Board game on quarry recultivation «Ecoquarry» Play elements: Play board, 56 of task cards, 57 of answer (methods of restoration), 8 cards of event cards. Individual marker for moving on the play desk every player can make by themselves (for example, folding a paper rectangle and then drawing on it) Play aim: to restore worked out quarry applying different methods of recultivation (technical, biological, methods of ecological management and public involvement). Play rules: 1) Cards of answers, tasks and events are placed in separate batches face down next to the playing board. Each player is dealt 5 answer cards that he has to put in front of him in a row, showing the contents to other players. Later the player can have a maximum of 10 answer cards. 2) Individual markers are placed on the board at the start cell. The youngest player takes a task card, and tries to reply it by matching answers cards. Pay attention to the keywords on the cards that are in bold, and look for consistency in the answers (key words there are in bold also). For each task there is a specific answer, which covers all the points (near the rhomb). Also, these points can be covered by additional answer cards (kind of answer and how much points it gives indicated below on the task card). The player can use the right to put laydown batches one of their cards and take one new answer card instead from batch of answers. You can also use the cards of the previous phase of reclamation, which give 0.5 points (for example, you have an issue with a green rhomb (i.e., from the biological stage), you can apply any answer cards from the technical stage, etc.) (check the scheme below the rules) 3) Before decision making player may ask for help another player and get (change) necessary answer card on any conditions. 4) If a player is able to cover a task card with completely appropriate response, then he moves for 2 steps forward on the board, if he can use only additional answers - then at one step. After complete the task player takes one card from the batch of answers (if the player has already reached the "shrub stage" on the board, then he have to pull 2 answer cards). If player can not or does not want to perform the task, then it goes to the laydown batch, and the player is left in the same place. Afterwards, the game moves to the next player clockwise. 5) Reaching the cells with stages of succession (change of plant communities), the player take event card and answer it. There is no indication of the keywords, and the player must decide what kind of response here is the solution, and the other players must collectively validate his action. If everyone agrees with the player’s answer decision, then he moves on board according to the instructions on the cards (numbers separated by a fraction). But there are three cards of the event on which you do not have to respond to - or take a step back, or a step forward, and
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Board game on quarry recultivation
«Ecoquarry»
Play elements:
Play board, 56 of task cards, 57 of answer (methods of restoration), 8 cards of event cards. Individual
marker for moving on the play desk every player can make by themselves (for example, folding a paper
rectangle and then drawing on it)
Play aim: to restore worked out quarry applying different methods of recultivation (technical, biological,
methods of ecological management and public involvement).
Play rules:
1) Cards of answers, tasks and events are placed in separate batches face down next to the playing
board. Each player is dealt 5 answer cards that he has to put in front of him in a row, showing
the contents to other players. Later the player can have a maximum of 10 answer cards.
2) Individual markers are placed on the board at the start cell. The youngest player takes a task
card, and tries to reply it by matching answers cards. Pay attention to the keywords on the
cards that are in bold, and look for consistency in the answers (key words there are in bold
also). For each task there is a specific answer, which covers all the points (near the rhomb). Also,
these points can be covered by additional answer cards (kind of answer and how much points it
gives indicated below on the task card). The player can use the right to put laydown batches one
of their cards and take one new answer card instead from batch of answers. You can also use
the cards of the previous phase of reclamation, which give 0.5 points (for example, you have an
issue with a green rhomb (i.e., from the biological stage), you can apply any answer cards from
the technical stage, etc.) (check the scheme below the rules)
3) Before decision making player may ask for help another player and get (change) necessary
answer card on any conditions.
4) If a player is able to cover a task card with completely appropriate response, then he moves for
2 steps forward on the board, if he can use only additional answers - then at one step. After
complete the task player takes one card from the batch of answers (if the player has already
reached the "shrub stage" on the board, then he have to pull 2 answer cards). If player can not
or does not want to perform the task, then it goes to the laydown batch, and the player is left in
the same place. Afterwards, the game moves to the next player clockwise.
5) Reaching the cells with stages of succession (change of plant communities), the player take
event card and answer it. There is no indication of the keywords, and the player must decide
what kind of response here is the solution, and the other players must collectively validate his
action. If everyone agrees with the player’s answer decision, then he moves on board according
to the instructions on the cards (numbers separated by a fraction). But there are three cards of
the event on which you do not have to respond to - or take a step back, or a step forward, and
the arrival of a specialist will help you solve the next task card, and then you go only for one cell
forward.
6) The player who first reaches the finish line wins. But, most importantly, do not cross it. That is, if
the player is standing on the previous cell before the finish, he must make decisions that will
move him only for 1 cell forward.
Why is credited with 0.5 points for the answer cards from the previous stage: biological phase is
able to be carried out on the basis of technical restored area; ecological management allow to efficiently
enhance biological diversity; public involvement appears in the game as a result of proper ecological
management; and technical stage must be carried out at the preliminary approval of recultivation with
public. The scheme is very simple and does not reflect the complexity of the interactions between stages
of mining sites recovery. Above there is an image of the scheme, and the color-coded stages of
reclamation used in rhombs on the cards.
TASKS CARDS
2
Form a relief on the worked
out quarry
+1 strengthening of soils and
dumps
+1 leveling dumps
2
Strengthen soil cover
+1 planting, sowing
2
Create a soil cover on the
waste rock, for this purpose
carry out earthing
+1 strengthening of soils and
dumps
+1 fertilizing
+1 planting, sowing
2
In your careers dumps contain
toxic substances. Carry out
neutralization of soil or
isolation
+1 drainage water treatment
+1 ecological monitoring
2
Company decided to flood the
territory of quarry and create
water pond
+1 formation of shores
+1 formation of relief
+1 increase of pond
productivity
3
It is necessary to increase the
productivity of the soil at the
quarry
+1 earthing
+1 fertilizing
+1 planting, sowing
2
Under the influence of wind
and rain at the quarry dumps
and the soil are destroyed.
Carry out measures to control
erosion
+1 strengthening of soils and
dumps
+1 planting, sowing
3
The quarry is not inhabited
with animals and plants. You
have to promote biodiversity
+1 introduction
+1 creation of forage base
3
It is necessary to plant forest
on the quarry territory
+1 tree planting
3
For formation of grass cover
carry out
sowing of grass plants
+1 promotion of biodiversity
+1 hydroseeding
2
* Territory of the quarry after
restoration should be actively
used. Offer your variants of use
+1 EIA
+1 public participation
+1 building
2
The territory of quarry was
flooded, but the pond needs
measures to increase
productivity
+1 fertilizing
+1 creation of forage base
2
It is necessary to increase
public participation
Find out public opinion at
quarry reclamation
+1 meetings with local
community
+1 EIA
3
You are planning building on
the worked out quarry territory
+1 EIA
+1 public participation
+1 formation of relief
3
Necessary to reduce harmful
emissions into atmosphere
from transport and techniques
operating on quarry
+2 reduction of fuel
consumption
+1 ecological management
3
Forage base are not formed in
created pond
+1 fertilizing of pond
+2 increase pond productivity
2
In the end you need to prepare
area for agricultural use
+1 fertilizing
3
Carry out assessment of
biodiversity for effective
management
+1 ecological monitoring
+2 ecological research
3
Your company needs to pass
ecological certification
+1 ecological management
+1 ecological research
+1 assessment of biodiversity
2
Tourism is significantly
developed in region. Apply
measures to attract tourists to
the restored quarry
+1 promotion of biodiversity
+1 fishing development
2
On the restored quarry slopes
are sloughing. Implement
measures for strengthening of
dump slopes
+1 planting, sowing
+1 control erosion
+1 control of ravine
3
For fast quarry restoration
applying of advanced
technologies are suitable
+1 ecological research
+1 hydroseeding
+1 introduction of bacterial
cultures
3
Apply advanced method –
hydroseeding – for fertilizing
and sowing
+1 strengthening of soils and
dumps
+1 field experiments
2
For attraction of wild animals
and support of forage base it is
necessary to establish feeders
+1 promotion of biodiversity
3
Put new species on the quarry
(introduction)
+1 promotion of biodiversity
+1 stocking
1
Carry out planting of larch in
the quarry. Larch is not
demanding tree to soil
conditions, and its planting will
prevent the soil erosion
3
Carry out planting of small-
leaved forest
1
Planting of Siberian cedar is
appropriate for severe climate
region
1
One of effective measures to
prevent erosion is planting of
pine
3
For strengthening soil cover
and dump slopes carry out tree
planting
+1 strengthening of soil
+3 planting
3
Organise work of technological
transport to reduce fuel
consumption
+2 reduction of harmful
emissions
2
To accelerate the overgrown on
quarry use advanced
technological methods of
plowing the soil when planting
+1 introduction of bacterial
cultures
3
Carry out field experiments for
research of recovery process of
environment on the quarry
+1 advanced technologies
+1 ecological research
3
For economic development of
territory organize fish hatchery
on the worked out quarry
+1 introduction
+1 stocking
+1 creation of pond
2
Develop fishery sport on
flooded quarry to attract
tourists
+ 1 tourism development
+1 stocking
1
To speed up soil formation
processes and increase soil
fertility introduce bacterial
cultures
2
You have to increase soil
productivity on quarry. Use
mineral or organic fertilizers
2
While creation of pond form
embayed coastline
+1 formation of gently sloping
coasts
+1 formation of relief
+1 water regime regulation
2
While creation of pond form
gently sloping coasts
+1 formation of embayed
coastline
+1 formation of relief
2
You are in the initial stage of
quarry reclamation and you
need to form a relief. Carry out
leveling of dumps
+1 formation of relief
+1 strengthening of soils and
dumps
2
While formation relief make
low gradient dump slopes
+1 formation of relief
1
To prevent invasion of toxic
substances from solid ground
carry out isolation measures
2
To decrease impact on
environment and toxicity of
drainage waters carry out its
treatment
+1 biologic water purification
2
With a content toxic
substances in the solid or soil at
the quarry conduct their
neutralization by liming
+1 drainage water treatment
2
Gullying process is
strengthening on the quarry,
carry out measures to control
ravines
+1 control erosion
+1 planting, sowing
+1 strengthening of soils and
dumps
3
In managing of biological
diversity on the quarry it is
necessary to assess
conservation value the
territory
+1 ecological research
+1 ecological monitoring
3
Integral part of managing the
quarry reclamation and
biodiversity is to hold
ecological research
+1 field experiments
+2 ecological monitoring
3
You need constantly look after
environment state. Organise
ecological monitoring
+1 ecological research
+2 ecological management
3
For successful restoration of
the quarry organize ecological
management in company
+1 EIA
+1 ecological certification
+1 ecological monitoring
3
Carry out Assess human activity
impact from quarry
recultivation on environment
(Environment impact
assessment EIA)
+1 ecological research
+1 public participation
+1 ecological management
2
It is necessary constantly to
follow and regulate water
regime on the quarry
+1 water removal system
+1 drainage net
+1 hydrogeological study
2
Organise water removal
system on the quarry
+1 drainage net
+1 hydrogeological study
+1 regulation of water regime
2
Construct drainage net on the
quarry
+1 water removal system
+1 hydrogeological study
2
You have to organize
interaction with local
community
+1 public participation
2
Carry out stocking of pond
+1 introduction
2
Apply methods of biologic
water purification in pond
EVENT CARDS
-1 – make one move back
+1 – make one move forward
0 / -1 – if you have the answer card, stay. If you do not have answer card, move for 1 step back