BNL-98815-2012-JA | JLAB-PHY-12-1652 | arXiv: 1212.1701 the scientific case realisation & challenges projections for key 3D-structure of nucleons from an EIC D. Hasch Workshop on the 3D-Structure of Nucleons & Nuclei Como (Italy), 10- 14 June 2013 measurements Acknowledgement: this presentation highly profits from the EIC white paper (2012) & INT-11-034 (2011) EIC science book
69
Embed
BNL-98815-2012-JA | JLAB-PHY-12-1652 | arXiv: 1212.1701 the scientific case realisation & challenges projections for key 3D-structure of nucleons.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
ion beams from deuterium to heaviest nuclei – uranium or lead
variable center of mass energies s = 20 – 150 GeV
high luminosity ~1034 cm2/s
staged designs with first stage up to s ~ 70 GeV
general characteristics:
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity :
“crab waist” crossing new for hadron beams (used @super-B factories)
o high luminosity machines use angle crossing to avoid more than one bunch-bunch collision
causes usually lumi loss Palmer 1988: RF deflects front and back of bunches in opposite ways head-on collisions even with angle crossed beams: You look in one direction
and walk in another one ...
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies
o super-conductive cavities for permanent operation: 2 loop passing for acceleration & deceleration
o oscillations in undulator (set of horse-shoe
magnets) causes X-ray & tiny energy loss BUT major part of energy recaptured in elm fields ready for next acceleration turn
o # of cavities determines the el energy
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
o ions pass monochromatic cold e- beam (plasma)o interaction with induced electric field of co-streaming e- energy kicks towards their central energy value
o proof-of-principle experiment for CeC @BNL in 2015
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
BNL: highly polarized e- source of 10x currently available intensities
o novel “super-lattice” GaAs cathodes gatling (‘revolver’) photo-gun
combining currents from multiple guns
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
BNL: highly polarised e- source of 10x currently available intensities
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity & polarisation :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
BNL: highly polarised e- source of 10x currently available intensities MEIC/ELIC: novel figure-8 storage rings (twisted spin dynamics) for both e & A
Siberian snakes
RF spinrotators
optimum for polarised ion beams:
o preserve polarisation by avoiding depol resonances
o energy independence of spin tune
o only practical way to accommodate polarised D
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity & polarisation :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
BNL: highly polarised e- source of 10x currently available intensities MEIC/ELIC: novel figure-8 storage rings (twisted spin dynamics) for both e & A
e- from 12GeV CEBAF
staged options @JLab: enlarge both figure-8 rings
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity & polarisation :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
BNL: highly polarised e- source of 10x currently available intensities MEIC/ELIC: novel figure-8 storage rings (twisted spin dynamics) for both e & A
staged options @BNL: increase e- beam energy from 5-
30 GeV by building up the ER-LINAC
PHENIX
STAR
Ce-cooling
four e-beam passes
main ERL (2 GeV per pass)
EIC @BNL or JLab-- technical challenges --
significant R&D required for realisation – high luminosity & polarisation :
“crab waist” crossing new for hadron beams (used @super-B factories)
ERL : energy recovering linear collider new for high energies new technique of coherent electron cooling of hadron beams using FEL [@BNL]
(standard electron cooling @JLab)
BNL: highly polarised e- source of 10x currently available intensities MEIC/ELIC: novel figure-8 storage rings (twisted spin dynamics) for both e & A
R&D for next 5-8 years
EIC @BNL or JLab-- status of machine design @POETIC2013 --
eRHIC design progresses well: Design is completed and went through the External Review Cost estimate is underway with two cost-effective designs Phase I eRHIC can be built for about $550M (excluding the detector)
Physics of the collider is well understood: No show-stoppers were found R&D is under way. In few years we will complete R&D and will be ready for eRHIC construction.
V. Litvinenko:
• The MEIC concept has been stable for 3 years– Allowing for refinement of the design
– MEIC design report completed and available on the arXiv: 1209.0757
– Phased options including use of 25 GeV booster under consideration
– Some accelerator R&D funds have been allocated
– Joint detector R&D projects have started
• The MEIC design is based predominantly on proven technology & our immediate goal is full validation of the MEIC design with R&D
Y. Derbenev:
EIC detector design
o acceptance & resolution for envisaged physicso design of IP (crossing angles, magnet locations, ecc.)o background conditions (sync. radiation)o minimising systematic uncertainties (polarimetry, luminosity measur.)
general concept driven by:
EIC detector design
o acceptance & resolution for envisaged physicso design of IP (crossing angles, magnet locations, ecc.)o background conditions (sync. radiation)o minimising systematic uncertainties (polarimetry, luminosity measur.)
general concept driven by:
example: detection of the remaining baryonic state closely connected with IP design:
very forward ion beam direction
EIC detector designgeneral concept requirements from physics reactions:
Inclusive DIS reactions: Dg, helicity PDFs from g1, FL, ... o very good e’ ID with excellent momentum and angular resolution
DIS kinematics from s catterred lepton o hadronic calorimetry (jets)
EIC detector designgeneral concept requirements from physics reactions:
Inclusive DIS reactions: Dg, helicity PDFs from g1, FL, ... o very good e’ ID with excellent momentum and angular resolution