Booker T. Washington High School Design Update Date: 06/02/2015 Presenter: Jim Hepburn Fanning Howey / House+Partners Architects
Booker T. Washington High School
Design Update
Date: 06/02/2015 Presenter: Jim Hepburn Fanning Howey / House+Partners Architects
2
• Description of the Fault – Impact on Current Design – Review of Current Site plans
• New Site Plan – Revised Building Layout – 2-Story Neighborhood – Design and Construction Schedule
• Discussion
Agenda
6
Current Overall Floor Plan
7
Current Overall Floor Plan
Relocated Child Care
8
Current Overall Floor Plan
Create 2-Story Neighborhood
9
Current Overall Floor Plan
Relocate Neighborhood And CTE
Solution Advantages • All buildings are north of
the fault line. • Utilizes existing design
components. • Allows completion of the
new buildings prior to demolishing of the existing school.
• Least disruptive to existing school schedule and activities.
• Current track and football field may be retained, as proposed in current documents.
Preliminary Design ( In Development )
12
Preliminary Design ( In Development )
13
Preliminary Design ( In Development )
14
Preliminary Design ( In Development )
15
Preliminary Design ( In Development )