Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 1
List of Cases to be submitted before 17th Consent Committee Meeting of 2014-15 scheduled on 05.11.2014 at 02:30 p.m. (Booklet No. - 32)
Sr. No.
Name & Address Capital
Investment Applied For Section Page No. Remarks
Resubmission
1 Wimco Ltd., P. B. No. 04, Off Kalyan - Badalapur Road, Amnernath, Dist - Thane
331.09 Crs. Establish JD(WPC) 1 to 24
2
Renuka Construction, "Renuka Gulmohar Phase II", Sr. No. 33/7, 36/1/1, 36/1/2(p), 36/2, Village Pimpri, Dist: Pune
59.84 Crs. Establish RO(HQ) 25 - 34
3
Kishor G. Patil, Plot bearing CTS No. 183, S. no. 265, H. No. 1 & S. No. 266, H. No. 1, 2 & 3 of village Nilemore, Tal - Vasai, Dist - Thane
63 Crs. Establish RO(HQ) 35 - 57
4
Vidarbha Infotech Pvt. Ltd., Plot No. 28, Survey No. 43-51, 53 & 96, IT Park, Gayatri Nagar, Nagpur
74.50 Crs. Establish RO(HQ) 58 - 74
5
RIA CETP Co-Op. Society Ltd., (C to E for Expasnion) Plot No. 9/11, MIDC Dhatav Tq. Roha
J.K. Developers, Survey No. 21. H. No. 1, S. No. 24, H.No.1(pt), Ghodbunder, Bhayander, Dist. Thane
_____ Reconsideration of final refusal
direction RO(HQ) 615 - 632
3
Yogi Developer Corporation (Yogi Dham), S. No. 24, 25 and 26, Vill. Gouripada, Kalyan(W)
_____ Reconsideration of final refusal
direction RO(HQ) 633 - 661
JD(WPC) 20
AS(T) 0
RO(HQ) 12
JD(APC) 4
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 4
PSO 0
Total 36
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 5
CC- Resubmission Agenda
Agenda no. 1 Region : SRO Kalyan - I Section : JD (WPC) Section Date : 22.10.2014
Name & Address M/s. Wimco Ltd. P. B. No. 04, off. Kalyan - Badalapur Road,
Ambernath, Dist - Thane
Consent For Consent to Establish
Capital Investment 331.09 Cr.
Previous Consent Validity
Industry has obtained previous consent to operate for
manufacturing of Safety Matches on the same plot under Red/LSI
category which was issued vide letter no. ROK-
318/Ulhas/Thane/CC-1039 dt. 29.11.2001 valid up to 31.01.2006
Industry Type O5 – Bakery & Confectionary units with production capacity > 1
TPD
Industry Category Orange
Compliance Of Water
Pollution Related Conditions
YES
Details: - ETP will be provided
Septic tank will be provided for DE.
Water Cess Assessment Done : Paid Up to :
BG Details:- Amount:- --- Validity :---
BG Obtained against : ---
Details of BG forfeited/ encashed, if any :---
Submission of Environmental
Statement Period ---
Other Relevant Information
Industry is in existence with land and building located in non MIDC area and now applied for consent to establish for change in product from safety matches (Red Category) to confectionery items Biscuits (Orange category), hence no requirement of EC for the built up area of the same.
Recommendation of SRO/RO SRO has recommended case for grant of consent to establish if approved.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 6
Agenda no. 2 Resubmission CC Agenda Item
Region : Pune Section :RO(HQ) Date :SRO Date of receipt;-15/04/2014
Ro (HQ) Date of receipt;- 08/07/2014
Name & Address M/s. Renuka Construction ., ‘Renuka Gulmohar Phase II”, S.No. 33/7,
36/1/1,36/1/2(p), 36/2, Village Pimpri, Dist. Pune.
Consent For C to E
Capital Investment 59.84 Crore
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Resubmission
CC Date 11/08/2014
CC decision It was decided to issue SCN for refusal of consent to establish and stop work as
PP has started construction work without C to E and EC.
SCN Issued on 27/08/2014.
Reply received on Not Received
Reply Applicant has not submitted reply of SCN
FO Applicant has not submitted reply of SCN issued by Board.
We may issue final refusal of consent to operate as started construction
activity without consent to establish and Environment Clearance.
RO(HQ) PP has not replied to the SCN.
We may issue final refusal of consent to Establish
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 7
Agenda no. 3 Region : Mumbai Section : RO(HQ) Date :SRO Date of receipt;- 25/4/2014
Ro (HQ) Date of receipt;- 25/06/2014
Name & Address M/s. Kishor G. Patil.,
Plot bearing CTS No.183,S.No.265,H.No.1 &
S. No.266,H.No.1,2 & 3 of village Nilemore,Tal-Vasai,Dist: Thane Consent For C to E
Capital Investment Rs.63 Crore
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of
Water Pollution
Related Conditions
YES ( ) NO ( )
Details :- Water Consumption :- 780 CMD ,
Effluent Generated :- 624 CMD.
Proposed STP Capacity :-715 CMD
Water Cess Assessment Done :- Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Other Relevant
Information
Resubmission: Said project was discussed in CC Meeting dated 31/7/2014 and It was decided to issue SCN
for refusal of consent to establish and stop work as PP has started construction work without
C to E and EC and SCN issued to PP dated 20/8/2014. PP has communicated reply of SCN which is received in HQ dated 29/9/2014 in which PP has mentioned that the project is under purview of vasai virar municipal corporation and project has obtained approval for construction BUA for individual for less than 20,000 Sq.mtrs.& planning authority not mentioned the approval requirement of EC (Copy of reply is attached) --------------------------------------------------------------------------------------------------------------- Application for consent to establish for construction of residential cum commercial project
Applied for C to E Residential cum commercial project.
Plot Area 28,380Sq.mtrs Built up area 30,754.49 Sq.mtrs
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 8
EC Status Not obtained Present status Applied for EC
Water
Consumption
780 CMD Effluent
Generated
624 CMD
STP Capacity 715 CMD
Bio-degradable
1672 Kg/D
Treatment
Will be treated in
OWC
Non-Bio
degradable
1187 Kg/D Treatment Will be given to
authorized party.
No of DG Sets 5 Nos Capacity 125 KVA, 83 KVA,
50 kva X2,20 KVA
Construction
status
started Date of Visit 25/8/2014
Env. Dept has issued PD dated 19/4/2014 & the copy of reply of PP submitted is also
attached.
SRO Reported that in their noting PP has stopped construction activity voluntarily.
Recommendation of
SRO/RO
SRO Recommended grant of Consent to Establish
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 9
Agenda no. 4 Region : SRO Nagpur I Section :ro(hq) Date :SRO Date of receipt;- 15/1/2014
Ro (HQ) Date of receipt;- 25/07/2014
Name & Address M/s.Vidarbha Infotech Pvt Ltd , Plot No. 28, Survey No. 43-51,53 & 96, IT Park, Gayatri
Nagar, Nagpur.
Consent For C to E
Capital Investment Rs.74.50 Cr
Previous Consent
Validity
----
Industry Type O39 Infrastructure development project
Industry Category Orange
Compliance Of
Water Pollution
Related Conditions
YES ( ) NO ( )
Details :-
Effluent generated-15 CMD.
STP proposed-32 CMD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Other Relevant
Information
Resubmission: 1)The case was discussed in CC Meeting dated 26/8/2014 and it was decide to issue SCN for refusal of consent to establish and stop work as PP has started construction work without C to E and EC. 2)SCN with stop work issued to PP dated 4/9/2014 and PP has submitted reply of SCN which is received in HQ dated 29/9/2014 in which PP has mentioned that (Copy of Repy attached) a)The development of IT Park is a project of Nagpur Improvement Trust, Nagpur & on DBOOT basis under concession agreement. b)PP has started construction activity as per plan approved by NIT which is less than 20,000 Sq.Mtrs. c) PP has mentioned that Nag river is more than 1 Km from site but PP has not submitted topo sheet issued by survey of INDIA, showing location of project site & nag river as mentioned by them in their reply letter and also not communicated architect plan showing location of STP & MSW more than 100mtrs & 500mtrs respectively from Nag river as mentioned in SCN
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 10
d)PP has submitted non hazardous waste details wet garbage:272 Kg/Day Dry garbage:408 Kg/Day All solid waste will be disposed through facility of NMC hence PP has no proposed to provide OWC. DG set: 3 NosX1380 KVA. 3)copy of SRO regarding delay in submission of Consent processing (Copy attached) 4)mailed to SRO Dated 5/9/2014 for submission of verification report of stop wok but reply is awaited. ---------------------------------------------------------------------------------------------------------------------------
The application for consent to establish for construction of IT Project.
Applied for C to E Construction of IT Activity
Plot Area 9,883.78 sq.mt Built up
area
50,157.030
sq.mt
EC Status Applied Dated 16/01/2013
River Distance 500 Mtrs Name of
River
Nag (A-IV)
Water
Consumption
32 CMD Effluent
Generated
15 CMD
STP Capacity 20 CMD
Bio-degradable
272 Kg/Day Treatment All solid waste will be disposed
through facility of NMC hence PP
has no proposed to provided OWC
Non-Bio
degradable
408 Kg/Day Treatment
No of DG Sets
3 Nos Capacity 1380 KVA
Construction
status
Started Date of
Visit
SRO has communicated only
construction status by fax on
25/8/2014
Not obtained EC from Competent authority but applied for EC for constriction of township
project at S.No. 43, 44, 46, 47, 48, 49,50/2 on 8/10/2013.
Recommendation
of SRO/RO
Recommended for C to E after submission reply of query letter issued by SRO.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 11
Agenda no. 5 Region : SRO Raigad II Section : JD(WPC) Date : 30.10.2014
Name & Address RIA CETP Co - Op Society Ltd. , Plot No. 9/11, MIDC Dhatav, Tal. Roha
Consent For CE for Upgradation & Expansion by 12.5 MLD.
Capital Investment 2591.8 Lacs
Previous Consent
Validity
Exiting 10 MLD consent validity is 31.12.2017
Industry Type R14 Common treatment and disposal facilities (CETP, TSDF, E-Wast
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :- Proposed Expansion capacity of CETP is 12.5 MLD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Submission of
Environmental
Statement
Period
Other Relevant
Information
1. Disposal point of the treated effluent is proposed at 14.7 KM away from CETP premises into saline zone of Kundalika River, However the point certified by the NIO is not mentioned for existing CETP as well as for proposed expansion.
2. As per the RRZ Policy the RED category industries are allowed beyond 750 mtrs in MIDC area and as per the application Kundalika River (Notified River) is at a distance of about 780 mtrs, However the River Distance Certificate from the Exe. Engg. of Irrigation Department is not submitted.
Resubmission note: 1. Application was discussed in CC meeting and it was decided to give final
chance for submission of river distance certificate from competent authority Executive Engineer Irrigation Dept. within 2 Months.
2. Letter is issued to the industry for the submission of same on 30.04.2014 and reminded too.
3. Industry has not submitted the River Distance Certificate in prescribed format from competent authority to this section yet.
Recommendation of
SRO/RO
Recommended for grant of C to E.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 12
Agenda no. 6 Region : SRO Thane - I Section : RO(HQ) – Resubmission Case Date : 27/09/2014
Name & Address M/s. Bharat Agri Fert & Realty Ltd , Sr.No. 112/1B, 2A, 3 to 12, 13A,14, Majiwada,
Thane
Consent For Part C to O
Capital Investment 3867.5 Lacs
Previous Consent
Validity
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Other Relevant
Information
- As per the minutes of 4th CC meeting held on 30/05/2014 the case was kept in abeyance for non revalidation of C to E.
- PP has submitted application for revalidation of C to E on 06/08/2014 and accordingly SRO Thane-I has submitted processed application to HQ on 27/08/2014. However area applied for revalidation of is for BUA – 35654.57 Sq. Mtrs. Out of TBUA – 57342.27 Sq. Mtrs.
- The question of revalidation of C to E for remaining area out of TBUA as mentioned in the EC obtained on 17/05/2013, was discussed personally with the representative of the PP on 23/09/2014.
- PP has submitted copy of revalidated consent granted by Board on 06/01/2014 for the TBUA – 57342.27 Sq. Mtrs. As per area prescribed in the EC granted by GOM.
- In view of above, the decision made during the CC meeting dated 30/05/2014 regarding revalidation of C to E may be reviewed and accordingly shall be cancelled.
- In view of above, it is clear that, PP has filed application for revalidation of C to E inadvertently and considering this we may grant part C to O for the area of 35654.57 Sq. Mtrs. Out of 57342.27 Sq. Mtrs.
- Further, we may consider the application made by PP for revalidation of C to E is disposed.
- Re submitted for discussing the application in forthcoming CC meeting.
Recommendation of
SRO/RO
SRO Thane-I has recommended grant of 1st Consent to operate up to 31/03/2016.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 13
Agenda no. 7 Region :- Thane Section : RO(HQ)- Resubmission Case Date :29/10/2014
Name & Address M/s. Azure Tree Townships Ltd. , Land Bearing S No. 231 (p), 232 (p), 233 (p), of
village Penkarpada, Mira Road, Dist. Thane
Consent For 1st Consent to Operate
Capital Investment 28216 Lacs
Previous Consent
Validity
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Other Relevant
Information
1. M/s. Azure Tree Townships Ltd has applied for 1st consent to operate
Residential Project to MPC Board and Area details of the project :- Total plot area-86139.75 sq.m Total BUA as per E.C. 89851Sq.mtr.
2. The application was placed before Consent Committee meeting of Board dated: 29/04/2014, along with their reply submitted in respect of show cause notice for refusal of consent to operate vide their letter dated: 28/02/2014 and submitted as under :
They are withdrawing their application for 1st Consent to Operate for residential project was inadvertently filed by them with MPC Board, in view of the judgment dated: 23/01/2012 passed by Hon’ble High Court of Delhi ( Division Bench) in LPA no: 895 of 2010 and 37 other petitions ( copy of the judgment is enclosed)- Consent to establish /Consent to Operate is not applicable to residential complex under Air Act and Water Act.
They reserve their right to file fresh application, if required in the mater. This is without prejudice to our rights, contentions and remedies available to them under law.
3. The application was placed before Consent Committee meeting of Board
dated: 29/04/2014, along with their reply submitted in respect of show cause
notice for refusal of consent to operate vide their letter dated: 28/02/2014 and
as per decision taken in the Consent Committee meeting dated: 29/04/2014, it
was decided to keep the case in abeyance and put up in next consent
committee meeting with legal opinion.
4. Legal wing opined that, as per decision taken in the CAC meeting held on
28/04/2014, P & L division has sent letter addressed to PS Env. Dept. regarding
applicability of consent under water and Air act on 19/05/2014.
5. As per instruction of Hon’ble Member Secretary we may place the application
for discussion in the forthcoming CC meeting.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 14
Agenda no. 8 CC Agenda (Resubmission)
Region : Nagpur Section :RO(HQ) SRO Date :- 30/11/2013 RO(HQ) Date :- 10/03/2014
Name & Address M/s. KSL and Industries Ltd.,C.S. No.101/1,2,3,4,5,Empress City,Nr. Gandhi Sagar,Dist-Nagpur
Consent For CO with Amalgamation
Capital Investment
99.53 Crs.
Industry Type O08 Building and Construction projects more than 20,000 sq.mtr.
Industry Category Orange
Resubmission
CC Date 26/08/2014
CC decision It was decided to issue SCN for refusal of consent to operate(amalgamation) as PP has failed to submit information regarding BUA,EC & C to E.
SCN Issued on 05/09/2014.
Reply received on 29/09/2014.
Reply PP has submitted information i.e BUA,EC & C to E. Total Plot Area is 75331.367 sq.m & Total BUA is 150621.14 sq.m.
FO In reply they have not stated about date & area of completion of
each project & details of STP & MSW facility provided to each
project. Same was communicated to PP,SRO Nagpur-I,RO Nagpur
vide e-mail dtd.21/10/2014.But till date they have not provided
required information.SRO Nagpur-I reported vide e-mail
dtd.29/10/2014 that PP has not provide information in spite of
repeated communication
In view of above, we may issue final refusal notice to PP, if
approved.
We may place case before CC for further decision.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 15
Agenda no. 9 Region : RO Thane Section : JD(WPC) Date : 27.06.2014
Capital Investment 3287.4 Lacs (Increased by Rs.2.27 Crs.
Previous Consent
Validity
31/01/2014
Industry Type Agrobase
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :- Industrial effluent Details:
a. Quantity – 600 CMD.
b. Treatment – Provided comprising primary & secondary treatment.
c. Disposal: On land 52 Acres for irrigation – By-lateral agreement with farmers.
Domestic effluent Details:
a. D.E quantity 40 CMD.
b. Treatment: Septic tank and soak pit.
Compliance Of Air
Pollution Related
Conditions
Fly ah arrestor is provided to bagasse fired boiler as an APC system.
Water Cess Assessment Done : June 2013 Paid Upto : Dec 2012
BG Details Amount : a) Rs.1.0 Lakhs
b) Rs.4.0 Lkahs
Validity : a) 15.05.2014
b) 15.02.104
BG Obtained against : a) ID issued dtd.09.04.2012, b) Directions issued
dtd.20.11.2006
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period 2012-13
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 18
Other Relevant
Information
JVS Analysis results:
a. JVS analysis results of effluent– exceeding in respect of BOD, COD, SS &
TDS.
b. JVS of stack dtd.25.09.2013, 23.10.2013 are exceeding the limit in respect of
TPM.
Special comment of SRO: Treated effluent disposal system is very poor; some part of
treated effluent is stored in unlined percolation tanks.
Resubmission Note:
- As per the decision of CC meeting SCN was issued on 04.09.2014 for exceeding JVS results and poor O & M of ETP.
- Industry has submitted reply to the SCN vide letter dtd.29.10.2014 mentioning that; a) ETP is provided with tertiary treatment. b) Anaerobic digester is now stabilized and got 96% reduction in COD and
80% reduction in BOD and also improved aerobic system by putting culture.
c) Some results are higher due to mechanical problem in blower and same shall be rectified, now all units are in operation.
d) Improved O & M of ETP. Recommendation of
SRO/RO
Renewal of consent may be decided at HQ level.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 19
Agenda no. 11 Region : SRO Sangli Section : JD(WPC) Section Date : 30.10.2014
Industry Type R05 Basic Chemicals and electro chemicals and its derivatives in
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :- The I.E generation is to the tune of 94 CMD.
Effluent was previously treated in the Sugar ETP and the primary treatment provided at
this plant is not in operational condition.
Compliance Of Air
Pollution Related
Conditions
Stack of height 24 mtrs is provided to LDO fired Boiler.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
Submission of
Environmental
Statement
Period
Other Relevant
Information
Industry has not submitted BG of Rs.5.0 Lakhs as per the previous consent condition towards installation and commissioning of separate ETP, for the treatment of effluent generated from this unit within 4 Months.
Effluent was previously treated in the Sugar ETP and SRO reported that the primary treatment provided at this plant is not in operational condition.
Resubmitted:
As per the decision of the CC meeting dtd.30.07.2014, SCN was issued to industry on 06.08.2014 for non submission of BG’s and non provision of separate ETP as per the previous consent conditions.
Industry has not submitted reply to this office. Recommendation of
SRO/RO
SRO has recommended that consent may be considered after completion of total work
of the plant and compliance of consent conditions.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 20
Agenda no. 12 Region : SRO Latur Section : JD-WPC Date : 24.06.2014
Name & Address M/s. Adlers Bio Energy Ltd , Sr. No.248 (B), Tal. Kallam Dist. Osmanabad
Consent For Applied for Renewal
Capital Investment 4980 Lacs
Previous Consent
Validity
31/01/2014
Industry Type R15 Distillery including Fermentation industry
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Industrial water consumption=60 CMD I.E.= 40 CMD
Domestic water consumption=20 CMD D.E.=10 CMD
Cooling purpose water consumption= 340.00 CMD
Boiler purpose water consumption = 50.00 CMD
Industry has provided ETP which comprises of Collection cum Neutralisation Tank
Sand & Carbon filter.
Water Cess Assessment Done : NO Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 21
Submission of
Environmental
Statement
Period
Details not submitted
Other Relevant
Information
Treated effluent is used for Ash Quenching/Cooling water in order to achieve
Zero Discharge.
Recommendation of
SRO/RO
1. This is a case of renewal of consent to operate. 2. It is a Grain base
distillery.3.Previous industry had obtained consent to operate which is valid upto
Details :- There is no generation of industrial effluent from the manufacturing process. The industrial effluent shown in the previous consents is scrubber water which is recycled fully
Water Cess Assessment Done : Dec-2013 Paid Upto: Dec-2013.
BG Details Amount : Rs. 2.0 Lakhs & Rs. 7.5 Lakhs
Validity : ….
BG Obtained against : BG of Rs. 7.5 Lakhs submitted on 21/07/2014 but BG of Rs. 2.0 Lakhs towards BR not submitted.
Details of BG forfeited/encashed, if any :
Submission of Environmental Statement
Period 2012-2013
Other Relevant Information
1) Paint empty containers, plastic liners and hand gloves contaminated with paint residues are stored haphazardly in the premises. No isolated storage area is made for storage of hazardous waste.
2) Fettling/shot blasting section is having dust collectors but O&M is very poor. Dust is allowed to fall on ground and stored on road resulting into fugitive emissions during movement of the vehicles.
3) There is no generation of industrial effluent from the manufacturing process. The industrial effluent shown in the previous consents is scrubber water which is recycled fully. This needs to be corrected.
4) Unit has started spray painting activity in a shed without any air pollution control system & without consent of the Board.
5) AAQM results show PM parameter exceeding the standards prescribed in notification.
6] The case was discussed in Board’s CC meeting dt: 11/08/2014 and it was decided to issue SCN for refusal for the non compliances.
7] Applicant vide letter dt: 31/08/2014 submitted reply but not enclosed details of cupola & induction furnace details along with stack details. This office called information vides email, dt: 10/09/2014 and applicant submitted details on 20/09/2014.
8] JD (APC) visited industry on dt: 10/10/2014 and submitted remarks that industry shall not operate cupola furnace unless & until permission issued by MPCB.
Recommendation of SRO/RO
Necessary action shall be taken at HQ.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 32
Agenda no. 19 Region : Raigad Section : JD(APC) Date :
Name & Address M/s. Goradia Special Steels Ltd., [Formerly Vipras Casting Ltd ]
Industry Type R37 Iron and steel (Involving processing from ore/scrap/integrat)
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
Yes
Details: - Domestic Effluent – 5.00 CMD, Septic tank and soak pit
provided.
Industrial Effluent – Nil.
Compliance Of Air
Pollution Related
Conditions
(No. )– Fume extraction system followed by bag filter provided.
- Analysis results of AAQM are exceeding the consented limit of SPM parameter.
Water Cess Assessment Done : ---- Paid Upto : ---
BG Details Amount : ---- Validity : -----
BG Obtained against : ----
Details of BG forfeited/encashed , if any : -------
Submission of
Environmental Statement
Period ----
Other Relevant
Information
1. Industry has applied for renewal of consent to operate. 2. Earlier consent obtained vide no. BO/APAE/TB-3/RD-1382-10/CC-524
dated 31.01.2014 valid till 28.02.2014. 3. Earlier CI was Rs. 17.93 Crs. Now shown Rs.32.25 Crs. Justification
about increase in CI [14.32 Crs] was not submitted. 4. Case was discussed in the CC meeting held on 14/07/2014.In this
meeting it was decided to issue SCN for refusal of consent as industry has not provided ETP to Boiler Blow Down, installed induction furnace without consent, inadequate APC to induction furnace, results exceeding of AAQM and location falls under NDZ of Patalganga River.
5. Industry has submitted reply to SCN dtd. 25/08/2014 (Copy enclosed for ready reference.).
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 33
6. Case was again discussed in CC Meeting dtd. 05/09/2014 & it was decided to keep the case in abeyance & put in next CC after visit report from JD(APC) & AS(T).
Recommendation of
SRO/RO
- The consent may be refused and necessary legal action may be decided at CC level.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 34
CC-Fresh Agenda
Agenda no. 1 Region : SRO Latur Section : JD-WPC Date : 28.10.2014
Name & Address M/s.Siddhi Sugar And Allied Ind Ltd,. , Mahesh Nagar,Ujna Tq.Ahmadpur Dist.Latur
Consent For CE
Capital Investment 3431.6 Lacs
Previous Consent
Validity
Applied for Consent to Establish
Industry Type R15 Distillery including Fermentation industry
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Industrial water consumption is 465 CMD whereas I.E. generation is 360 CMD
Domestic water consumption is 05 CMD whereas D.E. generation is 04 CMD.
For Industrial cooling and Boiler feed 210 CMD and boiler blow down will be of10 CMD
Industry has proposed to adopt ZLD by way of providing Biomethanation followed by
MEE followed by 6 acres of Bio-Composting for treatment of effluent.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Other Relevant
Information
Industry has applied for consent to establish for 30 KLPD Distillery.Earlier Industry
has obtained consent to operate for sugar unit(2500 TCD) which was valid upto
31.07.2014.The location of the Industry is in sugar premises which is located at 2.8 KM
from Manar river(A-II) class. Industry has submitted distance certificate in prescribed
format. Total C.I of the Industry (Exiting sugar-37.23 crs + Proposed Distillery 34.31
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 35
crs) is Rs. 71.54 crs.Industry has applied for EC.Industry has submitted minutes of 19th
reconstituted Expert Appraisal Committee held on 28-30 May 2014,also submitted
TOR letter dated 05.08.2014.
Recommendation of
SRO/RO
The proposed site of distillery is in the premises of existing sugar unit which is 2.8 Km
from river Manar ( A-II) Class & proposed to provided Biodigester, MEE & Composting.
consent to establish may be granted with condition of obtaining EC
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 36
Agenda no. 2 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;-20/08/2014
Ro (HQ) Date of receipt;- 29/09/2014
Name & Address M/s. Dnyanada Builders.,
Gat No. 1234, 1235,1236,1237,1257, Chakan Shikrapur Road,
Village Chakan Taluka Khed. Dist Pune
Consent For C to E
Capital Investment 95.0 Crore
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Capital Investment 821.71 Lacs (Total Cost: 28.58 Cr)
Previous Consent Validity
31/07/2012
Industry Type R36 Industry or process involving metal surface treatment or pro
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES ( Y)
Details :-.. They have provided primary ETP for spent Acid and Scrubber effluent, The spent acid is taken into a hopper bottom tank and lime slurry is added, sludge formation is done and sludge is taken into drying beds and further send to CHWTSDF. The effluent generated is taken into lamella clarifier and send to CETP by tankers
Water Cess Assessment Done : March-2014 Paid Upto : Dec-2013
BG Obtained against : 1] Towards ARP. 2] Towards O & M of pollution control system. 3] Towards submission of Board resolution.
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period 2013-2014.
Other Relevant Information
1] SRO-II, Nagpur has not submitted compliance w.r.t to BG imposed/submitted, compliance report of interim directions, dt: 19/12/2013, total fees paid (DR. nos/Date/Bank details), Proposed validity for grant of consent.
2] This office called information from SRO vide email, dt: 09/09/2014 & 16/10/2014. SRO-II has submitted BG details details on dt: 17/10/2014.
Recommendation of SRO/RO
Case may be discussed in CC Meeting.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 44
Agenda no. 7 Region : SRO Tarapur I Section : JD(WPC) Date : 20.10.2014
Name & Address VALSAD DISTRICT CO OP MILK PRODUCERS UNION LTD. , TARAPUR
INDL.AREA BOISAR
Consent For C to 1st O with along with amalgamation of plain renewal of consent
Capital Investment 2781 Lacs
Previous Consent
Validity
31.12.2014 and C to E for Coal Briquette fired Boiler.
Industry Type R47 Milk processing and dairy products (Integrated project)
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :- Industrial effluent Details: Quantity – 88.0 CMD. (Decrease by 2 CMD as
per C to E granted for Boiler), disposal: Through MIDC drain to TEPS Common
Effluent Treatment Plant.
. Domestic Effluent Details: Quantity – 9 CMD. (No change), Disposal: On
land of gardening.
ETP Status: ETP is provided with primary, secondary and ASF & PSF as
tertiary treatment. SRO also reported that industry had recently upgraded ETP.
Compliance Of Air
Pollution Related
Conditions
Dust collector is provided as an APC system.
Water Cess Assessment Done : March 2014 Paid Upto :
BG Details Amount : Rs.1.0 Lakhs & Rs.3.0
lakhs
Validity :
BG Obtained against : Rs.1.0 Lakhs towards the compliance of I.D issued
dt.28.03.25014 towards O & M of ETP, Details are called from SRO. and BG of
Rs.3.0 Lakhs submitted as per the C to E for coal / briquette fired Boiler towards
compliance of APC system.
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period 2013-14
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 45
Other Relevant
Information
JVS analysis results are exceeding the consented standards.
SRO reported that industry had recently upgraded ETP.
I.D issued dt.28.03.25014 and SCN issued for discharge of alkaline effluent observed during visit dtd.07.05.2014.
Recommendation of
SRO/RO
Recommended for grant of Consent to Operate to coal/ briquette fired Boiler along with
renewal of consent for period upto 31.12.2019.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 46
Agenda no. 8 Region : SRO Kolhapur Section : JD (WPC) Date : 27/10/2014
BG Obtained against : previous consent condition towards O & M of ETP and APC
system
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period 2012-13
Other Relevant
Information
Renewal of consent for Milk processing and Dairy Products unit, located in Parvati
Industrial Estate, Yadrav with increase in production quantity for Milk powder from
30 MT/D to 40 MT/D, Butter & Ghee -10 MT/Day to separately butter – 15 MT/D
and Ghee-10 MT/D.
Recommendation of
SRO/RO
Consent to renewal may be approved upto 30.04.2017.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 47
Agenda no. 9 Region : SRO Chiplun Section : JD(WPC) Date : 27/10/2014
Name & Address A.B.Mauri India Pvt Ltd , D-7/2A,M.I.D.C Area Lote Parshuram, Tal.- Khed, Dist.-
Ratnagiri.
Consent For CR
Capital Investment 7456 Lacs
Previous Consent
Validity
30/09/2014
Industry Type R05 Basic Chemicals and electro chemicals and its derivatives in
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Industrial effluent Details:
a) Quantity: 457 CMD. b) Previous consent was granted with I.E quantity 332.5 CMD. (70% of the
permitted quantity of 475 CMD.) c) SRO reported that out off 457 CMD treated effluent 167 CMD recycle for
industrial process, 260 CMD RO permeate send to CETP and 30 CMD high COD stream is used for composting.
d) ETP with primary, secondary & tertiary treatment is provided. e) SRO reported that industry has made upgradation in their ETP by way of
providing RO & MEE.
Compliance Of Air
Pollution Related
Conditions
Industry has changed the fuel pattern for one Boiler from F.O to Briquette. Ventury type
dust collector is provided as an APC system.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 48
Other Relevant
Information
Conditional Direction was issued vide letter dtd.27.06.2012 with the condition that
Industry shall dispose off the RO reject to M/s. ROCHEM in scientific manner till
commissioning of evaporator and also proposed direction was issued on
24.04.2014 for discharging High COD substandard effluent to CETP. Industry vide
letter dtd.14.05.2014 reported that industry has explored the possibility of sending
evaporator reject to ROCHEM Offsite at Pune for disposal during the months of
monsoon, however ROCHEM Offsite is not yet operational. Industry has proposed
to build a closed storage tank having capacity 2500 CMD for storing RO reject and
evaporator concentrate for the period of mansoon and later will be used for
composting.
Recommendation of
SRO/RO
Case is recommended for grant of renewal of consent subject to condition of
operational BG for PCS.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 49
Agenda no. 10 Region : SRO Bhandara Section : J.D. (WPC) Date : 30.10.2014.
Name & Address M/s. The Wainganga Sugar Power Ltd. , Villlge-Devhada,Tq-Mohadi,Dist-Bhandara
Consent For Applied for renewal of consent for same production qty. with increase in C.I.
Capital Investment 1) Previous consented C.I. of Rs. 46.71 Cr. 2) Enhanced C.I. of Rs. 14.93 Cr. (justification not given) 3) Total C.I. of Rs. 61.64 Cr.
Previous Consent
Validity
Valid upto: 31.07.2014.
Industry Type R74 Sugar (excluding Khandsari)
Industry Category Red/LSI.
Compliance Of Water
Pollution Related
Conditions
YES
Details :- ETP comprising, O & G trap, screen chamber, equalization cum neut. Tank,
Industry has provided multi-cyclone dust collector to boiler.
Water Cess Assessment Done : Paid Upto :
BG Details A) Amount : Rs. 2.0/- Lakhs. B) Amount: Rs. 2.0/- Lakhs.
C) Amount Rs. 4.0/- Lakhs
D) Amount: Rs. 5.0/- Lakhs.
E) Amount: Rs. 30.10/- Lakhs.
Validity : 13.07.2016.
Validity: 13.07.2017.
Validity : 13.07.2016.
Validity: 13.07.2016.
Validity: 09.09.2015.
A) BG Obtained against : submitted against consent condition dated 17.10.2012 towards providing necessary arrangements to cover the effluent collection system to avoid ingress of bagasse and other materials.
B) BG Obtained against: as per consent dtd. 17.10.2012.any non –
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 52
compliance of consent conditions/directions or damage etc. caused to the Environment by reason of any breach of provisions .
C) BG Obtained against: ,As per consent dtd. 17.10.2012,.Towards the
compliance of the CREP Norms.
D) BG Obtained against: As per consent dtd. 17.10.2012, Towards the O & M
of ETP and Air pollution control devices.
E) BG obtained against: As per consent dtd. 05.08.2014.
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Not submitted.
Other Relevant
Information
1) The cane crushing capacity of the unit is 2500 TCD. 2) Industry has reduced the waste water generation qty. to 100 liters per
ton of cane crushed. 3) Industry has provided multi-cyclone dust collector to boiler. 4) 60, acres land available for disposal of treated effluent, which is adequate. 5) Industry has covered the effluent collection system to avoid the ingress
of bagasse & other material.
Recommendation of
SRO/RO
---
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 53
Agenda no. 12 Region : SRO Chandrapur Section : JD-WPC Date : 27.10.2014
Name & Address M/s. Avantha Holdings Limited- Unit APR Sacks , Unit Ashti,Tal-Chamorshi,Dist-
Gadchiroli
Consent For Consent to Renewal
Capital Investment 33.41 Crores
Previous Consent
Validity
31.12.2013
Industry Type R61 Pulp and Paper (Paper manufacturing with or without)
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Industrial water consumption is NIL
Domestic water consumption is 40 CMD whereas D.E. generation is 23 CMD.
Overflow from septic tank is collected and taken into ETP of M/s. Ballarpur Industries
Ltd.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
April-2012 to March 2013.
Other Relevant
Information
Earlier name was APR sacks Ltd., now firm has applied for renewal of consent with
change in name as M/s. Avantha Holdings. It’s a plain renewal.
Recommendation of
SRO/RO
SRO=Consent to Operate (Renewal) may be granted up to 31/07/2014
RO=Consent to Operate (Renewal) may be granted up to 31/07/2014
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 54
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 55
Agenda no. 13 Region : SRO Aurangabad I Section : JD-WPC Date : 28.10.2014
Name & Address Grainotch Industries Ltd. , Gat No. 238, 239, Village Bhendale, Tq. Gangapur, Dist:
Aurangabad
Consent For Renewal
Capital Investment 62.99 Crores
Previous Consent
Validity
31.07.2014
Industry Type R15 Distillery including Fermentation industry
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Industrial water consumption is 1245 CMD whereas I.E. generation is 989 CMD
Domestic water consumption is 30 CMD whereas D.E. generation is 24 CMD.
Water consumption for Industrial cooling and Boiler feed is 1485 CMD
Industry has provided ETP which comprises of oil and grease trap,equalization
Industrial water consumption is 400 CMD whereas I.E. generation is 250 CMD.
Domestic water consumption is 60 CMD whereas D.E. generation is 50 CMD.
Water Cess Assessment Done : August 2014 Paid Upto : November 2013
BG Details Amount : Rs. 5 Lakh
Rs. 3 Lakh
Validity : 30.11.2014
BG Obtained against :
Rs. 5 Lakh =Towards O & M of pollution control system
Rs. 3 Lakh =m Towards provision of necessary APC system(CREP)
Details of BG forfeited/encashed , if any :
Borad has forfeited the BG of Rs.2.5 Lakh out of Rs. 5 Lakh for exceeding the
JVS report
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 60
Submission of
Environmental
Statement
Period
Year 2013-2014
Other Relevant
Information
Industry has requested to change the name of Industry from M/s. Balaghat SSK Ltd. to
M/s. Siddhi Sugar & Allied INd Ltd. for which Industry has submitted letter of Deputy
Registrar of companies,Mumbai and sale agreement between Industry & MSC Bank
Ltd, Mumbai.
Recommendation of
SRO/RO
Industry has submitted BG against consent conditions and provided wet scrubber to
the Boiler.Consent may be renewed with new name of the Industry.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 61
Agenda no. 16 Region : SRO Nagpur I Section : J.D.(WPC) Date : 31.10.2014.
Name & Address M/s. ADM Agro Industries India Pvt. Ltd. , S. No. 207, 209/2, 210/2, 210/3, NH - 7,
Near Dumri Railway Station, Village - Nandgaon Khurd, Tq. Parseoni, Dist. Nagpur
Consent For Applied for renewal of consent with additional products with increase in C.I.
Capital Investment 1) Previous consented C.I. of Rs. 25.83 Cr. 2) Enhanced C.I. of Rs. 11.70 Cr. 3) Total C.I. of Rs. 37.53 Cr.
Previous Consent
Validity
Granted on 15.04.2013 valid upto: 31.08.2014.
Industry Type R55 Oil refinery (Mineral oil or Petro refineries).
Industry Category Red/LSI.
Compliance Of Water
Pollution Related
Conditions
YES Effluent qty. Present Increased Total
I.E. 144.18 11.82 156.00 CMD.
D.E. 8.00 02.00 10.00 CMD
Details :- ETP comprising, primary & secondary . JVS result not submitted
Compliance Of Air
Pollution Related
Conditions
Boiler – Chimney height 30.00 mtr. provided.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity : ----
BG Obtained against : Information regarding BG details not submitted.
Submission of
Environmental
Statement
Period
Submitted.
Other Relevant
Information
Land available for disposal of treated effluent is 17780.37 Sq.mtr.
Recommendation of
SRO/RO
SRO recommended consent to operate may be granted after receipt of latest status
report, analysis result, BG status.
Web agenda of 17th CC meeting (Booklet No. 32) of 2014-15 dtd. 05.11.2014 62
Agenda no. 17 Region : SRO Chandrapur Section : JD APC Date : /11/2014
Name & Address WCL Junad Opencast Mine, Pimpalgaon Sub Area, Wani North Area, post Bhallar, Dist: Yavatmal.
Consent For CR
Capital Investment 3202 Lacs (Previos Rs. 28.72 Cr)
Previous Consent Validity
Industry Type R49 Mining and ore benification
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES (Y)
Details :- Min e has provided settling tanks for mine water discharge.
Water Cess Assessment Done : NIL Paid Upto : NIL
BG Details Amount : NA Validity : NA
BG Obtained against : NA
Details of BG forfeited/encashed , if any : NA
Submission of Environmental Statement
Period 2012-2013
Other Relevant Information
1) The distance of Junad Opencast Mine from the river Wardha (Notified A-II Class) is 0.10 Kms thus not meeting the RRZ policy in respect of Wardha River (A-II Class).
2) The Board had issued closure directions to the said mine vide letter no. MPCB/ROC/Dir/172/942/2013, dated 07/05/2013 due to coal transportations issues, RSPPM results exceeding consented limits & various non compliance observed during joint visit of WCL & MPCB officials.
3) RO-Chandrapur has already submitted the proposal for initiating further stringent action, in view of violation of closure directions vide letter dated 28/04/2014.
4) During the survey of overburden of various mines, in the region, the overburden of this mine was within 45 mtrs distance from the Wardha River.
5) The mine has submitted quarterly environmental monitoring reports. The mine has also submitted analysis reports of ambient air monitoring which revels exceeding RSPPM results.
6) RO-Chandrapur has already communicated the mining authorities not to take any steps for commencement of coal production activities, unless restart order from MPCB is obtained and consent to operate is granted to the said mine.
7) SRO-Chandrapur vide dt: 26/09/2014 submitted present status report along with details of pollution control system provided.