RYASNE II Industrial Park
Jul 16, 2015
Site Location
Prague - 850 kmVienna - 720 km
Minsk - 580 km
Kyiv - 575 km
Kishinev - 560 km
Budapest - 650 km
Krakow - 300 km
Warsaw - 400 km
City Center
A4 highway along the site 8 km
11 km
4,5 km
2 km
Public Trasport
Lviv International Airport
Airport Cargo Terminal
Major Rail Cargo Terminal
Catchment area (50k inhabitants)
10 intercity and municipal bus routes
Networks and Connection Points
point ofconnection
to the gas supply
point of connectionto the electricity
network
point of connectionto sewage treatment
networks
point of connectionto the water supply
25 ha
150 ha
Shevchenka Str.
A4 highway
25 ha land
150 ha land
road
railway
electricity
gas supply
water supply
sewage supply
border of the city
up to 25 hectares on Shevchenko St. in Ryasne II area
circa 150 hectaresStage: Stage: 1 2
Site Development Plan
Option 1 Option 2
Two land plots of 3,3 hectares, each for administrative and production buildings, engineering and transport infrastructure
Two land plots, divided into eight plots of 2 hectares each for administrative and production buildings, engineering and transport infrastructure.
Plot 3,3 hectares for administrative and production buildings, engineering and transport infrastructure – 2 plots
Plot 3,2 hectares — 2 plots
Plot 2,4 hectares — 2 plots
Plot 1,2 hectares — 2 plots
Plot 1,2 hа — 2 plots
Water
D = 500€ 0.45/m3
Gas
D = 89€ 0.374/m3
Electricity€ 0.076/kWh
Target Industries Expected Efficiency
Planning of Utilities’ Capacity Requirements (option 1)
• At least 5 companies attracted for 1, 2 and 3 hectares of the Park
• The companies may engage in the following business areas:
— Manufacture of wood and wood products
— Pulp and paper industry, publishing industry
— Manufacture of electrical, electronic and optical equipment
— Manufacture of rubber and plastic products
- Apparel and footwear industry, food industry
- Other low-pollution industries
• At least 12,000 new jobs inside the Park and similar number of indirect jobs in supply and service industry
• At least 38 million UAH of additional income tax revenue to the city budget per annum
• At least 2 million UAH in land lease per annum
• Regeneration of the industrial area and boost to residential development in Ryasne I.
Plot Plot 2 plots 3,3 hectares
each 8 plots 2 hectares
each All plots in total
Area, hectares 3,3 2,0 6,6 (2x3,3) 16 (8х2,0) 22,6
Water consumption, cubic meters per day
400 270 800 2160 2960
Sewerage, cubic meters per day
260 178 520 1424 1944
Heat supply, Gcal per hour 3,1 2,33 6,2 18,64 24,84
Gas supply, cubic meters per hour
481,4 361,8 962,7 2894,4 3857,1
Electric supply, MW 2,5 1,5 5 12 17
Why Lviv?
Human Resources
Existing Investors
Support by Strategies Support by Programs
Number of Students Academic Major
128 000 students
364 $average monthly salary
53 academies,universities and colleges
86 % of studentsspeak English
751 000 inhabitants
Lvivska Politechnika National University among the largest and the most popular in Ukraine with over 30,000 students and 4th in nation-wide ranking.
38 %
8 %
5 %
2 %
3 %
6 %
6 %
12 %
10 %
10 %
Economics
Natural Studies
Architecture& Design
Hospitality
Social Studies
Law
Health Care Science
Engineering
InformationalTechnologies
Humanities
Krakow 170 000
128 000Lviv
100 000Bucharest
91 000Budapest
80 000Prague
63 000Brno
56 000Bratislava
• Lviv Complex Development Strategy 2025
• Lviv Economic Competitiveness Strategy 2015
• Lviv Strategic Plan of Investment Attraction 2020
• Simplified procedure of state registration of legal entities and individual entrepreneurs
• Simplified procedure for obtaining permit documents, and counseling services for economic entities
• Program of single social contribution (tax) compensation
Contact information Serhiy KiralHead of Foreign Economic Relations& Investment Office of Lviv City Council
+38 (032) 254 60 [email protected]