Page 1: Bohemian Highway Bridge over the Russian River

Bohemian Highway Bridgeover the Russian River

CEQA Scoping Meeting

April 14, 2021

Page 2: Bohemian Highway Bridge over the Russian River

Welcome!

Page 3: Bohemian Highway Bridge over the Russian River

Agenda Overview

o Introductions o Project Overviewo What is CEQAo What is Scoping o Schedule and Next Stepso How to Submit Comments o Questions

Page 4: Bohemian Highway Bridge over the Russian River

Ground Rules

o Microphones will be muted during presentation, please use the hand raise function so individual microphones can be unmuted for comments, questions and answers session at the end of the presentation.

oWe will be unable to go into details about any particular project element at this time.

o A recording of the Scoping Meeting will be available in its entirety on the County Website.

Page 5: Bohemian Highway Bridge over the Russian River

Introductions

oCounty StaffoCEQA Team- Jackson Ford, Chris Seppeler, Deborah Waller

and John MackoEngineering Project Manager, Samuel Baumgardner-Kranz

oNot on the call are the consulting team helping to provide planning and design to move this project to fruition.

Page 6: Bohemian Highway Bridge over the Russian River

Bridge Project Overview

Page 7: Bohemian Highway Bridge over the Russian River

Project Location

Bohemian Highway Bridge Replacement Project

Page 8: Bohemian Highway Bridge over the Russian River

Purpose of the Project

oTo correct deficiencies in the bridgeoSeismic PerformanceoPier ScouroBridge Geometry

Page 9: Bohemian Highway Bridge over the Russian River

Seismic Performance

oRequired performance:o No collapseo 5% probability of

exceedance in 50 yearsoAnalysis of the Monte Rio

bridge found that it does not meet this criteria

Page 10: Bohemian Highway Bridge over the Russian River

Pier Scour

oThe bridge is supported by piers, which is supported by the soil underneath

oFlow from the water washes the soil away from the piers.

oBridge strength, including seismic performance, is reduced by the loss of soil

Page 11: Bohemian Highway Bridge over the Russian River

Pier Scour

Page 12: Bohemian Highway Bridge over the Russian River

Bridge Geometry

oNarrow LanesoNo shoulderoNarrow and obstructed

sidewalksoNot ADA compliant

Page 13: Bohemian Highway Bridge over the Russian River

Funding Source

o The Federal Highway Administration (FHWA) and Caltrans prioritize the repair and replacement of seismically deficient and scour critical bridges

o This project funded largely by FHWA with some state and local matching funds.

o Requirements for Funding:o Correct all deficiencieso Comply with the National Environmental Policy Act (NEPA)

and the California Environmental Quality Act (CEQA)

Page 14: Bohemian Highway Bridge over the Russian River

Work Completed to date

oPublic Workshops have helped determine preliminary project scope.

o December 2015o September 2018o January 2019o March 2021

oMain Topics of Discussion included aesthetic design, alignment, multi-modal structure, and beach access.

Page 15: Bohemian Highway Bridge over the Russian River

N

Page 16: Bohemian Highway Bridge over the Russian River
Page 17: Bohemian Highway Bridge over the Russian River

Proposed Bridge

Page 18: Bohemian Highway Bridge over the Russian River

Cross Section

Page 19: Bohemian Highway Bridge over the Russian River

Steel-tied Arch

Page 20: Bohemian Highway Bridge over the Russian River
Page 21: Bohemian Highway Bridge over the Russian River

What is CEQA?

Page 22: Bohemian Highway Bridge over the Russian River

CEQA (See-Qua)

o California Environmental Quality Act (1970)o Public disclosure and input processo Avoid, minimize, and reduce potential environmental

impacts o Adopt mitigation and monitoring program

Page 23: Bohemian Highway Bridge over the Russian River

CEQA Environmental Review Process

Page 24: Bohemian Highway Bridge over the Russian River

Environmental Analysis for EIR

oAesthetics/VisualoAgriculture and

Forestry ResourcesoAir QualityoBiological ResourcesoCultural ResourcesoEnergyoGeology and SoilsoGreenhouse Gas

Emissions

oHazards and Hazards Materials

oHydrology and Water Quality

oLand Use and PlanningoMineral ResourcesoNoiseoPopulation and HousingoPublic ServicesoRecreation

oTransportationoTribal Cultural

ResourcesoUtilities and

Service SystemsoWildfireoCumulative EffectsoGrowth Inducing Effects

Page 25: Bohemian Highway Bridge over the Russian River

What is Scoping?

Page 26: Bohemian Highway Bridge over the Russian River

CEQA Scoping

oPublic and resource agency input on the environmental analysis

oTopic areas oIssues of concerns oProposed avoidance, minimization and mitigation

measures

Page 27: Bohemian Highway Bridge over the Russian River

What Scoping is Not?

oJudgements on the merits of the project oDiscussion of property values and right-of-way

processes

Page 28: Bohemian Highway Bridge over the Russian River

Schedule and Next Steps

Page 29: Bohemian Highway Bridge over the Russian River

Moving forward

Publish Draft EIRFall 2021

Public Comment

PeriodLate Fall

2021 (45 days)

Publish Final EIRWinter 2021

Board Certifies

EIREarly 2022

Dates are approximate, may change based on project development.

Page 30: Bohemian Highway Bridge over the Russian River

How to Submit Scoping Comments

Page 31: Bohemian Highway Bridge over the Russian River

How to Submit Comments

oApril 21, 2021 by 5:00pm oEmail: [email protected]: Jackson Ford, 707-565-8356oRegular Mail to:

Permit Sonoma Attn: Jackson Ford2550 Ventura Avenue Santa Rosa, CA 95403

The scoping presentation will be available at this website: https://sonomacounty.ca.gov/PRMD/Planning/Natural-Resources/

Page 32: Bohemian Highway Bridge over the Russian River

Thank you!

Page 33: Bohemian Highway Bridge over the Russian River

CommentsPlease use the hand raise function so

individual microphones can be unmutedin the order received

Email: [email protected] gCall: Jackson Ford, 707-565-8356 Regular Mail to:

Permit Sonoma Attn: Jackson Ford 2550 Ventura Avenue Santa Rosa, CA 95403