Bluetooth™-IEEE Working Group and IEEE P802.15 Working Group for WPANs Liaison Meeting Ian Gifford P802.15 Vice Chairman December 8, 1999.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Bluetooth™-IEEE Working Group and IEEE Bluetooth™-IEEE Working Group and IEEE P802.15 Working Group for WPANsP802.15 Working Group for WPANs
Liaison MeetingLiaison Meeting
Ian GiffordIan Gifford
P802.15 Vice ChairmanP802.15 Vice Chairman
December 8, 1999December 8, 1999
2
Meeting Goal & AgendaMeeting Goal & Agenda
GoalGoal
• The goal of the meeting is to provide the Bluetooth SIG an The goal of the meeting is to provide the Bluetooth SIG an
opportunity to meet with some of the IEEE Leadership and opportunity to meet with some of the IEEE Leadership and
discuss the latest information on the Bluetoothdiscuss the latest information on the Bluetooth derivedderived
IEEE Draft Standard [P802-15/D0.6]IEEE Draft Standard [P802-15/D0.6]
Agenda 7:00am to 8:00amAgenda 7:00am to 8:00am
• IntroductionsIntroductions
• Time Schedules (BT & IEEE)Time Schedules (BT & IEEE)
• IEEE P802.15 Balloting Process (WG and Sponsor)IEEE P802.15 Balloting Process (WG and Sponsor)
• Next StepsNext Steps
3
How IEEE 802.15 Draft Was CreatedHow IEEE 802.15 Draft Was Created
Not covered hereNot covered here Go to Tom Siep’s presentation today at 5pm (session Go to Tom Siep’s presentation today at 5pm (session
D23) for an explanation D23) for an explanation
4
WG Draft Standard FlowchartWG Draft Standard Flowchart
S oftw are W ork in g G rou p A ir In te rface W ork in g G rou p
n W ork in g G rou p s
W G C h a irm an
IE E E E d ito ria l W ork in g G rou p
P rog ram M an ag em en t(P M )
B lu e too thS p ec ia l In te res t G rou p
A d visory C ore
C oexis ten ce S tu d y G rou p (S G )
H ig h R ate S tu d y G rou p (H R S G )
S tu d y G rou p s
M an ag m en t E n tityL L C S u b layerM A C S u b layerP H Y L ayer
S u b Task G rou p s
Task G rou p 1 (TG 1 )
Task G rou p s
M arke tin g C om m ittee (M C )
C om m ittees
P 8 0 2 .1 5 W G
W G C h a ir
S p on sorIE E E 8 0 2
There is a P802.15 WG TG1 Timeline Submission -99/148r0 (*.MPP) file thatdescribes, in detail, the WG TG1 Draft Standard Flowchart over time. Thefollowing slides are an abstract of this timeline after the LB #1 extension.
5
Letter Ballot #1Comment DB
WG Draft Standard Flowchart - 1WG Draft Standard Flowchart - 1
Draft StandardSubmission
V0.64Nov99
Draft StandardSubmission
V0.64Nov99
23Dec99
Letter Ballot #1
Letter Ballot #1Comment DB 27Dec99
11Nov99
*Letter Ballot 1Ballot Results & Comment Prep.
{
27Dec99
*All comments are loaded into the database. Any Bluetooth comments are also loaded.
approved standardapproved standardYou will be here
12
Our plan was to stop the Letter Ballot #1 Our plan was to stop the Letter Ballot #1 Process on 10Dec99Process on 10Dec99
ProjectAuthorization
MakeChanges toObtain WG
Appoval
WGLetterBallot
WGConfirmationLetter Ballot
WGReviewsReturned
Ballots
TechnicalChanges?
SponsorBallot
ResolvableNegatives?
Proceed toStandards Board
Approval
Yes
Yes
No No
Yes
No
PerpareDraft for
Circulation
EstablishCriteria forStandard
NewNegativeVotes?
LB #1 will be complete 23Dec99 and LB Comments the following week
Extended to 23Dec99
13
Our plan is to resolve the LB #1 Comments Our plan is to resolve the LB #1 Comments During our next meeting 10-14Jan00During our next meeting 10-14Jan00
ProjectAuthorization
MakeChanges toObtain WG
Appoval
WGLetterBallot
WGConfirmationLetter Ballot
WGReviewsReturned
Ballots
TechnicalChanges?
SponsorBallot
ResolvableNegatives?
Proceed toStandards Board
Approval
Yes
Yes
No No
Yes
No
PerpareDraft for
Circulation
EstablishCriteria forStandard
NewNegativeVotes?
LB #1 Comment Resolution the duringthe week of 10-14Jan00
Critical Step
14
IEEE: Contact InformationIEEE: Contact Information
IEEE-SA Balloting Pool FormIEEE-SA Balloting Pool Form• http://standards.ieee.org/db/balloting/http://standards.ieee.org/db/balloting/
ballotform.htmlballotform.html
IEEE P802.15 WG for WPANsIEEE P802.15 WG for WPANs• http://grouper.ieee.org/groups/802/15/http://grouper.ieee.org/groups/802/15/
16
BackupBackup
Bluetooth™-IEEE Working Group and IEEE Bluetooth™-IEEE Working Group and IEEE P802.15 Working Group for WPANsP802.15 Working Group for WPANs
Liaison MeetingLiaison Meeting
17
IEEE: An OverviewIEEE: An Overview
IEEE Established in 1884 (AIEE & IRE)IEEE Established in 1884 (AIEE & IRE) IEEE Dec98 Membership was 334,811; IEEE Dec98 Membership was 334,811;
66% USA & 33% Non-USA66% USA & 33% Non-USA IEEE produces 30 percent of the world's IEEE produces 30 percent of the world's
published literature in electrical published literature in electrical engineering, computers and control engineering, computers and control technology, technology,
IEEE holds annually more than 300 IEEE holds annually more than 300 major conferences and tradeshowsmajor conferences and tradeshows
IEEE has more than 800 active IEEE has more than 800 active standards with 700 under development.standards with 700 under development.
18
IEEE 802 InterfacesIEEE 802 Interfaces
19
IEEE 802 Standards ProcessIEEE 802 Standards Process
You are here
20
IEEE 802 OrganizationIEEE 802 Organization
802.3CSMA/CD
Geoff Thompson
802.4TOKEN BUS
Paul Eastman
802.5TOKEN RING
Bob Love
802.6DQDB WAN
Jim Mollenauer
802.7BROADBAND(802.14 Res)
802.8FIBER TAG
Chip Benson
802.9ISLAN
Dhad. Vamen
802.10SECURITYKen Alonge
802.11WIRELESSVic Hayes
802.12DEMAND PRIORITY
Pat Thaler
802.14CABLE-TV
Robert Russell
802.1BRIDGING/ARCH
Bill Lidinsky
802.2LLC
Dave Carlson
WORKING GROUP CHAIRS
VICE CHAIRPaul Nikolich
RECORDING SECHoward Frazier
TREASURERBob Grow
EXECUTIVE SECBuzz Rigsbee
EXEC OFFICERSCHAIR
Jim Carlo
LMSC SPONSOR
Hibernation
Active
Active
802.15WPAN
Bob Heile
802.16BWA
Roger Marks
21
IEEE 802 Status (Aug1999)IEEE 802 Status (Aug1999)
802.1 VLAN Approved (802.1)Q802.1 VLAN Approved (802.1)Q 802.2 Hibernation802.2 Hibernation 802.3 1000BASE-T Approved, 10G Study Group Underway802.3 1000BASE-T Approved, 10G Study Group Underway 802.4 Hibernation802.4 Hibernation 802.5 High Speed Token Ring802.5 High Speed Token Ring 802.6 Hibernation802.6 Hibernation 802.7 Hibernation802.7 Hibernation 802.8 Fiber Guidelines Ballot802.8 Fiber Guidelines Ballot 802.9 Hibernation802.9 Hibernation 802.10 Hibernation802.10 Hibernation 802.11 Higher Speed Activity Underway802.11 Higher Speed Activity Underway 802.12 Hibernation802.12 Hibernation 802.14 WG Draft Ballot, Advanced PHY PAR802.14 WG Draft Ballot, Advanced PHY PAR 802.15 WPAN Task Group, Coexistence Study Group and Marketing 802.15 WPAN Task Group, Coexistence Study Group and Marketing
Committee UnderwayCommittee Underway 802.16 Broadband Access Projects (LMDS). This will also have ETSI 802.16 Broadband Access Projects (LMDS). This will also have ETSI
M an ag m en t E n tityL L C S u b layerM A C S u b layerP H Y L ayer
S u b Task G rou p s
Task G rou p 1 (TG 1 )
Task G rou p s
M arke tin g C om m ittee (M C )
C om m ittees
P 8 0 2 .1 5 W G
W G C h a ir
S p on sorIE E E 8 0 2
23
IEEE P802.15 Meeting PlanIEEE P802.15 Meeting Plan
IEEE P802.15 WPAN MEETING INFORMATIONIEEE P802.15 WPAN MEETING INFORMATION• January 10-14, 2000 Tel-Aviv, Israel, David Inter-Continental January 10-14, 2000 Tel-Aviv, Israel, David Inter-Continental
Hotel, 802.15 Interim MeetingHotel, 802.15 Interim Meeting• March 6-10, 2000 Albuquerque, NM USA, Hyatt, 802 Plenary March 6-10, 2000 Albuquerque, NM USA, Hyatt, 802 Plenary
MeetingMeeting• May 8-12, 2000 Seattle, WA USA, Renaissance Madison May 8-12, 2000 Seattle, WA USA, Renaissance Madison
Hotel, 802.15 Interim MeetingHotel, 802.15 Interim Meeting• July 10-14, 2000 LaJolla, CA USA, Hyatt Regency, 802 July 10-14, 2000 LaJolla, CA USA, Hyatt Regency, 802
Plenary MeetingPlenary Meeting• Tentative September 18-22, 2000 Memphis, TN USA, TBD, Tentative September 18-22, 2000 Memphis, TN USA, TBD,
802.15 Interim Meeting802.15 Interim Meeting• November 6-10, 2000 Tampa, FL USA, Hyatt Regency, 802 November 6-10, 2000 Tampa, FL USA, Hyatt Regency, 802