Are We able to do what We need ?

Eng. MSc. Carlos Moncada

National University of Colombia

Munich, October, 2012

Traffic and Transport

Research Program

Page 2: Bogota

Traffic and Transport

Research Program BOGOTA - COLOMBIA

According to the 2005 National Census has a

population of 7.4 Million inhabitants.

Total area: 1.776 km² - Total Density 4.146 inhab/ Km²

Page 3: Bogota

Traffic and Transport

Research Program BOGOTA – DENSITY

Page 4: Bogota

Traffic and Transport

Research Program TOTAL TRIPS- MODAL SHARE

On a working day 17.611.061

trips are made.

Source: “Informe de indicadores de Movilidad de Bogota 2011”

Steer Davies & Gleave Limited.

3% 3%

1% 1%

2% 1%

46%

10%

4%

9%

20%

bicycle

school

informal

intermunicipal

motorbike

other

foot

car

taxi

TransMilenio

Public transport

Page 5: Bogota

BOGOTA’S

SECRETARY of

TRANSPORT

TRANSPORT

COMPANY

VEHICLE

OWNER

DRIVER

USER

Exploits

authorizations to

operate routes

Pay to operate

Pay a fixed value to the

owner

Pay for the

service

Granted permits to operate without clear control mechanisms

and assigns fares

Get income based on the number and

not take risks

Receives a fixed

income and assumes

some risks

Earn per passenger transported and

assumes the majority of business risks

ORIGINAL BUSINESS MODEL

Page 6: Bogota

EXPECTED COVERAGE OF

TRANSMILENIO BY 2032

Page 7: Bogota

Traffic and Transport

Research Program

TRANSMILENIO SYSTEM

(PHASE I – II- III)

Source: Alcaldía Mayor Bogotá DC:

Documento Técnico Fase III TransMilenio S.A ( December 2004)

• What’s the success ???

TM

Page 8: Bogota

Source: TransMilenio and IDU, 2006

TRUNK LINES OF TRANSMILENIO

(PHASES I-IV)

Page 9: Bogota

Traffic and Transport

Research Program

Source: Observatorio de Movilidad de Bogotá y la Región con

base en datos de la Secretaría Distrital de Movilidad.

(Junio 2010) Camara de Comercio de Bogotá www.camara.ccb.org.co

AVERAGE TRAVEL TIME IN BOGOTA

Page 10: Bogota

Traffic and Transport

Research Program BOGOTA - COLOMBIA

Page 11: Bogota

DEMOGRAPHIC CHANGE

INCREASING MOTORIZATION GROWING UNIFORMLY

URBANIZATION CLIMATE CHANGE

WHAT ARE THE NEEDS ?

Page 12: Bogota

Traffic and Transport

Research Program

BOGOTA’S TRANSPORTATION

PROJECTS

TransMilenio

Underground

Tramway

Intelligent Transportation System (ITS)

Cable car’s

Bicycle Paths

Integrated system

Page 13: Bogota

Traffic and Transport

Research Program

BOGOTA’S TRANSPORTATION

PROJECTS

Source: Secretaria Distrital de Movilidad de Bogotá. (May 2012)

Page 14: Bogota

Traffic and Transport

Research Program UNDERGROUND SYSTEM

Length: 29 Km and 28 stations, where

18,7 km are underground, 3,6 km are over

the surface,.

Commercial speed: 35 km/h

Estimated demand: 800.000 persons per

day

Cost of the initial investment: USD $1.900

Mio

Cost per kilometer: USD $90 millions

Cost person / kilometer: USD $112

Page 15: Bogota

Traffic and Transport

Research Program TRAMWAY LINES

Source: Secretaria Distrital de Movilidad de Bogotá. (May 2012)

Page 16: Bogota

Traffic and Transport

Research Program TRAMWAY

Page 17: Bogota

Traffic and Transport

Research Program

CABLE CAR

Cable car system in the

south of the city is targeted

to the low social class

population and will be initially

connected with TransMilenio

system, and later on with the

underground system. Its

construction will begin on

2013.

Page 18: Bogota

Traffic and Transport

Research Program BICYCLE PATHS

Source: Instituto de Desarrollo Urbano IDU. www.idu.gov.co;

Revista Económica Supuestos, Universidad de los Andes

“Evaluación de la ciclorutas como política pública en Bogota:

Estado Actual y retos”

Page 19: Bogota

Traffic and Transport

Research Program BICYCLE PATHS MAP

Page 20: Bogota

Traffic and Transport

Research Program INTEGRATED SYSTEM

Page 21: Bogota

Traffic and Transport

Research Program ITS (INTELIGENT

TRANSPORTATION SYSTEM)

Modernization of the traffic light system.

Permanent information to the users and to

mobility authorities through traffic monitoring

Electronic detection of offenders

Level improvements on transit services

Decrease on accidentally indexes

Source: Concejo de Bogota, www.concejodebogota.gov.co;

Movilidad y Señales de transito (2009)

Page 22: Bogota

ITS (INTELIGENT

TRANSPORTATION SYSTEM)

Source: www.interactic.org.co/index

“Alcaldía de Bogotá firmó convenio con ETB y Universidad Distrital para sistema inteligente de transporte”

www.bogota.gov.co Sistema Inteligente de Transporte: Distrito moderniza semaforización (2010)

It’s been estimated a total

investment of USD $146 million

It includes traffic lights, cameras,

traffic control center, equipment for

operation and maintenance, and

road safety for pedestrian.

Traffic and Transport

Research Program

Page 23: Bogota

Traffic and Transport

Research Program

PROJECT COST USD $ Million

TransMilenio PHASE I - II PHASE III PHASE IV

682 730 700

Underground (UFL) 1.900

Tramway First Line 1.500

ITS 146

South Cable 120

Bicycle Paths 60

TOTAL INVESTMENT COST

Total investment of USD $ 5.400 Millions

Page 24: Bogota

Traffic and Transport

Research Program BUT ALL THESE STRATEGIES

MEET OUR NEEDS ?

Transport systems are measures for mitigation not to solve the

real problem

Until now there is no strategy for the 46 % of trips (pedestrians)

Change land use and reorganize our city planning will be less

expensive

TOD and land use policies are more effective than increase

infrastructure of transport

Transport policies (like our BRT) require not only technical

approach but also a strong legal framework and land use control

if you are looking for efficient measures

It is required to follow the master’s plan and accomplish the

goals to meet the needs of population

Page 25: Bogota

Traffic and Transport

Research Program

Thanks so much

Carlos Alberto Moncada A.