetti SPA: contr./DD/PE/CS Expansion.

UOP: lic.Hydrotreater 95,000 Engineering 2006 Foster Wheeler Ltd.: engr. New.

Axens: lic.Isomerization 15,000 Under constr. Dec. 2005 Snamprogetti SPA: contr./DD/PE/CS Expansion.

Saudi EuorpeanPetrochemical—Al Jubail MTBE 1,500 Under constr. June 2005 Snamprogetti SPA Expansion.

SERBIA AND MONTENEGRONIS Oil Refinery—Novi Sad Crude distillation 33,800 Under constr. 2005 Nizegorodninefteproekt: DD/PE Expansion. $7 million. Hydrotreater 16,600 Planning 2005 New. $50 million. Isomerization 4,010 Engineering 2006 Axens: lic. New. $12 million. Lube oils 96,400 Under constr. 2005 New. $2.5 million. Visbreaker 8,600 Under constr. 2005 Koch Glitsch: PD/DD New. $10 million.NIS-Rafinerija Nafte

Pancevo—Pancevo Isomerization …. Engineering 2005 UOP New. Reformer …. Engineering 2005 UOP New.

SOUTH AFRICACaltex Oil South Africa Ltd.—

Cape Town Hydrogen …. Engineering Nov. 2005 Foster Wheeler New. Hydrotreater …. Engineering Nov. 2005 Foster Wheeler Revamp.National Petroleum Refiners

of South Africa Pty Ltd.—Sasolburg Hydrotreater …. Engineering Aug. 2006 Fluor Corp.: contr. Revamp.

South African PetroleumRefinerieis (Pty.) Ltd.—Durban Hydrotreater …. Under constr. Oct. 2005 Fluor Corp.: engr./PD/DD/PE/CS Revamp for clean fuels.

Isomerization …. Planning Jan. 2006 Fluor Corp.: contr. Revamp for clean fuels. Reformer …. Under constr. Oct. 2005 Fluor Corp.: engr./PD/DD/PE/CS Revamp for clean fuels.

SOUTH KOREAHyundai Oil Refinery Co.—

Daesan Hydrodesulfurization 20,000 Engineering 2005 Foster Wheeler New. Hydrogen 40 MMcfd Engineering 2005 Foster Wheeler New. Hydrotreater 25,000 Engineering 2005 Foster Wheeler New. Hydrotreater …. Engineering 2005 Foster Wheeler Revamp.LG Caltex—Yosu Alkylation 10,000 Engineering June 2005 Stratco: contr. New. $100 million. Hydrotreater 60,000 Engineering 2006 Haldor Topsoe: lic. New. Hydrotreater 70,000 Engineering 2006 Haldor Topsoe: lic. New.S K Corp.—Ulsan Hydrotreater 30,000 Engineering 2005 Axens: lic. New. Reformer 30,000 Engineering 2006 Axens: lic. New.

SPAINCia. Espanola de

Petroleos SA—Huelva Reformer 12,000 Engineering 2007 Chevron/Fluor Corp. New. $158 million.

Petronor SA—Somorrostro Vizcaya Hydrocracker 22,000 Under constr. Dec. 2005 UOP: lic. New.

Hydrodesulfurization 12,000 Under constr. May 2005 Axens-IFP Group Technologies: lic. New.Repsol YPF SA—

La Coruna Hydrocracker 28,000 Planning 2005 Axens-IFP Group Technologies: lic. New.

SUDANPort Sudan Refining Ltd.—Port Sudan *Refinery 100,000 Planning Oct. 2008 ONGC New. $1.2 billion.

TAIWANChinese Petroleum Corp.—

Ta-Lin *Hydrotreater 20,000 Planning 2008 New. $79 million. *Lube oils 5,000 Planning 2007 New. $130 million. Tao-Yuan Hydrotreater 30,000 Planning 2008 New. $36 million.Formosa Petrochemical Co.—

Mailiao CCR 40,000 Engineering 2006 Axens: lic. New. *RFCC 36,500 Engineering 2006 UOP Revamp. *RFCC 36,500 Engineering 2006 UOP Revamp. *Hydrotreater 64,000 Engineering 2005 Haldor Topsoe: lic. New. Yunlin Co. *Refinery 600,000 Planning 2010 New. $3.72 billion.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 8

Page 9: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 9/25

THAILANDAromatics Thailand

Public Co.—Rayong Aromatics 150,000 tpy Engineering 2006 Axens: lic. New.

TURKEYTurkish Petroleum

Refineries Corp.—Izmir Hydrodesulfurization 60,400 Under constr. 2005 UOP New. Izmit CCR reformer 28,300 Under constr. 2006 UOP New. $81 million. Hydrodesulfurization 53,500 Under constr. 2006 UOP New. Kirikkale CCR reformer 22,650 Under constr. 2007 Axens New. Hydrodesulfurization 28,300 Engineering 2007 ABB Lummus Global New.

TURKMENISTANTurkmenneftgas—

Turkmenibashi Hydrotreater 34,000 Under constr. 2005 Technip: engr./PE/constr. New. $113 million.Axens: lic.

UKRAINELukoil—Odessa FCC 20,000 Engineering 2005 New. Refinery .... Engineering 2005 Modernization.

UNITED ARAB EMIRATESAbu Dhabi Oil Refining Co.—

Ruwais CCR 12,000 Planning July 2005 Technip Expansion.Parsons Energy & Chemicals: PM

Hydrotreater 19,000 Engineering July 2005 Technip: engr./contr./DD/PE/constr. Expansion, refinery-wide.Parsons Energy & Chemicals: PM $480 million.

Hydrotreater 12,300 Engineering July 2005 Technip: engr./contr./DD/PE/constr. Expansion.Parsons Energy & Chemicals: PM

Hydrotreater 15,000 Engineering July 2005 Technip: engr./contr./DD/PE/constr. Expansion.Parsons Energy & Chemicals: PM

Isomerization 19,000 Engineering July 2005 Technip Expansion.Parsons Energy & Chemicals: PM

Emirates National Oil Co.—Jebel Ali, Dubai *CCR 36,000 Engineering 2007 Foster Wheeler: lic. New.

Axens: lic. *Hydrotreater 70,000 Engineering 2007 Foster Wheeler: engr. New.

Axens: lic.

UNITED KINGDOMBP PLC—Coryton FCC …. Under constr. May 2005 International Alliance Group: Expansion. $10 million.engr./contr./PD/DD/PE/CS

UOP: lic.

UNITED STATESAlon USA—

Big Spring, Tex. Hydrodesulfurization 250 Engineering June 2006 Revamp for ULSD. $20 million.BP PLC—

Ferndale, Wash. *Hydrodesulfurization …. Engineering 2006 Jacobs Engineering: DD New. $75 million. Texas City, Tex. *FCC …. Planning 2006 International Alliance Group:

engr./contr.Stone & Webster: lic.

Cenex Harvest States—Laurel, Mont. Hydrotreater 18,900 Engineering 2005 Fluor Corp.: PD New.

Citgo Petroleum Corp.—Corpus Christi, Tex. Hydrotreater 45,000 Planning Dec. 2005 New.

Houston, Tex. *Hydrotreater 70,000 Engineering Oct. 2006 New. Low sulfur gasoline.$200 million.

*Hydrotreater 6,000 Engineering May 2006 Expansion. Low sulfur diesel.$40 million.

Lake Charles, La. Vacuum distillation 130,000 Under constr. June 2005 Fluor Corp. New.Mustang Engineering

Coffeyville Resources—Coffeyville, Kan. *FCC …. Engineering May 2005 International Alliance Group: Expansion.

engr./contr./PD/DD/PE/CSUOP: tech.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 9

Page 10: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 10/25

ConocoPhillips—Billings, Mont. Hydrogen 15 MMcfd Engineering 2005 CBI/Howe-Baker: engr./lic. New.

Hydrotreater 25,000 Engineering Nov. 2005 Fluor Corp.: engr./contr./DD/PE/CS New. Borger, Tex. Hydrogen 25 MMcfd Engineering 2005 CBI/Howe-Baker: engr./lic. New. Lake Charles, La. Desulfurization 38,500 Engineering Jul. 2006 Fluor Corp. New. Linden, NJ Hydrogen 20 MMcfd Engineering 2005 CBI/Howe-Baker: engr./lic. New. Ponca City, Okla. Hydrogen 25 MMcfd Engineering 2005 CBI/Howe-Baker: engr./lic. New. Rodeo, Calif. Hydrotreater 32,000 Under constr. 2005 Bechtel: engr./contr./DD/PE/CS Expansion. $130 million.Haldor Topsoe: lic.

Wood River, Ill. Hydrocracker 3,000 Engineering Nov. 2005 Fluor Corp.: engr. Expansion. Revamp for ULSD Hydrogen 45 MMcfd Engineering 2005 CBI/Howe-Baker: engr./lic. New. Hydrotreater 40,000 Engineering May 2006 Fluor Corp.: engr. Expansion. Revamp for ULSD.Flint Hills Resources LP—

Rosemount, Minn. *Crude distillation 50,000 Planning June 2007 Expansion. $100 million. Hydrocracker 36,000 Planning June 2006 Jacobs Engineering New. $300 million.

UOP: lic.Frontier Oil Corp.—

Cheyenne, Wyo. Hydrotreater 18,500 Engineering 2006 Haldor Topsoe: lic. New. Hydrogen 35 MMcfd Planning Mar. 2006 CBI/Howe-Baker New. Lump sum turnkey. Hydrotreater 25,000 Engineering Mar. 2006 CBI/Howe-Baker New. $75 million. Lump sum tuHolly Corp.—

Artesia, NM *Hydrotreater 15,000 Planning 2006 Koch Partners: engr./PE/constr. New. Turnkey. $14 million. Woods Cross, Utah *Hydrotreater 10,000 Engineering June 2006 Benham Cos. LLC New.Interline Energy Services Inc.—

Douglas, Wyo. Distillation 3,200 Engineering Apr. 2005 New. $2 million.Kern Oil—Bakersfield, Calif. Desulfurization …. Engineering June 2006 Expansion.Marathon Ashland LLP—

Detroit, Mich. Crude distillation 32,000 Under constr. Nov. 2005 Jacobs: engr./PE/constr. Expansion. Hydrotreater 9,000 Under constr. Nov. 2005 Jacobs: engr. Expansion. Hydrotreater …. Under constr. Nov. 2005 Jacobs: engr. Revamp for ULSD. Hydrotreater 33,000 Under constr. July 2005 CBI/Howe-Baker: engr./PE/constr. New.

Haldor Topsoe: tech.Reformer 8,000 Under constr. Sept. 2005 UOP/Jacobs/ Howe-Baker: engr. Expansion. Conversion from

SR to CCR. Garyville, La. Hydrodesulfurization 87,000 Under constr. Sept. 2005 Stone & Webster Inc.: New.

engr./PE/constr.Axens: lic.

Hydrotreater 46,000 Under constr. June 2006 Stone & Webster Inc.: engr. New.Criterion: lic.

Robinson, Ill. Hydrotreater 6,000 Under constr. May 2006 Fluor Daniel: engr./contr./DD/PE Expansion.SGS/Criterion: tech.

Hydrodesulfurization 39,000 Under constr. May 2005 Fluor Corp.: engr./contr./DD/PE Expansion.Axens: lic.Motiva Enterprises LLC—

Convent, La. Hydrogen 110 MMcfd Engineering Nov. 2005 New. Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.

Shell Oil Co.: lic.Norco, La. Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.

Shell Oil Co.: lic.Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.

Shell Oil Co.: lic.Port Arthur, Tex. Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.

Shell Oil Co.: lic.Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.

Shell Oil Co.: lic.National Cooperative

Refining Assoc.—McPherson, Kan. Hydrocracker 35,000 Under constr. Nov. 2005 Harmony: contr. New.

UOP: lic.Hydrogen 30 MMcfd Under constr. Nov. 2005 Technip New.

Hydrogen 35 MMcfd Under constr. Nov. 2005 Technip New. Hydrotreater …. Under constr. Nov. 2005 Burns & McDonald: engr. Revamp.Mustang: engr.

Pasadena Refining System—Pasadena, Tex. *Hydrodesulfurization 40,000 Engineering Dec. 2006 New. $40 million.

ConocoPhillips S Zorb SRT.Paramount Petroleum Corp.—

Paramount, Calif. *Isomerization 3,750 Under constr. Apr. 2005 New. *Naphtha distillation 5,000 Under constr. Apr. 2005 New.Premcor Refining Group—

Port Arthur, Tex. *Crude distillation 75,000 Engineering June 2006 Jacobs: PE New. $220 million. *Hydrotreater 45,000 Engineering June 2006 Jacobs: PE New. $100 million. Memphis, Tenn. *Hydrotreater 33,000 Engineering June 2006 Jacobs: PE New. $100 million. Lima, Ohio *Hydrotreater 25,000 Engineering June 2006 Jacobs: PE New. $100 million.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 10

Page 11: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 11/25

San Joaquin Refining Co. Inc.—Bakersfield, Calif. *Hydrotreater 1,800 Engineering 2005 Haldor Topsoe: engr./lic. New.

Shell Oil Products—Deer Park, Tex. Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.

Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp. Puget Sound, Wash. Hydrotreater …. Under constr. Mar. 2006 Bechtel: engr./contr./DD/PE/PM Revamp.Suncor Energy USA—

Commerce City, Colo. Desulfurization 22,000 Engineering Nov. 2005 Jacobs Engineering: New. $120 million.engr./PD/DD/PE/CSShell Global Solutions: lic.

Hydrogen 30 MMcfd Engineering Aug. 2005 Technip: engr./PD/DD/PE/CS/lic. New. $35 million. Hydrotreater 4,000 Engineering Feb. 2006 Jacobs: engr./PD/DD/PE/CS/lic. Expansion. $15 million.Tesoro West Coast Co.—

Anacortes, Wash. *Hydrotreater 25,000 Engineering 2006 Haldor Topsoe: lic. New. Mandan, ND *Hydrotreater 14,000 Engineering 2006 Haldor Topsoe: lic. New.United Refining—

Warren, Pa. Delayed coker 14,100 Engineering 2007 Foster WheelerHydrotreater 26,000 Engineering 2007 Foster Wheeler

Valero Energy Corp.—Ardmore, Okla. FCC 3,000 Engineering 2005 Expansion. $16 million.

Houston, Tex. Hydrocracker …. Planning 2006 UOP: lic. New. Paulsboro, NJ FCC 4,800 Engineering May 2005 Expansion. $18 million. St. Charles, La. Alkylation 8,000 Planning May 2005 Expansion. $15 million. FCC 15,000 Planning May 2005 Expansion. $24 million. Hydrocracker …. Planning 2006 UOP: lic. New. Hydrodesulfurization 60,000 Under constr. June 2005 Chicago Bridge & Iron New. $118 million.CD Tech: lic. Sunray, Tex. Hydrodesulfurization 35,000 Under constr. Nov. 2005 Chicago Bridge & Iron: New. $100 million.

engr./PE/constr.Western Refining—

El Paso, Tex. *Hydrotreater …. Engineering 2006 Haldor Topsoe: lic. New.Wynnewood Refining Co.—

Wynnewood, Okla. Hydrocracker 10,000 Engineering Mar. 2006 Ambitech: engr. Expansion. $25 million.UOP: lic.

Wyoming Refining Co.—Newcastle, Wyo. Hydrocracker …. Engineering Mar. 2006 Expansion.

US VIRGIN ISLANDSHovensa—

St. Croix Hydrodesulfurization …. Planning 2006 Expansion. $400 million for projClean fuels project.

*Hydrotreater 50,000 Engineering Nov. 2006 Technip New.

VENEZUELAPDVSA—

Caripito *Refinery 50,000 Planning 2010 New. Mostly asphalt. Barinas *Refinery 50,000 Planning 2010 New. Cabruta *Refinery 400,000 Planning 2010 New. Crude upgrader.

VIET NAMDzung Quat Refinery—

Quang Ngai *CCR …. Engineering 2006 UOP: lic./tech. New. Hydrotreater 29,000 Engineering 2006 Axens: lic. New. *Isomerization 6,500 Engineering 2006 UOP: lic./tech. New. Refinery 130,000 Planning 2006 Technip: engr. New. $1.3 billion.

JGC Corp./Technicas ReunidasRFCC 69,700 Planning 2006 Axens-IFP Group Technologies: lic.

YEMENYemen DieselProduction Unit—

Yemen oil field Crude distillation 1,500 Under constr. May 2005 Ventech Engineers: engr. New. For diesel production.Naphtha and fuel oil to berecombined and piped to refinery.

REFINERIES W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 11

Page 12: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 12/25

AUSTRALIABurrup Fertilisers—

Burrup Peninsula Ammonia 800,000 Under constr. 2005 SNC Lavalin: engr./PE/constr. New. $350 million.

AUSTRIABorealis AS—

Schwechat Polyethylene 350,000 Under constr. Nov. 2005 Tecnimont SPA: engr./contr./constr. New. $200 million.OMV AG—

Schwechat Ethylene 150,000 Engineering Nov. 2005 Linde AG: engr./lic. Expansion. $200 million.

BELARUSJSC Mozyr Oil Refinery—

Mozyr Benzene …. Planning 2005 New. $12 million.

BELGIUMBP PLC—Geel Purified 700,000 Engineering 2006 Technip Italy: DD New.

terephthalic acid

BRAZILPetroquimica Uniao SA—Santo Andre, Sao Paulo Ethylene 200,000 Planning 2006 Expansion. $175 million.Rio Polimeros—

Duque de Caxias Ethylene 520,000 Under constr. June 2005 Snamprogetti: lic. Grassroots olefins complex.$650million.

Polyethylene 540,000 Under constr. June 2005 ABB Lummus Global: New.engr./DD/PE/CS

Snamprogetti

CANADAHusky Energy Co.—

Lloydminster, Sask. Ethanol 130,000 Under constr. 2006 New.Suncor Energy Products—

Sarnia, Ont. Ethanol 121,000 Engineering June 2006 New. $120 million.

CHILEMethanex Corp.—

Punta Arenas Methanol 840,000 Under constr. 2005 Lurgi Oel & Gas Chemie GMBH: New.engr./contr./PD/DD/PE/CS/lic.

CHINACabot Corp.—

Tianjin *Carbon black 50,000 Planning 2006 New.Cangzhou Cang Hua

Chemical Industry—Huizhou, Guangdong Polyvinyl chloride 400,000 Engineering 2005 Technip New.

China NationalBlue Star Corp.—Tianjin *Butadiene 30,000 Engineering 2006 ABB Lummus Global: lic. New.

China NationalOffshore/Shell Nanhai—Huizhou, Guangdong Benzene 250,000 Engineering 2005 Uhde Group New.

Ethylene 800,000 Under constr. Dec. 2005 Bechtel/Sinopec/Foster New. $4.5 billion forWheeler JV: contr. chemical complex.

Stone & Webster: lic.Ethylene glycol …. Under constr. Dec. 2005 Bechtel/Sinopec/Foster Wheeler New.JV: engr./PD/DD/PE/lic./constr.

CTCI Corp.HDPE …. Under constr. Dec. 2005 Bechtel/Sinopec/Foster New.

Wheeler JV: contr.LDPE …. Under constr. Dec. 2005 Bechtel/Sinopec/Foster New.

Wheeler JV: contr.Polypropylene …. Under constr. Dec. 2005 Bechtel/Sinopec/Foster New.

Wheeler JV: contr.Propylene oxide 250,000 Under constr. Dec. 2005 Bechtel/Sinopec/Foster New.

Wheeler JV: contr.Chiyoda Corp.

Styrene monomer 550,000 Under constr. Dec. 2005 Bechtel/Sinopec/Foster New.Wheeler JV: contr.

Technip/Chiyoda: E/DD/PE/CS

PETROCHEMICALS W ORLDWIDE C ONSTRUCTION

Oil & Gas Journal / Apr. 25, 2005 12

Added Expected Company and location Project capacity, tpy Status completion Contractor and contract type Project notes

Petrochemicals Added capacity listed in tonnes per year (t/y) unless otherwise specified.

Page 13: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 13/25

CNOOC ShellPetrochemicalsCo. Ltd.—Nanhai Benzene .... Engineering 2005 Foster Wheeler New. Total petrochemical

complex $4.3 billion. Butadiene .... Engineering 2005 Foster Wheeler New. Ethylbenzene 640,000 Under constr. 2005 ABB Lummus Global: engr./lic. New. Ethylene 800,000 Under constr. 2005 Stone & Webster New. Ethylene oxide .... Engineering 2005 Foster Wheeler New. HDPE .... Engineering 2005 Foster Wheeler New. LDPE .... Engineering 2005 Foster Wheeler New. Styrene monomer 550,000 Engineering 2005 Chiyoda Corp.: New.

engr./contr./DD/PE/CS Styrene monomer 560,000 Engineering 2005 Foster Wheeler New.Daqing Oilfield

Methanol—Daqing Ammonia 50,000 Engineering 2005 Linde AG: engr./PD New.

Formosa Chemicalsand Fiber Corp.—Ningbo *Polystyrene 200,000 Engineering 2005 ABB Lummus Global: lic. New.

Fujian Petrochemical Co. Ltd.— Fujian Province Paraxylene 700,000 Planning 2008 New. Polyethylene 450,000 Planning 2008 New. Quanzhou City Ethylene 800,000 Planning 2008 ABB Lummus Global: lic. New. Part of JV with ExxonM

and Saudi Aramco. $3.5 billion. Polypropylene 300,000 Planning 2008 ABB Lummus Global: lic. New.Guizhou Crystal OrganicChemical—Guizhou Acetic acid 36,000 Engineering Feb. 2005 Chiyoda Corp.: contr./lic. New.Lanzhou Petrochemical—

Lanzhou City, Gansu Ethylene 360,000 Engineering 2006 Kellog Brown & Root: engr. Expansion.Luthianhua Group Inc.—

Luzhou, Sichuan Methanol 450,000 Under constr. Mar. 2005 Toyo Engineering Corp.: PD/PE/lic. New.PetroChina Co. Ltd.—

Ningxia *Ammonia 540,000 Engineering 2005 Haldor Topsoe: engr./lic. New.Shanghai Gaoqiao

Petrochemical Corp.—Shanghai Phenol 200,000 Planning 2005 Kellog Brown & Root: PD/lic./tech. New.

Shanghai Secco PetrochemicalCo. Ltd.—Caojing Acrylonitrile 260,000 Engineering 2005 ABB Lummus Global/BASF New. Part of the $2.7 billion

petrochemical complex. Butadiene 90,000 Under constr. 2005 ABB Lummus Global/BASF New. Ethylbenzene 550,000 Under constr. 2005 ABB Lummus Global: engr./lic. New. Polyethylene 600,000 Planning June 2005 ABB Lummus Global: engr./PE New. Polypropylene 250,000 Engineering 2005 Technip: DD New. $100 million. Polystyrene 300,000 Under constr. 2005 ABB Lummus Global: engr. New. Propylene 590,000 Under constr. 2005 ABB Lummus Global: engr./lic. New. Styrene 500,000 Under constr. 2005 ABB Lummus Global: engr./lic. New.Sichuan Chemical Works

(Group) Ltd.—Chengdu, Sichuan Melamine 30,000 Engineering Oct. 2005 Eurotechnica C & E SPA: New.

engr./contr./DD/PE/CS/lic.Sichuan Tianhua Co.—

Luzhou, Sichuan *Formaldehyde 72,000 Engineering 2005 Haldor Topsoe: lic. New.Sinopec—

Maoming, Guangdong Ethylene 320,000 Engineering July 2006 Expansion.Yunnan Jiehua Chemical

Group—Quiling *Ammonia 587,000 Engineering 2007 Haldor Topsoe: engr./lic. New.Zhenhai Refining and

Chemical Co. Ltd.—Ningbo, Zhejiang Ethylene 1,000,000 Planning 2010 New. $2.4 billion.

Zhong Yurn Da HuaGroup Co.—Henan Melamine 30,000 Under constr. Spet. 2005 Eurotechnica C & E SPA: New.

engr./contr./PD/PE/CS/lic.

CZECH REPUBLICChemopetrol AS—Litvinov Ethylene 50,000 Planning Dec. 2006 Technip Benelux $34 million.

EGYPTAlexandria Fertilizer Co.—

Abu Qir Ammonia 396,000 Engineering 2006 Uhde Group: engr./contr./PE/constr. New. Turnkey. Urea 635,000 Engineering 2006 Uhde Group: engr./contr./PE/constr. New. Turnkey.

Stamicarbon: lic.Egyptian Fertilizer Co.—

Ain Sukhna Ammonia 396,000 Engineering 2006 Uhde Group: engr./contr./PE/constr. New. Turnkey. Urea 635,000 Engineering 2006 Uhde Group: engr./contr./PE/constr. New. Turnkey.

Stamicarbon: lic.Egyptian Linear Alkl

Benzene—Alexandria Alklbenzene …. Engineering 2006 Fluor Corp. New.

PETROCHEMICALS W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, tpy Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 13

Page 14: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 14/25

FRANCELinde Gas—Estarac Hydrogen 2,700 cu m/hr Engineering 2006 Linde AG: engr./contr./PD/DD/PE/CS New.

INDIABrahmputra Valley Fertilizer

Corp. Ltd.—Namrup *Ammonia 72,000 Under constr. 2005 Haldor Topsoe: lic. New.

*Ammonia 216,000 Under constr. 2005 Haldor Topsoe: lic. New. *Ammonia 216,000 Under constr. 2005 Haldor Topsoe: lic. New. *Urea 72,000 Under constr. 2005 Haldor Topsoe: lic. New. *Urea 420,000 Under constr. 2005 Haldor Topsoe: lic. New.Gas Authority of India Ltd.—

Auraiya Polyethylene 70,000 Planning 2005 Stone & Webster Inc. Expansion.Indian Farmers Fertilizer

Cooperative Ltd.—Aonia *Ammonia 547,000 Engineering 2005 Haldor Topsoe: lic. New.Jubilant Organosys Ltd.—

Gajraula *Formaldehyde 72,000 Engineering 2005 Haldor Topsoe: lic. New.Indian Farmers Fertilizer

Cooperative Ltd.—Kalol *Ammonia 400,000 Engineering 2005 Haldor Topsoe: lic. New. Phulpur *Ammonia 547,000 Engineering 2005 Haldor Topsoe: lic. New. *Ammonia 350,000 Engineering 2005 Haldor Topsoe: lic. New.Rashtriya Chemicals

Fertilizer Ltd.—Mumbai *Ammonia …. Under constr. 2007 Haldor Topsoe: lic. New. Trombay *Ammonia 324,000 Under constr. 2005 Haldor Topsoe: lic. New. *Ammonia …. Under constr. 2006 Haldor Topsoe: lic. New.Reliance AssamPetrochemicals—

Lepetkata, Dibrugarh Ethylene 300,000 Planning 2005 New. $1 billion.

INDONESIAP. T. Pupuk Kujang—

Kujang Ammonia 365,000 Under constr. 2005 Toyo Engineering Corp.: New.engr./contr./PE

Urea 629,625 Under constr. 2005 Toyo Engineering Corp.: New.engr./contr./PE

Trans-PacificPetrochemicalIndotama Benzene 207,000 Under constr. 2006 JGC Corp. New.

Orthoxylene 120,000 Under constr. 2008 JGC Corp.Paraxylene 500,000 Under constr. 2007 JGC Corp.Toluene 100,000 Under constr. 2008 JGC Corp.

IRANArak Petrochemical—Arak Ethylene 59,000 Under constr. 2005 Technip Expansion. HDPE 25,000 Engineering 2005 Uhde Group: engr. Expansion.

Basell: lic. Polyethylene 25,000 Engineering 2005 Uhde Group: engr. New.

Basell: lic.Arvand Petrochemical Co.—

Bandar Imam Vinyl chloride 343,200 Engineering 2006 Uhde/Sazeh: contr. New. Ethylene 1,000,000 Planning 2007

Ethylene di-chloride 267,300 Engineering 2006 Uhde/Sazeh: contr. New.Arya Sasol Polymer Co.—

Bousher Ethylene 1,000,000 Under constr. 2005 Technip New.Intecsa Uhde

Bandar ImamPetrochemical Co.—Bandar Imam Ethylene 100,000 Under constr. 2005 ABB Lummus Global: engr. Expansion.

Ilam Petrochemical Co.—Ilam Ethylene 318,000 Planning 2007 New.Jam Petrochemical Co.—Bandar Assaluyeh Butadiene 110,000 Engineering 2005 Lurgi Oel & Gas Chemie GMBH: New.

engr./PD/lic.Ethylene 1,320,000 Under constr. 2005 Technip: engr./contr./PE/lic. New. $280 million.

NargenKharg Petrochemical Co.—

Karg Island Ethylene 500,000 Engineering 2008 Technip New.Nargan

Marun Petrochemical—Bandar Imam Ethylene 1,100,000 Under constr. 2005 Linde AG: engr./lic. New.

Sazeh KhavarNational Petrochemical Co.—

Bandar Assaluyeh Aniline 30,000 Planning 2006 New. Kharg Island HDPE 310,000 Planning 2005 New. Methanol 660,000 Planning 2005 New.

PETROCHEMICALS W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, tpy Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 14

Page 15: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 15/25

Pars Petrochemical Complex—Bandar Assaluyeh MD/HDPE 300,000 Engineering 2006 Uhde Group: engr./contr./PE/constr. New. Turnkey.

Basell: lic.Petrochemical Industries

Dev. Mgmt. Co.—Bandar Assaluyeh Ethylene 1,200,000 Planning 2008 New.

Ethylene 1,900,000 Planning 2009 New. Urea 1,170,000 Under constr. Apr. 2005 Chiyoda Corp.: New. $205 million.engr./contr./DD/PE/lic.

Toyo Engineering Corp.Urea 1,170,000 Under constr. 2006 Chiyoda Corp.: New. $205 million.

engr./contr./DD/PE/lic.Toyo Engineering Corp.

Sherkat Carbon Simorgh—Mahakllat Carbon black 42,000 Engineering Feb. 2006 Eurotechnica C&E SPA: New.

engr./contr./DD/PE/CS/lic.

ISRAELCarmel Olefins Ltd.—

Haifa Bay Ethylene 50,000 Engineering June 2006 Expansion. $$60 million. *Propylene 150,000 Under constr. 2006 New. $70 million. *Polypropylene 200,000 Under constr. 2006 New. $20 million.

JAPANNippon PetroleumRefining Co. Ltd.—

Kurashiki, Okayama Propylene 100,000 Under constr. Oct. 2005 TEC New.Tosoh Corp.—Nanyo Aniline 150,000 Engineering Mar. 2005 Toyo Engineering Corp.: New.

engr./contr./PE

KUWAITPetrochemical Industries Co.—

Shuaiba Ethylene 850,000 Planning 2007 Dow Chemical Co. New. $1 billion expetrochemicalFluor complex.

Ethylene glycol 600,000 Planning 2007 Dow Chemical Co. New.Fluor

Benzene 325,000 Planning 2008 Bechtel: contr./PD/PM New. Paraxylene 768,000 Planning 2008 Bechtel: contr./PD/PM New. $1.4 billion.

MEXICOPetroquimica Cangrejera SA—

Morelos Ethylbenzene 110,000 Engineering 2006 ABB Lummus Global Revamp. Styrene 100,000 Engineering 2006 ABB Lummus Global Revamp.Petroquimica Morelos—

Coatzacoalcos, Veracruz *Ethylene 850,000 Engineering 2007 ABB Lummus Global: lic. Expansion.

NIGERIAEurochem Technologies Corp.—

Ibeju Lekki, Lagos HDPE 400,000 Under constr. 2006 UOP LLC/Norsk Hydro ASA: New. Methanol-to-olefins.lic./tech.

Lagos Methanol .... Engineering 2007 Haldor Topsoe: lic. New.

OMANOman India Fertilizer Co.—Sur Ammonia 630,000 Under constr. July 2005 Snamprogetti SPA: engr./DD/PE/CS New.

Haldor Topsoe: lic. Urea 1,846,900 Under constr. July 2005 Snamprogetti SPA: engr./DD/PE/CS New.

TechnipOman Oil Co.—Sohar Polyproylene 340,000 Engineering Mar. 2006 ABB Lummus Global: engr./PD/DD New.

LG InternationalSohar International—Sohar Ammonia 660,000 Planning 2006 Uhde Group: contr. New. Urea 1,155,000 Planning 2006 Uhde Group: contr. New.

PAKISTANAttock Refinery Ltd.—

Rawalpindi *Polyethylene 100,000 Planning 2006 New.Fauji Fertilizer Bin

Qasim Ltd.—Rawalpindi *Ammonia 565,000 Engineering 2005 Haldor Topsoe: engr./lic. New.

POLANDPKN Orlen SA—Orlen Benzene 180,000 Engineering 2005 Uhde Group: engr./PD/tech. New. Ethylene 330,000 Engineering 2005 ABB Lummus Global: contr./lic. Expansion. $165 million. Toluene 220,000 Engineering 2005 Uhde Group: engr./PD/tech. New.

PETROCHEMICALS W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, tpy Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 15

Page 16: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 16/25

QATARQatar Chemical Co. Ltd.—

Mesaieed Ethylene 195,000 Engineering June 2006 JGC Engineering: Expansion. Lump sum turnkey.engr./PE/design/constr. $193 million.

Linear alkyl benzene 100,000 Engineering 2005 Foster Wheeler: engr. New. $240 million. Normal paraffin 80,000 Engineering 2005 Foster Wheeler: engr. New. Ras Laffan Ethylene 1,300,000 Engineering 2007 ChevronPhillips Chemical Co. New. JV of Q-Chem, Atofin, aQatar Petrochemical Co.—

Ras Laffan HDPE 450,000 Planning 2006 Univation: lic. New.

ROMANIAArpechem SA—Pitesti Ethylene 100,000 Planning Oct. 2005 New.

RUSSIAGazprom—

Novyi Urengoi, Tyumen Polyethylene 300,000 Under constr. 2005 New.JSC Acron—Novgorod *Formaldehyde 81,000 Engineering 2005 Haldor Topsoe: engr./lic. New. *Formaldehyde 81,000 Engineering 2005 Haldor Topsoe: engr./lic. New.Nizhnekamskneftekhim—

Tatarstan Polypropylene 120,000 Planning 2006 Technimont New. $150 million. Polystyrene 40,000 Planning 2006 New.Salavatnefteorgsyntez—

Salavat *Polystyrene 70,000 Engineering 2006 ABB Lummus Global: lic. New.

SAUDI ARABIAChevron Phillips Chemical

Co. LLC—Al-Jubail Benzene 443,000 Engineering 2005 Uhde Group: engr./tech. Expansion. Part of $1 billionWorley Parsons: PM/engr. petrochemical complex.

Ethylbenzene 715,000 Engineering 2007 Worley Parsons New. Ethylene 202,000 Engineering 2005 JGC: contr. New.

Worley Parsons: PM/engr. Propylene …. Planning 2006 Worley Parsons New. Styrene 715,000 Engineering 2007 Worley Parsons New.

ABB Lummus GlobalEastern Petrochemical Co.—

Al-Jubail Ethylene 1,300,000 Engineering 2008 Foster Wheeler New. Ethylene glycol 600,000 Engineering 2008 Foster Wheeler New. Polyethylene 800,000 Engineering 2008 Foster Wheeler New.Jubail United

Petrochemical Co.—Al-Jubail Ethylene glycol 690,000 Under constr. 2005 Toyo Engineering Corp.: New.

engr./contr./PENational PetrochemicalIndustrialization Co.—Al-Jubail Acetic acid 500,000 Planning 2007 Acetex Corp. New.

Fluor Methanol 1,800,000 Planning 2007 Acetex Corp. New.

Fluor *Vinyl Acetate 255,000 Planning 2008 Fluor: PM New. Yanbu Polypropylene 420,000 Under constr. 2007 Technimont SPA New.Saudi Arabian Fertilizer Co.—

Al-Jubail Ammonia 202,680 Engineering 2006 Uhde Group: contr./PE/tech./constr. New. Turnkey.Haldor Topsoe: lic.

Urea 1,100,000 Engineering 2006 Uhde Group: engr./contr./PE/ New. Turnkey.tech./constr.

Stamicarbon: lic.Saudi Aramco/Sumitomo

Chemical Co.—Rabigh Ethylene 2,200,000 Planning 2008 Foster Wheeler New. Part of $4.3 billionpetrochemical/refining complex.

Saudi Basic Industries Corp.—Al-Jubail Ethylene Glycol 630,000 Engineering June 2006 Toyo Engineering Corp.: New.engr./contr./PE

Al-Jubail Methanol 1,700,000 Planning 2007 Expansion. Yanbu Ethylene 1,300,000 Engineering 2007 New.Saudi International

Petrochemical Co.—Al-Jubail *Acetic acid 460,000 Planning 2008 Foster Wheeler: PM New.

Methanol 1,058,500 Under constr. Jan. 2005 Chiyoda Corp.: New.engr./contr./DD/PE/CS

Saudi FormaldehydeChemicals—Al-Jubail *Formaldehyde 72,000 Engineering 2005 Haldor Topsoe: engr./lic. New.

PETROCHEMICALS W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, tpy Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 16

Page 17: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 17/25

SINGAPOREExxonMobil Corp.—

Jurong Island *Ethylene 75,000 Planning 2006 Expansion.Shell Chemical Co.— Ethylene … Planning 2006 New. $1 billion.

SLOVAKIASlovnaft AS—Bratislava Polypropylene 255,000 Engineering 2005 Linde AG: engr. New.

SOUTH KOREADongbu Hannong

Chemical Co.—Ulsan *Ethylbenzene 170,000 Engineering 2006 ABB Lummus Global: lic. Expansion.

LG Petrochemicals—Yeosu Cumene 200,000 Engineering 2005 LG Engineering & Construction New. $62 million.

Corp.: engr./contr./DD Ethylene 100,000 Engineering May 2006 Expansion. $68 million. Phenol 150,000 Engineering 2005 LG Engineering & Construction New.

Corp.: engr./contr./DDYeochun NCC Co.—Yeosu City *Styrene 272,000 Engineering 2005 ABB Lummus Global: lic. Expansion.

SPAINERTISA—La Rabida *Acetone 125,000 Planning 2006 New. *Cumene 300,000 Planning 2006 New. *Phenol 200,000 Planning 2006 New.

TAIWANChinese Petroleum Corp.—

Kaohsiung Linyuan Ethylene 1,000,000 Planning 2011 New. $1.25 billion.Formosa Chemicals

Fiber Corp.—Mailiao Acetic acid 300,000 Engineering 2005 Aker Kvaerner: engr. New.

THAILANDIndorama Petrochem Ltd.—

Map Ta Phut Terephthalic acid 640,000 Engineering 2006 Foster Wheeler New.

TRINIDAD TOBAGOClico Energy LLC—

Point Lisas Ammonia …. Planning 2006 New. JV of Clico, Colonial Life,and MAN Ferrostaal.

Melamine …. Planning 2006 New. Urea …. Planning 2006 New.

TURKEYPetkim Petrokimya

Holding AS—Aliaga Ethylene 120,000 Under constr. 2005 Mitsui Engineering Expansion. $80 million.

TURKMENISTANTurkmeneftegaz—

Turkmenbashi Polyethylene 200,000 Planning 2006 JGS/Linde AG: PE/design/constr. New. $490 million.Marubeni-JGC/Linde AG/Mitsui

UKRAINEOAO Rivne Azot—Rivne *Ammonia 216,000 Under constr. 2005 Haldor Topsoe: lic. New.

UNITED STATESInnovene (BP PLC)—

Chocolate Bayou, Tex. Ethylene 295,000 Engineering June 2005 Kellogg Brown & Root: engr. Expansion.SCORE: engr.

Dow Chemical Co.—Seadrift, Tex. Ethylene 900,000 Under constr. 2009 New.

VENEZUELAPequiven—

Jose, Anzoategui Acetic Acid 500,000 Planning 2005 New. $210 million. Ammonia 1,460,000 Planning 2005 New. $1.1 billion. Ammonia 730,000 Planning 2008 New. $510 million. Ethylene 1,050,000 Planning 2008 ExxonMobil Technologies: lic. New. $880 million. Methanol 830,000 Planning 2006 New. $280 million.

Oil & Gas Journal / Apr. 25, 2005 17

PETROCHEMICALS W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, tpy Status completion Contractor and contract type Project notes

Page 18: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 18/25

BOLIVIAGTL Bolivia SA—Santa Cruz GTL plant 10,000 Planning 2007 Jacobs Engineering UK New.

CHILEEmpresa Nacional

del Petroleo—Punta Arenas GTL plant 10,000 Planning 2006 New.

IRANNational Petrochemical Co.—

Bandar Assaluyeh GTL plant 70,000 Planning 2006 New. Bushehr GTL plant 40,000 Planning 2006 New.

NIGERIAChevron Nigeria Ltd.—

Escravos GTL plant 34,000 Engineering 2007 JGC, KBR, Snamprogetti: engr. New. FEED complete.

QATARExxonMobil/Qatar Petroleum

GTL Ltd.—Ras Laffan GTL plant 154,000 Planning 2011 New.Oryx GTL Ltd.—Ras Laffan GTL plant 34,000 Under constr. 2006 Technip: contr./PE/design/constr. New. Sasol/ChevronTexaco.

FEED complete.Shell Oil/Qatar Petroleum

Pearl GTL—Ras Laffan GTL plant 140,000 Planning 2010 New.

ALGERIABP/Sonatrach—In Amenas NGL processing 1,050 Under constr. 2005 JGC Corp./KBR New.Repsol YPF/Gas Natural/

Sonatrach—Arzew *LNG 5.2 Planning 2009 New.

ANGOLAAngola LNG Ltd.—Soyo LNG 4 MMtpy Planning 2006 New. One train. $2 billion.

AUSTRALIAChevronTexaco Gorgon LNG—

Barrow Island LNG 5 MMtpy Planning 2009 KBR/JGC/Clough/Hatch New. JV of ChevronTexaco (5Shell (28.6%), ExxonMobil (14.3%

ConocoPhillips—Darwin LNG 400 Under constr. Mar. 2006 Bechtel Corp.: engr./contr./PD New. $900 million.Woodside Energy Ltd.—

Kanatha, NWS LNG 4.2 MMtpy Planning 2008 Foster Wheeler/Worley Parsons Expansion. Fifth train.Clough Eng. Ltd.: engr.

Port Campbell NGL processing …. Planning June 2006 Technip New.

BAHAMASEl Paso Corp.—

South Riding Point,Grand Bahama Island LNG regasification 1,000 Planning 2007 New. For delivery to Florida.

High Rock LNG.

BANGLADESHUnocal Corp.—

Bibiyana field *Gas plant 300 Planning 2006 Pegasus International Ltd. New.Wilbros Engineers Inc.

GAS-TO-LIQUIDS W ORLDWIDE C ONSTRUCTION

Oil & Gas Journal / Apr. 25, 2005 18

Added Expected Company and location Project capacity, b/d Status completion Contractor and contract type Project notes

Gas-To-Liquids Added capacity listed in barrels per day (b/d) unless otherwise specified.

Gas Processing Added capacity listed in millions of cubic feet per day (MMcfd) unless otherwise specified.

Added Expected

Company and location Project capacity, MMcfd Status completion Contractor and contract type Project notes

Page 19: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 19/25

BELGIUMFluxys LNG—Zeebrugge LNG regasification 3 MMtpy Engineering 2007 Saipem SPA: engr./PE/constr. Expansion.

BRAZILPetrobras—Ipojuca Gas plant …. Engineering Jan. 2006 New.Praxair White

Martens/Petrobras—Paulina, Sao Paulo LNG 5 MMtpy Engineering 2006 Black & Veatch Pritchard Inc. New. $38 million.

CABINDAChevronTexaco Inc.—Offshore FLPG 6 Planning 2005 Mitsui/Ishikawajima-Harmina Heavy New. Floating LPG plant on a

Industries: engr./PE/constr.

CANADAAnadarko Petroleum Corp.—

Bear Head, Point Tupper, NS LNG regasification 1 bcfd Under constr. 2007 New.Irving Oil Ltd.—Canaport, NB LNG regasification 500 Planning 2008 New. $400 million.OPTI Canada Inc.—

Ft. McMurray, Alta. Syngas 340 Engineering 2007 Fluor New.TransCanada/Petro-Canada—

Gros Cacouna, Que. LNG regasification 500 Planning 2008 New. $660 million.

CHINABeijing Oxygen Plant—

Beijing LNG regasification 130 Mtpy Engineering 2007 Black & Veatch Pritchard Inc.: engr. New.CNOOC—Fujian LNG regasification 2.6 MMtpy Under constr. 2007 New. To be supplied from BP

PLC’s Tangguh project. Hengqin Island, Zhuhai City,

Guangdong Gas treatment 1.6 bcmd Under constr. 2006Shanghai LNG regasification 3 MMtpy Planning 2008 New. $554 million.

Shenzhen City, Guangdong LNG regasification 3.7 MMtpy Under constr. 2006 Sofregaz: engr. New. $600 million. JV of CNOJGC Engineering BP PLC

Tianjin LNG regasification 3 MMtpy Planning 2010 New. Zhejiang LNG regasification 3 MMtpy Under constr. 2008 New. To be supplied from

Gorgon project.Sinopec Group—

Quingdao, Shandong LNG regasification 3 MMtpy Planning 2007 New. $500 million.

COLOMBIABP Exploration Co. Ltd.—

Cusiana Gas sweetening plant 236 Engineering 2005 CB&I/Howe-Baker New.

DOMINICAN REPUBLICAES Corp.—Andres LNG … Under constr. 2005 New.

EGYPTEl Behera Natural Gas

Liquifaction SAE—Idku LNG 2 MMtpy Under constr. 2005 Bechtel: engr./contr./PD/DD/CS/PM New. Train 1. LNG 2 MMtpy Under constr. 2006 Bechtel: engr./contr./PD/DD/CS/PM New. Train 2.

EQUATORIAL GUINEAMarathon Oil—Bioko Island LNG 3.4 MMtpy Under constr. 2008 Bechtel: engr./contr./PD New. Export to BG, Lake Cha

Chicago Bridge & Iron

FRANCEGaz De France—Fos Cavaou LNG 8.25 b cu m/y Engineering 2007 Saipem SPA: engr./PE/constr. New. $300 million.

regasification Technimont

JAPANMizushima LNG Co Ltd.—

Mizushima, Okayama Pref. LNG 0.5 MMtpy Under constr. Mar. 2006 Chiyoda Corp.: New.regasification engr./contr./DD/PE/CS

HONG KONGExxonMobil/CLP Holding—

Black Point *LNG regasification 3 MMtpy Planning 2010 New. $600 million.

HONDURASAES Corp.—El Faro LNG …. Under constr. 2005 New.

GAS PROCESSING W ORLDWIDE C ONSTRUCTION

Oil & Gas Journal / Apr. 25, 2005 19

Added Expected Company and location Project capacity, MMcfd Status completion Contractor and contract type Project notes

Page 20: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 20/25

Page 21: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 21/25

Repsol YPF SA—Lazaro Cardenas, Michoacan LNG 4 b cu m/y Planning 2008 New. $350 million.

regasificationSempra/Shell—Costa Azul LNG 1 bcfd Under constr. 2008 Techint/Black & Veatch Pritchard/ New. $500 million.

regasification Mitsubishi/Vinci ConstructionShell/Total SA/Mitsui—

Port Altamira LNG regasification 5 b cu m/y Under constr. Aug. 2006 ICA Fluor New. $250 million lump sum t

NIGERIABrass LNG Ltd.—Brass Terminal LNG 10 MMtpy Engineering 2009 Bechtel New. $3 billion. NNPC,

ConocoPhillips, ChevronTexaco,ENI. Cascade LNG technology.

Nigeria LNG Ltd.—Bonny Island LNG 4 MMtpy Under constr. 2005 Kellogg/JGC Corp./Technip/ Expansion. Train 4.Snamprogetti SPA: engr.

Air Products: lic. LNG 3 MMtpy Engineering 2006 Kellogg/JGC Corp./Technip/ Expansion. Train 5.

Snamprogetti SPA: engr.Air Products: lic.

LNG 4 MMtpy Planning Nov. 2007 Kellogg/JGC Corp./Technip/ Expansion. Train 6.Snamprogetti SPA:engr./PE/constr.

Air Products: lic.LNG 4.8 MMtpy Planning 2010 Expansion. Train 7.

Shell PetroleumDevelopment Co.—Soku *LNG …. Engineering June 2006 Saipem: engr./PE/constr. Expansion.

NORWAYStatoil ASA—Kaarsto Gas plant 950 Planning 2005 Expansion. Kollsnes Gas plant …. Engineering Aug. 2006 Fluor: contr. Expansion. $57 million. Melkoya Island LNG 4 MMtpy Under constr. 2006 Linde AG: engr. New.

Statoil: lic. Mongstad LNG 1.4 MMtpy Planning 2006 Kvaerner Engineering & Construction Expansion.

OMANQalhat LNG SAOC—Qalhat, Sur LNG 3.3 MMtpy Under constr. May 2006 Chiyoda Corp.: engr./contr./ New. Third train.

DD/PE/CSFoster Wheeler

PAKISTANJamshoro Group—Hyderabad LPG 200 Under constr. 2005 Ortloff Engineers Inc.: lic. New. $31 million.

Hanover Compressor Co.Pakistan Petroleum—Adhi, North Punjab NGL …. Planning 2005 Ranhill Berhad Expansion. $21 million.

PERUPeru LNG Co.—

Pampa Melchorita LNG 4 MMtpy Planning 2008 Kellogg Brown & Root: engr. New. $1.6 billion.PlusPetrol Peru Corp. SA—

Pisco LPG 50,000 Under constr. 2005 Ortloff Engineers Ltd.: lic. New. $140 million.Howe-Baker: contr.

QATARExxonMobil Middle East

Gas Marketing Ltd.—Ras Laffan NGL processing 750 Under constr. 2006 Chiyoda Corp./Technip/Ortloff: New. LPG 1,849 tpd,

engr./contr./DD/PE/CS condensate 7,150 b/d.Snamprogetti SPA

*LPG 1.7 MMtpy Under constr. 2006 Chiyoda Corp.: engr./DD/PE/CS New.Qatar Petroleum Corp.—Mesaieed NGL processing 1,650 tpd Under constr. Sept. 2005 Snamprogetti SPA: contr. Expansion.

Hyundai E&CQatarGas—Doha NGL processing 2,600 Engineering 2007 JGC Corp. New. Two trains.QatarGas II—Ras Laffan LNG 7.8 MMtpy Under constr. 2008 Chiyoda Corp./Technip New. Qatar Petroleum/ExxonM

Corp. To UK.QatarGas III—Ras Laffan LNG 7.5 MMtpy Engineering 2009 New. Qatar Petroleum/

ConocoPhillips.RasGas—Ras Laffan LNG 4.7 MMtpy Under constr. 2006 Chiyoda Corp./Technip: Expansion. Trains 4 and 5 to e

engr./contr./DD/PE/CS to Europe.Snamprogetti SPA

LPG …. Under constr. 2006 Ortloff Engineers Ltd.RasGas II—Ras Laffan LNG 7.8 MMtpy Planning 2007 Chiyoda Corp./Technip: Expansion. Trains 6 and 7 to e

engr./contr./DD/PE/CS U.S. Qatar Petroleum/ExxonMobSnamprogetti SPA

GAS PROCESSING W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, MMcfd Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 21

Page 22: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 22/25

RUSSIASakhalin Energy

Investment Co. Ltd.—Onshore gas processing Gas plant 1.8 bcfd Under constr. 2007 Parsons E&C: PE New.

Prigorodnoye, Sakhalin LNG 9.6 MMtpy Under constr. 2008 Chiyoda Corp./Toyo Engineering: New. Consortium of Shell, Miengr./DD/PE/CS Mitsubishi. Two trains.

Fluor/Toyo Engineering

SAUDI ARABIASaudi Arabian Oil Co.—Berri Gas plant 250 Under constr. Nov. 2005 Technip Expansion. Hawiyah NGL processing 4,000 Engineering 2008 JGC Corp. New. Ju’aymah *NGL 270,000 Engineering 2008 Technicas Reunidas Expansion.

fractionation plant bpd Khursaniyah *NGL processing 1,000 Engineering 2007 Technip/Bechtel New.

SINGAPORESingapore Public Utilities

Board—Jurong Island *LNG regasification 3 MMtpy Engineering 2010 Tokyo Gas Engineering New. $500 million.

SOUTH KOREAPosco Steel—Kwangyang LNG regasification 1.7 MMtpy Engineering Mar. 2005 New. $290 million.

SPAINBahia de Bizkaia—Bilbao LNG 3.3 b cu m/y Engineering 2005 Sofregaz/SN Technigaz/Initec: Expansion.

regasification DD/PE/constr.Enagas SA—Barcelona LNG 150 M cu m/y Under constr. 2006 Foster Wheeler Iberia SA: Expansion.

regasification contr./PD/DD/PE/CSM W Kellogg: lic.

Cartagena LNG 300,000 cu m/hr Under constr. Nov. 2006 Foster Wheeler Iberia SA: Expansion.regasification contr./PD/DD/PE/CS

Huelva LNG regasification .... Under constr. 2005 Foster Wheeler Iberia SA: Expansion.contr./PD/DD/PE/CS

Regasification delNoroeste SA—El Ferrol, La Coruna LNG regasification …. Engineering Nov. 2006 Foster Wheeler Iberia SA New.

TAIWANChinese Petroleum Corp.—

Taichung LNG regasification 3 MMtpy Engineering 2008 CTCI Corp. New.

THAILANDTrans Thai Malaysia—

Songkhla NGL processing 425 Under constr. 2005 Ortloff Engineers Ltd.: lic. New.Samsung Engineering: contr.

TRINIDAD TOBAGOAtlantic LNG Ltd.—

Point Fortin LNG 4.6 MMtpy Under constr. 2005 Bechtel: engr./DD/PE/CS New. Train 4. LNG 3 MMtpy Planning 2009 New. Train 5. LNG 3 MMtpy Planning 2010 New. Train 6.

TUNISIABG Tunisia—Sfax *Compression 340 Under constr. June 2005 Bechtel: engr./contr./PD/DD/PE/CS Expansion.

UNITED ARAB EMIRATESAbu Dhabi Gas Industries

Ltd.—Asab NGL processing 820 Engineering 2008 Foster Wheeler International Corp. Expansion.Bechtel: engr./PD, Ortloff: lic.Habshan NGL processing 1,300 Engineering 2007 Foster Wheeler International Corp.: Expansion.

engr./PE/constr.Bechtel: engr./PD, Ortloff: lic.

Ruwais NGL processing …. Engineering 2005 Foster Wheeler International Corp. Expansion.

UNITED KINGDOMEncana—Buzzard, England *Gas treating 75 Under constr. 2006 Parsons E&C: engr. New.

John BrownExxonMobil/QatarGas—

Milford Haven, Wales LNG regasification 7.8 MMtpy Engineering 2007 Kellog Brown & Root New. $750 million.Chicago Bridge & Iron

National Grid Transco—Isle of Grain, England LNG regasification 7.2 MMtpy Under constr. 2006 Black & Veatch Pritchard Expansion. Train 2.

Statoil—Langeled, England *LNG regasification 2.5 bcfd Engineering 2006 Parsons E&C: PE/CS New.

GAS PROCESSING W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, MMcfd Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 22

Page 23: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 23/25

UNITED STATESAustralian-Canadian

Oil Royalties Ltd.—Park Cities, Ky. NGL plant 12.5 Under constr. 2005 Holloman Engineering New.

BHP Billiton—OffshoreCabrillo Port, Calif. LNG regasification 800 Planning 2008 New.

Cheniere Energy Inc.—Corpus Christi, Tex. LNG regasification 2.6 bcfd Engineering 2007 Bechtel New. $400 million.

Black & Veatch Pritchard Sabine Pass, Tex. LNG regasification 2.6 bcfd Under constr. 2008 Bechtel: engr. New. $647 million.

Black & Veatch PritchardChevronTexaco—

Offshore Port Pelican, La. LNG regasification 1.6 bcfd Engineering On hold Black & Veatch Pritchard New. Offshore concreteFluor/Aker Kvaerner gravity terminal.

Crystal Energy LLC—Offshore ClearwaterPort, Calif. LNG regasification 800 Planning 2007 New. $300 million.

Modify Platform Grace.Dominion Cove Point—

Chesapeake Bay, Md. LNG regasification 800 Planning 2008 Chicago Bridge & Iron Co. Expansion.El Paso Corp.—

Elba Island, Ga. LNG regasification 400 Engineering 2006 Chicago Bridge & Iron Co. Expansion. $145 million.Energy Bridge

Deepwater Port—Offshore GOMWest Cameroon LNG regasification 500 Planning 2007 Advanced Production New.

and Loading ASEnterprise Products

Partners LP—Mont Belvieu, Tex. *NGL 15,000 Planning 2006 Expansion.

*NGL 60,000 Planning 2006 New.Excelerate Energy

Northeast Gateway—Offshore Bay, Mass. *LNG regasification 1 bcfd Planning 2007 New.

ExxonMobil Golden Pass—Sabine Pass, Tex. LNG regasification 1 bcfd Planning 2008 New.

ExxonMobil Vista Del Sol—Quintana Island, Tex. LNG regasification 1 bcfd Planning 2008 New. $600 million.

Freeport LNG—Quintana Island, Tex. LNG regasification 1.5 bcfd Planning 2007 Technip/Fluor New. Cheniere Energy and

Conoco Phillips. $400 million.Interline Energy

Services Inc.—Douglas, Wyo. NGL plant 20,000 gpd Engineering Apr. 2005 New. $2.3 million.

KeySpan Corp.—Fields Point, RI LNG regasification 1 bcfd Planning 2006 Black & Veatch Pritchard: Revamp to LNG. $50 million.

engr./PE/constr.Occidental Petroleum—

Ingleside, Tex. LNG regasification 1 bcfd Planning 2009 New. $400 million.Sempra Energy LNG—

Hackberry, La. LNG regasification 1.5 bcfd Engineering 2008 Black & Veatch Pritchard New. $500 million. Cameron LAker Kvaerner/Ishikawajima-Harima

Port Arthur, Tex. LNG regasification 1.5 bcfd Planning 2009 New. $600 million.Trunkline LNG Co.—

Lake Charles, La. LNG regasification 600 Engineering June 2006 Chicago Bridge & Iron Co.: Expansion. Lump-sum turnkeengr./PE/constr. Final capacity to be 1.8 bcfd.

UZBEKISTANUnico/Sumy Machine

Building/NPC—Shurtan *LPG 180,000 tpy Engineering 2006 New.

VENEZUELAPDVSA—Gran Mariscal

de Ayacucho, Sucre LNG 4.7 MMtpy Planning 2009 New. JV of PDVSA, Energy Minof Venezuela, Shell Group,Mitsubishi Corp. $2.7 billion.

Jose, Anzoategui LNG 2.1 MMtpy Planning 2006 New. $600 million.

VIET NAMPetrovietnam—Ho Chi Min City LPG 100,000 tpy Planning 2005

YEMENTotal SA Yemen LNG—Bal Haf LNG 6.2 MMtpy Planning 2008 Technip/Bechtel New.

GAS PROCESSING W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, MMcfd Status completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 25, 2005 23

Page 24: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 24/25

ARUBAValero Energy Corp.—

San Nicolas Sulfur recovery 450 Engineering May 2005 New. $14 million.

BAHRAINBahrain Oil Co.—Sitra Sulfur unit 340 Engineering 2007 Revamp.

BANGLADESHEastern Refinery Ltd.—

Chittagong Sulfur unit 20 Planning June 2007 New.

BRAZILPetrobras—Sao Paulo *Sulfur unit 170 Engineering 2005 CB&I Howe-Baker

CANADAOPTI Canada Inc.—

Ft. McMurray, Alta. Claus 600 Engineering 2007 Fluor: engr. New.Suncor Energy Inc.—

Ft. McMurray, Alta. Claus 250 Engineering 2007 Bechtel: lic. New. Sarnia, Ont. Sulfur unit 150 Engineering 2005 CB&I Howe-Baker: lic. New.

CHINAShanghai Ethylene

Cracker Complex—Shanghai Sulfur unit .... Engineering 2005 CTCI Corp. New.

COLOMBIAEcoPetrol—

Cartagena Claus 86 Engineering 2005 Axens New.

CROATIAINA Industrija Nafte—

Rijeka Sulfur unit 55 Planning 2005 New. Sisak Sulfur unit 41 Planning 2005 New.

IRANNational Iranian Oil Co.—

Bandar e-Bushehr, Claus 400 Planning 2005 New.Pars 9,10

South Pars Tombak Sulfur unit 734 Engineering 2005 Lurgi Oel & Gas Chemie GMBH New.

ITALYAgip Petroli—

Sannazzaro Claus 120 Engineering 2005 Worley Parsons/Siirtec-Nigi: PD/lic. Expansion.Falconara Refinery—

Falconara Claus 80 Engineering 2005 Worley Parsons/Siirtec-Nigi Expansion.

JAPANTonen General Oil—

Wakayama Claus 140 Engineering 2005 Worley Parsons: PD/lic. Revamp one train.

KAZAKHSTANAgip Petroli—

Kashagan FieldDevelopment Claus 3,800 Engineering 2008 Worley Parsons/Fluor: PD/lic. New. Two trains at 1,900 tpd ea

CNPC-AMG—Zanazhol Claus 720 Engineering 2006 Worley Parsons/CPE New.

Engineering: PDTengizChevroil—

Tengiz Claus 2,450 Engineering 2005 Worley Parsons/Fluor: New.engr./contr./PD/DD/CS/lic.

SULFUR W ORLDWIDE C ONSTRUCTION

Oil & Gas Journal / Apr. 25, 2005 24

Sulfur Added capacity listed in tonnes per day (t/d) unless otherwise specified. Added Expected Company and location Project capacity, tpd Status completion Contractor and contract type Project notes

Page 25: Boom Is On

7/24/2019 Boom Is On

http://slidepdf.com/reader/full/boom-is-on 25/25

MOROCCOSociete Anonyme Marocaine de

L’Industrie de Raffinage—Mohammedia Claus 250 Engineering 2006 Parsons Energy & Chemical: New. Two trains at 250 tpd each.

engr./PE

PUERTO RICOShell Chemical Co.—Yabucoa Claus/Scot 40 Engineering 2005 Black & Veatch Pritchard Inc.: engr. New.

RUSSIARosneft—

Komsomolsk Claus 38 Engineering 2005 Worley Parsons/ABB Lummus Global New.

SAUDI ARABIASaudi Arabia Oil Co.—

Berri Sulfur unit 600 Under constr. Nov. 2005 Technip/Foster Wheeler New. Two new units, three revam Riyadh Claus 140 Under constr. 2005 Technip: DD/PE/constr./lic. New. Two 70 tpd units.

SERBIA AND MONTENEGRONIS Oil Refinery—

Novi Sad Sulfur unit …. Engineering 2006 New.Pancevo *Claus 180 Engineering 2006 Worley Parsons New.

SOUTH AFRICANATREF—

Sasolburg Sulfur unit …. Engineering May 2005 Fluor: engr. Revamp.

UNITED ARAB EMIRATESAbu Dhabi National

Oil Co.—Habshan Claus 1,600 Planning 2005 Jacobs Engineering: New.

engr./PD Ruwais Sulfur unit 50 Engineering July 2005 Ortloff Engineers New.

Ltd./Chiyoda: lic.Gasco—

Ruwais Sulfur unit 35 Engineering 2007 Worley Parsons/Bechtel New.

UNITED KINGDOMBP PLC—Coryton Tail gas treating 136 Engineering 2005 Black & Veatch Pritchard: engr. New.

UNITED STATESConocoPhillips—

Ponca City, Okla. *Claus …. Planning 2005 Black & Veatch Pritchard Revamp.National Cooperative

Refining Association—McPherson, Kan. Claus 60 Under constr. Nov. 2005 TKS: contr. New.

Premcor Refining—Memphis, Tenn. Sulfur unit 260 Engineering 2005 Ortloff Engineers Ltd./Inde: lic. New.

Port Arthur, Tex. Sulfur unit 424 Engineering 2006 Ortloff Engineers Ltd./Linde: lic. New.Suncor Energy USA—

Commerce City, Colo. Claus 7 Engineering Aug. 2005 Worley Parsons/Jacobs: New. $20 million.engr./PD/lic.

Sunoco Inc.—Eagle Point, NJ *Sulfur unit 48 Under constr. 2005 CB&I Howe-Baker

Valero Energy Corp.—Ardmore, Okla. Sulfur unit 130 Engineering Apr. 2005 CB&I Howe-Baker: New. $29 million.

engr./PE/constr. Paulsboro, NJ Tail gas treating 165 Engineering 2005 CB&I Howe-Baker: New. $21 million.

engr./PE/constr. Three Rivers, Tex. Sulfur unit 130 Engineering 2005 CB&I Howe-Baker: New. $21 million.

engr./PE/constr.

SULFUR W ORLDWIDE C ONSTRUCTION Added Expected Company and location Project capacity, tpd Status completion Contractor and contract type Project notes