Introductory Comments Bob Gall November 8, 2011 Miami, FL
26

Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

Aug 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

Introductory Comments

Bob Gall

November 8, 2011

Miami, FL

Page 2: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

2

HFIP Schedule

• Nov 2011 – Start annual report

• Dec 2011 – Start the milestone process and publications

• Jan 2012 – Begin retro testing for Stream 1.5 candidates

• Feb 2012 – Final annual report and publication manuscripts

• March 2012 – Finish milestone document (by teams)

• March 2012 – Develop organization milestones

• March – June 2012 – Funding letters to organizations

• April 15 – Stream 1.5 retro tests complete and submitted to TCMT

• May 31 – NHC decision on Stream 1.5 candidates

• June 1 – Begin prep. For 2012 hurricane season real-time runs

• July 7 – Begin setting up real-time reservations on t-jet, u-jet

• July 15 – 22 – Full up test of real-time system (using retro runs?)

• Aug 1 – Real time system officially running

Page 3: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

2012 HFIP Priorities

• Computing

– Continued development of the Experimental Numerical Forecast System (Real-Time) during hurricane season on T-jet

o New paradigm for NWS transitioning research to operations

• Operational Commitments

– Work with NCEP to make the global hybrid DA operational

– Continue the coordinated community effort to improve HWRF

• Development

– Development of the hybrid system (the NCEP system) for

regional models

• Develop methods to include more satellite data near

hurricane core

– Develop a physics package suitable for 3 KM models

3

Page 4: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

4

The HFIP Project –

Vision/Goals

• Vision o Organize the hurricane community to dramatically

improve numerical forecast guidance to NHC in 5-10 years

• Goals o Reduce numerical forecast errors in track and

intensity by 20% in 5 years, 50% in 10 years

o Extend forecasts to 7 days

o Increase probability of detecting rapid intensification at day 1 to 90% and 60% at day 5

Page 5: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

Position Error (km) Intensity Error (kt)

Performance of the 2011 PSU WRF-EnKF Real-time Forecasts with assimilation of P3 airborne radar (Irene 7 + Rina 5)

Page 6: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

Position Error (km) Intensity Error (kt)

Updated Performance of the PSU WRF-EnKF during 2008-2011 with assimilation of P3 airborne radar

Page 7: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

7

Track Error of Models (% Improvement over HFIP Baseline)

Page 8: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

8

HFIP Promising Early Results

Some Stream 1.5 models (COQI and SPC3) significantly outperformed the operational models and NHC for the 2011 season through mid September (includes Irene)

Page 9: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

9

HFIP Promising Early Results

Some Stream 1.5 models (COQI and SPC3) significantly outperformed the operational models and NHC for the 2011 season through mid September (includes Irene)

HFIP

Baseline

HFIP 20% Goal

Page 10: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

10

Examples of products from HFIP models

Page 11: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

11

Example of an Ensemble Forecast

Page 12: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

12

Example of an Ensemble Forecast

Page 13: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

13

Irene 000Z August 23, 2011

Page 14: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

14

Irene 000Z August 23, 2011

Page 15: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

HFIP Global Ensemble Forecast for Irene

Starting at 1200Z August 18, 2011

Forecast lead time in days

Ellipse includes

80% of members

Irene named

•Irene declared an investigation area at 1200Z on August 18, 2011

•Irene named at 0000Z August 21, 2011

•Initial indication of the formation of Irene from ensemble at 00Z August 16, 2011 •2 days before it was declared an investigation area

•5 days before it was named

Ensemble

mean track

Observed Track (Aug 21 – 26)

Page 16: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

7 Day Ensemble Forecast (Irene August 16, 2011)

Page 17: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

7 Day Ensemble Forecast (Irene August 18, 2011)

Page 18: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

18

EnKF Ensemble (Untracked Storms)

Page 19: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

19

EnKF Ensemble (Tracked Storms)

Page 20: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

20

EnKF Ensemble (Tracked Storms)

Page 21: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

NCEP Ensemble

Page 22: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

7 day forecast genesis for

Irene—70%

Became Harvey

Wave that became Irene

Page 23: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

23

Ensemble track-based probabilistic

genesis guidance

Page 24: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

NCEP Ensemble

Page 25: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the
Page 26: Bob Gall November 8, 2011 Miami, FL - HFIP...Introductory Comments Bob Gall November 8, 2011 Miami, FL 2 HFIP Schedule • Nov 2011 – Start annual report • Dec 2011 – Start the

26

• http://www.esrl.noaa.gov/psd/forecasts/gfsenkf/

• http://www.ral.ucar.edu/projects/hfip/d2011/

• http://ruc.noaa.gov/tracks/

• http://www.emc.ncep.noaa.gov/gmb/tpm/emchur

r/tcgen/

• http://www.hfip.org/ (go to related links)

• http://www.emc.ncep.noaa.gov/gmb/tpm/emchur

r/gfs_gen/ (change gfs gen to tcgen)