  • 7/31/2019 BOOK 21 [SA]

    1/13

    APPROVED BYREV. DATE DESCRIPTION PREPARED BY CHECKED BY

    Ir. Dwi Priyanta,MSE.

    Ir. Hari Prastowo,MSc.

    I Gusti N. Dirgantara

    DOCUMENT NO. DOC. NO. 21 - 42 09 050 - SA

    -

    DESIGN-IV: MACHINERY BASIC DESIGNTECHNICAL SPECIFICATION OFSANITARY DISCHARGE SYSTEM

    ATTACHMENT NO. 01 02 - - -

    NUMBER OF PAGES 2 4 - -

    DESIGN-IV: MACHINERY BASIC DESIGN

  • 7/31/2019 BOOK 21 [SA]

    2/13

    Proj ectDoc. NoRev.NoType

    TABLE OF CONTENTS

    PHILOSOPHY

    1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 Descript ion 11.2 Purpose 1

    2. REFERENCES 13. ABBREVIATIONS 14. DESIGN PARAMETE 1

    4.1 Principal Dimension 15. DESIGN REQUIREMENT 1

    5.1 SEWAGE PUMP 1

    6. SUMMARY 3

    ATTACHMENT NO. 01 - CALCULATION

    1. SEWAGE PUMP 1

    ATTACHMENT NO. 02 - PUMP SPECIFICATION

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    TECHNICAL SPECIFICATION OF

    SANITARY DISCHARGE SYSTEM

    : DESIGN IV: 21 - 42 09 050 - SA: 0: Table of Contents

  • 7/31/2019 BOOK 21 [SA]

    3/13

    ProjectDoc. NoRev.NoType

    1. INTRODUCTION

    1.1 Description

    1.2 Objective

    2. REFERENCES

    a. Germanischer Lloyd Rules and Guidelines 2011b. Engine Selection Guide - Two Stroke MC/MC-C Engines, 6th Edition: January 2002, MAN B& W

    3. ABBREVIATION

    Rn = Reynold numbern = viscocityhs = head statichp = head pressurehv = head velocityhf = head frictionhl = head lossesH = head total

    4. DESIGN PARAMETER

    4.1 Principal Dimension1. Lpp = 123 m

    2. B = m

    3. T = 8.8 m

    4. H = m

    5. L WL = m

    6. Vs = knot = km/hours7. Distance = Nm = km8. Time of Voyage = 4 days = 96 hours

    5. DESIGN REQUIREMENT

    5.1 SEWAGE PUMPWill be estimated at the port about two days.Volume = amount of ABK x sewage x day at port estimation (1)

    = 12*19*2= 456 liter

    The Sewage tank volume will be planned = 0.5 m3

    Emptying time = hours

    Pump capacity = 2 m3/h

    =m3/s

    Diameter of pump will be planned 0.05 metre = 50 mma. Head statis = 9.2 mb. Head pressure = 1 bar

    2222.4

    . . . . . . . . .

    0.25

    0.00056

    TECHNICAL SPECIFICATION OF

    SANITARY DISCHARGE SYSTEM

    : DESIGN IV: 21 - 42 09 050 - SA: 0: Philosophy

    20.2

    11.5127.92

    14.5 26.8308

    We will determined the needed of sewage pump, and all the specification of calculation. Sewageis include in the crews live and their accomodations. The pump specification must be can backup for everyday. Sewage tank need to be fitted a air pipe to the open deck and sewage tankmust install a filling connection, rinsing connection and level alarm.

    This document purpose is to determine the technical specification of sanitary discharge system.

    1200

    Page 1 of 3

  • 7/31/2019 BOOK 21 [SA]

    4/13

    ProjectDoc. NoRev.NoType

    mc. Head velocity = 0 m

    Fluid velocity = Q / ( / 4 * (ds/1000)2*3600)Vs = m/s

    d. Suctionn = kinematic viscocity

    n = m2/s (1.1 cSt at 50 0C)dH = Inside diameter

    = m (estimated 50 mm)v = fluid velocity

    = m/sReynold number (Rn)

    according to formula below:Rn = (v*dH)/n (2)= (0.283*0.05)/0.000001= (turbulen)

    for the friction losses (f) = 0.02+0.0005/D=

    The length of pipe in suction is 1.5 m

    major losses (hf1) = f x L x v 2 / (D x 2g) (3)= 0.03*1.5*0.283^2/(0.05*2*9.8)= m

    minor losses (hl1)

    No n1 22 1

    minnor losses (hl1) = k total*v2/(2g) (4)= 2.1*(0.283^2)/(2*9.8)= m

    e. Dischargen = kinematic viscocity

    n = m2/s (1.1 cSt at 50 0C)

    dH = Inside diameter

    = m (estimated 50 mm)v = fluid velocity

    = m/sReynold number (Rn)according to formula below:Rn = (v*dH)/n (5)

    = (0.283*0.05)/0.000001= (turbulen)

    for the friction losses (f) = 0.02+0.0005/D=

    The length of pipe in suction is 10.5 m

    major losses (hf1) = f x L x v 2 / (D x 2g) (6)= 0.03*10.5*0.283^2/(0.05*2*9.8)= m0.02574

    0.283

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14150

    0.03

    . . . . . . . . . . . . . . . . . . .

    0.05

    total 2.1. . . . . . . . . . . . . . . . . . .

    0.009

    0.6

    0.000001

    0.05

    0.28309

    0.000001

    0.6

    0.283

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14150

    0.03

    . . . . . . . . . . . . . . . . . . .

    0.00368

    Types k nxkElbow 90 0 0.75 1.5Buttterfly valve

    10.078

    TECHNICAL SPECIFICATION OF

    SANITARY DISCHARGE SYSTEM

    : DESIGN IV: 21 - 42 09 050 - SA: 0: Philosophy

    Page 2 of 3

  • 7/31/2019 BOOK 21 [SA]

    5/13

    ProjectDoc. NoRev.NoType

    minor losses (hl1)No n

    1 32 23 1

    minnor losses (hl1) = k total*v2/(2g) (7)= 6.35*(0.283^2)/(2*9.8)= m

    Therefore, the total head losses can be calculate:hf1+hl1+hf2+hl2 = 0.00368+0.009+0.02574+0.026

    = mThe Head Total is:

    = 9.2+10.078+0+0.064= m

    6. SUMMARY

    NO

    1

    234

    For the pump selection,Merk = SHINKO PUMPType = AHJ 50-2Head = 20 m

    Capacity = 5 m3/hPower = 2.2 kWRPM = 3600 RPMFrequency = 50 Hz

    : DESIGN IV: 21 - 42 09 050 - SA: 0: Philosophy

    Sewage Tank Volume V 0.50

    CALCULATION SYMBOL RESULT

    TECHNICAL SPECIFICATION OF

    SANITARY DISCHARGE SYSTEM

    Head Total H 19.34 m

    m3

    Capacity Q 2.00 m 3/hInside diameter D 50.00 mm

    Buttterfly valve 0.6 1.2

    Types k nxk

    Elbow 90 0 0.75 2.25

    19.342

    T-joint 2.9 2.9total 6.35

    . . . . . . . . . . . . . . . . . . .

    0.026

    0.064

    Hs+Hp+Hv+Hl

    Page 3 of 3

  • 7/31/2019 BOOK 21 [SA]

    6/13

    ATTACHMENT NO. 01 - CALCULATION

    TECHNICAL SPECIFICATION OF SANITARYDISCHARGE SYSTEM

    DESIGN-IV: MACHINERY BASIC DESIGN

  • 7/31/2019 BOOK 21 [SA]

    7/13

    ProjectDoc. NoRev.NoType

    1. SEWAGE PUMP

    Will be estimated at the port about two days.Volume = amount of ABK x sewage x day at port estimation (1)

    = 12*19*2= 456 liter

    The Sewage tank volume will be planned = 0.5 m 3

    Emptying time = hours

    Pump capacity = 2 m 3/h

    = m 3/sDiameter of pump will be planned 0.05 metres = 50 mma. Head statis = 9.2 mb. Head pressure = 1 bar

    mc. Head velocity = 0 m

    Fluid velocity = Q / ( / 4 * (ds/1000)2*3600)Vs = m/s

    d. Suctionn = kinematic viscocity

    n = m2/s (1.1 cSt at 50 0C)dH = Inside diameter

    = m (estimated 50 mm)v = fluid velocity

    = m/s

    Reynold number (Rn)according to formula below:Rn = (v*dH)/n (2)

    = (0.283*0.05)/0.000001= (turbulen)

    for the friction losses (f) = 0.02+0.0005/D=

    The length of pipe in suction is 1.5 m

    major losses (hf1) = f x L x v 2 / (D x 2g) (3)= 0.03*1.5*0.283^2/(0.05*2*9.8)= m

    minor losses (hl1)No n

    1 22 1

    minnor losses (hl1) = k total*v2/(2g) (4)= 2.1*(0.283^2)/(2*9.8)= m

    e. Dischargen = kinematic viscocity

    n = m2/s (1.1 cSt at 50 0C)dH = Inside diameter

    = m (estimated 50 mm)v = fluid velocity

    0.75 1.5Buttterfly valveElbow 90 0

    0.03

    . . . . . . . . . . . . . . . . . . .

    0.00368

    Types k nxk

    . . . . . . . . .

    0.05

    0.283

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14150

    0.25

    0.00056

    10.078

    0.28309

    0.000001

    TECHNICAL SPECIFICATION OF

    SANITARY DISCHARGE SYSTEM

    : DESIGN IV: 21 - 42 09 050 - SA: 0: Attachment No. 01

    0.6 0.6total 2.1

    . . . . . . . . . . . . . . . . . . .

    0.009

    0.000001

    0.05

    Page 1 of 2

  • 7/31/2019 BOOK 21 [SA]

    8/13

    ProjectDoc. NoRev.NoType

    = m/sReynold number (Rn)according to formula below:Rn = (v*dH)/n (5)

    = (0.283*0.05)/0.000001= (turbulen)

    for the friction losses (f) = 0.02+0.0005/D=

    The length of pipe in suction is 10.5 m

    major losses (hf1) = f x L x v 2 / (D x 2g) (6)= 0.03*10.5*0.283^2/(0.05*2*9.8)= m

    minor losses (hl1)No n

    1 32 23 1

    minnor losses (hl1) = k total*v2/(2g) (7)= 6.35*(0.283^2)/(2*9.8)= m

    Therefore, the total head losses can be calculate:hf1+hl1+hf2+hl2 = 0.00368+0.009+0.02574+0.026

    = mThe Head Total is:= 9.2+10.078+0+0.064= m

    For the pump selection,Merk = SHINKO PUMPType = AHJ 50-2Head = 20 m

    Capacity = 5 m3/hPower = 2.2 kWRPM = 3600 RPM

    Frequency = 50 Hz

    0.064

    Hs+Hp+Hv+Hl19.342

    TECHNICAL SPECIFICATION OF

    SANITARY DISCHARGE SYSTEM

    : DESIGN IV: 21 - 42 09 050 - SA: 0: Attachment No. 01

    . . . . . . . . . . . . . . . . . . .

    0.026

    T-joint 2.9 2.9total 6.35

    Elbow 90 0 0.75 2.25Buttterfly valve 0.6 1.2

    0.02574

    Types k nxk

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14150

    0.03

    . . . . . . . . . . . . . . . . . . .

    0.283

    Page 2 of 2

  • 7/31/2019 BOOK 21 [SA]

    9/13

    DESIGN-IV: MACHINERY BASIC DESIGN

    ATTACHMENT NO. 02 - PUMP SPECIFICATION

    TECHNICAL SPECIFICATION OF SANITARYDISCHARGE SYSTEM

  • 7/31/2019 BOOK 21 [SA]

    10/13

  • 7/31/2019 BOOK 21 [SA]

    11/13

  • 7/31/2019 BOOK 21 [SA]

    12/13

  • 7/31/2019 BOOK 21 [SA]

    13/13